Amendment No. 1 Continuation with new replacement Schedule of Pay Items.

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Amdt4_Continuation.docx DOCX document
Amendment_3.pdf PDF
Amdt3_Continuation.docx DOCX document
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Work Description 041310.pdf PDF
Offer Submittal Package.doc DOC document
Drawings1-21.pdf PDF
RFP_Evans_Ck_ORV_Roads.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page 2 of Amendment No. 1 Solicitation AG-0489-S-10-0332 Evans Creek ORV Area Roads – Mt. Baker-Snoqualmie NF

b. Add the attached Work Description. The following Errata/Corrections apply:

· For Item 321(15)(A) Aggregate Surfacing change the unit from “CY” to “TON” in two places [page 2 FSR 7920 ORV Park Entrance and page 3 FSR 7920 ORV Day Use].

· For Item 807F-1(2) Excavation for road/parking, this item is covered by the Excavator and Dump Truck hourly rental.

· Under “FSR 7920 ORV Day Use” change the quantity for Item 602(01)B from “120” LF to “60” LF.

· Under “Decommission Work” delete all entries for Sub-Item 60201A Install Road Closure Device. This work is covered under Sub-Item 650(04) Earth Mound.

c. Delete the original Schedule of Pay Items and substitute the attached 3 pages. Offers should be submitted on the Amendment pages. The following changes have been made:

BASE ITEMS:

Sub-Item 833F-1(2)(B) – the quantity is changed to 20 Each

OPTION A

Sub-Item 834F-1(5) - the quantity is changed to 0.05 Mile

Sub-Item 811F-1(1) has been added for Surfacing Shaping and Grading

OPTION B

Sub-Item 833F-1(2)a - the quantity is changed to 66 Each

Amendment No. 1

PART I—THE SCHEDULE

SCHEDULE OF ITEMS

EVANS CREEK ORV AREA ROADS

BASE ITEMS – ENTRANCE, ROAD 7920 & DAY USE

ITEM

NO.

DESCRIPTION
EST QTY.
PAY UNIT
UNIT PRICE
AMOUNT
157
Soil Erosion and Pollution Control
2
EACH
$________
$___________
173
Establish Clearing Limits
0.2
MILE
$________
$___________
201(02)
Clearing & Grubbing
2
LUMP SUM
$________
$___________
251(12)
Hand Placed riprap
3
SQUARE YARD
$________
$___________
251(14)
Placed Riprap Barrier Boulders, Class 8, Method A
175
EACH
$________
$___________
321(15)
Aggregate Surface Course, Type 5/8” -, Compaction Method B
13,932
TON
$________
$___________
553(01)
Precast Pre-stressed Concrete Member (wheel stop)
44
EACH
$________
$___________
602(01)A
Install 24" HDPE culvert avg 40' lengths
720
LINEAR FOOT
$________
$___________
602(01)B
Install 36" HDPE
60
LINEAR FOOT
$________
$___________
605(03)
Geocomposite Underdrain System
380
LINEAR FOOT
$________
$___________
619(01)
Install Double Arm Gate
1
EACH
$________
$___________
635(51)
ARRA signage with posts
1
LUMP SUM
$________
$___________
650(04)
Install Earth Mound Road Closure on 7920 road at mile post 6.5
1
EACH
$________
$___________
807F-1(2)
Excavator
10
HOUR
$________
$___________
807F-1 (6)
Dump Truck
10
HOUR
$________
$___________
811F-1 (1)
Surface Maintenance Level 3-5 Roads

Average 16’ Running Surface ; Reshape surface & grade in new rock

2.4
ROAD MILE
$________
$___________

ITEM

NO.

DESCRIPTION
EST QTY.
PAY UNIT
UNIT PRICE
AMOUNT
832-1
Load Place and Haul 800 CY under 1 mile
1
LUMP SUM
$________
$___________
833F-1 (2)B
Culvert Removal - 12" to 24" sizes as part of a new installation of average 36’ length
20
EACH
$________
$___________
834F-1 (1)
Clean and Recond. < 24" diameter
24
EACH
$________
$___________
834F-1 (5)
Clean Ditches and Drainage Structures
2.4
MILE
$________
$___________
851F-1 (2)
Hazard Obstruction Removal
3
EACH
$________
$___________
881F-1 (1)
Mobilization
1
LUMP SUM
$________
$___________

TOTAL ALL BASE PAYMENT ITEMS: $_____________

OPTION A: 7930 ROAD AND CAMPGROUND ROAD

ITEM

NO.

DESCRIPTION
EST QTY.
PAY UNIT
UNIT PRICE
AMOUNT
60201A
Install 24" HDPE culvert avg 40' length
280
LINEAR FOOT
$________
$___________
811F-1 (1)
Surface Maintenance;

Reshape surface & grade

0.15
ROAD MILE
$________
$___________
833F-1(2)b
Culvert Removal - 12" to 24" of avg. 36’ length sizes as part of a new installation
7
EACH
$________
$___________
834F-1(5)
Clean Ditches and Drainage Structures
0.05
MILE
$________
$___________

TOTAL ALL OPTION A PAYMENT ITEMS: $_____________

OPTION B: MULTIPLE ROAD DECOMMISSIONING

ITEM

NO.

DESCRIPTION
EST QTY.
PAY UNIT
UNIT PRICE
AMOUNT
650(04)
Install Road Closure Devices (See Decommission map)
10
EACH
$________
$___________
833F-1(2)a
Culvert Removal - 12" to 36" of average 36’ length sizes; Turn into cross ditch after
66
EACH
$________
$___________
833F-1(6)
Install Water Bar
84
EACH
$________
$___________
836F-1(9)
Embankment Pullback
500
LINAR FOOT
$________
$___________

TOTAL ALL OPTION B PAYMENT ITEMS: $_____________

GRAND TOTAL BASE + OPTION A: $________________

GRAND TOTAL BASE + OPTION B: $________________

GRAND TOTAL BASE + OPTIONS A + B : $________________

Offeror Name:

Mailing Address:

City, State, Zip:

Phone

Phone

Fax

E-Mail:

DUNS NUMBER:

TAX IDENTIFICATION NUMBER (TIN):

File details come from the government source that posted it. Updated .