SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
| 1. REQUISITION NUMBER |
| PAGE 1 OF |
| OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 |
| 341243 |
| 2. CONTRACT NO. |
| 3. AWARD/EFFECTIVE |
| 4. ORDER NUMBER |
| 5. SOLICITATION NUMBER |
| 6. SOLICITATION ISSUE |
03/10/10
| a. NAME |
| b. TELEPHONE NUMBER(No collect |
| 8. OFFER DUE DATE/ |
| 7. FOR SOLICITATION |
| See block 20 continuation sheet |
| calls) see block 20 |
| LOCAL TIME |
INFORMATION CALL:
04/12/10 0900 PACIFIC
| 9. ISSUED BY CODE |
| 10. THIS ACQUISITON IS |
| USDA Forest Service, EROC Northwest |
| FORMCHECKBOX |
UNRESTRICTED OR FORMCHECKBOX
SET ASIDE: 100 % FOR
| @ Umpqua National Forest |
| FORMCHECKBOX |
SMALL BUSINESS FORMCHECKBOX
EMERGING SMALL
BUSINESS
2900 NW Stewart Parkway – Room 220 Roseburg, OR 97470
FORMCHECKBOX
HUBZONE SMALL
NAICS: 237310 BUSINESS
FORMCHECKBOX
SERVICE-DISABLED VETERAN- FORMCHECKBOX
8(A)
SIZE STANDARD: $33.5 M OWNED SMALL BUSINESS
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED
FORMCHECKBOX
SEE SCHEDULE
| 12. DISCOUNT TERMS |
| FORMCHECKBOX |
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) 13b. RATING
14. METHOD OF SOLICITATION
FORMCHECKBOX
RFQ FORMCHECKBOX
IFB FORMCHECKBOX
RFP
15. DELIVER TO CODE
Mt. Baker-Snoqualmie National Forest
16. ADMINISTERED BY CODE
USDA FOREST SERVICE
EROC NORTHWEST
16400 CHAMPION WAY
SANDY, OR 97055
17a. CONTRACTOR/ CODE FACILITY
OFFEROR CODE
18a. PAYMENT WILL BE MADE BY CODE
See block 16
TELEPHONE N0.
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
FORMCHECKBOX
SEE ADDENDUM
| ITEM N0. |
| SCHEDULE OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| TAS::12 1102::TAS RECOVERY |
North Zone Road Maintenance
Mt. Baker Ranger District and Darrington Ranger District, Mt. Baker-Snoqualmie National Forest
This solicitation is issued under the provisions of the American Recovery and Reinvestment Act of 2009 (Use Reverse and/or Attach Additional Sheets as Necessary) See List of Payment Items
List of
Payment
Items See List of
Payment
Items
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
FORMCHECKBOX
| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA |
| FORMCHECKBOX |
ARE NOT ATTACHED
FORMCHECKBOX
| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |
| FORMCHECKBOX |
ARE NOT ATTACHED
| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ________1_______ |
| FORMCHECKBOX |
29. AWARD OF CONTRACT: REF. OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
| DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY |
| DATED .. YOUR OFFER ON SOLICITATION |
| ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED |
| (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE |
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS: ____________________
| 30a. SIGNATURE OF OFFEROR/CONTRACTOR |
| 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) |
| 30b. NAME AND TITLE OF SIGNER (Type or print) |
| 30c. DATE SIGNED |
| 31b. NAME OF CONTRACTING OFFICER (Type or print) |
| 31c. DATE SIGNED |
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 1449 (REV.3/2005)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA ‑ FAR (48 CFR) 53.212
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
| SEE SCHEDULE OF PAYMENT ITEMS |
THIS IS A 100% SET-ASIDE FOR CERTIFIED HUBZONE SMALL BUSINESS
Technical Contact:
Jim Mitchell 360-854-2620
Contract Specialist:
Dennis Danz 541-957-3230 Continuation of SF1449 Block 27:
The full text of a clause or provision may be accessed electronically at www.acquisition.gov/far/
| Enter pricing on Schedule of Payment Items |
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED
FORMCHECKBOX
INSPECTED
FORMCHECKBOX
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
| 33. SHIP NUMBER |
| 34. VOUCHER NUMBER |
| 35. AMOUNT VERIFIED |
CORRECT FOR
| 36. PAYMENT |
| 37. CHECK NUMBER |
|PARTIAL | |FINAL
FORMCHECKBOX
COMPLETE FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
| 38. S/R ACCOUNT NUMBER |
| 39. S/R VOUCHER NUMBER |
| 40. PAID BY |
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER
FOR PAYMENT
42a. RECEIVED BY (Print)
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
| 42c. DATE RECD (YY/MM/DD) |
| 42d. TOTAL CONTAINERS |
STANDARD FORM 1449 (REV.3/2005) BACK
TABLE OF CONTENTS
SF 1449 – Solicitation For Commercial Items
Table of Contents
Schedule of Payment Items
Contract Specifications, Requirements, Plans, Exhibits and Attachments
Addendum To FAR 52.212-4 Special Contract Clauses
· Full Text Clauses
· FAR 52.204-11 American Recovery and Reinvestment Act—Reporting Requirements
· Supplement to FAR 52.222-42 Statement of Equivalent Rates for Federal Hires
· AGAR 452.219-70 Size Standard and NAICS Code Information List of Clauses Incorporated by Reference:
Far 52.215-5 Contract Terms And Conditions-Commercial Items Solicitation Provisions Addendum to FAR 52.212-1
· Technical Proposal Submission Instructions
· Proposal Submission Documents FAR 52.212-2 Evaluation – Commercial Items FAR 52.212-3 Offeror Representations and Certifications – Commercial Items
Addendum To FAR 52.212-3 Questionnaire
THE SCHEDULE OF PAYMENT ITEMS
SUPPLIES OR SERVICES AND PRICES/COSTS
SUBITEM 1A (CRRD03) – Mt Baker Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 807F(2) |
| Excavator – 150 min. |
| 170 |
| Hour |
| $______________ |
| $____________ |
| 807F(3) |
| Backhoe W Thumb and Extendahoe |
| 140 |
| Hour |
| $______________ |
| $____________ |
| 807F(4) |
| Grader – 12 G |
| 160 |
| Hour |
| $______________ |
| $____________ |
| 807F(6) |
| Dump Truck |
| 100 |
| Hour |
| $______________ |
| $____________ |
| 807F(10) |
| Trailer |
| 40 |
| Hour |
| $______________ |
| $____________ |
| 807F(11) |
| 3 Axle Low Boy |
| 60 |
| Hour |
| $______________ |
| $____________ |
| 807F(12) |
| Service Truck W / Chain Saw / Includes Laborer |
| 136 |
| Hour |
| $______________ |
| $____________ |
| 807F(13) |
| Steel Wheel Vibratory Roller – 64” drum width |
| 40 |
| Hour |
| $______________ |
| $____________ |
| 807(14) |
| Power Broom Self Propelled 48”wide Min. |
| 40 |
| Hour |
| $______________ |
| $____________ |
| 811F(1) |
| Surface Maintenance Level 3-5 Roads |
| 60 |
| Single Lane Mile |
| $______________ |
| $____________ |
| 813F(1) |
| Spot Surfacing, Forest Service Furnished |
| 20 |
| C. Y. |
| $______________ |
| $____________ |
| 834F(4) |
| Clean Ditches |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 839F(1) |
| Spring Recurrent Maintenance of ML 4 and 5 Roads |
| 20 |
| Mile |
| $______________ |
| $____________ |
| 839F(2) |
| Spring Recurrent Maintenance of ML 3 and 2 Roads |
| 40 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)a |
| Cutting Roadside Vegetation – Level 2 Roads |
| 20 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)b |
| Cutting Roadside Vegetation – Level 3 Roads |
| 20 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)c |
| Cutting Roadside Vegetation – Level 4 Roads |
| 18 |
| Mile |
| $______________ |
| $____________ |
| 881F(1) |
| Mobilization |
| 1 |
| L. S. |
| $______________ |
| $____________ |
Total for Subitem 1A: $_________________
SUBITEM 1B (CMRD05) – Mt Baker Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 807F(5) |
| Crawler Tractor D4 |
| 10 |
| Hour |
| $______________ |
| $____________ |
| 813F(3) |
| Spot Surfacing, Commercial Source |
| 100 |
| Ton |
| $______________ |
| $____________ |
| 832F(1) |
| Load, Haul and Place Material |
| 100 |
| C. Y. |
| $______________ |
| $____________ |
| 832F(4) |
| Haul |
| 200 |
| CYMile |
| $______________ |
| $____________ |
| 833F(1)a |
| Installation of 18” dia. culvert Govt Furnished |
| 80 |
| L. F. |
| $______________ |
| $____________ |
| 833F(2) |
| Culvert Removal – 12” to 36” sizes |
| 5 |
| Each |
| $______________ |
| $____________ |
| 833F(6) |
| Cross Ditch Installation |
| 25 |
| Each |
| $______________ |
| $____________ |
| 834F(5) |
| Clean Ditches and Drainage Structures |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)d |
| Cutting Roadside Vegetation – Level 5 Roads |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 851F(2) |
| Danger Tree Removal |
| 5 |
| Each |
| $______________ |
| $____________ |
| 861F(4) |
| Recondition/clean traffic gate |
| 2 |
| Each |
| $______________ |
| $____________ |
| 861F(8) |
| Structure component and fastener replacement gate |
| 2 |
| L. S. |
| $______________ |
| $____________ |
| 872F(1) |
| Clean Sign Face |
| 10 |
| Each |
| $______________ |
| $____________ |
| 872F(3) |
| Recondition Sign Face Government Materials |
| 10 |
| Each |
| $______________ |
| $____________ |
| 872F(4) |
| Install or Replace Post |
| 20 |
| Each |
| $______________ |
| $____________ |
| 872F(8) |
| Install or Replace Sign Government Furnished |
| 20 |
| Each |
| $______________ |
| $____________ |
| 872F(9) |
| Remove Sign |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(10) |
| Remount Sign |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(12) |
| Maintain Marker (ARRA Signs) 42”w x 27”h |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(14) |
| Replace Marker Government Furnished |
| 30 |
| Each |
| $______________ |
| $____________ |
| 881F(3)a |
| Equipment Moving – Dump Truck |
| 100 |
| Miles |
| $______________ |
| $____________ |
| 881F(3)b |
| Equipment Moving – Dump Truck and Backhoe |
| 100 |
| Miles |
| $______________ |
| $____________ |
| 881F(3)c |
| Equipment Moving - Backhoe |
| 100 |
| Miles |
| $______________ |
| $____________ |
Total for Subitem 1B: $_________________
SUBITEM 1C (CRRD08) – Mt Baker Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 813F(5) |
| Haul |
| 30 |
| Trk Hr. |
| $______________ |
| $____________ |
| 814(1)a |
| Asphalt Surface Maintenance - Cold Mix Contractor Furnished – Commercial Source |
| 20 |
| Ton |
| $______________ |
| $____________ |
| 814(1)b |
| Asphalt Surface Maintenance - Hot Mix AR 4000 - 1/2" Agg. - Contractor Furnished |
| 20 |
| Ton |
| $______________ |
| $____________ |
| 814(3) |
| Asphalt Surface Maintenance - Existing Asphalt Crack Sealing |
| 500 |
| L.F. |
| $______________ |
| $____________ |
| 814(5) |
| Asphalt Surface Maintenance - Surface Cleaning by Power Broom Machine |
| 10 |
| Mile |
| $______________ |
| $____________ |
| 833F(1)b |
| Installation of 24” dia. culvert Govt Furnished |
| 80 |
| L. F. |
| $______________ |
| $____________ |
| 833F(1)c |
| Installation of 36” dia. culvert Govt Furnished |
| 80 |
| Lin. Ft |
| $______________ |
| $____________ |
| 834F(1) |
| Clean and Recondition Culverts 24 inch Diameter and under |
| 40 |
| Each |
| $______________ |
| $____________ |
| 834F(2) |
| Clean and Recondition Culverts 24 inch through 48 inch Diameter |
| 60 |
| Each |
| $______________ |
| $____________ |
| 834F(3) |
| Clean and Recondition Culverts Over 48 Inch Diameter |
| 18 |
| Each |
| $______________ |
| $____________ |
| 851F(3) |
| Hazard or Obstruction Removal ML 3-5 Roads |
| 40 |
| Miles |
| $______________ |
| $____________ |
| 851F(4) |
| Hazard or Obstruction Removal ML 2 Roads |
| 5 |
| Miles |
| $______________ |
| $____________ |
| 851F(5) |
| Hazard or Obstruction Removal ML 3-5 Roads |
| 20 |
| Each |
| $______________ |
| $____________ |
| 851F(6) |
| Hazard or Obstruction Removal ML 2 Roads |
| 5 |
| Each |
| $______________ |
| $____________ |
Total for Subitem 1C: $_________________
Mt Baker Ranger District Grand Total for Item 1: $_________________
SUBITEM 2A (CRRD03) – Darrington Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 807F(2) |
| Excavator – 150 min. |
| 170 |
| Hour |
| $______________ |
| $____________ |
| 807F(3) |
| Backhoe W Thumb and Extendahoe |
| 140 |
| Hour |
| $______________ |
| $____________ |
| 807F(4) |
| Grader – 12 G |
| 160 |
| Hour |
| $______________ |
| $____________ |
| 807F(6) |
| Dump Truck |
| 133 |
| Hour |
| $______________ |
| $____________ |
| 807F(10) |
| Trailer |
| 30 |
| Hour |
| $______________ |
| $____________ |
| 807F(11) |
| 3 Axle Low Boy |
| 30 |
| Hour |
| $______________ |
| $____________ |
| 807F(12) |
| Service Truck W / Chain Saw / Includes Laborer |
| 160 |
| Hour |
| $______________ |
| $____________ |
| 807F(13) |
| Steel Wheel Vibratory Roller – 64” drum width |
| 40 |
| Hour |
| $______________ |
| $____________ |
| 807(14) |
| Power Broom Self Propelled 48”wide Min. |
| 40 |
| Hour |
| $______________ |
| $____________ |
| 811F(1) |
| Surface Maintenance Level 3-5 Roads |
| 60 |
| Single Lane Mile |
| $______________ |
| $____________ |
| 813F(1) |
| Spot Surfacing, Forest Service Furnished |
| 50 |
| C.Y. |
| $______________ |
| $____________ |
| 839F(1) |
| Spring Recurrent Maintenance of ML 4 and 5 Roads |
| 25 |
| Mile |
| $______________ |
| $____________ |
| 839F(2) |
| Spring Recurrent Maintenance of ML 3 and 2 Roads |
| 45 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)a |
| Cutting Roadside Vegetation – Level 2 Roads |
| 20 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)b |
| Cutting Roadside Vegetation – Level 3 Roads |
| 20 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)c |
| Cutting Roadside Vegetation – Level 4 Roads |
| 18 |
| Mile |
| $______________ |
| $____________ |
| 881F(1) |
| Mobilization |
| 1 |
| Lump Sum |
| $______________ |
| $____________ |
Total for Subitem 2A: $_________________
SUBITEM 2B (CMRD05) – Darrington Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 807F(5) |
| Crawler Tractor D4 |
| 10 |
| Hour |
| $______________ |
| $____________ |
| 813F(3) |
| Spot Surfacing, Commercial Source |
| 120 |
| Ton |
| $______________ |
| $____________ |
| 832F(1) |
| Load, Haul and Place Material |
| 80 |
| C. Y. |
| $______________ |
| $____________ |
| 832F(4) |
| Haul |
| 500 |
| CY Mile |
| $______________ |
| $____________ |
| 833F(1)a |
| Installation of 18” dia. culvert Govt Furnished |
| 80 |
| L. F. |
| $______________ |
| $____________ |
| 833F(2) |
| Culvert Removal – 12” to 36” sizes |
| 5 |
| Each |
| $______________ |
| $____________ |
| 833F(6) |
| Cross Ditch Installation |
| 5 |
| Each |
| $______________ |
| $____________ |
| 834F(5) |
| Clean Ditches and Drainage Structures |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 842F(2)d |
| Cutting Roadside Vegetation – Level 5 Roads |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 851F(2) |
| Danger Tree Removal |
| 5 |
| Each |
| $______________ |
| $____________ |
| 861F(4) |
| Recondition/clean traffic gate |
| 2 |
| Each |
| $______________ |
| $____________ |
| 861F(8) |
| Structure component and fastener replacement gate |
| 2 |
| Lump Sum |
| $______________ |
| $____________ |
| 872F(1) |
| Clean Sign Face |
| 10 |
| Each |
| $______________ |
| $____________ |
| 872F(3) |
| Recondition Sign Face Government Materials |
| 10 |
| Each |
| $______________ |
| $____________ |
| 872F(4) |
| Install or Replace Post |
| 20 |
| Each |
| $______________ |
| $____________ |
| 872F(8) |
| Install or Replace Sign Government Furnished |
| 20 |
| Each |
| $______________ |
| $____________ |
| 872F(9) |
| Remove Sign |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(10) |
| Remount Sign |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(12) |
| Maintain Marker (ARRA Signs) – 42”w x 27”h |
| 5 |
| Each |
| $______________ |
| $____________ |
| 872F(14) |
| Replace Marker Government Furnished |
| 40 |
| Each |
| $______________ |
| $____________ |
| 881F(3)a |
| Equipment Moving – Dump Truck |
| 80 |
| Miles |
| $______________ |
| $____________ |
| 881F(3)b |
| Equipment Moving – Dump Truck and Backhoe |
| 80 |
| Miles |
| $______________ |
| $____________ |
| 881F(3)c |
| Equipment Moving - Backhoe |
| 80 |
| Miles |
| $______________ |
| $____________ |
Total for Subitem 2B: $_________________
SUBITEM 2C (CRRD08) – Darrington Ranger District
| SUB-ITEM NO. |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Amount |
| 813F(5) |
| Haul |
| 60 |
| Trk Hr. |
| $______________ |
| $____________ |
| 814(1)a |
| Asphalt Surface Maintenance - Cold Mix Contractor Furnished – Commercial Source |
| 20 |
| Ton |
| $______________ |
| $____________ |
| 814(1)b |
| Asphalt Surface Maintenance - Hot Mix AR 4000 - 1/2" Agg. - Contractor Furnished |
| 20 |
| Ton |
| $______________ |
| $____________ |
| 814(3) |
| Asphalt Surface Maintenance - Existing Asphalt Crack Sealing |
| 650 |
| L.F. |
| $______________ |
| $____________ |
| 814(5) |
| Asphalt Surface Maintenance - Surface Cleaning by Power Broom Machine |
| 10 |
| Mile |
| $______________ |
| $____________ |
| 833F(1)b |
| Installation of 24” dia. culvert Govt Furnished |
| 80 |
| L. F. |
| $______________ |
| $____________ |
| 833F(1)c |
| Installation of 36” dia. culvert Govt Furnished |
| 80 |
| L. F. |
| $______________ |
| $____________ |
| 834F(1) |
| Clean and Recondition Culverts 24 inch Diameter and under |
| 40 |
| Each |
| $______________ |
| $____________ |
| 834F(2) |
| Clean and Recondition Culverts 24 inch through 48 inch Diameter |
| 60 |
| Each |
| $______________ |
| $____________ |
| 834F(3) |
| Clean and Recondition Culverts Over 48 Inch Diameter |
| 9 |
| Each |
| $______________ |
| $____________ |
| 834F(4) |
| Clean Ditches |
| 5 |
| Mile |
| $______________ |
| $____________ |
| 851F(3) |
| Hazard or Obstruction Removal ML 3-5 Roads |
| 35 |
| Miles |
| $______________ |
| $____________ |
| 851F(4) |
| Hazard or Obstruction Removal ML 2 Roads |
| 10 |
| Miles |
| $______________ |
| $____________ |
| 851F(5) |
| Hazard or Obstruction Removal ML 3-5 Roads |
| 5 |
| Each |
| $______________ |
| $____________ |
| 851F(6) |
| Hazard or Obstruction Removal ML 2 Roads |
| 5 |
| Each |
| $______________ |
| $____________ |
Total for Subitem 2C: $_________________
Darrington Ranger District Grand Total for Item 2: $_________________
GRAND TOTAL BOTH ITEMS 1 AND 2: $__________________
Vendor Name:
Mailing Address:
City, State, Zip:
Phone
Phone
Fax
E-Mail:
DUNS NUMBER:
TAX IDENTIFICATION NUMBER (TIN):
FAR 52.217-6 Option for Increased Quantity (MAR 1989)
The Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the option by written notice to the Contractor within the time specified below. Completion/delivery of added items shall continue as shown elsewhere herein.
The exercise of an increased quantity will be accomplished by a unilateral contract modification issued by the Contracting Officer. There may be multiple modifications.
The quantities for the Payment Items shown above are considered to be base quantities. Each individual Payment Item may be increased by any quantity up to and including 100% of the base quantity specified above. [As an example: Item 2C Payment Item 851F(6) Hazard Removal, 5 each, may be increased by an addition of either 1, 2, 3, 4 or 5 each].
The exercise of the option for any one payment item is independent of any other payment item.
If an option quantity is exercised for only part of the allowed 100% increase, an additional option quantity may be exercised to cover the remainder.
Exercise of an increased quantity of any single Payment Item will be available to the government from the date of award until work on the base quantity for that same Payment Item is completed, unless a later date is mutually agreed, but in no event shall any exercise of option quantities be later than September 30, 2010.
Offers on Subitems and Payment Items Offerors may submit prices for only Item 1 or for only Item 2 or for both Items 1 and 2.
Offerors submitting prices for Item 1 shall submit a unit price and amount for every Payment Item on every Subitem for Item 1.
Offerors submitting prices for Item 2 shall submit a unit price and amount for every Payment Item on every Subitem for Item 2.
Award By Item Subitems 1A, 1B and 1C are separated for accounting purposes only. These subitems are grouped together as Item 1 for award purposes. Award will be for the total of all payment items under Item 1.
Subitems 2A, 2B and 2C are separated for accounting purposes only. These subitems are grouped together as Item 2 for award purposes. Award will be for the total of all payment items under Item 2.
Item 1, Mt Baker RD work is independent of Item 2, Darrington RD work. Award may be made for each item separately or award may be made for both items together.
HUBZONE Small Business Set-Aside This is a 100% set-aside for HUBZONE small business enterprises. HUBZONE concerns must be certified by the Small Business Administration in advance. See www.sba.gov/hubzone.
Offers may be submitted by non-HUBZONE small business enterprises, but will only be evaluated for award purposes if no offers are received from HUBZONE firms or if all offers from HUBZONE firms are considered to be unreasonably priced.
Offer Submittal Documents A list of offer submittal documents is provided under the Addendum to FAR 52.212-1 Instructions. To receive full consideration for award, all documents must be completed, including a completed Questionnaire. Offers must be submitted to the SF1449 Block 9 location.
CONTRACT SPECIFICATIONS, REQUIREMENTS, PLANS, EXHIBITS AND ATTACHMENTS
Section C - Description/Specification/Statement of Work
Section E - Inspection and Acceptance
Section F - Performance
Section G - Contract Administration and Special Contract Requirements
Section H - Special Contract Requirements
Road Listing
Specification and Drawing List
Detailed Specifications
Project Drawings [separate pdf files] ARRA Signing Plans [separate pdf file] Fire Requirements
Service Contract Act Wage Determination 05-2561 Revision 13 dated 070109 applicable for work in Skagit County Service Contract Act Wage Determination 05-2563 Revision 10 dated 070109 applicable for work in Whatcom County and Snohomish County
SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK
The intent of this performance based service contract is to provide for road maintenance of National Forest System Roads on the Mt. Baker-Snoqualmie National Forest (Mt Baker and Darrington Ranger Districts).
District maps may obtained at both district offices. Mt Baker Ranger District 810 State Route 20, Sedro-Woolley, Wa and Darrington Ranger District 1405 Emens St. Darrington WA. For any questions on the roads listing contact Jim Mitchell at jbmitchell@fs.fed.us or at 360-854-2620
A Road Listing is included. Detailed work requirements on individual roads will be provided after award.
Culvert installation with Government Furnished culverts is considered incidental to the overall road maintenance services. Service Contract Act wage rates apply to all work under this contract. Davis-Bacon Act wages do not apply.
The specifications, drawings, terms and conditions are intended to be mutually complementary and shall be read as a whole.
Measurement and payment for contract work will be made only for those pay items included in the Schedule of Items. All other related items or work shall be concidered incidental.
Unless otherwise stated in the Special Project Specifications, the Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. The Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
The specifications are numbered in the "800" series codes. Only those sections which are applicable to this contract are included. There will be gaps between the section numbers due to the fact that many sections have been purposely omitted or because certain specification sections have been reserved for possible future inclusion in the "800" series.
The following publications and forms that apply to this contract. Publications and forms listed can be obtained via the Internet, ordered through the U.S. Government Printing Office, or through the Mt. Baker-Snoqualmie National Forest. Supplements or amendments to listed publications from any organizational level may be issued throughout the performance period. The Contractor shall immediately implement those changes that result in a decrease or no change in cost and notify the contracting officer in writing of such changes. Before implementing any change that will result in an increase in cost, the Contractor shall submit to the Contracting Officer a price proposal within 30 calendar days following receipt of the change by the Contractor.
| Publication |
| Publication Number or WWW Address |
| Revision Date |
| Manual of Uniform Traffic Control Devices |
| MUTCD 2003 |
| 2003 |
| Sign and Poster Guidelines for the Forest Service |
| EM-7100-15 |
| 2005 |
| Mt. Baker-Snoqualmie National Forest Road Rules Document |
| Copy of Commercial Road Rules Listing is available upon request. |
| 1991 |
| Mt. Baker-Snoqualmie N.F. Programmatic Biological Assessment for North Zone Road Maintenance (2007-2009), |
| A copy of the Biological Assessment is available upon request. |
| 2009 |
SECTION E - INSPECTION AND ACCEPTANCE
Inspection The Government will perform sampling, testing and inspection of work in progress where these responsibilities are not expressly assigned to the Contractor by the specifications.
Acceptability Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.
Final Cleanup Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment. All sections of the work shall be left in a neat and presentable condition. This includes removal of all construction stakes and associated flagging & ribbon, whether placed by the contractor or the government.
SECTION F - PERFORMANCE
The Contractor shall start work within three calendar days after the effective date of notice to proceed and shall prosecute the work diligently.
All contract work [including all base quantities and any exercised option quantities] shall be completed no later than May 15, 2011, except that all payment items measured by the hour shall be completed no later than September 30, 2010.
SECTION G - CONTRACT ADMINISTRATION
Pre-Work Conference Prior to the start of work the Contractor shall meet with the Government to discuss contract terms and work performance requirements. Discussion will include the Contractor’s Work Progress Schedule, and Fire Prevention and Suppression Plans. The meeting shall be held prior to issuance of any notice to proceed and within 10 days from contact award at the Mt. Baker-Snoqualmie National Forest, Mt Baker Ranger District at Sedro-Woolley Washington, unless otherwise changed by mutual agreement. A Contractor-designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.
Government Furnished Property The Government will provide the following item(s) of Government property/services to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
| Property Item |
| Delivery Point |
| Time of Delivery |
| Culvert |
| See Specification 833 |
| See Specification 833 |
| Borrow Sources |
| See Specification 814 |
| See Specification 814 |
| Temporary Signs |
| See Specification 839 |
| See Specification 839 |
| Signing |
| See Specification 861 |
| See Specification 861 |
Pre-Approvals The Contractor is advised of the following special approval requirements.
| Mix Approval |
| See Specification 814 |
| Spot Surfacing Source Approval |
| See Specification 813 |
SECTION H - SPECIAL CONTRACT REQUIREMENTS
MUTCD - The Contractor shall be responsible for furnishing warning devices and complying with Federal and any State or local safety standards and traffic management procedures including the Manual for Traffic Control Devices (MUTCD). See “FAR 52.236-13 Accident Prevention” incorporated by reference herein.
Risk of Loss - The Contractor shall assume all risk, loss, damage, or expense arising out of the prosecution of the work, except as otherwise provided in the contract.
Staging and Use of Premisses - Locations that may be used for staging of equipment and materials are available at both contract areas but are limited and not guaranteed. The Government will not be held liable for Contractor’s equipment and material stored in these locations. Additionally there are limitations on camp sites. The National Forest Road Rules apply to this contract. See “AGAR 452.236-72 Use Of Premises” incorporated by reference herein.
Pollution Control - Pollution control requirements apply. See “AGAR 452.236-74 Control of Erosion, Sedimentation and Pollution” incorporated by reference herein.
Rights In and Use Of Materials - The Contractor, with the written approval of the Contracting Officer, may use on the project suitable stone, gravel, and sand, or other material found in the excavation. Payment will be made both for the excavation of such materials at the corresponding contract unit price and for the pay items for which the excavated material is used. The Contractor shall replace without additional compensation sufficient suitable materials to complete the portion of the work which was originally contemplated to be constructed with such material.
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to reimburse the Contractor for the cost of their production.
Environmental Constraints - Several plant and animal species present on the Mt. Baker-Snoqualmie National Forest(s) are listed as threatened and endangered under the Endangered Species Act. In addition, other plant and animal species are listed as Sensitive by the Forest Service. Due to listing and de-listing of species, these lists can change at any time. Contractors operations (timing and technique) may be impacted due to requirements necessary for protection of these species. The period of time that specific work activities may be accomplished in certain locations may be severely restricted. Timing restrictions are specified under each activity.
Mandatory Terms and Conditions included in Biological Opinions written by the appropriate regulatory agencies (USDI Fish and Wildlife Service; USDC National Marine Fisheries Service) must be followed and are specified in section C.6.
Contractor shall conduct work activities so that they do not interfere with or impact plants or animals listed as Endangered, or Threatened species under the Endangered Species Act of 1973, as amended, or as Sensitive by the Regional Forester under authority of FSM 2670.
Noxious Weed Control – Equipment Cleaning - To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.
The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.
ROAD LISTING
The following is a list of roads that MAY be maintained with this contract. Not all roads listed are expected to be maintained. This list includes Maintenance Level 5, 4, 3 and 2 roads. If maintenance on Level 2 roads is performed it will primaraly be for opening, drainage work and traffic safety issues. The objective of this contract is to provide appropriate maintenance of the Forest roads, with the following priority for maintenance, 1st: User safety, 2nd: Resource protection and 3rd: User comfort.
ITEM # 1 - MT BAKER RANGER DISTRICT
| Rd. # |
| NAME |
| BEGIN_TERMINI |
| END_TERMINI |
| BMP |
| EMP |
| OPER M L |
| OBJE M L |
| SURF. TYPE |
| LANES |
| 1010000 |
| BAKER RIVER RS |
| ST ROUTE 20 |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 1030000 |
| SAUK MTN |
| ST ROUTE 20 |
| 0.74 |
| 0.00 |
| 7.40 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1036000 |
| SAUK LO |
| 1030 |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1050000 |
| DIOBSUD CREEK |
| ST ROUTE 20 |
| 1.50 |
| 0.00 |
| 1.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1060000 |
| BACON CREEK |
| ST ROUTE 20 |
| 4.50 |
| 0.00 |
| 4.50 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1100000 |
| BAKER LAKE HIGHWAY |
| COUNTY RD |
| 20.03 |
| 15.54 |
| 20.03 |
| 5 |
| 5 |
| PAVED |
| 2 |
| 1100000 |
| BAKER LAKE HIGHWAY |
| 20.03 |
| 26.20 |
| 20.03 |
| 26.20 |
| 4 |
| 4 |
| AGG |
| 1 |
| 1105000 |
| DIKE ROAD |
| COUNTY ROAD |
| 1.30 |
| 0.00 |
| 1.30 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1106000 |
| EAST BANK |
| COUNTY ROAD |
| 2.10 |
| 0.00 |
| 2.10 |
| 4 |
| 4 |
| AGG |
| 1 |
| 1106011 |
| DEPPRESSION LAKE |
| 1106 |
| 1.00 |
| 0.00 |
| 1.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1107000 |
| ANDERSON |
| 1106 |
| 9.00 |
| 0.00 |
| 9.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1107022 |
| TRAIL RIDGE |
| 1107 |
| 1.10 |
| 0.00 |
| 1.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1110000 |
| KOMA KULSHAN |
| COUNTY ROAD |
| 0.20 |
| 0.00 |
| 0.20 |
| 2 |
| 2 |
| PAVED |
| 1 |
| 1114000 |
| SULPHUR CRK CUTOFF |
| COUNTY ROAD |
| 2.00 |
| 0.00 |
| 2.00 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1116000 |
| SHADOW OF SENTINALS |
| COUNTY ROAD |
| 0.10 |
| 0.00 |
| 0.10 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 1118000 |
| DRY CREEK |
| COUNTY ROAD |
| 1.90 |
| 0.00 |
| 1.90 |
| 3 |
| 3 |
| PAVED |
| 2 |
| 1118012 |
| HORSESHOE COVE CG |
| 1118 |
| 0.40 |
| 0.00 |
| 0.40 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 1122000 |
| LOWER SANDY C |
| COUNTY ROAD |
| 2.20 |
| 0.00 |
| 2.20 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1122011 |
| LOWER SANDY B |
| 1122 |
| 0.90 |
| 0.00 |
| 0.90 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1128000 |
| BOULDER CREEK CG |
| COUNTY ROAD |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1130000 |
| MARTEN LAKE |
| COUNTY ROAD |
| 4.50 |
| 0.00 |
| 4.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1130000 |
| MARTEN LAKE |
| 4.50 |
| 4.80 |
| 4.50 |
| 9.30 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1131000 |
| BOULDER RIDGE |
| 1130 |
| 4.70 |
| 0.00 |
| 4.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1137000 |
| PANORAMA PT CG |
| 11 |
| 1.00 |
| 0.00 |
| 1.00 |
| 3 |
| 3 |
| PAVED |
| 2 |
| 1142000 |
| RESORT |
| 11 |
| 1.00 |
| 0.00 |
| 1.00 |
| 3 |
| 3 |
| PAVED |
| 2 |
| 1144000 |
| MOROVITZ CREEK |
| 11 |
| 0.50 |
| 0.00 |
| 0.50 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1144011 |
| PARK CREEK CG |
| 1144 |
| 0.40 |
| 0.00 |
| 0.40 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1150000 |
| SHANNON CRK CG |
| 11 |
| 0.70 |
| 0.00 |
| 0.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1152000 |
| SHUKSAN CRK |
| 11 |
| 4.00 |
| 0.00 |
| 4.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1152000 |
| SHUKSAN CRK |
| 4.00 |
| 4.50 |
| 4.00 |
| 4.50 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1200000 |
| LOOMIS NOOKSACK |
| COUNTY ROAD |
| 3.40 |
| 0.00 |
| 3.40 |
| 4 |
| 4 |
| AGG |
| 1 |
| 1200000 |
| LOOMIS NOOKSACK |
| 3.40 |
| 10.30 |
| 3.40 |
| 10.30 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1230000 |
| BLUE LAKE |
| 12 |
| 4.00 |
| 0.00 |
| 4.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1260000 |
| SISTERS MTN |
| 12 |
| 0.80 |
| 0.00 |
| 0.80 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1300000 |
| SCHRIBERS MEADOW |
| 12 |
| 5.60 |
| 0.00 |
| 5.60 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1400000 |
| JACKMAN THUNDER LKS |
| ST ROUTE 20 |
| 9.00 |
| 0.00 |
| 9.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1530000 |
| MARBLE CREEK CG |
| 15 |
| 1.00 |
| 0.00 |
| 1.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1540000 |
| SIBLEY CREEK |
| 15 |
| 4.90 |
| 0.00 |
| 4.90 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1550000 |
| IRENE CREEK |
| 15 |
| 7.10 |
| 0.00 |
| 7.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1570000 |
| FOUND CREEK |
| 15 |
| 2.10 |
| 0.00 |
| 2.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1580000 |
| MINERAL PARK CG |
| 15 |
| 0.70 |
| 0.00 |
| 0.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1600000 |
| ILLABOT |
| ST ROUTE 530 |
| 20.50 |
| 0.00 |
| 20.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1700000 |
| FINNEY-CUMBERLAND |
| COUNTY ROAD |
| 8.00 |
| 6.00 |
| 14.00 |
| 4 |
| 4 |
| AGG |
| 1 |
| Rd. # |
| NAME |
| BEGIN_TERMINI |
| END_TERMINI |
| BMP |
| EMP |
| OPER M L |
| OBJE M L |
| SURF. TYPE |
| LANES |
| 1700000 |
| FINNEY-CUMBERLAND |
| 14.00 |
| 18.30 |
| 14.00 |
| 32.30 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1720000 |
| GEE POINT |
| 17 |
| 2.10 |
| 0.00 |
| 2.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1800000 |
| SEGELSEN |
| 17 |
| 9.10 |
| 0.00 |
| 9.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3015000 |
| RANGER STATION |
| ST ROUTE 542 |
| 0.20 |
| 0.00 |
| 0.20 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 3020000 |
| DOUGLAS FIR CG |
| ST ROUTE 542 |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| PAVED |
| 2 |
| 3040000 |
| EAST CHURCH |
| ST ROUTE 542 |
| 2.70 |
| 0.00 |
| 2.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3045000 |
| EXCELSIOR CG |
| ST ROUTE 542 |
| 0.70 |
| 0.00 |
| 0.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3065000 |
| TWIN LAKES |
| ST ROUTE 542 |
| 4.00 |
| 0.00 |
| 4.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3067000 |
| SILVER FIR CG |
| ST ROUTE 542 |
| 0.80 |
| 0.00 |
| 0.80 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3070000 |
| RAZOR HONE |
| ST ROUTE 542 |
| 2.50 |
| 0.00 |
| 2.50 |
| 2 |
| 3 |
| AGG |
| 1 |
| 3100000 |
| CANYON CREEK |
| ST ROUTE 542 |
| 10.00 |
| 0.00 |
| 10.00 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 3100000 |
| CANYON CREEK |
| 10.00 |
| 5.00 |
| 10.00 |
| 15.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3140000 |
| CANYON RIDGE |
| 31 |
| 6.50 |
| 0.00 |
| 6.50 |
| 2 |
| 2 |
| AGG |
| 1 |
| 3160000 |
| WHISTLER CREEK |
| 31 |
| 2.00 |
| 0.00 |
| 2.00 |
| 2 |
| 2 |
| AGG |
| 1 |
| 3200000 |
| HENNEGAN |
| ST ROUTE 542 |
| 5.50 |
| 0.00 |
| 5.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3300000 |
| WELLS CREEK |
| ST ROUTE 542 |
| 12.00 |
| 0.00 |
| 12.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3600000 |
| GROUSE BUTTE |
| 39 |
| 4.00 |
| 0.00 |
| 4.00 |
| 2 |
| 2 |
| AGG |
| 1 |
| 3700000 |
| DEADHORSE |
| 39 |
| 12.80 |
| 0.00 |
| 12.80 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3800000 |
| MIDDLE FK NOOKSACK |
| COUNTY ROAD |
| 12.30 |
| 0.00 |
| 12.30 |
| 3 |
| 3 |
| AGG |
| 1 |
| 3900000 |
| GLACIER |
| ST ROUTE 542 |
| 1.00 |
| 0.00 |
| 1.00 |
| 5 |
| 5 |
| AC |
| 2 |
| 3900000 |
| GLACIER |
| 1.00 |
| 7.70 |
| 0.00 |
| 7.70 |
| 3 |
| 3 |
| AGG |
| 1 |
ITEM # 2 - DARRINGTON RANGER DISTRICT
| Rd. # |
| NAME |
| BEGIN_TERMINI |
| END_TERMINI |
| BMP |
| EMP |
| OPER M L |
| OBJE M L |
| SURF. TYPE |
| LANES |
| 1800000 |
| SEGELSEN |
| COUNTY ROAD |
| 12.00 |
| 0.00 |
| 12.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 1850000 |
| CONEY PASS RD |
| 18 |
| 1.70 |
| 0.00 |
| 1.70 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1880000 |
| BOLT CAMP |
| 18 |
| 4.50 |
| 0.00 |
| 4.50 |
| 2 |
| 2 |
| AGG |
| 1 |
| 1890000 |
| ROUND MTN |
| 18 |
| 4.30 |
| 0.00 |
| 4.30 |
| 2 |
| 2 |
| AGG |
| 1 |
| 2000000 |
| MOUNTAIN LOOP |
| COUNTY ROAD |
| 6.40 |
| 0.00 |
| 6.40 |
| 5 |
| 5 |
| PAVED |
| 2 |
| 2000000 |
| MOUNTAIN LOOP |
| 6.40 |
| COUNTY ROAD |
| 6.40 |
| 20.40 |
| 4 |
| 4 |
| AGG |
| 1 |
| 2000011 |
| CLEAR CRK CG |
| COUNTY ROAD |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2010000 |
| FRENCH CRK |
| ST ROUTE 530 |
| 3.66 |
| 0.00 |
| 3.66 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2030000 |
| MOOSE CREEK |
| ST ROUTE 530 |
| 2.00 |
| 0.00 |
| 2.00 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2040000 |
| SQUIRE CREEK |
| COUNTY ROAD |
| 2.00 |
| 0.00 |
| 2.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2060000 |
| CLEAR CREEK |
| COUNTY ROAD |
| 8.50 |
| 0.00 |
| 8.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2070000 |
| MURPHY CREEK |
| COUNTY ROAD |
| 4.00 |
| 0.00 |
| 4.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2080000 |
| FALLS CREEK |
| COUNTY ROAD |
| 1.10 |
| 0.00 |
| 1.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2081000 |
| GOODMAN |
| 2080 |
| 3.50 |
| 0.00 |
| 3.50 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2095000 |
| PUGH MTN |
| 20 |
| 2.00 |
| 0.00 |
| 2.00 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2130000 |
| N. SIDE DANS CRK |
| COUNTY ROAD |
| 1.00 |
| 0.00 |
| 1.00 |
| 2 |
| 2 |
| AGG |
| 1 |
| 2140000 |
| PRAIRIE MTN |
| COUNTY ROAD |
| 6.20 |
| 0.00 |
| 6.20 |
| 2 |
| 2 |
| AGG |
| 1 |
| 2200000 |
| N. SIDE SAUK RIVER |
| 24 |
| 3.97 |
| 0.00 |
| 3.97 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2200013 |
| WHITE CHUCK PIT |
| 24 |
| 2.35 |
| 0.00 |
| 2.35 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2300000 |
| WHITE CHUCK |
| COUNTY ROAD |
| 1.90 |
| 0.00 |
| 1.90 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2400000 |
| DANS CREEK |
| COUNTY ROAD |
| 12.00 |
| 0.00 |
| 12.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2420000 |
| DANS CREEK DIVIDE |
| 24 |
| 24 |
| 0.00 |
| 13.10 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2430000 |
| DECLINE |
| 24 |
| 6.20 |
| 0.00 |
| 6.20 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2430014 |
| 2430014 |
| 2430 |
| 1.60 |
| 0.00 |
| 1.60 |
| 1 |
| 1 |
| AGG |
| 1 |
| 2432000 |
| DAPPER DAN |
| 2430 |
| 2.90 |
| 0.00 |
| 2.90 |
| 2 |
| 2 |
| AGG |
| 1 |
| 2435000 |
| UPPER DECLINE |
| 2430 |
| 5.70 |
| 0.00 |
| 5.70 |
| 2 |
| 3 |
| AGG |
| 1 |
| 2600000 |
| SUIATTLE |
| ST ROUTE 530 |
| 9.80 |
| 0.00 |
| 9.80 |
| 5 |
| 5 |
| PAVED |
| 2 |
| 2600000 |
| SUIATTLE |
| 9.80 |
| 12.50 |
| 9.80 |
| 12.50 |
| 4 |
| 4 |
| AGG |
| 1 |
| 2640000 |
| GRADE CREEK |
| 26 |
| 3.70 |
| 0.00 |
| 3.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2660000 |
| TENAS CREEK |
| 26 |
| 4.10 |
| 0.00 |
| 4.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2800000 |
| N. F. STILLY |
| COUNTY ROAD |
| 9.00 |
| 0.00 |
| 9.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2810000 |
| NORTH MTN |
| COUNTY ROAD |
| 2.80 |
| 0.00 |
| 2.80 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 2810000 |
| NORTH MTN |
| 2810 |
| 10.70 |
| 2.80 |
| 10.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2811000 |
| TEXAS POND |
| 2810 |
| 28 |
| 0.00 |
| 2.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2900000 |
| RINKER RIDGE |
| 28 |
| 0.70 |
| 0.00 |
| 0.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 2910000 |
| DARRINGTON RS |
| ST ROUTE 530 |
| 0.80 |
| 0.00 |
| 0.80 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4002000 |
| TURLO CG |
| COUNTY ROAD |
| 0.70 |
| 0.00 |
| 0.70 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4003000 |
| VERLOT RS |
| COUNTY ROAD |
| 0.10 |
| 0.00 |
| 0.10 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4004000 |
| VERLOT CG |
| COUNTY ROAD |
| 0.60 |
| 0.00 |
| 0.60 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4006000 |
| LAKE 22 PARKING |
| COUNTY ROAD |
| 0.10 |
| 0.00 |
| 0.10 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 4018000 |
| GOLD BASIN CG |
| COUNTY ROAD |
| 1.50 |
| 0.00 |
| 1.50 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4019000 |
| GOLD BASIN MILL PD |
| COUNTY ROAD |
| 0.20 |
| 0.00 |
| 0.20 |
| 4 |
| 4 |
| PAVED |
| 1 |
| Rd. # |
| NAME |
| BEGIN_TERMINI |
| END_TERMINI |
| BMP |
| EMP |
| OPER M L |
| OBJE M L |
| SURF. TYPE |
| LANES |
| 4020000 |
| SCHWEITZER CREEK |
| COUNTY ROAD |
| 4.90 |
| 0.00 |
| 4.90 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4021000 |
| BEAR LAKE |
| 4020 |
| 3.90 |
| 0.00 |
| 3.90 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4030000 |
| MALLARDY CREEK |
| COUNTY ROAD |
| 1.22 |
| 0.00 |
| 1.22 |
| 3 |
| 3 |
| PAVED |
| 1 |
| 4030000 |
| MALLARDY CREEK |
| 1.22 |
| 5.70 |
| 1.22 |
| 6.92 |
| 3 |
| 2 |
| AGG |
| 1 |
| 4032000 |
| BOARDMAN RIDGE |
| 4030 |
| 5.84 |
| 0.00 |
| 5.84 |
| 2 |
| 3 |
| AGG |
| 1 |
| 4036000 |
| RED BRIDGE CG |
| COUNTY ROAD |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4037000 |
| RIVER ROAD |
| COUNTY ROAD |
| 2.35 |
| 0.00 |
| 2.35 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4040000 |
| YOUTH ON AGE |
| COUNTY ROAD |
| 0.20 |
| 0.00 |
| 0.20 |
| 4 |
| 4 |
| PAVED |
| 1 |
| 4052000 |
| DEER CREEK |
| COUNTY ROAD |
| 4.43 |
| 0.00 |
| 4.43 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4059000 |
| BIG 4 TH |
| COUNTY ROAD |
| 0.60 |
| 0.00 |
| 0.60 |
| 4 |
| 4 |
| PAVED |
| 2 |
| 4060000 |
| COAL LAKE |
| COUNTY ROAD |
| 4.80 |
| 0.00 |
| 4.80 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4063000 |
| PERRY CRK |
| 4060 |
| 1.10 |
| 0.00 |
| 1.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4070000 |
| BARLOW TH |
| COUNTY ROAD |
| 0.10 |
| 0.00 |
| 0.10 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4100000 |
| TUPSO PASS |
| COUNTY ROAD |
| 1.84 |
| 0.00 |
| 1.84 |
| 4 |
| 4 |
| PAVED |
| 2 |
| 4100000 |
| TUPSO PASS |
| 1.84 |
| 14.19 |
| 1.84 |
| 14.19 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4110000 |
| GREEN MTN |
| 41 |
| 8.70 |
| 0.00 |
| 8.70 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4200000 |
| PILCHUCK |
| COUNTY ROAD |
| 7.00 |
| 0.00 |
| 7.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4900000 |
| SLOAN CREEK |
| 20 |
| 13.00 |
| 0.00 |
| 13.00 |
| 3 |
| 3 |
| AGG |
| 1 |
| 4900020 |
| SLOAN CRK CG |
| 49 |
| 0.50 |
| 0.00 |
| 0.50 |
| 3 |
| 3 |
| AGG |
| 1 |
SPECIFICATION and DRAWING LIST FOR ROAD MAINTENANCE
| Specification Number |
| Description |
| Latest Revision Date |
| 800F-1 |
| Definitions and Abbreviations |
| 03/2006 |
| 801 |
| Quantity Measurement Terms |
| 02/2006 |
| 807F-1 |
| Equipment Rental |
| 03/2007 |
| 808F-1 |
| Work Area Management |
| 03/2006 |
| 811F-1 |
| Surface Maintenance |
| 03/2007 |
| 813F-1 |
| Spot Surfacing |
| 03/2007 |
| 814 |
| Asphalt Surface Maintenance |
| 09/2009 |
| 832F-1 |
| Load, Haul, and Place Materials |
| 03/2006 |
| 833F-1 |
| Drainage Structure Installation or Replacement |
| 03/2006 |
| 834F-1 |
| Road Way Drainage System Maintenance |
| 03/2007 |
| 839F-1 |
| Spring Recurrent Maintenance of ML 3, 4 and 5 Roads |
| 03/2007 |
| 841F-1 |
| Vegetation Treatment |
| 02/2006 |
| 842 |
| Cutting Roadway Vegetation |
| 02/2008 |
| 851F-1 |
| Hazard and Obstruction Removal |
| 03/2006 |
| 861F-1 |
| Maintenance of Cattleguards, Traffic Gates, and Guardrails |
| 02/2006 |
| 872F-1 |
| Sign Maintenance (Including ARRA signs) |
| 02/2006 |
| 881F-1 |
| Mobilization/Equipment |
| 02/2007 |
| Drawing Number |
| Description |
| Latest Revision Date |
| 814-1 |
| Drawing: Asphalt Repair |
| 09/2009 |
| 833-1 |
| Drawing: Cross Ditching |
| 09/13/2004 |
| 834-1 |
| Drawing: Cleaning of Ditch Relief Catch Basin and Transition |
| 04/02/2009 |
| 842-1 |
| Drawing: Cutting Dimensions |
| 03/2007 |
| 851-1 |
| Drawing: Hazard Removal |
| 09/2009 |
| 851-2 |
| Drawing: Hazard Removal |
| 09/13/2006 |
| ------- |
| ARRA Signing [8pages] |
| 09/13/2006 |
Section 800F-1 Definitions and Abbreviations
03/2006
800.1 Definitions
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Contractor's Representative and are dated.
Base course - The layer or layers of material placed on a subbase or a subgrade to support a surface course. (See Illustration of Road Maintenance Terms.)
Berm - A curb or dike that controls roadway runoff water, or delineates traffic direction.
Broad based dip - A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by high clearance vehicles; usually placed diagonal to the centerline.
Catch Basin. The area immediately adjacent to inlet invert of the culvert.
Channel. A natural waterway leading into or away from a culvert or bridge.
Cross ditch. A shallow ditch placed across the roadbed to remove water from the roadbed surface that can be driven across by full-size pickups or other high clearance vehicles; usually placed diagonal to the centerline.
Culvert. Any structure that provides a passageway, drain, or waterway under a road or embankment.
Lead-off ditch. A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.
Ditch. A relatively long narrow excavation placed to collect or disperse water.
Drainage dip. A drainage structure that was previously constructed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.
Drainage ditch. A ditch located parallel to and abutting the roadbed.
Drainage structure. A term identifying manufactured devices placed to control water movements.
Drawings. Illustrations showing details of required work.
Equipment. All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.
Excess Material. Material from the roadway in excess to that needed for maintenance of roadway.
Foreslope. The slope of the ditch section nearest to the traveled way.
Grade. The vertical alignment of the top surface of the road.
Highway Vehicles. Vehicles such as, passenger cars and high clearance vehicles.
High Clearance Vehicles. Vehicles such as, pickups, 4x4s, and log trucks.
Hydrologic Function. Physical properties of the occurrence and movement of water on the earth’s surface and in particular that part which crosses transportation systems.
Materials. Any substances specified for use in the performance of the work.
Measurement. The process of identifying the dimensions, quantity, or capacity of an item..
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements for the work.
Original Contract Quantities. Those estimated quantities shown in the Schedule of Items as awarded.
Patching. Minor repairs.
Paved Surface or Pavement. Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.
Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private Lands), or (2) real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Roadbed. The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.
Road Listing. A preliminary listing of road locations and any established work priorities.
31. Road Maintenance Levels. As used in this Contract -
OBJECTIVE MAINT LEVEL: The maintenance level to be assigned at a future date considering future road management objectives, traffic needs, budget constraints, and environmental concerns.
OPER MAINT LEVEL: The Maintenance level currently assigned to the road considering today's needs, road condition, budget constraints and environmental concerns; in other words it defines the level to which the road is currently being maintained.
Maintenance Level 4 & 5: Roads with a moderate to high degree of user comfort and convenience. These roads receive maintenance on a routine basis, normally with brushing done yearly or biyearly.
Maintenance Level 3: Roads maintained for use by a prudent driver in a passenger car.
These roads generally receive maintenance on a routine basis, usually getting brushed every 3 to 4 years.
Maintenance Level 2: Roads maintained for use by high clearance vehicles. These roads generally receive only drainage related maintenance on a routine basic, and usually getting relegated to the lowest priority for brushing. Many have become mostly brushed in.
Maintenance Level 1: Assigned to intermittent service roads during time they are closed to vehicular traffic.
D – Decommission: Assigned to roads that have been or are to be decommissioned.
C - Convert Use: Convert use of the facility to another use such as a trail.
Schedule of Items. A schedule in the contract that contains a listing and description of maintenance items, quantities, units of measure, methods of measurement, unit price, and amount.
Shoulder. The portion of the roadway continuous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of travel way structure.
Slough or Slide. Material deposited on the roadway that may need to be repositioned or removed.
Slump. A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.
Standard Specifications. Specifications for all divisions of work.
Subgrade. Top surface of roadbed upon which the pavement structure, shoulders, and curbs are constructed.
Traveled Way. The portion of the roadway designated for the movement of vehicles, exclusive of shoulders but including turnouts and curve widening.
Turnouts. A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.
Unit of Measure. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. Material removed during maintenance, which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.
Waterbar. A deeper type cross ditch, which is not intended for standard passenger vehicles.
Work Schedule. The Contractor's current schedule for work progression.
Abbreviations
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows: (Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)
AASHTO – American Association of State Highway and Transportation Officials.
ASTM – American Society for Testing and Materials.
EPA – Environmental Protection Agency.
FAR – Federal Acquisition Regulation System.
FED SPEC – Federal Specifications.
FP-03 – Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
FSSS- Forest Service Supplemental Specifications
MSHA – Mine Safety Health Administration.
MUTCD – Manual of Uniform Traffic Control Devices.
NBS – National Bureau of Standards.
OSHA – Occupational Safety and Health Act.
Illustration of Road Maintenance Terms.
Section 801 Quantity Measurement Terms
02/2006
1. U.S. Customary Units of measure are used in conjunction with these specifications.
2. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.
3. All items, which are measured by the feet, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.
4. A station when used as a definition of term or measurement will be one hundred feet, or a precise location along a survey line.
5. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.
6. The term "ton" means 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.
7. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined.
8. Measurement by the acre will use the length and width treated. Measurement of width will approximate significant slope breaks, but will not include minor deviations along the slopes. The measured slope distance for the length will multiply width treated and converted to a standard 10,000 square yard or acreage value of the surface area treated.
9. Measure square yard with horizontal longitudinal and traverse measurements.
10. The term "lump sum" when used in the Schedule of Items means the complete unit as required by or described in the contract.
11. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.
807F-1 EQUIPMENT RENTAL
03/2007 807.01 Service Required
Furnishing and operating equipment.
807.02 Performance Standard
Equipment will be weed free before used on Nation Forest System lands.
Make equipment available for inspection and approval before use. Furnish the equipment specified in the table below:
| Description |
| Max Age |
| Min HP |
| Min Reach |
| Weight |
| Capacity |
| Attachments |
| Remarks |
| Excavator |
| 12 |
| 140 |
| 32’ |
| 46000 |
| 8900 lbs |
| Thumb |
| Backhoe |
| 12 |
| 90 |
| 21’ |
| 15000 |
| 4400 lbs |
| Thumb/ Extendahoe |
27000
Tilt Blade
10 CY’s min.
50000 lbs
100000 lbs
| Service Truck W / Chain Saw – Includes Laborer |
| 10 |
* Make equipment available for inspection and approval before use 807.03
Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN HEREIN, or as ordered by the Contracting Officer.
807.04
Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
Moving of equipment will be paid at the established hourly rate.
807.05
Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
PAY ITEM
PAY UNIT
| 807(1) Equipment, Type ________ |
| Hour |
| 807(5) Crawler Tractor |
| Hour |
| 807(11) 3 Axle Low Boy |
| Hour |
| 807(12) Service Truck w / chain saw / Including laborer |
| Hour |
807.06 Acceptable Quality Levels
| Description |
| Major |
| Minor |
| Allowable Defects |
| Required Action |
| Defect |
| Defect |
| Major |
| Minor |
| Major |
| Minor |
| Weed free equipment |
| Equipment not weed free. |
| N/A |
| 0 |
| N/A |
| Equipment rejected until it can be made weed free |
| N/A |
| Maintenance of Equipment |
| Equipment not capable of operating at least 90% of the time |
| N/A |
| 0 |
| N/A |
| Replace defective equipment |
| N/A |
| Equipment meets all state and federal regulations |
| Does not meet state and federal regulations |
| N/A |
| 0 |
| N/A |
| Bring equipment up to state and federal regulations or replace equipment |
| N/A |
| Equipment leaks |
| Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment |
| Small leaks inherent in the specific type equipment |
| 0 |
| N/A |
| Replace equipment and restore affected site as directed by the Contracting Officer |
| Place absorbent pads under equipment when not operating. ((Contractor shall have pads on hand and available at ALL times when equipment is operating )) |
| Equipment will be operated by a fully trained, qualified, and competent operator at all times. |
| Operator not fully trained, qualified, and competent. |
| N/A |
| 0 |
| N/A |
| Stop equipment operation until a fully trained, qualified, and competent operator is available. Repair any damage done by incompetent operator as directed by the Contracting Officer |
| N/A |
808F-1 - WORK AREA MANAGEMENT
(3/06)
808.01 Service Required
Contractor requirements for traffic control and equipment requirements in work areas. NO WORK SHALL BE STARTED WITHOUT PROPER SIGNS IN PLACE.