abstract_marx-creek.pdf
PDF 161 KB Posted
- Solicitation number
- AG-0489-S-10-0227
About this file
Bid Abstract
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0489-S-10-0227_amend2.pdf | ||
| AG-0489-S-10-0227_amend1.pdf | ||
| AG-0489-S-10-0227_marx-creek-sectj.pdf | ||
| AG-0489-S-10-0227_marx-creek-rehab.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID ABSTRACT - FORMAL Solicitation No. AG-0489-S-10-0227 Project Name: MARX CREEK SPAWNING CHANNEL REHABILITATION PHASE II RECOVERY PROJECT Issuing Office:
EROC Northwest Gov't Estimate$687,012.42 Base Bid Bid Opening Date: 3/11/2010 2:00 PM PST 16400 Champion Way $14,490.33 Option 1 Sandy, OR 97055 $9,450.00 Option 2
$5,397.40 Option 3 $716,350.15 Total GOVT Estimate
Bidder #1 Bidder #2 Rock n Road Construction Rec'd in time? YES S & S General Contractors Rec'd in time? YES PO Box 1188 PO Box 1440 Petersburg AK 99833 Sitka, AK 99835
Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 15101 Mobilization Lump Sum LS 1 $315,000.00 $315,000.00 $60,000.00 $60,000.00 15201 Construction Survey and Staking Lump Sum LS 1 $40,000.00 $40,000.00 $22,000.00 $22,000.00 15713 Soil Erosin and Pollution Control Lump Sum LS 1 $35,000.00 $35,000.00 $18,000.00 $18,000.00 15722 Dewatering Lump Sum LS 1 $75,000.00 $75,000.00 $38,000.00 $38,000.00 15723 Impermeable Membrane (for Channel Each AQ 1 $8,000.00 $8,000.00 $1,100.00 $1,100.00
Infill) - furnish and Stockpile (polypropylene $0.00 20 feet x 100 feet x 36 mils thick) $0.00 $0.00 $0.00
15724 Calcium Bentonite, Furnish and Stockpile Ton AQ 2 $4,000.00 $8,000.00 $1,500.00 $3,000.00 20301 Remove Rock Weir Each AQ 1 $3,000.00 $3,000.00 $750.00 $750.00 20407 Select Borrow, Compaction Method B, CY CQ 209 $18.00 $3,762.00 $22.00 $4,598.00
Finishing Method D $0.00 $0.00 $0.00 20424 Haul CYMI CQ 128 $6.00 $768.00 $4.00 $512.00 20431 Gravel Hauling Sacks Each AQ 120 $400.00 $48,000.00 $60.00 $7,200.00 20434 Access Road Patching, Furnish (borrow Cubic Yard CQ 1000 $22.00 $22,000.00 $31.00 $31,000.00 materials max. size 12" minus), Haul $0.00 $0.00 $0.00 Excavate, Place and Compact $0.00 $0.00 $0.00
25104 Placed Riprap, Class 3 Cubic Yard CQ 734 $52.00 $38,168.00 $51.00 $37,434.00 30326 Road Reconditioning Cubic Yard CQ 2 $6,000.00 $12,000.00 $3,500.00 $7,000.00 55707 Untreated Timber Wood Weirs, Furnish, Each AQ 15 $4,533.00 $67,995.00 $8,900.00 $133,500.00
Construct, and Install New Wood Weirs $0.00 $0.00 55708 Untreated Timber Wood Weirs, Furnish Each AQ 4 $3,000.00 $12,000.00 $3,200.00 $12,800.00 materials and Repair Existing Wood Weirs $0.00 $0.00 6020124*24" Corrugated Metal Pipe 0.064" Thickness Linear Foot AQ 80 $90.00 $7,200.00 $85.00 $6,800.00 for Steel or 0.060" for Aluminium, Method C, $0.00 $0.00 2 2/3" x 1/2" corrugations Furnish & Install $0.00 $0.00
62201 Hydraulic Excavator #1 (235 CAT backhoe or Hour AQ 4 $350.00 $1,400.00 $245.00 $980.00 equivalent $0.00 $0.00
62301 General Laborer Hour AQ 88 $90.00 $7,920.00 $95.00 $8,360.00 64808 Spawning Gravel, furnish, haul, excavate, Cubic Yard CQ 1822 $25.00 $45,550.00 $51.00 $92,922.00 and install $0.00 $0.00 $0.00 $0.00 64809 Spawning Channel Construction, clear, grub, Linear Foot CQ 515 $299.00 $153,985.00 $273.00 $140,595.00 excavate, end haul, shape and construct $904,748.00 $626,551.00
Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 20404 Unclassified borrow, Compaction Method B, Cubic Yard CQ 180 22 $3,960.00 22 $3,960.00
Finishing Method D $0.00 $0.00 20424 Haul CYMI CQ 93 6 $558.00 4 $372.00 25104 Placed Riprap, Class 3 Cubic Yard CQ 36 45 $1,620.00 51 $1,836.00 64810 Overhanging Log Fish Habitat Structure Each AQ 6 3000 $18,000.00 6100 $36,600.00
$24,138.00 $42,768.00
Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 62201 Hydraulic Excavators #1 (235 CAT backhoe or Hour AQ 32 300 $9,600.00 245 $7,840.00 equivalent $0.00 $0.00 62201 Dump Truck #1 (14 to 18 CY) Hour AQ 4 300 $1,200.00 120 $480.00 62201 Log Truck Hour AQ 4 120 $480.00 190 $760.00 62301 Faller Hour AQ 4 140 $560.00 235 $940.00
$11,840.00 $10,020.00
Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 55502 Structural Steel Weir Plate Assemble, Furnish Each AQ 15 3000 $45,000.00 475 $7,125.00 and Install $45,000.00 $0.00 $7,125.00
$985,726.00 $987,726.00 $686,464.00
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
TOTAL BASE BID
Supplier Certs Supplier Certs
BASE BID
TOTAL OPTION 2 BID
TOTAL OPTION 1 BID
TOTAL OPTION 2 BID
OPTION 2 - EQUIPMENT RENTAL
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 3 - STEEL WEIR ASSEMBLE
BASE BID
OPTION 3 - STEEL WEIR ASSEMBLE OPTION 3 - STEEL WEIR ASSEMBLE
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
BASE BID
TOTAL BID AMOUNT - BASE BID PLUS OPTIONS
mailto:rocknrd@ak.net�
BID ABSTRACT - FORMAL Solicitation No. AG-0489-S-10-0227 Project Name: MARX CREEK SPAWNING CHANNEL REHABILITATION PHASE II RECOVERY PROJECT
Issuing Office: Gov't Estimate: $687,012.42 Base Bid Bid Opening Date: 3/11/2010 2:00 PM PST EROC Northwest $14,490.33 Option 1 16400 Champion Way $9,450.00 Option 2 Sandy, OR 97055 $5,397.40 Option 3
$716,350.15 Total GOVT Estimate
Bidder #3 Bidder #4 Bidder #5 Inuit Services Rec'd in time? Anderson Environmental Contracting Rec'd in time? YES Pool Engineering Rec'd in time? YES 4600 DeBarr Rd, Suite 200 705 Colorado Street PO Box 6000 Anchorage, AK 99508 Kelso, WA 98626 Ketchikan, AK 99901
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors $56,840.00 $56,840.00 $90,119.00 $90,119.00 $130,000.00 $130,000.00 $16,240.00 $16,240.00 $8,802.00 $8,802.00 $33,000.00 $33,000.00 $10,440.00 $10,440.00 $12,657.00 $12,657.00 $10,000.00 $10,000.00
$9,280.00 $9,280.00 $112,001.00 $112,001.00 $55,000.00 $55,000.00 $6,960.00 $6,960.00 $5,101.00 $5,101.00 $6,000.00 $6,000.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,784.00 $5,568.00 $4,128.00 $8,256.00 $700.00 $1,400.00 $2,088.00 $2,088.00 $183.00 $183.00 $500.00 $500.00
$51.00 $10,659.00 $33.00 $6,897.00 $30.00 $6,270.00 $0.00 $0.00 $0.00
$44.00 $5,632.00 $22.00 $2,816.00 $1.00 $128.00 $46.00 $5,520.00 $21.00 $2,520.00 $50.00 $6,000.00 $34.80 $34,800.00 $11.00 $11,000.00 $15.00 $15,000.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$127.60 $93,658.40 $36.00 $26,424.00 $50.00 $36,700.00 $12,760.00 $25,520.00 $2,437.00 $4,874.00 $4,000.00 $8,000.00
$2,900.00 $43,500.00 $6,104.00 $91,560.00 $12,000.00 $180,000.00 $0.00 $0.00 $0.00 $0.00
$2,204.00 $8,816.00 $1,413.00 $5,652.00 $5,000.00 $20,000.00 $0.00 $0.00 $0.00 $0.00
$127.60 $10,208.00 $28.00 $2,240.00 $50.00 $4,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$301.50 $1,206.00 $216.00 $864.00 $250.00 $1,000.00 $0.00 $0.00 $0.00
$99.00 $8,712.00 $78.00 $6,864.00 $80.00 $7,040.00 $55.68 $101,448.96 $33.00 $60,126.00 $40.00 $72,880.00
$0.00 $0.00 $0.00 $266.80 $137,402.00 $327.00 $168,405.00 $400.00 $206,000.00
$0.00 $594,498.36 $627,361.00 $798,918.00
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors
45.24 $8,143.20 59 $10,620.00 25 $4,500.00
0 $0.00
44.09 $4,100.37 7 $651.00 1 $93.00
290 $10,440.00 54 $1,944.00 100 $3,600.00 4640 $27,840.00 2377 $14,262.00 10000 $60,000.00
$50,523.57 $27,477.00 $68,193.00
Unit Price Total Amount Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors
301.6 $9,651.20 216 $6,912.00 250 $8,000.00
$0.00 174 $696.00 162 $648.00 125 $500.00 348 $1,392.00 162 $648.00 150 $600.00 140 $560.00 70 $280.00 100 $400.00
$12,299.20 $8,488.00 $9,500.00
Unit Price Total Amount Bid Errors Unit Price Total Amount Unit Price Total Amount Bid Errors 3248 $48,720.00 162 $2,430.00 300 $4,500.00
$48,720.00 $2,430.00 $4,500.00
$706,041.13 $665,756.00 $881,111.00
Supplier CertsSupplier CertsSupplier Certs
OPTION 3 - STEEL WEIR ASSEMBLE
BASE BID
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
OPTION 3 - STEEL WEIR ASSEMBLE
OPTION 1 - OVERHANGING FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
OPTION 3 - STEEL WEIR ASSEMBLE
BASE BID
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
BASE BID
BID ABSTRACT - FORMAL Solicitation No. AG-0489-S-10-0227 Project Name: MARX CREEK SPAWNING CHANNEL REHABILITATION PHASE II RECOVERY PROJECT
Issuing Office: Gov't Estimate: $687,012.42 Base Bid Bid Opening Date: 3/11/2010 2:00 PM PST EROC Northwest $14,490.33 Option 1 16400 Champion Way $9,450.00 Option 2 Sandy, OR 97055 $5,397.40 Option 3
$716,350.15 Total GOVT Estimate
Bidder #6 Bidder #7 Bidder #8 Drennon Construction Rec'd in time? YES Rec'd in time? Rec'd in time?
2530 Allen Adale Rd. Valid CCR? Valid CCR?
Fairbanks, AK 99709 Valid ORCA? Valid ORCA?
PP submitted? PP submitted?
(APPARENT LOW BIDDER) Hub Zone? Hub Zone?
EPLS? EPLS?
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors $87,906.00 $87,906.00 $0.00 $0.00 $0.00 $0.00 $18,112.50 $18,112.50 $0.00 $0.00 $0.00 $0.00 $18,209.10 $18,209.10 $0.00 $0.00 $0.00 $0.00 $45,152.82 $45,152.82 $0.00 $0.00 $0.00 $0.00
$2,511.60 $2,511.60 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$2,500.00 $5,000.00 $0.00 $0.00 $0.00 $0.00 $10,445.00 $10,445.00 $0.00 $0.00 $0.00 $0.00
$50.00 $10,450.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$16.00 $2,048.00 $0.00 $0.00 $0.00 $0.00 $65.00 $7,800.00 $0.00 $0.00 $0.00 $0.00 $21.00 $21,000.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$74.00 $54,316.00 $0.00 $0.00 $0.00 $0.00 $10,000.00 $20,000.00 $0.00 $0.00 $0.00 $0.00
$5,600.00 $84,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$3,000.00 $12,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$135.00 $10,800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$200.00 $800.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$86.00 $7,568.00 $0.00 $0.00 $0.00 $0.00 $36.00 $65,592.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150.00 $77,250.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $560,961.02 $0.00 $0.00 $0.00 $0.00
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 50 $9,000.00 $0.00 $0.00 $0.00 $0.00
0 $0.00 $0.00 $0.00 $0.00 $0.00 15 $1,395.00 $0.00 $0.00 $0.00 $0.00
150 $5,400.00 $0.00 $0.00 $0.00 $0.00 3550 $21,300.00 $0.00 $0.00 $0.00 $0.00
$37,095.00 $0.00 $0.00 $0.00 $0.00
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 200 $6,400.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 200 $800.00 $0.00 $0.00 $0.00 $0.00 500 $2,000.00 $0.00 $0.00 $0.00 $0.00 125 $500.00 $0.00 $0.00 $0.00 $0.00
$9,700.00 $0.00 $0.00 $0.00 $0.00
Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors Unit Price Total Amount Bid Errors 250 $3,750.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $3,750.00 $0.00 $0.00 $0.00 $0.00
$611,506.02 $0.00 $0.00 $0.00 $0.00
Supplier Certs Supplier Certs Supplier Certs
OPTION 1 - OVERHANGING FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
OPTION 3 - STEEL WEIR ASSEMBLE
BASE BID BASE BID
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
OPTION 3 - STEEL WEIR ASSEMBLE
BASE BID
OPTION 1 - FISH HABITAT STRUCTURES
OPTION 2 - EQUIPMENT RENTAL
OPTION 3 - STEEL WEIR ASSEMBLE