ARRA – Suiattle Roads Repair/Maintenance

Supplemental Project Specifications

Table of Contents

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

155 Delete

204 - Excavation and Embankment

204.11 Compaction

209 - Structure Excavation and Backfill

209.11 Compacting

Table 209-1 Sampling and Testing Requirements

273 - Geocell System Retaining Wall

322 - Minor Aggregate Courses

404 - Minor Hot Asphalt Concrete

404.02 Composition of Mix (Job-Mix Formula)

404.04 Weather Limitations

404.06 Placing

404.07 Compacting (a)

404.09 Acceptance

Table 404-1. Sampling and Testing Requirements

409 - Asphalt Surface Treatment

409.08 Asphalt Application

409.10 Fog Seal

409.11 Single Course Surface Treatments

409.13 Acceptance

Table 409-4 Sampling and Testing Requirements

412 - Asphalt Tack Coat

414 - Asphalt Pavement Crack and Joint Sealing

414.05 Crack Cleaning and Sealing

414.05 Asphalt Pavement Crack Sealing and Filling

602 - Culverts and Drains

602.03 General

602.06 Laying Plastic Pipe

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

607.01 Description

607.02 General

622 - Rental Equipment

622.02 Rental Equipment

633 - Permanent Traffic Control

633.02 Material

633.03 General

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

736 - Geocell

736.01 Geocell

811 - Surface Maintenance……………………………………………………………29-33

813 - Spot Surfacing…………………………………………………………………..34-36

834 - Roadway Drainage System Maintenance……………………………………….37-40

842 - Roadway Vegetative Maintenance……………………………………………...41-45

851 - Hazard and Obstruction Removal……………………………………………….46-49

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest

System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007 http://www.nist.gov/

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or

“construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service

Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of

Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill.

Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract.

Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

204 - Excavation and Embankment

204.11_nat_us_04_11_2005

204.11 Compaction.

Delete the first paragraph and replace it with the following:

For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.

Add the following compaction methods:

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer.

Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.

209 - Structure Excavation and Backfill

209.11_nat_us_02_24_2005

209.11 Compacting.

Delete the subsection and add the following:

Compact backfill using designated compaction method A, B, or C:

Method A. Ensure that backfill density exceeds the density of the surrounding embankment.

Method B. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each layer using appropriate compaction equipment until visual displacement ceases.

For compaction under sections 252, 254, 255, 257, 258 and 262 compact with a vibratory steel wheeled roller with a mass of at least 8 tons.

Method C. Determine optimum moisture content and maximum density according to AASHTO T 99 method C. Adjust the moisture content of the backfill material to a moisture content suitable for compaction.

Compact material placed in all layers to at least 95 percent of the maximum density. Determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

Table 209-1 Sampling and Testing Requirements

(2) Compaction methods (A) and (B) do not require AASHTO T-99 or T-310 test methods for foundation fill.

273 - Geocell System Retaining Wall

273.00_06_us_09_24_2009

Description

273.01 This work consists of constructing a geocell system retaining wall using a cellular confinement system such as Presto Geoweb Cellular Confinement System or approved equal, in accordance with the plans and manufacturer’s recommendations. Furnish the CO with product literature, certification, and product sample as required in Section 106.03 for review and approval 14 days prior to product purchasing.

Materials

273.02 Requirements. Ensure that material conforms to specifications in the following subsections:

Granular Backfill Type (a) 703.03

Geotextile, Type II (A, B, C) 714.01

Geocell, 8”x8’x21’ nominal dimensions 736

Construction Requirements

273.03 General. Perform the work specified in Section 209. Use ditches, grading or similar approved methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.

273.04 Storage and Handling of Material. During shipment and storage, wrap geotextile materials in heavy-duty protective covering per manufacturer’s recommendations. Protect the material from mud, soil, dust, debris, damage and sunlight exposure prior to installation.

273.05 Geotextile Installation. Where required, place the geotextile according to Section 207. The surface shall be approved in writing by the CO prior to placing geotextile.

Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.

The installed geotextile shall be approved in writing by the CO prior to setting the geocells.

273.06 Geocell Installation. Place the geocell sections directly on the prepared and approved subgrade.

Expand the geocell sections into position at the grades and lines as shown on the plans and per the manufactures recommendations for installation. Secure the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the manufacturer prior to filling. Ensure that the individual cells have expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines shown on the plans.

Connect geocell panels in accordance with the manufacturer’s recommendations.

273.07 Infill Placement. Furnish the CO with the manufacturer’s specific recommendations for backfilling 14 days prior to placement of the geocells.

Place coarse granular backfill meeting Subsection 703.03, AASTHO M43, Size 7 (3/8” clean pea gravel) into the expanded cells with equipment appropriate for the site conditions such as a backhoe, front-end loader or other equipment approved to place the material. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls. Fill and compact the outer cell with topsoil to aid in the establishment of vegetative new growth on wall face.

Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. Approved equipment may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material. Consolidate the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell. Make at least three complete passes or until visible deformation of the infill ceases. Grade the surface to be even with the top of the cells prior to the placement of a subsequent layer of geocell. Following the installation of the last (top) layer of geocell material, ensure that the cell walls are not exposed after final grading is completed.

If the CO determines the geocell manufacturer’s specific recommendations for backfilling are more stringent than stated above then the manufacturer’s backfilling recommendations will be used.

273.08 Acceptance. Geotextile will be evaluated under Subsections 106.02 and 714.01.

Material for geocell will be evaluated under Subsections 106.2 and 106.03.

Granular backfill material will be evaluated under Section 106.02 and 106.04.

Measurement

273.09 Method. Measure the items listed in the bid schedule according to Subsection 109.02 and the following.

Measure the Geocell by the square footage of wall face in place.

Payment

273.10 Basis. The accepted quantities will be paid for at the contract price per unit of measurement for the

Section 272 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

The cost for furnishing and placing the granular backfill required in Sections 207, 208, 209 and 209A for geocell infill is incidental to this pay item and no separate payment will be made.

The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.

322 - Minor Aggregate Courses

322.00_nat_us_10_24_2007

322.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

Material

322.02 Conform to the following Subsections:

Aggregate 703.05

Water 725.01

Construction Requirements

322.03 General. Prepare the surface on which the aggregate course is placed according to Section 204 or 303 as applicable.

Request approval of the roadbed in writing before placing aggregate.

Develop, haul, and apply water in accordance to Section 170.

Submit target values within the gradation ranges shown in Table 703-2 or 703-3 for the required grading. After reviewing the proposed target values the CO will determine the final values for the gradation and notify the

Contractor in writing.

No quality requirements or gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320.

Establish stockpile sites at approved locations.

322.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 322.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

322.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Operating spreading and hauling equipment over the full width of the travelway.

Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in Subsection

204.11(a)(1).

Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by

AASHTO T 99, method C or D.

Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest

Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by

AASHTO T 180, method C or D.

Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest

Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

322.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a

10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.

322.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to

Subsection 322.06.

322.08 Acceptance. See Table 322-1 or Table 322-2 as applicable, for sampling and testing requirements.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.04. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under

Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04.

Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.

322.09 Measure the Section 322 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening.

Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

322.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 322 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See

Subsection 109.05.

T a b le

-1

S m p li n g a n d es ti g

R eq u ir em e ts e p o r ti im e

B ef o re u si in w o rk h o u rs p li t

S a m le

Y w h en re q u es te

P o in t o f

S a m p li u rc e o f m at er ia l

F ro m w in d ro w o r ro ad b ed a ft er ro ce ss in g o r fr o m a p p ro v ed cr sh er s am p li ev ic e

S a m p li

F r e q u e n c y er t y p so rc e o f m at er ia l p er ay st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O

T

A

S H

T O

T

S H

T O

T

T M

D

S H

T O

C te g ry a ra c te r is ti c

L A a b ra si

(c ar se

S o d iu m s u lf at e so u n d n es s lo ss ar se f e)

D ra b il it y i n ex ar se f e) ra ct u fa ce s

S am p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a st fo co n fo rm an

(1

.0

M ea su re d a co n fo rm

.0

M te ri a l o r

P ro d u c t

A g g re g at e so u rc e q u al it

.0 b b as e, B as e, a n d

S u rf ac e co u b le

-1 co n ti n u ed

S a m p li n g a n d

T es ti n g R eq u ir e m p o r ti e

B ef o re u si n g i w rk

B ef o re p la ci ex t la

M in im u m o f p o in ts p er p ro ct r.

li t

S a m w q u es in t o f

S a m p li u rc e o f m at e ri al

In -p la m p li e q u e n er t y p e so rc e o f m at er ia l st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O

T

(1

R -1

M ar sh al l

A A

S H

T O

(1

R -1

M ar sh al l

A A

S H

T O

T o th er a p p ro ce d u re s

C a te g a ra c te r is ti c

M o is tu re -d en si ty et h o

D is tu re -d en h o

E is tu re -d en h o is tu re -d en h o

G

In -p la ce d en m o is tu co te n t

T y p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a co n fo rm

.0

M a te ri a l o r

P ro d u c t

S u b b as e, B as e, a n d S u rf ac a b le

-2 m p li n g a n d

T es ti n g R eq u ir e m p o r ti e h o li t

S a m in t o f

S a m p li m w in d ro w o r ro ad b ed a ft ce ss in g o r fr o m a p p ro cr sh er s am p li ev ic e

S a m p li e q u e n st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O te g a ra c te r is ti c

S am p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a co n fo rm

.0 te ri a l o r

P ro d u c t

S cr ee n ed A g g re g at

404 - Minor Hot Asphalt Concrete

404.02_nat_us_06_09_2006

404.02 Composition of Mix (Job-Mix Formula).

Delete the second paragraph and replace with the following:

Submit a job-mix formula and supporting documentation, test results, and calculations for the material to be incorporated into the work. Include copies of laboratory test results and mix design data that demonstrate that the properties of the aggregate, additives, and mixture meet the current requirements and criteria of Federal or state agencies. Ensure that the job-mix formula was performed no more than one year prior to placing the hot asphalt concrete. After reviewing the Contractor’s proposed job-mix formula, the CO will determine the final values for the job-mix formula to be used and notify the Contractor in writing.

404.04_nat_us_03_02_2005

404.04 Weather Limitations.

Change 35 o F to 45

F:

404.06_nat_us_03_02_2005

404.06 Placing.

Add the following:

Do not place asphalt until the CO has approved in writing the area where it will be placed.

Delete the last sentence and replace with the following:

Offset the longitudinal joint of one layer at least 6 inches from the joint in the layer immediately below. Make the longitudinal joint in the top layer along the centerline of two-lane roadways or at the lane lines of roadways with more than two lanes. Offset transverse joints in succeeding layers and in adjacent lanes at least 10 feet, where possible.

404.07_nat_us_03_02_2005

404.07 Compacting (a).

Delete and replace with the following:

(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:

(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than 1.5 ton/feet of width of the compression roll or rolls.

(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.

(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in

Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.

404.09_nat_us_03_02_2005

404.09 Acceptance.

Add the following to the second paragraph:

See Table 404-1 for sampling and testing requirements.

Table 404-1. Delete and replace with the following:

Table 404-1. Sampling and Testing Requirements.

Material or

Product

Type of

Acceptance

(Subsection)

Characteristic Category Sampling

Methods

Specifications

Sampling

Frequency

Point of

Sampling

Split

Sample

Reporting

Time

Asphalt

Mixture

(404.09)

- - - AASHTO T

Three minimum per project and at least one per

500 Cubic yards

Roadway prior to compaction yes As soon as sampled

409 - Asphalt Surface Treatment

409.08_nat_us_06_21_2005

409.08 Asphalt Application.

Add the following to the 3rd paragraph:

Ensure the length of spread is no more than what can be covered with aggregate within 1 minute of the asphalt application.

409.10 Fog Seal.

Add the following to the first paragraph:

Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.

409.11 Single Course Surface Treatments.

Do not permit traffic to travel over any Asphalt Surface Treatment until completion of rolling.

409.13_nat_us_05_13_2004

409.13 Acceptance.

Delete the 2 nd paragraph and replace with the following:

Aggregate gradation for asphalt surface treatment will be evaluated under Subsection 106.04.

Table 409-4 Sampling and Testing Requirements.

Delete the last cell (4 th

) under Sampling Frequency and replace with the following:

1 per tanker truck and 1 per trailer

Delete the 2 nd and 3 rd cell under Type of Acceptance and replace with the following:

Measured and tested for conformance (106.04)

412 - Asphalt Tack Coat

412.07_nat_us_07_03_2007

412.07 Acceptance

Delete the first paragraph and replace with the following:

Emulsified asphalt will be evaluated under Subsections 106.02, 106.03, and 702.07.

414 - Asphalt Pavement Crack and Joint Sealing

414.05_nat_us_05_12_2004

414.05 Crack Cleaning and Sealing.

Delete and replace with:

414.05 Asphalt Pavement Crack Sealing and Filling.

Crack seal and fill only when internal pavement temperatures are between 36 and 68 °F the road surface is dry, there is no frost in the road section, and the weather is not foggy or rainy.

Heat, mix, and apply the crack sealing and filling materials as recommended by the sealant manufacturer.

Submit a copy of the manufacture’s recommendations to the CO prior to the start of work.

Prepare cracks between 1/4 inch and 1 inch and apply sealant by one of the following methods:

Crack Sealing - Rout and clean all cracks between 1/4 inch and 1 inch wide. Rout cracks to produce a reservoir with straight ½ inch vertical walls and a 1 1/2 inch wide flat bottom. Use a low-modulus rubberized asphalt. Completely fill the routed cross section flush with the pavement surface.

Crack Filling - Clean the crack between 1/4 inch and 1 inch wide. Prepare cracks to a depth of at least three times the crack width. Ensure crack sealing materials penetrates more than twice the crack width.

For cracks between 1/2 inch and 1 inch where sealant penetrates more than two times the crack width, use a backer rod.

For cracks with a width greater than or equal to 1 inch, clean and fill flush to the existing surface with asphalt mix according to Section 401, 402, 403, 404, or 417.

For cracks less than ¼ inch wide, clean and fill with CSS-1, SS-1, or joint sealant. Apply a sealant band less than 2 inches over the crack, such that the crack is centered under the band. Submit a copy of, and adhere to, the manufacture’s recommendations for heating and applying the joint sealant.

Clean cracks with a stream of air to remove all dirt, dust, or deleterious matter adhering to the crack walls or remaining in the crack cavity so that the crack is clean and dry when the sealant is applied. Blow or brush dry material off the pavement surface. Avoid damage to the adjacent pavement.

Use approved methods to protect all seal materials from being picked up by traffic. Treat seal material tracked onto the road surface as directed by the CO.

602 - Culverts and Drains

602.03_nat_us_09_06_2005

602.03 General.

Add the following:

Ensure that the final installed alignment of all pipe allows no reverse grades, and does not permit horizontal and vertical alignments to vary from a straight line drawn from center of inlet to center of outlet by more than 2 percent of pipe center length or 1.0 feet, whichever is less.

602.06_nat_us_08_05_2009

602.06 Laying Plastic Pipe.

Delete the second paragraph and substitute the following:

Provide soil-tight bell and spigot joints for plastic pipe culverts.

607 - Cleaning, Reconditioning, and Repairing Existing Drainage Structures

607.01_06_us_09_15_2009

607.01 Description.

Add the following to the first sentence:

…..and bridges.

Add the following paragraph:

Remove all dirt and deleterious debris from bridge decks, expansion joints, curbs, rails and deck drains.

607.02 General.

Clean bridge decks and appurtenances by an approved pressurized water method and/or other approved mechanical and manual methods. Contain and remove loose material from the bridge off the work site to an approved location. Do not allow material to enter the waterways.

Remove cleaned material from bridge to designated site as specified in the plans.

622 - Rental Equipment

622.02_06_us_08_20_2009

622.02 Rental Equipment

Provide a track mounted hydraulic excavator. Equipment must be reasonably free of leaks and other mechanical deficiencies and not older than 15 years.

Bucket must be equipped with a hydraulic “thumb”. An excavator capable of performing the excavation and boulder placement needs for this project will be of an adequate size to be acceptable for any work that the

Contractor may be directed to perform under this section.

633 - Permanent Traffic Control

633.02_nat_us_03_03_2005

633.02 Material.

Add the following subsections

Protective Overlay Film 718.02

Edge Film 718.02

633.03_nat_us_03_03_2005

633.03 General.

Delete the subsection and add the following:

Furnish traffic control devices and guide signs according to the MUTCD, approved USDA-FS and state supplements, the current edition of USDA-FS EM-7100-15 Sign and Poster Guidelines for the Forest Service, and Standard Highway Signs published by FHWA. Submit the sign list for approval before ordering.

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

736 - Geocell

736.01_01_us_08_27_2004

736.01 Geocell.

Furnish geocell material consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.), connected in series at off-set, full-depth ultrasonic seams aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill material is placed.

736.02 Requirements. Furnish geocells consisting of polyethylene material treated to resist ultraviolet degradation and conforming to the requirements shown in table 736-1.

Table 736-1 – requirements for geocells.

Density ASTM D 1505 0.935 to 0.965 g/cm (58.4 to

60.2 pounds per cubic foot).

Environmental

Stress Crack

Resistance

ASTM D 1693 3000 hour

Strip Sheet

Thickness

ASTM D 5199 1.27 mm (50 mil), minus 5 percent, plus 10 percent.

Determine thickness in the flat before any surface texturing or other surface disruption.

Short-term peel strength

U.S. Army Corps of

Engineers Technical Report

GL-86-19, Appendix A

2000 N (450 pound) minimum for 203 mm (8.0 inch) depth cell

Seam Hang Strength 101.6 mm (4”) weld joint supporting load of 72.5 kg

(160 pounds) or

101.6 mm (4”) weld joint supporting load of 72.5 kg

(160 pounds) while undergoing temperature change from 23 O C to 54

O C

(74 O

F to 130 O

F) on 1 hour cycles.

30 days minimum

7 days minimum

811 SURFACE MAINTENANCE

811.01

Service Required

Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips.

811.02

Performance Standards

A. Maintenance Level 4 and 5 Roads

A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.

B. Maintenance Level 3 Roads

A road surface is maintained to standard when the surface is compact, crowned, or sloped to drain, without segregation of the surfacing materials. The road surface has no ruts or rills, suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.

C. Maintenance Level 2 Roads

A road surface is maintained to standard when the surface is shaped to drain, and where ditches and road surface drainage structures function efficiently. The road surface has no continuous ruts or rills, and no large concentrations of unsuitable materials remain.

D. All Roads

When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the Contracting Officer.

811.03

Location of Work

As specified on roads listed on the road listing, shown on the plans, marked on the ground, or as ordered by the Contracting Officer. Locations of weed infested areas are marked on the ground. Do not operate in the weed infested areas unless ordered to do so by the Contracting Officer.

811.04

Measurement under this Section will be made by the total number of units for each item listed in the

SCHEDULE OF ITEMS completed and accepted.

A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.

B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.

C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.

811.05

The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

Pay Item Pay Unit

811(1) Surface Maintenance Level 4 & 5 roads Single Lane Mile

811(2) Surface Maintenance Level 4 & 5 roads Double Lane Mile

811(3) Surface Maintenance Level 3 roads Single Lane Mile

811(4) Surface Maintenance Level 3 roads Double Lane Mile

811(5) Surface Maintenance Level 2 roads Single Lane Mile

811(6) Surface Maintenance Level 2 roads Double Lane Mile

811(7) Shoulder Maintenance Road Mile

811.06

Acceptable Quality Levels

Major Minor Allowable Defects Required Action

Defect Defect Major Minor Major Minor

Surface

Irregularities

(Level 4&5)

Potholes greater than 2" deep and wider than 1 foot

Potholes 2" or less deep and 1 foot or less wide 0 per unit

2 per unit

Rework if greater than 0 major defects *

Rework if greater than 2 minor defects

Washboards greater than 1" deep

Washboards 1” or less deep and not exceeding

20 feet long

0 per unit

0 per unit

Rework if greater than 0 major defects *

Rework if greater than 0 minor defects

Surface

Irregularities

(Level 3)

Potholes greater than 2" deep and wider than 1 foot

Potholes 2” or less deep and 1 foot or less wide 0 per unit

2 per unit

Rework if greater than 0 major defects *

Rework if greater than 2 minor defects

Washboards greater than 1" deep

Washboards less than

1" deep and not exceeding 20 feet long

0 per unit

2 per unit

Rework if greater than 0 major defects *

Rework if greater than 2 minor defects

Road Cross

Section (Level

4&5)

Crown or Cross Slope is not uniform and does not drain as specified on more than 250' of surface per mile

Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile

0 per unit Rework

Rework if greater than 0 minor defects

Road Cross

Section (Level 3)

Crown or Cross Slope is not uniform and does not drain as specified on more than 250' of surface per mile

Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile

0 per unit Rework

Rework if greater than 0 minor defects

Defect Defect Major Minor Major Minor

Road Cross

Section (Level 2)

Road surface does not drain properly and causes erosion, or obstructs high clearance vehicles

Road surface does not drain properly, but does not cause erosion

2 per unit

Rework if greater than 0 major defects *

Rework if greater than 2 minor defects

Oversized

Material (Level

3&4 aggregate surfaced roads)

Material greater than 3" diameter remaining on the road surface

Material less than 3" diameter remaining on the road surface and traffic safety is not compromised

0 per unit

Rework if greater than 0 major defects *

Rework if greater than 0 minor defects

Oversized

Material (Level

2)

Objects in traveled way that obstruct high clearance vehicles

Debris in traveled way that may impede high clearance vehicles

2 per unit Rework

Rework if greater than 2 minor defects

Aggregate

Surface Quality

Gradation of surface aggregate is degraded by more than 10 %

Gradation of surface aggregate is degraded by less than 10 %

2 per unit Rework

Rework if greater than 2 minor defects

A loss of more than 10

CY/mile

A loss of less than 10

CY/mile 0 2 per unit

Replace or recover lost material

Accept the loss of material surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised surfacing is segregated over less than a 100 square yard area per

1000 linear feet of road and traffic safety is not compromised

0 N/A Rework Accept the loss of surface quality*

Backslopes

Undercut backslope will result in destabilization of slope

Undercut backslope will not result in destabilization of slope

0 per unit

Repair and

Stabilize

Revegetate if greater than 0 minor defects

Defect Defect Major Minor Major Minor

Compaction

Visible displacement occurs under hauling or spreading equipment

N/A

0 per unit Rework N/A

Ditches and Road

Drainage

Structures

Impeded flow or water diverted out of drainage structures

< 20% impeded, but water will stay in the channel

0 per unit Rework

Rework if greater than 0 minor defects

Unpaved

Shoulders (Level

3, 4, & 5)

Elevation difference between pavement and shoulder is greater than 1"

Elevation difference between pavement and shoulder is less than 1"

2 per unit Rework

Rework if greater than 2 minor defects

Material greater than 1/4" diameter remaining on the road surface

Material 1/4" diameter or less remaining on the road surface and traffic safety is not compromised

2 per unit

Rework if greater than 0 major defects *

Rework if greater than 2 minor defects

Does not drain away from pavement

Does not drain away from pavement 0 0 Rework Rework

Working outside of project limits Area contains invasive weeds N/A 0 N/A

Repair and treat affected areas as directed by the

Contracting

Officer

N/A

* Units have the option to choose a pay reduction in lieu of rework. However, each unit must establish a threshold where rework is required and define pay reductions for each defect.

Intent and use: User to establish threshold for the acceptable level of quality.

813 SPOT SURFACING

813.01

Load, haul, and place surface material to repair or stabilize road surfaces.

813.02 Performance Standard

A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.

B. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto National Forest System land.

813.03

As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.

813.04

Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.

A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.

B. Material measured by the ton shall be verified by certified weight tickets.

813.05

The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.

813(1) Spot Surfacing, Gradation _____ Cubic Yard 813(2) Spot Surfacing, Gradation _____ Square Yard 813(3) Spot Surfacing, Gradation _____ Ton

813.04

Major Minor

Allowable Defects Required Action

Defect Defect Major Minor Major Minor

Depth of Aggregate

Dimension of spot surfacing deviates by more than 1" from depth specified. Or less than 1" from dimension specified but is consistently high or low.

Dimension of spot surfacing deviates by 1" or less than from depth specified and not consistently high or low.

0 N/A

If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount

Accept aggregate as placed, pay only for delivered quantities.

Width of Aggregate

Dimension of spot surfacing is less than specified width or more than 1' wider than specified.

Dimension of spot surfacing is up to 1' wider than specified but not consistently wide.

0 N/A

If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape.

Accept aggregate as placed, pay only for delivered quantities.

Length

Dimension of spot surfacing is shorter than specified length or more than 100' longer than specified.

Dimension of spot surfacing is shorter than specified length or up to 100' longer than specified.

0 N/A

If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount.

Accept aggregate as placed, pay only for delivered quantities.

Compaction Visible displacement occurs under heady spreading equipment

N/A 0 N/A Rework N/A

Aggregate Quality

Does not meet specified gradation or durability requirements and is not suitable for intended use

Does not meet specified gradation or durability requirements and is suitable for intended use

0 N/A

Reject and replace

Accept but may reduce payment.

Material source does not meet weed free requirement

N/A 0 N/A Reject source

N/A

Finish Quality

Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded.

Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed.

0 per unit

Reshape or recompact surfacing as needed.

Accept but may reduce payment.

* Forests have the option to choose a pay reduction in lieu of rework. However, each Forest must establish a threshold where rework is required and define pay reductions for each defect.

834 ROADWAY DRAINAGE SYSTEM MAINTENANCE

834.01

Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.

834.02

Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.

When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the Contracting Officer.

834.03

As specified on roads listed on the road listing, shown on the plans, marked on the ground and/or ordered by the Contracting Officer and;

1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area shown on the plans or in the supplemental specifications.

2. Culverts - a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.

3. Ditches adjacent to the roadbed.

4. This work does not include bridges, cattleguards, drain dips, or water bars.

5. Do not operate in the weed…