03-04_Sum_of_Quan.pdf

PDF 17 KB Posted

Attached to
RECOVERY--TINKHAM AREA ROAD MAINTENANCE
Solicitation number
AG-0489-S-10-0195
Issued by

About this file

Attachment 3 03-04_Sum_of_Quan

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET

TOTAL

SHEETS

3 32

Road number 5500000 5500101 5500110 9030000 9031000 9034 TOTALS

Miles 5.82 0.26 0.98 0.82 2.19 0.65 10.72

PAY ITEM PAY UNIT

15101 Mobilization Lump Sum All All All All All 1

20301 Removal of excavated culvert Each 1 6 11 18

20356A Removal of culvert end by cutting or beveling Each 2 2 5 9

(Metal)

20356B Removal of culvert end by cutting or beveling Each 6 6

(Plastic)

20407 Select borrow, compaction method C, *Cubic Yard 20 20 finishing method A (Commercial Source)

20415 Unsuitable excavation (with haul) *Cubic Yard 13 13

20419A Drainage excavation, type roadwday ditch Foot 435 55 710 1200

20419B Drainage excavation, type roadway ditch Foot 55 55

(with 3' wide Flat Bottom)

20419C Drainage excavation, type outlet lead-off Foot 45 60 25 130 ditch.

20420 Drainage excavation, type driveable rocked Each 8 8 drainage dip.

20950 Pipe bedding (Commercial Source) *Cubic Yard 5 36 72 113

23050B Roadside brushing (Heavy) Mile 0.98 0.98

25101 Placed riprap, class 2 *Cubic Yard 13 26 62 101

30322A Road reconditioning, compaction method (b) Mile 0.11 0.11

30322B Road reconditioning, compaction method (b) Mile 4.12 4.12

(grading & vibratory roller)

30322C Road reconditioning, compaction method (a) Mile 0.26 0.42 2.19 0.65 3.52

(grading, compacting with hauling equipment)

30322D Road reconditioning, compaction method (a) Mile 0.98 0.98

(other heavy equipment & grading)

32203 *Cubic Yard 5 30 66 101

60209 Pipe elbow, 24-Inch Turner Type (Field cut) Each 1 1

60273 Anchor,for outlet pipe Each 1 1

60274B Foot 10 10

(scarification, grading, & vibratory roller)

24-Inch polyethylene outlet pipe with smooth interior & annular exterior

SUMMARY OF QUANTITIES

ARRA DEFERRED MAINTENANCE -TINKHAM AREA ROAD REPAIRS

Note: * Denotes a Contract Quantity

ESTIMATED QUANTITIES

Aggregate base, grading equal to Washington

State DOT mix 1-1/4" minus, dense graded, compaction method A (Commercial Source)

DESCRIPTION

SHEET

TOTAL

SHEETS

4 32

Road number 5500000 5500101 5500110 9030000 9031000 9034 TOTALS

Miles 5.82 0.26 0.98 0.82 2.19 0.65 10.72

PAY ITEM PAY UNIT

60275A Foot 200 290 490

60275B Foot 40 170 210

60275C Foot 50 50

60710 Reconditioning drainage structure, Each 2 3 2 7 culverts inlets and/or outlets

62201A Medium excavator w/thumb, Hitachi 150 Hour 8 8 8 8 32 or equivalent

62201B Dump truck, 10 to 12 cubic yard Hour 8 8 8 8 32

63390 Install "American Recovery and Reinvestment Each 2 1 1 4

Act" sign (includes post)

36-Inch polyethylene pipe with smooth interior

& annular exterior, compaction method B

DESCRIPTION

18-Inch polyethylene pipe with smooth interior

& annular exterior, compaction method B

24-Inch polyethylene pipe with smooth interior

& annular exterior, compaction method B

ESTIMATED QUANTITIES

Note: * Denotes a Contract Quantity

SUMMARY OF QUANTITIES

ARRA DEFERRED MAINTENANCE -TINKHAM AREA ROAD REPAIRS