Sheet1

ARRA - South Zone Deferred Maintenance
FSR 6030
Mile PostSub-ItemEstimated Quantity
Begin Project at Junction with SR 2
0Begin road reconditioning,811(1)2.84Miles
Compaction method C
Typical D-3
(Other heavy equipment and grading)
0.3Bridge
0.3330.0336" Alder on Road851(5)1EA
.348 to .470.048 to .170Spot patch from Jacks Pass Pit813(1)4CY
0.5230.2231' lift for 120' with 60 CY from Jacks Pass Pit813(1)60CY
.623 to .697.323 to .397Spot patch from Jacks Pass Pit813(1)22CY
0.45Clean out 18" Culvert834(1)1EA
.787 to .88.487 to .58Spot patch with 6 1/2 CY from Jacks Pass Pit813(1)6.5CY
0.90.6Bridge
0.960.66Spot patch with 4 CY from Jacks Pass Pit813(1)4CY
10.7Road spurs off left
1.020.72~4" lift for 160' with 25 CY to cover soft area813(1)25CY
1.050.75Mile 1 marker
1.05 to 1.25.75 to .95Ditch left834(1)1EA
1.0760.776Remove & Replace 36" Culvert Dry833(1)b36L.F
1.1740.874Remove & Replace 18"CMP w/ 24"HDPE Culvert833(1)b36L.F
1.240.94Clean out two spots of 10CY slides
3-ft diameter sink hole on left
1.3 to 1.361.00 to 1.06Spot patch with 2 1/2 CY fill813(1)2.5CY
1.471.17Remove & Replace 18"CMP w/ 24" HDPE Culvert833(1)b36L.F
1.47 to 1.521.17 to 1.22Spot patch with 5 CY from Jacks Pass Pit813(1)5CY
1.541.24Install 24"HDPE Culvert at low point833(1)b36L.F.
1.581.28Remove & Replace culvert833(1)b36L.F
1.691.39Remove & Replace rusted 18"CMP with 24" HDPE833(1)b36L.F
1.71.4Remove & Replace rusted 18"CMP with 24" HDPE833(1)b36L.F
1.741.44Remove & Replace culvert833(1)b36L.F
1.771.47Remove & Replace culvert833(1)b36L.F
1.821.52Remove & Replace culvert833(1)b36L.F
1.9371.637Section Line Marker
1.971.67Good 36" Culvert
2.171.87Cleanout 18"CMP834(1)1EA
2.291.99Cleanout 18"CMP834(1)2EA
Fill washout/scour w/ 5CY
2.3Lowe Creek-bridge out494say 130
2Mobilization881(1)1LumpSum
FSR 6066
Mile PostBegin Project at Junction with HWY 2Sub-ItemEstimated Quantity
0Begin road reconditioning,811(1)2Miles
Compaction method C
Typical D-3
(Other heavy equipment and grading)
* 0.005Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
* 0.042Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.044Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.445GOOD
* 0.497Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.63Remove & Replace 24" CMP with 36" HDPE5833(1)c40L.F.
0.656Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
* 0.688Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.752matches .77 GOOD 4'
0.807Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.856Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.936Remove & Replace 18" CMP with 24" HDPE10833(1)b36L.F
1.09Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.187Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.276Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.381Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.523Remove & Replace 18" CMP with 24" HDPE15833(1)b36L.F
1.666Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
* 1.72Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.874Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.901Remove & Replace 18" CMP with 24" HDPE19833(1)b36L.F
FRS 70
Mile PostWork DescriptionSub-ItemEstimated Quantity
Begin Project at Junction with SR 2
0Begin Crack Cleaning and Sealing,814(3)13200L.F
0.00 to 0.59Chip seal after other work completed814(3)3115L.F
0.78Begin Grind and Patching814(1)b10.5Tons
0.89Grind and Patch814(1)b10.5Tons
1.86Fill depression in road with EZ Street Patch814(1)b10.5Tons
2.35Fill multiple small depressions with EZ Street Patch814(1)b10.5Tons
2.53Grind and Patch814(1)b10.5Tons
2.56Grind and Patch814(1)b10.5Tons
2.58 to 2.88Grind out crack and seal814(3)1056L.F
2.91Grind and Patch814(1)b10.5Tons
3.3Grind and Patch814(1)b10.5Tons
3.31Fill multiple small depressions with EZ Street Patch814(1)b10.5Tons
3.72Grind and Patch814(1)b10.5Tons
3.89Grind and Patch814(1)b10.5Tons
6.03Grind and Patch814(1)b10.5Tons
8.52Grind and Patch814(1)b10.5Tons
8.65Grind and Patch814(1)b10.5Tons
8.69Grind and Patch814(1)b10.5Tons
8.85Grind and Patch814(1)b10.5Tons
8.99Grind and Patch814(1)b10.5Tons
9.09Grind and Patch814(1)b10.5Tons
9.8End Grind and Patching814(1)b10.5Tons
FSR 7920
Mile PostWork DescriptionSub-ItemEstimated Quantity
Begin Project at Junction with SR 165
0Begin road reconditioning,811(2)1.76Miles
Compaction method C
Typical D-3
(Other heavy equipment and grading)
All removed culverts are to be disposed of in observance of all federal regulations
0.024Trailhead sign reconditioning872(3)1EA
0.037Junction with spur on right813(3)2200Ton
Begin Spot Surfacing
0.196Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.387Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.525Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.661Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
0.744Remove & Replace 18" CMP with 24" HDPE5833(1)b36L.F
0.939Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.067Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.13Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.217Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.274Remove & Replace 18" CMP with 24" HDPE10833(1)b36L.F
1.34Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.392Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.442Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.541Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.578Remove & Replace 18" CMP with 24" HDPE15833(1)b36L.F
1.579Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.622Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.701Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.755Remove & Replace 18" CMP with 24" HDPE833(1)b36L.F
1.965Remove & Replace 18" CMP with 24" HDPE20833(1)b36L.F
2.13Remove culvert833(2)a1EA
2.194Remove culvert833(2)a1EA
2.214Remove culvert833(2)a1EA
2.274Remove culvert833(2)a1EA
2.49Remove culvert5833(2)a1EA
2.611Remove culvert833(2)a1EA
2.744Remove culvert833(2)a1EA
2.792Remove culvert833(2)a1EA
2.882Remove culvert833(2)a1EA
3.038Remove culvert10833(2)a1EA
3.213Intersection with spur
3.307Remove culvert833(2)a1EA
3.344Remove culvert833(2)a1EA
3.549Remove culvert833(2)a1EA
3.624Remove culvert833(2)a1EA
3.681Remove culvert15833(2)a1EA
3.753Remove culvert833(2)a1EA
3.87Remove culvert833(2)a1EA
3.998Remove culvert833(2)a1EA
4.245Remove culvert833(2)a1EA
4.492Remove culvert20833(2)a1EA
4.618Remove culvert833(2)a1EA
4.647Remove culvert833(2)a1EA
4.884Remove culvert23833(2)a1EA
4.944Underdrain832(2)1EA
5.07Remove culvert833(2)a1EA
5.112Remove culvert833(2)a1EA
5.143Dip
5.963Dip
6.038Remove culvert833(2)a1EA
FSR 7930
Mile PostWork DescriptionSub-ItemEstimated Quantity
0Begin Project4.91 Miles
Begin road reconditioning, compaction method C, Typical D-3
(Other heavy equipment and grading)
Remove 18" CMP833(2)a1EA
0.01Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
0.21Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
0.39Remove 36" CMP833(2)a1EA
0.45Remove 18" CMP833(2)a1EA
0.51Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
0.62Remove 18" CMP833(2)a1EA
0.65Remove 18" CMP833(2)a1EA
0.71Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
0.8Remove 36" CMP833(2)a1EA
0.81Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
0.9Remove 24" CMP833(2)a1EA
add cross drain1EA
1.03Remove 5' CMPLarge833(2)b1EA
add cross drain833(3)1EA
1.18Remove 18" CMP833(2)a1EA
1.21Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
1.3Remove 18" CMP833(2)a1EA
1.33Remove 36" CMP833(2)a1EA
1.4Remove 36" CMP833(2)a1EA
add cross drain833(3)1EA
1.51Remove 18" CMP833(2)a1EA
1.52Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
1.64Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
1.8Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
1.91Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
2.04Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
2.13Remove 18" CMP833(2)a1EA
2.17Remove 4' CMPLarge833(2)b1EA
add cross drain833(3)1EA
2.31Remove 18" CMP833(2)a1EA
2.37Remove 18" CMP833(2)a1EA
2.41Remove 24" CMP833(2)a1EA
2.49Remove 18" CMP833(2)a1EA
2.56Remove 18" CMP833(2)a1EA
2.6Remove 18" CMP833(2)a1EA
2.62Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
2.72Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
2.81Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
2.91Remove 18" CMP833(2)a1EA
3.1Remove 24" CMP833(2)a1EA
3.16Remove 24" CMP833(2)a1EA
3.17Remove 18" CMPEnd ML3 to ML 2833(2)a1EA
add cross drain833(3)1EA
3.4Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
3.62Remove 24" CMP833(2)a1EA
add cross drain833(3)1EA
3.74Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
3.83Remove 18" CMP833(2)a1EA
add cross drain833(3)1EA
3.98Remove 30" CMP833(2)a1EA
add cross drain833(3)1EA
4.11Remove 24" CMPEA shown EOR833(2)a1EA