TitanTrailBridge_drawings.pdf
PDF 3 MB Posted
- Attached to
- RECOVERY Titan Trail Bridge Construction Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0378
About this file
DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0378 amend1.doc | DOC document | |
| SOL S-10-0378 FINAL TITAN BRIDGE.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
132°136°138° 134°
JUNEAU
Craig
132°
Sitka
136° 134°
56° Ketchikan
Wrangell
Petersburg
58°
130°
INDEX TO SHEETS
NO. DESCRIPTION
1 TITLE SHEET
TITAN TRAIL BRIDGE CONSTRUCTION
POW
SITE PLAN2
4 BOARDWALK DETAILS
TRAIL DETAILS
Parking /
Trailhead
Hydaburg Highway
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
TITAN TRAIL BRIDGE CONSTRUCTION TITLE SHEET
KETCHIKAN MISTY DISTRICT
e.oman 2/2010 e.oman 2/2010 mam, dm, ajm 2/2010 TitanTrail_title 1 8
PROJECT AREA
SALMON RIVER
TO KETCHIKAN
(VIA PORTLAND CANAL)
PREFAB STEEL TRUSS DETAILS
Hyder
TO
C
AS
SI
AR
H
IG
HW
AY
Stewart, B.C.
Hyder, AK
PROFILE
6-8
FISH CREEK WILDLIFE
OBSERVATION SITE
2/22/2010 3:12:08 PM
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
TITAN TRAIL BRIDGE CONSTRUCTION SITE PLAN
KETCHIKAN - MISTY DISTRICT
e.oman 2/2010 e.oman 2/2010 mam, dm, ajm 2/2010 TitanTrailBridge_siteplan 2 8
TO PARKING AREA
TITAN TRAIL
BRIDGE DESIGN CRITERIA
1. SPAN LENGTH = 90 ft
2. SPAN WIDTH = 5 ft
3. DEAD LOAD = SIZE AND PROPORTION COMPONENTS TO
ACCOMMODATE THE SELF WEIGHT OF THE STRUCTURE
4. LIVE LOAD = 85 psf (AASHTO PEDESTRIAN LOAD)
5. LIVE LOAD = 250 psf (GROUND SNOW LOAD)
6. SEISMIC:
SPECTRAL RESPONSE ACCELERATION PARAMETER AT SHORT
PERIODS (Ss) = 0.15
SPECTRAL RESPONSE ACCELERATION PARAMETER AT A PERIOD OF
ONE SECOND (S1) = 0.10
7. WIND SPEED 100 mph, EXPOSURE CATEGORY B
8. BOTTOM OF BRIDGE SUPERSTRUCTURE TO BE AT THE ELEVATION
SHOWN IN THE DRAWINGS.
9. BRIDGE SUPERSTRUCTURE COMPONENTS TO BE MOSTLY ABOVE
THE DECK. FOR EXAMPLE STEEL PONY TRUSS OR TIMBER TIED
ARCH.
BRIDGE ABUTMENT LOCATIONS WILL BE STAKED IN THE FIELD BY THE CO.
BEAVER DAM
EXISTING TITAN TRAIL
RECONSTRUCT 700 feet OF
TRAIL FROM PARKING AREA
TO NEW BRIDGE. 36" WIDE.
ALL GRAVEL TRAIL EXCEPT 30
FT OF ELEVATED BOARDWALK.
FLO
W
90 ft NEW BRIDGE
97 ft NEW ELEVATED BOARDWALK TRAIL 42" wide
72 ft NEW GRAVEL TRAIL
CONSTRUCT 30 ft of
36" WIDE ELEVATED
BOARDWALK OVER
CHANNEL
SCALE IN FEET
5025025
EDGE OF WATER ON OCT. 23, 2009
DESIGN AND INSTALL BANK PROTECTION, SUCH AS GABIONS,
TO PROTECT ABUTMENT FROM SCOUR. BANK PROTECTION TO
BE DESIGNED BY THE CONTRACTOR TO COMPLEMENT
SUBSTRUCTURE DESIGN. PROVIDE TIMBER FASCIA OR RIPRAP
IN FRONT OF GABIONS TO PROTECT FROM FLOATING DEBRIS.
MAGNETIC
FISH CREEK
POINT 1
HAZARD TREE TO
BE REMOVED
APPROX. LOCATION
EXISTING TRAIL
TO BE ABANDONED
O V
ERFLO
W C
H
AN
N
EL
36" WIDE
5 ft WIDE STAIRS
2/22/2010 3:12:19 PM
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
TITAN TRAIL BRIDGE CONSTRUCTION PROFILE
KETCHIKAN - MISTY DISTRICT
e.oman 2/2010 e.oman 2/2010 mam, dm, ajm 2/2010 TitanTrailBridge_siteplan 3 8
PROFILE
EXISTING GROUND
FINISH GRADE
NEW GRAVEL TRAIL
PLANK STEPS TO BRIDGE
NEW TRAIL BRIDGE
90 ft LONG x 5 ft WIDE w/ MOST SUPERSTRUCTURE
COMPONENTS ABOVE THE DECK
WATER LEVEL ON
OCT. 23, 2009
ELEV. 101 ft
ELEVATED BOARDWALK FROM BRIDGE TO EXISTING TITAN TRAIL
DECK ELEV. 108 ft
FOR SILL OR GRADE BEAM SUBSTRUCTURE :
EXCAVATE TO MINERAL SOIL, 2 ft DEPTH, MINIMUM. FILL WITH CRUSHED AGGREGATE, COMPACT IN 1 ft LAYERS.
(TYP. BOTH SIDES)
MAINTAIN EXISTING 2H:1V SLOPE
PLACE RIPRAP AS SHOWN ON SHEET 8
B
EG
IN
B
R
ID
G E
EN
D
B R
ID
G E
BRIDGE DECK ELEV. = 108 ft
INSTALL GABIONS OR OTHER BANK
PROTECTION PER CONTRACTOR DESIGN
END PROJECT
INTERSECTION WITH
EXISTING TITAN TRAIL
MAINTAIN 3 ft (min) BETWEEN FRONT OF SILL AND TOP OF BANK
TO BEGINNING OF PROJECT
AT TRAILHEAD PARKING AREA
2/22/2010 3:12:22 PM
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
TITAN TRAIL BRIDGE CONSTRUCTION BOARDWALK DETAILS
KETCHIKAN MISTY DISTRICT
USFS
USFS
mam, dm, ajm 2/2010 TitanTrail_traildetails 4 8
ELEVATION
NOTE
THIS SHEET DEPICTS THE BOARDWALK FROM THE
LEFT (EAST) BRIDGE ABUTMENT TO THE TITAN TRAIL.
POSTS FOR BOARDWALK ACROSS THE OVERFLOW
CHANNEL ON RIGHT (WEST) APPROACH TRAIL MAY
BURIED 24" IF SOIL CONDITIONS ARE APPROVED
BY THE CO. NO RAILING IS REQUIRED ON THE
OVERFLOW CHANNEL BOARDWALK IF THE DECK
ELEVATION IS LESS THAN 30" ABOVE EXISTING
GROUND.
INSTALL RAILING WHERE TOP OF
BOARDWALK DECKING IS GREATER
THAN 30" ABOVE GROUND SURFACE
BLEND BOARDWALK TO NATURAL
GROUND AT EXISTING TRAIL
(max) SPAN 5.0'
3x8 TOP RAIL. ATTACH w/ #10
DECK SCREWS, 2 PER RAIL POST,
AND 18" c/c ALONG SIDE RAIL
2x4 SIDE RAILS. BOLT TO RAIL POST w/ 38" CARRIAGE BOLTS, 1 PER POST
6x6 RAIL POST
3x12 DECKING (ROUGH CUT). ATTACH TO LEDGER w/ 20d NAILS, 2 PER PLANK & #10
DECK SCREW, 1 AT PLANK CENTER.
2x6 CROSS BRACING. INSTALL WHERE DECK
HEIGHT ABOVE EXISTING GROUND IS
GREATER THAN 42" OR WHERE POSTS
CANNOT BE SET ON STABLE BEARING
MATERIAL
BOLT CROSS BRACE TO POST W/ 3
8" BOLTS,
2 PER END
EXISTING GROUND
6x6 RAIL POST
BURY POSTS 36" (min) IN SOIL
OR LOOSE ROCK. POST SHALL
REST ON 6" OF UNDISTURBED
MINERAL SOIL OR COMPACTED
CRUSHED AGGREGATE.
BACKFILL w/ CRUSHED
AGGREGATE, COMPACTED
IN 12" LAYERS
DUCKBILL EARTH ANCHOR MODEL 88
w/ 14" CABLE. BURY 4 ft.
SECURE CABLE TO SPACER BLOCK AND
BETWEEN CROSS BRACING w/ CABLE.
3x8 LEDGER. BOLT TO RAIL POST w/ 3 8"
THROUGH BOLTS, 2 PER END
6x6
SPACER
BLOCK
BLEND 42"
BOARDWALK WIDTH
TO 60" BRIDGE
WIDTH AT BRIDGE
ENDS. SUPPORT
BOARDWALK
INDEPENDENT OF
BRIDGE STRUCTURE.
ELEVATION CROSS SECTION
3x8 LEDGER
2x6 CROSS BRACING
3x12 DECKING
TRANSITION TOP RAIL AND 2
SIDE RAILS AS SHOWN
3x8 TOP RAIL
2x4 SIDE RAIL
6x6 RAIL POST
6x6
SPACER
BLOCK
EQUAL
EQUAL
EQUAL
2" SPACING
BETW PLANKS
42"
PROVIDE 42" CLEAR SPACE
BETW INSIDE FACE OF RAILING
PROVIDE 36" CLEAR SPACE
BETW POSTS FOR BOARDWALK
ACROSS OVERFLOW CHANNEL
.5
' WHERE
RAILING IS
NOT
REQUIRED
2/22/2010 3:12:27 PM
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
TITAN TRAIL BRIDGE CONSTRUCTION TRAIL DETAILS
KETCHIKAN MISTY DISTRICT
USFS
USFS
mam, dm, ajm 2/2010 TitanTrail_traildetails 5 8
NOT TO SCALE
GRAVEL TRAIL CROSS SECTION
TRAILBED PREPARATION
1. FOLLOW EXISTING TRAIL ALIGNMENT FROM THE PARKING
AREA TO THE BRIDGE SITE. EXISTING ALIGNMENT IS
THROUGH A WOODED AREA WITH GRADES LESS THAN 10%.
2. WHERE SOUPY MUCK EXISTS, REMOVE MUCK TO A DEPTH
EQUAL TO CRUSHED AGGREGATE DEPTH PRIOR TO PLACING
GEOTEXTILE AND AGGREGATE.
3. RETAIN ROOTS AND ROCKS THAT PROVIDE STRUCTURAL
STRENGTH AND DO NOT PRESENT TRIPPING HAZARD.
V er tic al
C le ar in g Li m it
TRAILWAY
TRAILBED
LC
LC
UPHILL CLEARING LIMIT IS 18" FROM EDGE OF TRAILBED OR TOP OF CUT SLOPE, WHICHEVER IS GREATER.
DOWNHILL CLEARING LIMIT IS 18" FROM EDGE OF TRAILBED OR BOTTOM OF FILL SLOPE, WHICHEVER IS GREATER.
VERTICAL CLEARING LIMIT IS 8' ABOVE FINISHED GRADE.
TRIM BRANCHES FLUSH
WITH TRUNK RATHER
THAN REMOVE TREE.UPHILL
CLEARING LIMIT
DOWNHILL
CLEARING LIMIT
CUT
Hinge
CLEARING LIMITS
CUT
CUT ALL LOGS
CUT
CLEARING LIMIT
UP TO 20%
CRUSHED AGGREGATE SURFACING
6" (min) DEPTH
EXISTING GROUND
GEOTEXTILE
PREPARED TRAILBED
3'
4'-6"
CUT STUMPS TO 6" HIGH
4x12 STAIR STRINGER
2 EACH
∠2 x 2 x 14 TREAD BRACKET
SEE DETAIL THIS SHEET
3 x 12 STAIR TREAD
STEP WIDTH IS 5 ft BETWEEN INSIDE
RAIL FACES, TO MATCH BRIDGE WIDTH.
RISE SHALL BE 6" MIN TO 8" MAX. RISE
SHALL BE EQUAL FOR ALL STEPS.
6x6 POST. BURY 36" (min) AND BACKFILL AS
SHOWN ON SHEET 4.
TOP (ATTACH TO
STAIR TREAD)
∠2 x 2 x 14
SIDE (ATTACH
TO STRINGER)
2" 2"
2"
2"
3"
3"
TREAD BRACKET
PLANK STEPS
2x6 TOP RAIL. ATTACH w/ #10 DECK SCREWS 2 PER RAIL POST AND 18" c/c ALONG SIDE RAIL
2x4 SIDE RAILS. BOLT TO RAIL POST w/ 38" THROUGH BOLTS, 1 PER POST
6x6 POST. BOLT TO STRINGER & LEDGER w/ 3 8"
THROUGH BOLTS, 2 PER STRINGER AND 2 PER
LEDGER END.
3x10 LEDGER
TRAIL BRIDGE
5 ft ( max)
EQ
U A L
EQ
U A L in
M
ID
S
TE
P
TO
T O
P O
F R A
IL
1 ft ( max)
12"
ATTACH TO TREAD AND
STRINGER w/ 38" BOLTS
3x12x 8 ft LONG SILL. PLACE
ON 6" COMPACTED CRUSHED
AGGREGATE. ATTACH TO
STRINGERS w/ TREAD BRACKET
6x6 POST
1.5
TRAILBED WIDTH
2/22/2010 3:12:34 PM
ELEVATION
DRAWING NO. R10875
SHEET 6 Of 8
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
STANDARD PLANS
For
PLAN SET _ OF _
PREFABRICATED STEEL TRUSS TRAIL BRIDGE
ALASKA REGION (R10)
SPANS LIMITED TO 100 FEET OR LESS
PROJECT DESIGN CRITERIA:
SHEET 1 Of 3
2/22/2010 3:12:43 PM
TYPICAL SECTION
SHEET 7 Of 8
PLAN SET _ OF _
PREFABRICATED STEEL TRUSS TRAIL BRIDGE
ALASKA REGION (R10)
SPANS LIMITED TO 100 FEET OR LESS
PREFABRICATED STEEL BRIDGE SUPERSTRUCTURE:
DESIGN:
MATERIALS:
STEEL FABRICATION:
FIELD TREATMENT:
TREATMENT:
GENERAL NOTES:
TIMBER & LUMBER:SPECIFICATIONS:
TIMBER FABRICATION:
ERECTION PLAN:
RIPRAP ARMORING W/GEOCELLRIPRAP ARMORING
GRADE BEAM FOUNDATIONGRADE BEAM FOUNDATION
No treatment required for a steel truss bridge. If a timber tied arch bridge design is selected, main structural members shall be treated.
SHEET 2 Of 3
2/22/2010 3:12:48 PM
SHEET 8 Of 8
PLAN SET _ OF _
ALASKA REGION (R10)
PREFABRICATED STEEL TRUSS TRAIL BRIDGE
SPANS LIMITED TO 100 FEET OR LESS
TYPICAL SECTION
BEARING DETAIL
ELEVATION - GRADE BEAM
PLAN - GRADE BEAM
SPECIFICATIONS:
CONCRETE:
REINFORCING STEEL:
NOTES:
CONCRETE GRADE BEAM:
BEARING ASSEMBLY:
SHEET 3 Of 3
2/22/2010 3:12:53 PM
File details come from the government source that posted it. Updated .