Dwg2-49.pdf
PDF 4 MB Posted
- Attached to
- RECOVERY - BESSEMER MOUNTAIN ROAD DECOMMISSIONING - MT. BAKER-SNOQUALMIE NATIONAL FOREST, WASHINGTON
- Solicitation number
- AG-0489-S-10-0331
About this file
Drawings 2-49
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Amdt2_Continuation.docx | DOCX document | |
| Amendment_2.pdf | ||
| Amdt1_Continuation.docx | DOCX document | |
| Amendment_1.pdf | ||
| WDFW Freshwater Work Window.pdf | ||
| RFP_Bessemer Rds.doc | DOC document | |
| Dwg1 Vicinity Map.pdf | ||
| Offer Submission Packet.doc | DOC document | |
| Trail Specifications.pdf | ||
| Dwg50-57.pdf | ||
| WDFW_MOU.pdf | ||
| Road Specifications.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Station Comments Actions Approximate
Excavation Volume in Cubic Yards
Area Disturbed in
Square Feet
0+00 Drivable water bar
0+30 Road blocked with debris Build road barricade 40 600
1+90 Top of vertical curve
3+30 Begin side cast failure area, toe on - 80% ground Begin side cast pull back
1100 8800
5+50 End End side cast pull back
5+90 Drivable water
6+90 Enter DNR
7+30 TYPED WATER Small drainage across road, no scour, begin side cast failure area
Install water bar, begin side cast pull bar 10 400 seed. & mulch
800 7600 seed. & mulch
8+50 End side cast pull back
9+20 TYPED WATER 5 stream, No CMP, 4’ centerline Rock fill Remove fill and reestablish 5’ stream bed 175 1200 seed. & mulch
10+50 TYPED WATER 5 stream, No CMP, 4’ centerline Rock fill Remove fill and reestablish 3’ stream bed 115 1200 seed. & mulch
11+20 TYPED WATER, 18+30’ CMP in poor condition, in 3 ’ fill Remove CMP and reestablish 2’ stream bed 60 700 seed. & mulch
12+30 TYPED WATER, Water off cut slope, No CMP Install water bar 10 400 seed. & mulch
13+30 Install water bar 10 400 seed. & mulch
14+30 Install water bar 10 400 seed. & mulch
15+30 TYPED WATER, Water off cut slope Install water bar 10 400 seed. & mulch
16+80 Side cast failing, toe on 50% ground Begin side cast pull back
230 4000
17+80 End side cast failure End side cast pull back
19+50 Landing, nose of ridge
20+50 Install water bar 10 400
21+12 Enter USFS, side cast failing on -40% NO WORK BEYOND THIS POINT
Station Comments Action Approximate Excavation
Volume in Cubic Yards
Area Disturbed in Square Ft.
0+00
1+00 Beginning of side cast failing area - 8% AH Begin side cast pull back
1600 12000
4+00 End side cast failing End side cast pull back
5+50 Big landing. OK
10+00 Big landing bottom of vertical curve +2% AH
12+00 Nose of ridge -4% AH
16+00 Swale -7% AH Install water bar 10 400
18+00 Typical road bed
18+50 Landing
19+50 Grade change -12% AH
24+70 Slump on road, 1’ stream coming off of cut back. Road is naturally outsloped
27+00 Landing
28+60 100’ spur and big landing to the right. Bottom of vertical curve +14 AH
33+10 Install water bar & 3’ berm
NO WORK BEYOND THIS POINT
30 600 reveg. & mulch
33+60 15’ slump on road, 4’ stream across road, some going to Sta.33+10
35+50 Rock cut side cast failing, but on to talus below. No harm.
36+90 End side cast failure area
39+80 Side cast failing over talus. No harm.
40+80 Landing
42+00 End of road
Station Comments Action Approx.
Excavation Volume in CY
Area Disturbed
Sq. Ft.
0+00 Jct. MF-200 + MF-225 Block with road barricade 20 400
1+30 Existing drive able water bar
2+50 24x34 CMP cross drain in fair condition,3’ fill, dry <6% both ways Remove CMP 10 400
3+20 Begin side cast pull back
3+80 Water from ditch out off of MF-225 switchback directly above, side cast already failed.
Install water bar 10 400 seed & mulch
1500 10,000 seed & mulch
5+70 Side pull back volume change
700 2800 seed & mulch
6+40 End side cast failure End side cast pull back
6+45 Existing drive able water bar
7+00 12’ wide stream, bottom of vertical curve. Low rock fill, no erosion potential. None
8+60 Existing drive able water bar
9+80 Nose begin climbing +18%
12+00 Enter DNR
12+20 TYPED WATER, 18x40 CMP, 7’ fill at centerline Remove CMP, reestablish 3’ streambed 180 1600 seed & mulch
13+20 TYPED WATER, 24x40 CMP, 7’ fill at centerline Remove CMP, reestablish 3’ streambed 180 1600 seed & mulch
14+00 Install water bar 10 400 seed & mulch
14+70 TYPED WATER, 24x30 CMP, 3’ fill at centerline Remove CMP, reestablish 5’ streambed 50 900 seed & mulch
15+50 Install water bar 10 400 seed & mulch
16+40 Existing drive able water bar Install water bar 10 400
17+30 Install water bar 10 400
Station Comments Action Excavated
Yards
Area Disturbed
Sq. Ft.
18+00 TYPED WATER, Swale, water going down ditch to 16+40 Install water bar 10 400
18+80 TYPED WATER, 18x30 CMP, 3’ fill at centerline Remove CMP, reestablish 3’streambed 60 1100 seed & mulch
19+30 Natural swale Install water bar 10 400 seed & mulch
19+80 TYPED WATER, 24”x36’ CMP, 5’fill at centerline Remove CMP, reestablish 3’ streambed 130 1900 seed & mulch
20+45 Enter USFS Install water bar 10 400 seed & mulch
21+10 Existing drive able water bar
21+95 Natural swale Install water bar 10 400
22+40 Existing drive able water bar
22+90 Natural swale Install water bar 10 400
24+00 Natural swale Install water bar 10 400
28+00 Existing drive able water bar
31+90 Existing drive able water bar
35+30 Existing drive able water bar
37+60 JCT with MF 200-110
39+40 Install water bar 10 400
43+40 Grade change from <8% to >12% Install water bar 10 400
44+60 Side cast failing, no water toe on 40% ground, bench below None
48+60 End side cast failure.
50+10 Grade change >12% to <5%
51+10 Begin side cast failure. Stream below Begin side cast pull back
2400 14,000 seed & mulch
54+60 End side cast failure. Begin rock cut full bench area End side cast pull back
Area Disturbed
Sq. Ft.
55+90 Begin side cast failure area, stream below Begin side cast pull back
500 7600 seed & mulch
57+80 End side cast failure area. End side cast pull back
58+60 5’ stream crossing on rock fill, bottom of vertical curve, no CMP, 40% side slope Reestablish 5’ streambed,3’deep inlet and 9’ deep outlet 200 2000 seed & mulch
59+00 Begin side cast failure area above creek Begin side cast pull back
900 6400 seed & mulch
60+60 End side cast failure area. End side cast pull back
61+60 Nose of ridge grade <5%
62+60 Side cast failing Begin side cast pull back
64+90 24x30 CMP, in poor condition,1/3 plugged type 5 perched outlet, scour downstream, bedrock up stream
Remove CMP, reestablish 2’stream bed. Lower stream bed elevation at down stream end to 4 ft below CMP outlet
60 600 seed & mulch
65+60 Water off of cut slope Install water bar 10 400 seed & mulch
66+80 24x30 CMP, in poor condition, perched outlet 3’, no scour, inlet buried. Type 5 stream.
Remove CMP. Reestablish 2’stream bed. Lower stream bed elevation 3 ft below CMP outlet
50 600 seed & mulch
67+20 Water off of cut slope Install water bar with 3’ bottom 20 400 seed & mulch
67+40 Berm
67+60 5’ stream, rock fill. No CMP, 5% grade Reestablish 5’ stream bed 5’ deep 330 1200 seed & mulch
1000 29200 seed & mulch
70+70 End side cast failure area. End side cast pull back
71+60 Nose of ridge, big landing
74+10 Side cast failing Begin side cast pull back
Area Disturbed
Sq. Ft.
320 6400 seed & mulch
75+70 End failure area. End side cast pull back
76+60 Begin side cast failure area. Begin side cast pull back
220 5200 seed & mulch
77+90 End side cast failure. End side cast pull back
78+90 Rock fill, no CMP, 6’ stream across rock, 5 % road grade Reestablish 10’ wide x3’ deep stream channel berm at
78+60
100 2400 seed & mulch
79+60 Side cast failure. Begin side cast pull back
480 9600 seed & mulch
82+00 Talus above & below End side cast pull back
85+80 18x30 CMP, in poor condition, dry crossdrain Remove CMP 10 400 seed & mulch
87+00 Side cast failing on >70% ground Begin side cast pull back
Water below 640 15200 seed & mulch
90+80 End side cast failure. End side cast pull back
91+30 Nose of ridge, landing
94+00 Existing drive able water bar +14% grade
96+00 Nose of ridge, big landing
98+70 Existing drive able water bar. Begin side cast failure. Begin side cast pull back
950 22800
102+40 Existing non-drive able water bar. Side cast has been removed beyond. End side cast pull back
NO WORK BEYOND THIS POINT
Area Disturbed
Sq. Ft.
0+00 Jct. station 37 + 60 of MF-200 None
2+00 Install water bar 10 400
4+00 Install water bar 10 400
6+00 Install water bar 10 400
8+00 Constant 12% grade from 0+00 to here. No CMP or water bars. Some pirating. +5% ahead
Install water bar 10 400
10+00 Install water bar 10 400
12+00 Install water bar 10 400
14+00 Install water bar 10 400
15+50 Nose of ridge, grade less then 5% both ways. No CMP’s, water bars or drainage.
16+75 Drainage across road 50% side slopes, no CMP’s, water dip in road. None
17+95 Enter DNR
18+30 TYPED WATER, Water out of ravine 30% side slopes. Reestablish 2 ft streambed, 4 ft deep at road centerline
60 1000 seed & mulch
20+00 TYPED WATER, Natural draw. No water, nose of ridge, at top of vertical curve Install water bar 10 400
20+90 Nose of ridge, at top of vertical curve
22+00 Install water bar 10 400 seed. & mulch
23+00 TYPED WATER, Water off of cut slope Install new 2 ft. wide Stream bed 2’ below roadway
30 600 seed. & mulch
23+70 TYPED WATER, Water off of cut slope Install new 3 ft. streambed , 3’below roadway 40 1000 seed & mulch
25+30 Build 3’ high berm 25 600 seed & mulch
25+50 TYPED WATER, 5’ stream crosses road in 2’ deep channel < 30% side slopes Reestablish 5’streambed, 4’below roadway at centerline
70 1200 seed & mulch
26+80 TYPED WATER, Water off of cut slope, 40% side slopes. Reestabish 3’wide streambed, 3’ deep average 40 1000 seed & mulch
Area Disturbed
Sq. Ft.
27+30 Install water bar 10 400 seed & mulch
28+30 Install water bar 10 400
29+40 Install water bar 10 400
29+56 Enter USFS
30+90 Nose of ridge
32+70 Install water bar 10 400
35+30 Side cast failing Begin side cast pull back
180 2700 seed & mulch
36+40 End of road End of side cast pull back
Station Comments Action Excavation Volume in
Cubic Yards
Area Disturbed in
Square Ft.
0+00 Non drive able water bar
1+40 Swale, 4’ fill Establish 3’ stream bed 50 900 reveg& mulch
2+25 24”x32’ CMP in poor condition, 8’ fill Remove CMP & Re establish 4’ stream bed 190 2200 reveg& mulch
3+00 Spur to the right
5+30 18”x30’ CMP in poor condition, 5’ fill Remove CMP & Re establish 3’ stream bed 90 1600 reveg& mulch
8+10 Top of vertical curve, seep 20’ to right Install water bar 10 400 reveg& mulch
9+90 Swale Install water bar 40 600
11+70 24”x28’ CMP in poor condition, 5’ fill Remove CMP & Re establish 5’ stream bed 110 1600 reveg& mulch
12+70 2’ stream off of cut slope
13+10 18”x20’ CMP in poor condition, 3’ fill Remove CMP & Re establish 3’ stream bed 30 600 reveg& mulch
13+30 1’ stream off of cut slope, 3’ fill Install water bar 30 600 reveg& mulch
14+50 1’ stream off of cut slope, 3’ fill Install water bar 30 600 reveg& mulch
14+70 Install water bar 10 400 reveg& mulch
16+50 18”x20’ CMP in poor condition, 4’ fill Remove CMP & Re establish 3’ stream bed 40 700 reveg& mulch
21+90 Spur to right, 18”x30’ CMP in poor condition, 4’ fill Remove CMP & Re establish 2’ stream bed 30 600 reveg& mulch
22+70 Stream off of cut slope, 3’ fill Re establish 3’ stream bed 30 600 reveg& mulch
23+70 Stream off of cut slope, 3’ fill Re establish 3’ stream bed 30 600 reveg& mulch
24+20 24”x30’ CMP in poor condition, 4’ fill Remove CMP & Re establish 4’ stream bed 50 900 reveg& mulch
25+30 Stream off of cut slope, 3’ fill Re establish 3’ stream bed
NO WORK BEYOND THIS POINT
40 700 reveg& mulch
31+00 Big stockpile site
37+70 Rock pit at end of road. Dry road back to Station 25+30
Station Comments Action Excavation Volume in Cubic Yards
Area Disturbed in Square Ft.
0+00 = Station 21+90 of MF-200-090
0+90 Install water bar 10 400
2+10 Stream off of cut slope, 4’ fill Establish 4’ stream bed 70 1400 seed & mulch
2+90 Stream off of cut slope, 4’ fill Establish 4’ stream bed 90 1800 seed & mulch
3+90 30”x20’ CMP at bottom of vertical curve, poor condition, 4’ fill Remove CMP, re establish 8’ stream bed 70 1400 seed & mulch
5+00 Top of vertical curve
6+50 Swale Install water bar 10 400
9+00 Swale Install water bar
NO WORK BEYOND THIS POINT
10 400
10+70 Top of vertical curve
13+00 JCT with MF-200-070, Station 34+50
Station Comments Action Excavation Volume in Cubic Yards
Area Disturbed in
Square Ft.
0+00 Station 3+00 MF-200-090 Rd
2+50 Install water bar
NO WORK BEYOND THIS POINT
10 400 seed & mulch
4+00 Switch back
7+00 Landing
Station Comments Action Excavation
Volume in Cubic Yards
Area Disturbed in
Square Ft.
0+00 Switchback ML-200 Rd. blocked by non drive able water bar
1+75 Old wood culvert crossing Remove logs and pull back slopes 300 2800 seed & mulch
2+75 Install water bar 10 400 seed & mulch
3+75 Install water bar 10 400 seed & mulch
4+75 Install water bar 10 400
5+00 Typical road section
5+75 Install water bar 10 400 seed & mulch
6+20 Rock crossing in bottom of vertical curve None
6+90 Small seep Install water bar 10 400 seed & mulch
7+40 Enter USFS
11+00 Install water bar 10 400 seed & mulch
14+80 Failure due to water pirating
15+00 12”x30’ CMP, plugged in poor condition, in 2’ fill Remove CMP. Install water bar 10 400 seed & mulch
15+60 1’ stream off of cut slope. Water off of back slope Install water bar 10 400 seed & mulch
16+90 1’ stream off of cut slope. Water pirating to Station 14+80 Install water bar 10 400 seed & mulch
17+40 Failure due to water pirating
18+30 1’ stream off of cut slope Install water bar 10 400 seed & mulch
19+00 Road out sloped ahead
24+20 Road turns & climbs at 14%
26+20 Install water bar 10 400
28+70 Install water bar 10 400
31+45 Rock cliff, top of vertical curve, 1’ stream off of cliffs Install water bar 10 400 seed & mulch
34+00 Side cast failing Begin side cast pull back
1260 20800 seed & mulch
39+20 Out of failing area End side cast pull back
Yards
Area Disturbed in
Square Ft.
41+80 Install water bar 10 400 seed & mulch
42+80 2’ stream crosses road in good channel
44+00 60” CMP blown out fair condition. Water ran down Road to 42+80 with debris on road
Lower stream bed at crossing 5’ & make stream bed 20’ wide, remove CMP, downstream 50 feet.
200 2000 seed & mulch
47+70 Big landing
48+60 8’ stream crossing could easily jump out of channel Lower stream bed 3’ & build 5’ berm at Station 48+30 80 1400 seed & mulch
55+70 Bottom of vertical curve 5’ stream crossing road & pirating from ahead ends here
58+70 Pirating water starts here from 2’ stream off of cut slope Establish 3’ stream bed 50 900 seed & mulch
59+00 1’ stream off of cut slope, begin side cast failure Install water bar & begin side cast pull back 10 400 seed & mulch
900 12000 seed & mulch
62+00 End side cast pull back
62+80 Nose of ridge, landing
67+80 End of road
Yards
Area Disturbed in
Square Ft.
0+00 DNR land, 4 th Switchback, drive able Bessemer road
1+00 TYPED WATER, 36”x30’ CMP blow out in poor condition, 8’ fill Remove CMP, reestablish 10’ wide streambed 240 2800 seed & mulch
2+50 Install water bar 10 400 seed & mulch
3+50 Install water bar 10 400 seed & mulch
4+30 TYPED WATER, off of cut slope pirated back to Sta 1+00 Install water bar with 2’ wide streambed 10 400 seed & mulch
5+30 Install water bar 10 400 seed & mulch
6+40 TYPED WATER, 30”x36’ CMP in poor condition, 4’ fill Remove CMP, reestablish 6’ wide streambed 70 1400 seed & mulch
6+92 Enter USFS
10+40 Landing
11+00 Pirating ends here Install water bar 10 400 seed & mulch
13+50 Pirated water, 24”x34’ CMP plugged in poor condition, 3’ centerline fill Remove CMP, reestablish 4’ wide streambed 50 900 seed & mulch
14+40 1’ stream off cut bank, 3’centerline fill Reestablish 2’ streambed 40 600 seed & mulch
14+80 1’ stream off cut bank, 3’ centerline fill Reestablish 2’ streambed 40 600 seed & mulch
15+80 30”x36’ plugged CMP in poor condition, 4’ centerline fill Remove CMP, reestablish 4’ wide streambed 60 1200 seed & mulch
17+20 Install water bar 10 400 seed & mulch
18+00 Stream off cut bank Reestablish 3’ streambed 50 900 seed & mulch
18+70 Stream off cut bank Reestablish 2’ streambed 50 900 seed & mulch
20+00 18”x40’ CMP in poor condition, 4’fill centerline fill Remove CMP, reestablish 2’ streambed 50 900 seed & mulch
23+10 Swale Install water bar 10 400
26+40 Install 3’ high berm 60’ long 100 2000 seed & mulch
26+60 8’ wide stream, no CMP
27+40 Stream off of cutback Reestablish 3’ streambed 50 900 seed & mulch
28+60 Stream off of cutback Reestablish 3’ streambed 50 900 seed & mulch
29+60 Stream off of cutback Reestablish 3’ streambed, 60’ long 80 1400 seed & mulch
Yards
Area Disturbed in
Square Ft.
31+00 Stream off of cutback Reestablish 3’ streambed, 60’ long 80 1400 seed & mulch
34+50 Spur left, top of vertical curve
38+50 Swale Install water bar 10 400 seed & mulch
39+00 18”x30’ CMP in poor condition, 2’ centerline fill Remove CMP, reestablish 3’ wide streambed 50 900 seed & mulch
41+50 Swale Install water bar 10 400 seed & mulch
42+00 18”x30’ CMP plugged in poor condition, 3’ centerline fill Remove CMP, reestablish 2’ wide streambed 40 600 seed & mulch
45+00 End of day
45+70 Bottom of vertical curve Install water bar 10 400 seed & mulch
46+20 Stream off of cutback, 4’ centerline fill Establish 6’ streambed 80 1500 seed & mulch
46+80 Pirating ends here, +12% AH
47+60 Swale Install water bar 10 400
49+00 Swale Install water bar 10 400
50+00 Swale Install water bar 10 400 seed & mulch
50+90 Stream off of cutback, 3 fill Establish3’ streambed 40 800 seed & mulch
53+00 Install water bar 10 400
55+20 Top of vertical curve
58+00 Stream off of cutback, 4’ centerline fill Establish3’ streambed 50 900 seed & mulch
61+40 Landing, Top of vertical curve -10% AH
63+30 Swale Install water bar 10 400
65+60 Side cast failure, basic rock cut material, low probability of future failure if drainage is controlled
67+60 Install water bar 10 400 seed & mulch
68+60 Install water bar
NO WORK BEYOND THIS POINT
10 400 seed & mulch
68+90 End of road, stream just beyond end, sent debris from up slope onto end of road & pirating some water down road, causing side cast failure.
Yards
Area Disturbed in
Square Ft.
0+00 = STA 35+00 of MF-200-070
0+70 18”x30’ CMP in Poor condition. 5’ fill Remove CMP
NO WORK BEYOND THIS POINT
90 1600
10+80 End of road. Road runs out a ridge & has no problem beyond culvert.
No other work required.
Volume in
Cubic Yds
Area Disturbed in
Square Ft
166+00 Leave Bessemer Mt. Road at switch back
167+40 30”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 4’ streambed 100 1200 seed & mulch
168+30 Swale Install water bar 15 400 seed & mulch
168+90 24”x40’ CMP in poor condition, 6’ fill. Enter USFS Remove CMP, reestablish 4’ streambed 100 1600 seed & mulch
169+60 18”x?”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 6’ streambed 100 1200 seed & mulch
170+60 Swale Install water bar 15 400 seed & mulch
171+50 Swale Install water bar 15 400
172+50 Swale Install water bar 15 400
173+40 Swale Install water bar 15 400
Cubic Yds
Area Disturbed in Square Ft.
0+00 Station 177+50 of MF-200-050
0+70 Typical road section view
2+40 36’x40 CMP in poor condition, fill 9’ Remove CMP, reestablish 5’ streambed 300 2800 seed & mulch
4+10
4+50 36’x40 CMP blown out, in poor condition, fill 12’ Remove CMP, reestablish 10’ streambed 400 3200 seed & mulch
12+10 Landing at end of road
166+00 DNR land, Leave Bessemer Mt. Road at switch back
167+40 TYPED WATER, 30”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 4’ streambed 120 1400 seed & mulch
168+30 Swale Install water bar 15 400 seed & mulch
168+90 TYPED WATER, 24”x40’ CMP in poor condition, 6’ fill. Enter USFS Remove CMP, reestablish 4’ streambed 120 1400 seed & mulch
169+60 18”x?”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 6’ streambed 100 1200 seed & mulch
170+60 Swale Install water bar 15 400 seed & mulch
171+50 Swale Install water bar 15 400
172+50 Swale Install water bar 15 400
173+40 Swale Install water bar 15 400
Cubic Yds
Area Disturbed in
Square Ft
174+50 Swale Install water bar 15 400 seed & mulch
175+50 18”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 8’ streambed 110 1200 seed & mulch
176+10 Top of vertical curve
176+80 24”x40’ CMP in poor condition, 12’ fill Remove CMP, reestablish 8’ streambed 430 3200 seed & mulch
From 176+80 to 177+50 create a 8’ wide ditch, with a 2’ high berm to channel stream at 177+50 to 176+80
50 2100 seed & mulch
177+50 JCT/MF-200-050-01 to right
178+60 Swale Install water bar 15 400
179+50 Swale Install water bar 15 400
180+40 End of day
181+00 30”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 6’ streambed 100 1200 seed & mulch
182+50 18”x30’ CMP in poor condition, 4’ fill Remove CMP, reestablish 4’ streambed 40 750 seed & mulch
185+40 3’ stream off of cut slope pirated to STA 182+56, 5’ fill Establish 3’ streambed 90 900 seed & mulch
185+70 24”x30’ CMP in poor condition, 5’ fill. Remove CMP, reestablish 5’ streambed 90 900 seed & mulch
186+60 24”x30’ CMP in poor condition, 6’ fill. Remove CMP, reestablish 6’ streambed 100 1200 seed & mulch
187+40 187+40 -- 188+90 wide waste area
188+90 Swale Install water bar 15 400
190+70 Swale Install water bar 15 400 seed & mulch
191+70 8-ft diameter stump on right edge of road
193+10 18”x30’ CMP in poor condition, 4’ fill. Top of vertical curve Remove CMP, reestablish 3’ streambed 50 750 seed & mulch
195+60 18”x30’ CMP in poor condition, 4’ fill. Bottom of vertical curve Remove CMP, reestablish 3’ streambed 50 750 seed & mulch
196+40 Swale. Bottom of vertical curve Install water bar 15 400 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
197+00 Begin rock cut, full bench road section, no problems
202+20 End rock cut. Top of vertical curve -7% AH
204+50 Swale Install water bar 15 400
205+70 JCT/MF-200-050-020 to the left
206+60 Swale Install water bar 15 400 seed & mulch
207+60 Swale, 2’ stream over road Establish 2’ streambed 15 400 seed & mulch
208+00 Begin rock cut, full bench road section
213+00 Swale between rock cut areas Install water bar 15 400
215+70 End rock cut. Swale Install water bar 15 400
218+90 Swale Install water bar 15 400
220+90 Swale Install water bar 15 400
221+70 Existing water bar
224+30 Natural out sloped
227+80 Bottom of vertical curve, full bench in rock
229+40 Swale Install water bar 15 400
230+70 Climb alluvial fan deposit, 25 years old
231+40 Top of vertical curve Raise trail 1.5-ft on left 50
232+90 Swale Install 3 water bars between here & 231+40 15 400
233+70 Existing water bar
236+70 Swale. Bottom of vertical curve Install water bar 15 400
240+90 Existing water bar
243+00 Existing water bar
Cubic Yds
Area Disturbed in
Square Ft
244+50 Install water bar 15
245+50 24”x40’ CMP in poor condition, 8’ fill Remove CMP, reestablish 10’ streambed 240 2000 seed & mulch
247+90 18”x30’ Crossdrain in poor condition, 3’ fill Remove CMP 50 600
252+50 18”x44’ CMP in poor condition, 10’ fill Remove CMP, reestablish 3’ streambed 300 3000 seed & mulch
253+60 24”x50’ CMP in poor condition, 10’ fill Remove CMP, reestablish 3’ streambed 300 3000 seed & mulch
254+50 Swale Install water bar 15 400 seed & mulch
255+40 Nose of ridge
256+80 Swale Install water bar 15 400
259+80 36”x50’ in poor condition, 4’ fill Remove CMP, reestablish 3’ streambed 70 1500 seed & mulch
260+20 Build 3’ berm across road 30 900 seed & mulch
262+20 Edge of debris flow at bottom of vertical curve
263+00 On top of debris flow, dry creek centerline, source of riprap Establish equipment trail at interface of woody & rock debris
263+60 Edge of debris flow
264+00 Build a 5’ high berm adjacent to 6’ DBH Big
Leaf Maple
100 1200 seed & mulch
265+20 18”x30’ CMP in poor condition, 5’ fill Remove CMP, reestablish 3’ streambed 80 900 seed & mulch
267+60 18”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 3’ streambed 90 1200 seed & mulch
269+70 Top of vertical curve, nose of ridge
271+40 18”x30’ CMP in poor condition, 5’ fill Remove CMP, reestablish 3’ streambed 80 900 seed & mulch
273+40 12”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 3’ streambed 90 1200 seed & mulch
274+40 18”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 3’ streambed 90 1200 seed & mulch
276+10 Top of vertical curve
312+70 Existing blockage berm
313+50 USFS 56 Road
Cubic Yds
Area Disturbed in
Square Ft
278+90 Swale Install water bar 15 400
281+10 24”x30’ CMP in poor condition, 4’ fill Remove CMP, reestablish 4’ streambed 40 750 seed & mulch
282+10 24”x40’ CMP in poor condition, 4’ fill Remove CMP, reestablish 3’ streambed 60 1000 seed & mulch
284+00 Swale Install water bar 15 400 seed & mulch
285+40 18”x40’ CMP Crossdrain in poor condition, 5’ fill Remove CMP 80 1200 seed & mulch
286+30 Swale Install water bar 15 400 seed & mulch
286+80 Edge of debris flow
287+60 Middle of debris flow, source of large riprap Build equipment trail on right edge of old road from 286+80 to 288+80 in rocky debris
200 8000 seed & mulch
288+80 Edge of debris flow
289+30 Build a 5’ high berm 100 1200 seed & mulch
290+80 JCT/MF-200-050-04 Install water bar 15 400
294+00 Swale Install water bar 15 400
296+60 30”x40’ CMP in poor condition, 5’ fill Remove CMP, reestablish 4’ streambed 90 1200 seed & mulch
301+70 24”x46’ CMP in poor condition, 10’ fill Remove CMP, reestablish 4’ streambed 350 1400 seed & mulch
305+40 Swale Install water bar, raise trail 2’ on left for 120’ 65 400 seed & mulch
306+60 13’ stream onto road, 24’x? buried, water runs down road 60’ Remove CMP 20
307+20 Install a 2’ high berm 30 500 seed & mulch
309+10 18”x?’ CMP in poor condition, 2’ fill Remove CMP 15 400 seed & mulch
310+40 18”x20’ CMP Crossdrain in poor condition, 3’ fill
Remove CMP
30 500
310+90 Existing blockage berm
312+10 Existing water bar
Yards
Area Disturbed in
Square Ft.
0+00 = STA 118+60 of MF-200-050
0+60 Side cast failing Begin side cast pull back
1+10 Water coming from water bar on MF-200-050 road Install water bar 500 5600 seed & mulch
1+50 18”x36’ CMP in poor condition, 5’ fill bottom of vertical curve Remove CMP, establish 2’ streambed
2+00 End side cast pull back
3+00 Top of vertical curve
4+00 Install water bar 10 400 seed & mulch
4+60 Water off of cutback 3’ fill Install water bar, establish 2’ streambed 30 600 seed & mulch
5+40 18”x28’ CMP, plugged crossdrain in poor condition 3’ fill Remove CMP 30 600 seed & mulch
8+80 18”x30’ CMP in poor condition, 5’ fill Remove CMP, reestablish 3’ streambed 60 1000 seed & mulch
13+00 24”x30’ CMP in poor condition, 6’ fill, bottom of vertical curve Remove CMP, reestablish 4’ streambed 110 1600 seed & mulch
15+50 24”x30’ CMP blown out in poor condition, 6’ fill Remove CMP, reestablish 6’ streambed 150 1500 seed & mulch
16+20 Stream off of cut bank, 3’ fill Establish 4’ streambed 50 900 seed & mulch
18+00 Top of vertical curve
20+00 24”x30’ CMP in poor condition, 7’ fill, bottom of vertical curve Remove CMP, reestablish 6’ streambed 150 1000 seed & mulch
24+00 MF-200-045-01 Spur
27+00 20’ log bridge, dirt fill failing Remove log stringer bridge, including sills.
Reestablish 30’ streambed
600 3200 seed & mulch
28+00 Pirating down ditch
29+60 End pirating. Best to leave water in ditch, beaver dam above road causing water to be where it’s at.
32+40 18”x30’ CMP in poor condition, 3’ fill Remove CMP, reestablish 4’ streambed 50 900 seed & mulch
34+80 Swale, 3’ fill Install water bar 30 600
37+60 JCT MF 200-045-04 to right, MF 200-045-03 to left
38+80 12”x30’ CMP in poor condition, 5’ fill Remove CMP, reestablish 2’ streambed 30 600 seed & mulch
Yards
Area Disturbed in
Square Ft.
40+50 18”x28’ CMP, plugged 4’ fill Remove CMP, reestablish 1’ streambed 20 500 seed & mulch
43+30 Enter DNR
44+00 TYPED WATER, 18”x28’ CMP in poor condition, 4’ fill over CMP invert, ¼ac pond behind 10’ road fill with shot rock, outlet protection exists.
Remove cmp & fill to bottom of CMP, estab.
6’ streambed, maintain existing water level
90 2100 seed & mulch
45+00 Install water bar 10 400
46+00 Install water bar 10 400
47+00 Install water bar 10 400
47+40 Top of vertical curve
48+40 Install water bar 10 400
49+40 Install water bar 10 400
50+40 Install water bar 10 400
51+40 Install water bar 10 400
52+40 Install water bar 10 400
53+40 Install water bar 10 400
54+40 Install water bar 10 400
55+40 Install water bar 10 400
56+40 Install water bar 10 400
57+40 Install water bar 10 400
58+40 Install water bar 10 400
59+40 Install water bar 10 400
60+40 Install water bar 10 400
61+40 Install water bar 10 400
62+40 Install water bar 10 400
63+40 Install water bar 10 400
64+40 Install water bar 10 400
65+40 Install water bar 10 400
66+40 Install water bar 10 400
67+40 End of Ballasted road Install water bar 10 400
68+50 Install water bar 10 400
69+60 TYPED WATER, 2’ wood culvert failed Remove wood, reestablish 2’ streambed 10 400 seed & mulch
70+60 Install water bar 10 400
71+00 Install water bar 10 400 seed & mulch
72+00 Install water bar 10 400
73+00 Install water bar 10 400
74+00 End of road Install water bar 10 400
Yards
Area Disturbed in Square Ft.
0+00 = STA 37+60 of MF-200-045
3+70 Enter DNR Install water bar 10 400
4+70 Jct. Spur to right Install water bar 10 400
5+70 Install water bar 10 400
6+60 Swale, 4’ fill Install water bar 50 600 seed & mulch
7+50 Install water bar 10 400
8+40 Install water bar 10 400
9+30 Install water bar 10 400
10-20 Install water bar 10 400
11+10 Install water bar 10 400
12+10 Swale, 3’ fill Install water bar 30 600 seed & mulch
13+10 Install water bar 10 400
13+30 Landing, road curves to left
14-30 Swale, 3’ fill Install water bar 30 600 seed & mulch
15+30 Install water bar 10 400
16+30 Install water bar 10 400
17+20 Install water bar 30 600
18+20 Install water bar 10 400
19+20 Swale, 3’ fill Install water bar 20 500 seed & mulch
20+20 Install water bar 10 400
21+20 Install water bar 10 400
22+20 Install water bar 10 400
23+30 End of road
Yards
Area Disturbed in Square Ft.
0+00 = STA 4+70 of MF-200-045-04
1+00 Install water bar 10 400
2+00 Install water bar 10 400
3+00 Install water bar 10 400
4+00 Install water bar 10 400
4+80 Swale, 5’ fill 30’wide Install water bar 60 1000 seed & mulch
5+80 Install water bar 10 400
6+80 Install water bar 10 400
7+80 Install water bar 10 400
8+80 Install water bar 10 400
9+20 Install water bar, NO WORK BEYOND THIS POINT 10 400
Yards
Area Disturbed in Square Ft.
0+00 STA 128+90 of MF-200-O5O Rd.
1+80 Existing ditch out right
2+80 18”x20’ CMP, in poor condition, 4’ fill Remove CMP & establish 3’ stream bed 40 800 seed & mulch
6+80 Pond on right edge of road
8+70 24”x20’ CMP, in poor condition, 5’ fill Remove CMP & establish 4’ stream bed. A beaver dam is constructed 5’ above CMP inlet. DO NOT DISTURB.
50 1200 seed & mulch
10+10 Swale 3’ fill Install water bar 30 600 seed & mulch
11+50 Swale 3’ fill Install water bar, NO WORK BEYOND THIS POINT 30 600 seed & mulch
12+40 End of pond effected area
37+90 End of road. From STA 12+40 to here road is on ridge top with no drainage problems. No work needed.
Cubic Yds
Area Disturbed in
Square Ft
0+00 DNR land, JCT/ Loop road Construct vehicle barricade with, riprap from
Sta. 3+80, leave 5’ wide opening for trail
1+00 Install water bar 15 400
2+00 Install water bar 15 400
3+00 Install water bar 15 400 seed & mulch
3+80 TYPED WATER, 103”x71”x52’ arch pipe, in good condition, with riprap armored, 11’ fill
Remove arch pipe & fill, reestablish 20’wide streambed
900 4500 seed & mulch
4+70 MF-200-047 Rd. to right
5+00 Install water bar 15 400
6+50 Top of vertical curve
7+50 Install water bar 15 400
8+50 Swale, 2’ fill Install water bar
9+50 Install water bar 15 400
10+50 Install water bar 15 400
11+90 TYPED WATER, 103”x71”x36’ arch pipe, in good condition, with riprap armored, 10’ fill
Remove arch pipe & fill, reestablish 15’wide streambed
600 2800 seed & mulch
12+60 Swale Install water bar 15 400 seed & mulch
13+80 Swale Install water bar 15 400
14+90 Swale Install water bar 15 400
15+90 Swale Install water bar 15 400
16+70 Swale Install water bar 15 400
18+40 Swale Install water bar 15 400 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
19+20 TYPED WATER, 18”x20’ CMP poor condition, 3’ fill Remove CMP, reestablish 3’ streambed 40 1400 seed & mulch
20+40 Swale Install water bar 15 400
21+90 Swale Install water bar 15 400
23+10 Install water bar 15 400
24+30 Top of vertical curve
25+40 Swale Install water bar 15 400
26+50 Top of vertical curve
27+00 Natural swale, outsloped
27+50 Top of vertical curve
28+30 Install water bar 15 400 seed & mulch
29+20 TYPED WATER, 87”x63”x44’ arch pipe in good condition with riprap armored, 10’ fill
Remove arch pipe, fill, reestablish 15’ streambed
600 2800 seed & mulch
30+30 Swale Install water bar 15 400
31+20 Top of vertical curve
32+60 Bottom of vertical curve - swale Install water bar 15 400
33+40 Top of vertical curve
34+30 TYPED WATER, 36”x40’ CMP in good condition, 10’ fill Remove CMP, reestablish 5’ streambed 550 2800 seed & mulch
35+40 Install water bar 15 400
36+70 Existing water bar
37+50 Top of vertical curve
38+40 Bottom of vertical curve, existing water bar
39+60 Swale Install water bar 15 400
Cubic Yds
Area Disturbed in
Square Ft
40+90 TYPED WATER, 36”x40’ CMP in poor condition, 9’ fill Remove CMP, reestablish 8’ streambed 600 2200 seed & mulch
42+00 Swale Install water bar 15 400
43+00 Swale Install water bar 15 400
44+30 Existing water bar
44+60 18”x30’ CMP Crossdrain in poor condition, dry, 2’ fill Remove CMP 20 600 seed & mulch
45+50 Existing water bar
46+10 1’ stream off of cut slope Install water bar 15 400
46+60 Existing water bar
47+30 12”x20’ CMP Crossdrain in poor condition, dry, 2’ fill Remove CMP 20 600
48+30 Top of vertical curve, start rock cut, full bench road
49+90 Existing water bar
51+20 18”x20’ CMP crossdrain in poor condition, bottom of vertical curve, dry, 2’ fill Remove CMP 20 600
52+50 Top of vertical curve, No water bar needed. -5% back
53+30 Descend -12%
54+10 18”x20’ CMP, Crossdrain in poor condition, 2’ fill Remove CMP 20 600
55+10 Swale Install water bar 15 400 seed & mulch
56+10 TYPED WATER, 18”x30’ CMP,poor cond. 1’ stream coming off of cut slope Remove CMP, establish 2’ streambed 30 700 seed & mulch
56+80 Swale Install water bar 15 400 seed & mulch
58+00 15”x20’ CMP, Crossdrain in poor condition, 2’ fill Remove CMP 20 600 seed & mulch
59+00 Swale Install water bar 15 400 seed & mulch
60+30 18”x20’ CMP, Crossdrain in poor condition, 3’ fill Remove CMP 30 600
61+50 Install water bar 15 400
Cubic Yds
Area Disturbed in
Square Ft
63+00 18”x30’ CMP, Crossdrain in poor condition, 3’ fill Remove CMP 30 600
64+00 Install water bar 15 400
65+50 Existing water bar
66+40 18”x20’ CMP, Crossdrain in poor condition, 3’ fill Remove CMP 30 600
67+40 12”x20’ CMP, Crossdrain in poor condition, 3’fill Remove CMP 30 600
68+00 Swale Install water bar 15 400
68+70 Turn around
69+30 TYPED WATER, 3’ stream off of cut slope, 3’ fill Establish 3’ stream bed 40 700 seed & mulch
69+70 TYPED WATER, 12”x12’ CMP in poor condition. 1’stream, 2’ fill Remove CMP, reestablish 2’ stream bed 30 500 seed & mulch
70+50 Swale Install water bar 15 400 seed & mulch
71+50 12”x20’ CMP, Crossdrain in poor condition, 2’fill Remove CMP 20 600
71+60 Existing water bar
72+00 12”x20’ CMP, Crossdrain in poor condition, 2’fill Remove CMP 20 600
73+30 Existing water bar
74+00 12”x20’ CMP, Crossdrain in poor condition, bottom of vertical, 2’fill Remove CMP 20 600
74+80 Top of vertical curve
75+80 12”x20’ CMP, Crossdrain in poor condition, 2’fill Remove CMP 20 600
77+20 Existing water bar
78+30 Existing water bar
79+40 Swale Install water bar 15 400 seed & mulch
80+40 TYPED WATER, 3’ stream in natural swale, 3’ fill, water flowing thru road Establish 3’ streambed 40 700 seed & mulch
80+70 TYPED WATER, 12”x20’ CMP in poor condition. 4’ fill Remove CMP, reestablish 4’ stream bed 100 800 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
81+20 TYPED WATER, 12”x20’ CMP in poor condition. 4’ fill Remove CMP, reestablish 2’ stream bed 70 800 seed & mulch
81+80 Install water bar 15 400 seed & mulch
82+80 Top of vertical curve
84+20 TYPED WATER, 87”x63”x44’ arch pipe in good condition, 12’fill Remove arch pipe, reestablish 15’ streambed 700 4600 seed & mulch
85+00 Existing water bar
86+00 Existing water bar
86+70 TYPED WATER, 42”x40’ CMP in fair condition, 9’ fill Remove CMP, reestablish 10’ streambed 420 1400 seed & mulch
87+50 Existing water bar
87+90 Start of debris flow
88+60 60” CMP? Buried Remove CMP 60 --
89+10 Leave debris flow
89+80 Install water bar 15 400 seed & mulch
91+00 Existing water bar
92+10 Existing water bar
93+10 Existing water bar
94+00 15”x20’ CMP crossdrain in poor condition, 3’ fill Remove CMP 30 600
94+60 Swale Install water bar 15 400
95+60 Swale Install water bar 15 400
96+70 Enter USFS, edge of debris, swale Install water bar 15 400 seed & mulch
97+80 Creek in debris flow, 5”x7”x? arch pipe buried at bottom of vertical curve Remove arch pipe 60 ---
98+70 Swale Install water bar 15 400 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
100+30 18”x20’ CMP crossdrain in poor condition, 4’ fill Remove CMP 60 600
101+20 12”x20’ CMP crossdrain in poor condition, 3’ fill Remove CMP 30 600
102+20 Existing water bar
103+00 15”x20’ CMP crossdrain in poor condition, 3’ fill Remove CMP 30 600
104+40 18”x30’ CMP crossdrain in fair condition, 4’ fill Remove CMP 90 600
105+60 Swale Install water bar 15 400
106+80 Existing water bar
107+80 Swale Install water bar 15 400
108+80 Install water bar 15 400
109+90 24”x20’ CMP in poor condition, 5’ fill Remove CMP, reestablish 4’ streambed 60 800 seed & mulch
110+80 Swale Install water bar 15 400 seed & mulch
111+30 Existing water bar
111+50 36”x30’ CMP in fair condition, 5’ fill Remove CMP, reestablish 4’ streambed 80 900 seed & mulch
112+80 Install water bar 15 400 seed & mulch
114+00 12”x20’ CMP in poor condition, 3’ fill Remove CMP, reestablish 2’ streambed 20 500 seed & mulch
115+20 Swale Install water bar 15 400
116+70 Existing water bar with 1’ stream
117+60 Swale Install water bar 15 400 seed & mulch
118+60 JCT/MF-200-045
118+70 Swale Install water bar 15 400 seed & mulch
119+20 30”x30’ CMP in poor condition, 6’ fill Remove CMP, reestablish 5’ streambed 100 1200 seed & mulch
120+20 Swale Install 40’ long water bar 20 500 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
121+10 58”x36”x40’ arch pipe in good condition, 6’ fill Remove arch pipe, reestablish 5’ streambed 140 1600 seed & mulch
121+70 87”x63”x36’ arch pipe in good condition, 10’ fill Remove arch pipe, reestablish 10’ streambed
300 2400 seed & mulch
123+00 Top of vertical curve
124+10 24”x30’ CMP, in poor condition, 5’ fill Remove CMP, reestablish 5’ streambed 90 900 seed & mulch
124+95 Swale Install water bar 15 400 seed & mulch
125+80 87”x63”x40’ arch pipe in good condition, 10’ fill Remove arch pipe, reestablish 10’ streambed
370 2400 seed & mulch
127+30 42”x30’ CMP, in poor condition, 8’ fill Remove CMP, reestablish 3’ streambed 210 1500 seed & mulch
127+70 Existing water bar
128+90 JCT/MF-200-043
129+40 18”x30’ CMP in poor condition, 6’ fill, bottom of vertical curve Remove CMP, reestablish 3’ streambed 90 1100 seed & mulch
130+30 Swale Install water bar 15 400
131+20 Swale Install water bar 15 400
132+30 24” x30’CMP in fair condition, 5’ fill, in 25 year old slide area, dry Remove CMP 70 900 seed & mulch
132+90 24”x30’ CMP in good condition, 4’ fill Remove CMP, reestablish 5’ streambed 90 750 seed & mulch
134+00 12”x30’ CMP in poor condition, 4’ fill Remove CMP, reestablish 2’ streambed 60 750 seed & mulch
135+00 Swale Install water bar 15 400 seed & mulch
135+43 Enter DNR
136+00 TYPED WATER, 18”x30’ CMP in poor condition, 5’ fill Remove CMP, reestablish 2’ streambed 80 1100 seed & mulch
136+40 TYPED WATER, 24”x30’ CMP in fair condition, 4’ fill Remove CMP, reestablish 2’ streambed 70 900 seed & mulch
136+70 Existing water bar
137+20 TYPED WATER, 48”x40’ CMP in fair condition, 5’ fill Remove CMP, reestablish 6’ streambed 170 1400 seed & mulch
Cubic Yds
Area Disturbed in
Square Ft
138+20 Swale Install water bar 15 400 seed & mulch
139+30 TYPED WATER, 18”x30’ CMP in poor condition, 4’ fill Remove CMP, reestablish 2’ streambed 70 800 seed & mulch
140+50 TYPED WATER, 18”x20’ CMP in poor condition, 4’ fill Remove CMP, reestablish 3’ streambed 40 600 seed & mulch
140+80 TYPED WATER, 18”x40’ CMP in poor condition, 6’ fill Remove CMP, reestablish 3’ streambed 120 1800 seed & mulch
141+80 Swale Install water bar 15 400 seed & mulch
143+00 Swale Install water bar 15 400
143+90 Swale Install water bar 15 400
144+90 Swale Install water bar 15 400
145+50 Swale Install water bar 15 400
146+10 JCT/MF-200-042, waste area opposite side of road
146+70 Existing Earthen Berm
147+00 2 – 36”x 30 CMP partially buried in 25’ wide stream Remove CMP’s 60
147+50 JCT/Bessemer Mt. Road, follow it for 18+50 STA
Yards
Area Disturbed in
Square Ft.
0+00 DNR land, STA 4+70 of MF-200-050 Rd.
0+10 18”x40’ CMP cross drain in fair condition Remove CMP 20 400
1+50 Top of vertical curve -10% AH
2+50 Install water bar 10 400
3+30 18”x30’ CMP 6’ fill, cross drain in fair condition Remove CMP 100 1400
4+30 Install water bar 10 400
5+30 Install water bar 10 400
6+70 TYPED WATER, 18”x40’ CMP 8’ fill, in fair condition Remove CMP & re establish 3’ stream bed 340 2200 seed & mulch
7+60 Swale Install water bar 10 400 seed & mulch
8+50 TYPED WATER, 18”x26’ CMP 6’ fill, in fair condition Remove CMP & re establish 2’ stream bed 120 1600 seed & mulch
9+60 TYPED WATER, 30”x40’ CMP 12’ fill in fair condition Remove CMP & re establish 12’ stream bed 950 9000 seed & mulch
10+30 Existing disposal area, do not use
11+60 Install water bar 10 400
12+60 Install water bar 10 400
13+60 Install water bar 10 400
14+60 Install water bar 10 400
15+30 18”x30’ CMP 5’ fill, cross drain in fair condition Install water bar 80 1200
16+30 Install water bar 10 400
17+60 Install water bar, NO WORK BEYOND THIS POINT 10 400
18+70 Landing, End of road
| 2Bessemer_Location-Layout1 |
| 3-6Bessemer_Base&Contract Option Maps-3_Base |
| 3-6Bessemer_Base&Contract Option Maps-4_Option A |
| 3-6Bessemer_Base&Contract Option Maps-5_Option B |
| 3-6Bessemer_Base&Contract Option Maps-6_Option C |
| 7-8Bessemer_ESTI_OF_QUAN-Estimate of Quantities 1 |
| 7-8Bessemer_ESTI_OF_QUAN-Estimate of Quantities 2 |
| 9Bessemer_GenNotes Sht 20 (1) |
| 10Bessemer_WkList_225 Sht 20 (1) |
| 11Bessemer_WkList_225-01 Sht 20 (1) |
| 12-15Bessemer_WkList_200 Sht 20 (1) |
| 12-15Bessemer_WkList_200 Sht 20 (2) (1) |
| 12-15Bessemer_WkList_200 Sht 20 (3) (1) |
| 12-15Bessemer_WkList_200 Sht 20 (4) (1) |
| 16-17Bessemer_WkList_200-110 Sht 20 (1) |
| 16-17Bessemer_WkList_200-110 Sht 20 (2) (1) |
| 18Bessemer_WkList_200-090 Sht 20 (1) |
| 19Bessemer_WkList_200-090-03 & -01 Sht 20 (1) |
| 20-21Bessemer_WkList_200-080 Sht 20 (1) |
| 20-21Bessemer_WkList_200-080 Sht 20 (2) (1) |
| 22-23Bessemer_WkList_200-070 &070-01 Sht 20 (1) |
| 22-23Bessemer_WkList_200-070 &070-01 Sht 20 (2) (1) |
| 24-28Bessemer_WkList_200-050_&-050-010_OPT A Sht 20 (1) |
| 24-28Bessemer_WkList_200-050_&-050-010_OPT A Sht 20 (2) (1) |
| 24-28Bessemer_WkList_200-050_&-050-010_OPT A Sht 20 (3) (1) |
| 24-28Bessemer_WkList_200-050_&-050-010_OPT A Sht 20 (4) (1) |
| 24-28Bessemer_WkList_200-050_&-050-010_OPT A Sht 20 (5) (1) |
| 29-30Bessemer_WkList_200-045_OPT B Sht 20 (1) |
| 29-30Bessemer_WkList_200-045_OPT B Sht 20 (2) (1) |
| 31Bessemer_WkList_200-045-04_OPT B Sht 20 (1) |
| 32Bessemer_WkList_200-045-04-02 & 200-043_OPT B Sht 20 (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (2) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (3) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (4) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (5) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (6) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (7) (1) |
| 33-40Bessemer_WkList_200-050_OPT C Sht 20 (8) (1) |
| 41Bessemer_WkList_200-047_OPT C Sht 20 (1) |
| 42Bessemer_TypRd_drain_swale Sht 19 (1) |
| 43Bessemer_TypRd_Cross_Drain_Culvert_Removal Layout1 (1) |
| 44Bessemer_TypRd_Non_Drive_WB&Road Closure Layout1 (1) |
| 45Bessemer_TypTRAIL-912.2-912 |
| 46Bessemer_TypTRAIL-911-912 Layout1 (1) |
| 47Bessemer_TypTRAIL_1ILLUSTRATION Sht 21 (1) |
| 48Bessemer_TypTRAIL_Debris Trail&Grade Dip Sht 21 (1) |
| 49Bessemer_Temp Traffic Control-Layout1 |
File details come from the government source that posted it. Updated .