RECOVERY-EVERGREEN ROAD REPAIR AND MAINTENANCE
Solicitation number
AG-0489-S-10-0142
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
AG-0489-S-10-0142-evergreen.pdf PDF
Copy To Submit.pdf PDF
bid-guarantee-sf24.pdf PDF
Davis-Bacon Wage Rates.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Evergreen Road Repair Project Location Map

MP 0.00: BEGINNING OF PROJECT:

ARRA SIGN LOCATION

ROAD CLOSURE LOCATION

MP 3.75: END OF PROJECT

5 MILES TO

HIGHWAY 2

Summary of Quantities

MP 0.86 MP 1.3 MP 3.75

ITEM DESCRIPTION PAY EST. EST. EST.

NO. UNIT QTY. QTY. QTY. Total

15101 Mobilization Lump Sum

15702 Silt fence Foot

20401 Roadway excavation, equipment compaction method, no deflection finishing method

Cubic Yard

20701A Earthwork geotextile type IV-A Square Yard

25101 Placed riprap, class III with welded wire mats

Cubic Yard

25104A Keyed riprap, classIII Cubic Yard

25104B Keyed riprap, classV Cubic Yard

25503 Select granular backfill Cubic Yard

30801 Roadway aggregate, equipment compaction method

Cubic Yard

60602 Corrugated Metal Spillway Foot 20 0 0 20

62201A Dump Truck Minimum 10 CY capacity

Hour

62201B Hydraulic Excavator, Hydraulic Mounted, 1.0 CY Minimum Capacity with Thumb

Hour

3 67 30 100

62201C Smooth Drum Vibratory Roller Hour 0 2 0 2

62503 Seeding,dry method Lump Sum

62901 Erosion control mat type 5.C Square Yard

63501 Temporary Traffic Control Lump Sum ALL - - 1

63551 ARRA Signage Installed Lump Sum 1 - - 1

Use $43/CY if using Beckler pit (1.5 hour round trip to MP 0.86 and MP 1.3) Use $57/CY if using Beckler pit (2 hours round trip to MP 3.75)

1ALLALL

ALL

ALL

ALL

ALL

MP 0.86

NOTE: SILT FENCE LOCATION TO BE DESIGNATED BY FOREST SERVICE.

RIP RAP DETAILS

MP 1.3

14-FT ROAD WIDTH

TYPICAL SECTION

CONSTRUCTION LOCATION TO BE STAKED BY FOREST SERVICE

REINFORCED SOIL SLOPE DETAIL

MP 0.86

MP 3.75

Evergreen Rd Repair SHT 1_9-29-09
Evergreen Rd Repair SHT 2-18