WAGE RATE 3
Text of this file
General Decision Number: WA080120 10/23/2009 WA120
State: Washington
Construction Type: Heavy Dredging
Counties: Washington Statewide.
DREDGING CONSTRUCTION PROJECTS (Excludes D.O.E. Hanford Site in Benton and Franklin Counties)
Modification Number Publication Date 0 09/25/2009 1 10/23/2009
* ENGI0302-009 06/01/2009
CHELAN (WEST OF THE 120TH MERIDIAN), CLALLAM, DOUGLAS (WEST OF
THE 120TH MERIDIAN), GRAYS HARBOR, ISLAND, JEFFERSON, KING,
KITSAP, KITTITAS, MASON, OKANOGAN (WEST OF THE 120TH MERIDIAN),
SAN JUNA,SKAGIT, SNOHOMISH, WHATCOM AND YAKIMA (WEST OF THE
120TH MERIDIAN) COUNTIES
ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH
GROUP SHALL BE 95% OF THE BASE RATE PLUS FULL FRINGE BENEFITS.
ON ALL OTHER WORK, THE FOLLOWING RATES APPLY.
WORK PERFORMED ON HYDRAULIC DREDDGES:
Zone 1 (0-25 radius miles):
Rates Fringes
Power equipment operators:
GROUP 1
TOTAL PROJECT COST
$300,000 AND OVER..........$ 33.91 15.15
GROUP 2
TOTAL PROJECT COST
$300,000 AND OVER..........$ 34.04 15.15
GROUP 3
TOTAL PROJECT COST
$300,000 AND OVER..........$ 34.42 15.15
GROUP 4
TOTAL PROJECT COST
$300,000 AND OVER..........$ 34.47 15.15
GROUP 5
TOATL PROJECT COST
$300,000 AND OVER..........$ 36.04 15.15
GROUP 6
TOTAL PROJECT COST
$300,000 AND OVER..........$ 33.91 15.15
Zone Differential (Add to Zone 1 rates):
Zone 2 (26-45 radius miles) - $ .70 Zone 3 (Over 45 radius miles) - $1.00
BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima
POWER EQUIPMENT OPERATORS CLASSIFICATIONS:
GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance
Category B Projects: 95% of the basic hourly reate for each group plus full fringe benefits applicable to category A projects shall apply to the following projects. A Reduced rates may be paid on the following:
1. Projects involving work on structures such as buildings and bridges whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.
2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.
3. Marine projects (docks, wharfs, etc.) less than $150,000.
Heavy Wage rates (Category A) Applies to clam shell dredge, hoe and dipper, shovels and shovel attachments, cranes and bulldozers.
HANDLING OF HAZARDOUS WASTE MATERIALS:
Personnel in all craft classifications subject to working inside a federally designated hazardous perimeter shall be elgible for compensation in accordance with the following group schedule relative to the level of hazardous waste as outlined in the specific hazardous waste project site safety plan.
H-1 Base wage rate when on a hazardous waste site when not outfitted with protective clothing
H-2 Class "C" Suit - Base wage rate plus $ .25 per hour.
H-3 Class "B" Suit - Base wage rate plus $ .50 per hour.
H-4 Class "A" Suit - Base wage rate plus $ .75 per hour.
* ENGI0370-006 06/01/2009
ADAMS, ASOTIN, BENTON, CHELAN (EAST OF THE 120TH MERIDIAN),
COLUMBIA, DOUGLAS (EAST OF THE 120TH MERIDIAN), FERRY,
FRANKLIN, GARFIELD, GRANT, LINCOLN, OKANOGAN (EAST OF THE 120TH
MERIDIAN), PEND OREILLE, SPOKANE, STEVENS, WALLA WALLA, WHITMAN
AND YAKIMA (EAST OF THE 120TH MERIDIAN) COUNTIES
WORK PERFORMED ON HYDRAULIC DREDGES
Hydraulic Dredge
GROUP 1:....................$ 33.91 15.15
GROUP 2:....................$ 34.42 15.15
GROUP 3:....................$ 34.47 15.15
GROUP 4:....................$ 36.04 15.15
GROUP 5:....................$ 33.91 15.15
GROUP 6:....................$ 34.04 15.15
GROUP 7:....................$ 34.42 15.15
GROUP 1: Assistant Mate (Deckhand) GROUP 2: Assistant Engineer (Electric, Diesel, Steam, or Booster Pump) GROUP 3: Engineer Welder GROUP 4: Leverman, Hydraulic GROUP 5: Maintenance GROUP 6: Oiler GROUP 7: Mates & Boatman
HEAVY WAGE RATES APPLIES TO CLAM SHELL DREDGE, HOE AND
DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND
BULLDOZERS.
* ENGI0612-001 06/01/2009
LEWIS, PIERCE, PACIFIC (THAT PORTION WHICH LIES NORTH OF A
PARALLEL LINE EXTENDED WEST FROM THE NORTHERN BOUNDARY OF
WAHKAIKUM COUNTY TO THE SEA IN THE STATE OF WASHINGTON) AND
THURSTON COUNTIES
PROJECTS:
CATEGORY A PROJECTS (excludes Category B projects, as shown below)
Power equipment operators:
WORK PERFORMED ON
HYDRAULIC DREDGES:Total Project cost $300,000 and over
GROUP 1....................$ 33.91 15.15
GROUP 2....................$ 34.04 15.15
GROUP 3....................$ 34.42 15.15
GROUP 4....................$ 34.47 15.15
GROUP 5....................$ 36.04 15.15
GROUP 6....................$ 33.91 15.15
WORK PERFORMED ON
HYDRAULIC DREDGES:Total Project Cost under $300,000
GROUP 1....................$ 26.96 8.40
GROUP 2....................$ 27.06 8.40
GROUP 3....................$ 27.38 8.40
GROUP 4....................$ 27.43 8.40
GROUP 5....................$ 28.75 8.40
GROUP 6....................$ 26.96 8.40
ZONE 2 (26-45 radius miles) - Add $.70 to Zone 1 rates ZONE 3 (Over 45 radius miles) - Add $1.00 to Zone 1 rates
BASEPOINTS: Tacoma, Olympia, and Centralia
CATEGORY B PROJECTS - 95% of the basic hourly rate for each group plus full fringe benefits applicable to Category A projects shall apply to the following projects: Reduced rates may be paid on the following:
1. Projects involving work on structures such as buildings and structures whose total value is less than $1.5 million excluding mechanical, electrical, and utility portions of the contract.
2. Projects of less than $1 million where no building is involved. Surfacing and paving included, but utilities excluded.
3. Marine projects (docts, wharfs, etc.) less than $150,000
WORK PERFORMED ON HYDRAULIC DREDGES:
GROUP 1: Assistant Mate (Deckhand GROUP 2: Oiler GROUP 3: Assistant Engineer (Electric, Diesel, Steam or Booster Pump); Mates and Boatmen GROUP 4: Craneman, Engineer Welder GROUP 5: Leverman, Hydraulic GROUP 6: Maintenance
HEAVY WAGE RATES APPLIES TO CLAM SHEEL DREDGE, HOE AND
DIPPER, SHOVELS AND SHOVEL ATTACHMENTS, CRANES AND
BULLDOZERS
HANDLING OF HAZARDOUS WASTE MATERIALS
H-1 - When not outfitted with protective clothing of level D equipment - Base wage rate H-2 - Class "C" Suit - Base wage rate + $.25 per hour H-3 - Class "B" Suit - Base wage rate + $.50 per hour H-4 - Class "A" Suit - Base wage rate +$.75 per hour
* ENGI0701-003 01/01/2009
CLARK, COWLITZ, KLICKITAT, PACIFIC (SOUTH), SKAMANIA, AND
WAHKIAKUM COUNTIES
DREDGING:
Dredging:
ZONE A
ASSISTANT ENGINEER.........$ 37.30 10.80
ASSISTANT MATE.............$ 32.96 10.80
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 39.88 10.80
LEVERMAN, HYDRAULIC........$ 39.88 10.80
TENDERMAN..................$ 36.12 10.80
ZONE B
ASSISTANT ENGINEER.........$ 39.80 10.80
ASSISTANT MATE.............$ 35.46 10.80
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 42.38 10.80
LEVERMAN, HYDRAULIC........$ 42.38 10.80
TENDERMAN..................$ 38.62 10.80
ZONE C
ASSISTANT ENGINEER.........$ 41.30 10.80
ASSISTANT MATE.............$ 36.96 10.80
LEVERMAN, DIPPER,
FLOATING CLAMSHELL.........$ 43.88 10.80
LEVERMAN, HYDRAULIC........$ 43.88 10.80
TENDERMAN..................$ 40.12 10.80
ZONE DESCRIPTION FOR DREDGING:
ZONE A - All jobs or projects located within 30 road miles of Portland City Hall.
ZONE B - Over 30-60 road miles from Portland City Hall.
ZONE C - Over 60 road miles from Portland City Hall.
*All jobs or projects shall be computed from the city hall by the shortest route to the geographical center of the project.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Other files
| File | Type | Posted |
|---|---|---|
| Drawings_ SnowCreek20091029.pdf | ||
| sf25_e.pdf | ||
| MOU-Jan25_signed.pdf | ||
| Fire Plan.doc | DOC document | |
| sf24_e.pdf | ||
| sf25a_e.pdf | ||
| WA1_dvb.txt | TXT text file | |
| SOW_Specs_ Snow_Creek.doc | DOC document | |
| Industrial Fire Protection Clause Olympic.doc | DOC document | |
| WA88_dvb.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .