03-04_Sum_of_Quan.pdf
PDF 17 KB Posted
- Attached to
- RECOVERY--TINKHAM AREA ROAD MAINTENANCE
- Solicitation number
- AG-0489-S-10-0195
About this file
Attachment 3 03-04_Sum_of_Quan
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET
TOTAL
SHEETS
3 32
Road number 5500000 5500101 5500110 9030000 9031000 9034 TOTALS
Miles 5.82 0.26 0.98 0.82 2.19 0.65 10.72
PAY ITEM PAY UNIT
15101 Mobilization Lump Sum All All All All All 1
20301 Removal of excavated culvert Each 1 6 11 18
20356A Removal of culvert end by cutting or beveling Each 2 2 5 9
(Metal)
20356B Removal of culvert end by cutting or beveling Each 6 6
(Plastic)
20407 Select borrow, compaction method C, *Cubic Yard 20 20 finishing method A (Commercial Source)
20415 Unsuitable excavation (with haul) *Cubic Yard 13 13
20419A Drainage excavation, type roadwday ditch Foot 435 55 710 1200
20419B Drainage excavation, type roadway ditch Foot 55 55
(with 3' wide Flat Bottom)
20419C Drainage excavation, type outlet lead-off Foot 45 60 25 130 ditch.
20420 Drainage excavation, type driveable rocked Each 8 8 drainage dip.
20950 Pipe bedding (Commercial Source) *Cubic Yard 5 36 72 113
23050B Roadside brushing (Heavy) Mile 0.98 0.98
25101 Placed riprap, class 2 *Cubic Yard 13 26 62 101
30322A Road reconditioning, compaction method (b) Mile 0.11 0.11
30322B Road reconditioning, compaction method (b) Mile 4.12 4.12
(grading & vibratory roller)
30322C Road reconditioning, compaction method (a) Mile 0.26 0.42 2.19 0.65 3.52
(grading, compacting with hauling equipment)
30322D Road reconditioning, compaction method (a) Mile 0.98 0.98
(other heavy equipment & grading)
32203 *Cubic Yard 5 30 66 101
60209 Pipe elbow, 24-Inch Turner Type (Field cut) Each 1 1
60273 Anchor,for outlet pipe Each 1 1
60274B Foot 10 10
(scarification, grading, & vibratory roller)
24-Inch polyethylene outlet pipe with smooth interior & annular exterior
SUMMARY OF QUANTITIES
ARRA DEFERRED MAINTENANCE -TINKHAM AREA ROAD REPAIRS
Note: * Denotes a Contract Quantity
ESTIMATED QUANTITIES
Aggregate base, grading equal to Washington
State DOT mix 1-1/4" minus, dense graded, compaction method A (Commercial Source)
DESCRIPTION
SHEET
TOTAL
SHEETS
4 32
Road number 5500000 5500101 5500110 9030000 9031000 9034 TOTALS
Miles 5.82 0.26 0.98 0.82 2.19 0.65 10.72
PAY ITEM PAY UNIT
60275A Foot 200 290 490
60275B Foot 40 170 210
60275C Foot 50 50
60710 Reconditioning drainage structure, Each 2 3 2 7 culverts inlets and/or outlets
62201A Medium excavator w/thumb, Hitachi 150 Hour 8 8 8 8 32 or equivalent
62201B Dump truck, 10 to 12 cubic yard Hour 8 8 8 8 32
63390 Install "American Recovery and Reinvestment Each 2 1 1 4
Act" sign (includes post)
36-Inch polyethylene pipe with smooth interior
& annular exterior, compaction method B
DESCRIPTION
18-Inch polyethylene pipe with smooth interior
& annular exterior, compaction method B
24-Inch polyethylene pipe with smooth interior
& annular exterior, compaction method B
ESTIMATED QUANTITIES
Note: * Denotes a Contract Quantity
SUMMARY OF QUANTITIES
ARRA DEFERRED MAINTENANCE -TINKHAM AREA ROAD REPAIRS