SOW_TimberlineBoilers.pdf

PDF 132 KB Posted

Attached to
Timberline Complex Boiler Systems Replacement
Solicitation number
AG-046W-S-14-0032
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
Amendment2_TimberlineBoilerReplacement.pdf PDF
Amendment1_SF30.pdf PDF
TimberlineBoilerSynopsis-Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA FOREST SERVICE TIMBERLINE LODGE

STATEMENT OF WORK – DESIGN

TIMBERLINE COMPLEX BOILER SYSTEMS REPLACEMENT

Mount Hood National Forest Clackamas County, Oregon

Prepared by:

Mathew Hackett, Facilities Engineer June 2014

Technical Reviewer:

Michael Teems, Facilities Manager June 2014

Approved by:

Kevin Korman, Acting Forest Engineer June 2014

May 2014 Timberline Boiler System Replacement Page 1 of 15

TABLE OF CONTENTS

1. SECTION 1 – GENERAL ITEMS

1.01 GENERAL REQUIREMENTS

1.02 PROJECT BACKGROUND

1.03 PROJECT LOCATION

1.04 AVAILABLE CONSTRUCTION FUNDING………………………………………………………………..4

1.05 GOVERNMENT RIGHTS

1.06 MINOR SERVICES

1.07 DESIGN PERSONNEL QUALIFICATIONS

1.08 DESIGN WORK OVERSIGHT

1.09 KEY FOREST SERVICE PERSONNEL

1.10 DEFINITIONS

2. SECTION 2 - SUBMITTAL REVIEWS, FORMATS, AND SCHEDULE

2.01 REVIEW AND CONCURRENCE

2.02 PROJECT ALTERNATIVES MEETING

2.03 DESIGN DELIVERABLES

2.04 SUBMITTAL SCHEDULE

3. SECTION 3 – GOVERNMENT FURNISHED ITEMS

3.01 GENERAL INFORMATION

4. SECTION 4 – DESIGN CRITERIA

4.01 APPLICABLE REGULATIONS, STANDARDS & CODES

4.02 GENERAL

4.03 HEATING DESIGN

4.04 HOT WATER GENERATION. HOT WATER AND STEAM DISTRIBUTION

4.05 ELECTRICAL SERVICE

4.06 STRUCTURAL REQUIREMENTS

4.07 REQUIREMENTS FOR CONSTRUCTION DOCUMENTS

May 2014 Timberline Boiler System Replacement Page 2 of 15

1. SECTION 1 – GENERAL ITEMS

1.01 GENERAL REQUIREMENTS

A. This Statement of Work defines the requirements for the design of replacements for the hot water and steam heating systems in Timberline Lodge and the Wy’East Day Lodge at the Timberline Lodge Complex, Mt. Hood National Forest, Oregon.

B. The scope of work will consist of, but is not limited to, all aspects of site investigation services and professional services. Work includes: performing site investigations, writing engineering reports, system efficiency analysis, alternative analysis, system calculations, boiler and piping system design, creating working drawings, architectural and structural design, mechanical and electrical design, and providing contract packages with drawings, specifications and cost estimates.

C. The scope of work includes 3 inspection visits of the work during construction and reporting findings to the Government. All other project management will be conducted by the Government.

D. The design will be in compliance with all the scope of work, pertinent governing codes, energy efficient, and within budgetary limitations.

E. The information contained within this document is not all inclusive and shall not be substituted for good engineering practices. It is the responsibility of the designers to check, verify and include architectural, civil, electrical and mechanical data for all elements of the design, and determine project needs in conformance with applicable Codes and standards.

F. Compliance Requirements:

1. All designs shall comply with state and local building codes, national standards, and federal design requirements. The A/E is responsible for identifying all permits that will be required, and ensuring the construction documents comply with those requirements.

2. The Contractor will prepare the permit applications and make submissions to the agencies, except where a supplemental agreement between the Government and one or more entities associated with this project is enacted. The Contractor will pay all fees directly to the permitting agency.

3. It is the responsibility of the A/E Contractor to identify prospectus items that, if incorporated into the design, will result in code violations. Submittals found to include engineering errors and/or code violations will be rejected by the Government. The A/E firm shall bear the expense of efforts required to correct code violations or design deficiencies.

1.02 PROJECT BACKGROUND

A. Timberline Lodge is a National Historic Landmark located on Mt. Hood, Oregon. It has served as a ski lodge and mountain retreat since 1937 and today sees approximately 2 million visitors each year. The Lodge is located at timberline (6,000 feet) and therefore experiences extreme weather variations. Much of the steam piping is original to the building. The existing boilers are approximately 50 years old. The system in Timberline Lodge has exceeded its service life and must be upgraded and replaced. The Wy-East Day Lodge was constructed in the early 80’s and the hot water boiler system is the original system and is nearing the end of its design life. The intent is to produce a phased design that can be used to update the complete heating and hot water producing systems of both Timberline Lodge and Wy’East Day Lodge over multiple funding

May 2014 Timberline Boiler System Replacement Page 3 of 15 cycles. These designs will need to minimize the impacts to the operations of the two lodges as they will remain in business during construction.

1.03 PROJECT LOCATION

A. The project site is located on Mt. Hood approximately 6 miles north of Government Camp, Oregon, off State Highway 26.

1.04 AVAILABLE CONSTRUCTION FUNDING

A. The funding available for constructing this project is unknown. The Construction Design and

Estimate will enable the Forest Service to budget for the project in upcoming fiscal years. It is anticipated that the construction costs will not exceed $3,000,000 for this project. It is expected that the designer will develop a system that will adequately meet the needs of the Forest Service with industry standard components and service life without exceeding reasonable cost standards.

1.05 GOVERNMENT RIGHTS

A. All physical and intellectual property submitted to the Government including drawings, documents, samples, software, reports and specifications, in physical or electronic format, becomes the property of the Government upon receipt, and the Government shall have the right to alter, use and reuse these items in the future, as it sees fit, without further compensation to the entity that created them. The A/E firm named in this agreement and its affiliates’, contractors, subcontractors and associates right, title and interest in the Intellectual and Physical Property is passed to the Government at the time the Government accepts the submittal and pays the invoice associated with the portions of the work covered by the submittal. The A/E Contractor, for a period of three years after completion of the project, agrees to furnish the original or copies of all such works on the request of the Contracting Officer.

B. The A/E liability for suitability of drawings, specifications, and other works developed under this contract is limited to the Scope of Work and project goals related to this contract.

1.06 MINOR SERVICES

A. Reproduction: The cost of reproduction and distribution of submittals required under this contract shall be the responsibility of the A/E. After final acceptance of the submittal, reproduction and distribution costs shall be borne by the Government.

B. Other: The cost of all local and long distance telephonic and telegraphic communications initiated by the A/E in regard to the performance of his services under this contract and the cost of transporting from the office of the A/E all correspondence, drawings, report, samples, and related matter shall be borne by the A/E without additional reimbursement by the Government. Local and distance correspondence shall be dispatched by first-class mail, or express next-day mail. Original or reproducible drawings shall be insured, whether local or long distance.

C. The Government will deliver to the A/E Firm copies of any drawings, reports or documents related to the site that it has. This will include any architectural, site, and utility plans. The A/E Firm shall be liable for loss or damage of this property until it is returned to the Government after completion and final acceptance of work required under this contract.

D. The Government does not guarantee the accuracy or completeness of any documents or drawings.

The A/E Firm shall perform site investigations and take applicable measurements.

May 2014 Timberline Boiler System Replacement Page 4 of 15

1.07 DESIGN PERSONNEL QUALIFICATIONS

A. All design work, including preliminary work, shall be performed by or under the direct supervision of Oregon licensed professionals. Licensed professionals include licensed Architects;

Civil; Industrial; Electrical; Mechanical; Fire Protection and Structural engineers. Designers shall be qualified by education and experience to design the required systems.

B. All Contractors and Sub-Contractors shall be licensed in their specialties according to Oregon state regulations.

C. The A/E shall identify a Designer of Record for each area of analysis and/or design. The Designer of Record for each design discipline shall be responsible for ensuring the integrity of their design and design integration in all construction submittals and extensions to design developed by others, including suppliers, the constructor and subcontractors. The A/E shall stamp, sign and date all final reports and/or design drawings and specifications in accordance with the submittal requirements herein.

1.08 DESIGN WORK OVERSIGHT

A. The Contracting Officer [CO] or the Contracting Officer’s Representative [COR] will be responsible for reviewing design submittals for determining conformance with the terms of the contract. Government concurrence in this design review process does not relieve the A/E from correction of errors or omissions.

1.09 KEY FOREST SERVICE PERSONNEL

Contracting Officer Brian Johnson Phone (425) 783-6056

FAX (425) 783-0129

Email bajohnson03@fs.fed.us

Contracting Officer’s Representative Mathew Hackett Phone (503) 668-1643

FAX (503) 668-1423

Email mhackett01@fs.fed.us

Facility Manager, Timberline Lodge Mike Teems Phone (503) 622-0118 Cell Phone (503) 250-2026 Email mteems@fs.fed.us

May 2014 Timberline Boiler System Replacement Page 5 of 15 mailto:bajohnson03@fs.fed.us mailto:mhackett01@fs.fed.us mailto:mteems@fs.fed.us

1.10 DEFINITIONS

A. CO – Contracting Officer. The Official with authority to bind the Government to Contracts. They have authority to enter into, administer, or terminate contracts and make related determinations and findings.

B. COR – Contracting Officer’s Representative. For the purposes of this contract, the Contracting Officer’s Representative is an Architect or Engineer with contracting authority and Work inspection responsibility, representing the Government. The terms, Architect, Engineer, Architect/Engineer and Owner when found in these documents all refer to COR.

C. A/E, Contractor, Firm, Design Firm, Engineering Firm or Design Team. The members of the architectural and engineering professions (and individuals in their employ) providing “Architect and Engineer services” that are associated with research, planning, development, design, construction, alteration, or repair of real property.

D. Construction Documents: Construction drawings, specifications, schedule of items, construction estimate, and engineering calculations (including assumptions).

END SECTION 1

May 2014 Timberline Boiler System Replacement Page 6 of 15

2. SECTION 2 - SUBMITTAL REVIEWS, FORMATS, AND SCHEDULE

2.01 REVIEW AND CONCURRENCE

A. The Government will meet with the A/E at mutually agreed upon times at the project site or other mutually agreed location for review of design submittals.

B. The Government will meet with the A/E for review of design work, drawings, and specifications as the work progresses. The A/E shall present all work accomplished and proposed direction of work. As requested, the A/E shall make copies of work accomplished. Furnish these copies to the Government.

C. The A/E Firm shall provide and maintain an effective quality control program which will assure that all services required by this design contract are performed and provided in a manner that meets professional architectural and engineering quality standards. As a minimum, all documents shall be technically reviewed by competent, independent reviewers. The same element that produced the product shall not perform the independent technical review. The A/E shall correct errors and deficiencies in the design documents prior to submitting them to the Government.

D. Construction documents submitted to the Government for review, shall be considered preliminary submittals until approved by the Government. If the preliminary documents do not meet the requirements of this contract, or errors and omissions prevent acceptance of the submittal, the A/E will be advised of corrections and additions needed before acceptance. If preliminary submittals need major revision, a second preliminary submittal may be required.

E. Government review or approval of submittals shall not be construed as a complete check, but will indicate only that the design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted Proposal.

F. Government review or approval will not relieve the A/E of the responsibility for any error which may exist, as the A/E is responsible for the design and the satisfactory construction of all work.

2.02 PROJECT ALTERNATIVES MEETING

A. Engineering Investigation and Report.

1. Perform a comprehensive site investigation at the complex and perform a heat loss/water demand analysis of both facilities. Use the heat loss/water analysis as a basis for alternative selection and boiler sizing.

2. After performing the site investigation and providing the Government with an engineering report documenting findings, provide three alternatives, based upon experience, with anticipated performance and maintenance characteristics. Confirm alternative selection with Government prior to executing the study. Determine the best recommendation to correct the deficiencies found at the Timberline complex.

a. Provide 40 year life cycle cost analysis to support recommendation. Include first costs, equipment efficiencies, fuel and maintenance costs in analysis. Recommend an alternative as the “first choice” with justification statement. Rank remaining two alternatives.

b. Actual design will be based on equipment selected from these alternates for heating, cooling, humidification, ventilation, and filtration.

3. Provide Three Design Alternatives to Include

a. Description of Mechanical System (heating, steam, hot water, and distribution piping)

May 2014 Timberline Boiler System Replacement Page 7 of 15

b. Energy Savings Analysis

c. Description of Electrical System

d. Description of likely Structural Modifications

e. Cost Estimate for each Alternative

f. Life Cycle Cost Estimate for Each Alternative

g. Disruption to Operations at the Lodge – how does each system impact the ability of the lodges to operate at full or partial service?

B. A Design Meeting shall be held within 15 calendar days after the site investigation report has been accepted. The purpose of the meeting is to utilize a collaborative approach, with input from all involved parties, to develop design options for the facility that are realistic and achievable.

C. Specific outcomes of the process shall include:

1. Discussions of the summary of the design criteria

2. Information presented in a workshop format

3. Detailed summary of the specific strategies that will be included in the project design

4. Sketches and drawings that will be incorporated into the project construction plans

2.03 DESIGN DELIVERABLES

A. Deliverables shall be submitted as detailed in the document titled A/E Submission Instructions for Forest Service Construction Projects provided by the Government with this solicitation. Not all portions of this document are applicable to this project. At a minimum, the Architectural, Structural, HVAC, and Electrical submissions will be required, but other submissions may be necessary due to the proposed design, and will be identified during the Project Alternatives meeting, if not before.

2.04 SUBMITTAL SCHEDULE

Item Schedule Item Requirements Site Investigation 10 Calendar Days

After Award Meet Government representatives on site. Use provided documents and site investigation to formulate alternatives.

Engineering Report 30 Calendar Days After Site

Investigation

Submit Trip Summary Letter and description of 3 Alternatives as detailed above in Section 2.02, Item A.

Project Alternatives Meeting

15 Calendar Days After Submittal of the Engineering

Report

Hold the Project Alternatives Meeting at Timberline Lodge as detailed above in Section 2.02, Item B.

First Review 30 Calendar Days After the Project

Alternatives Meeting

See attached document titled A/E Submission Instructions for Forest Service Construction Projects for details of item requirements.

May 2014 Timberline Boiler System Replacement Page 8 of 15

Second Review 30 Calendar Days After Receipt of

Government Comments on First

Review

See attached document titled A/E Submission Instructions for Forest Service Construction Projects for details of item requirements.

Plan-in-Hand Review

30 calendar days after receipt of Government

Comments for Second Review

Meeting on site with revised construction documents. The meeting will:

• Review the construction documents while walking the site.

• Identify any problems that might exist that were not identified during the first two reviews.

Final Submittal 30 calendar days after plan-in-hand review

See attached document titled A/E Submission Instructions for Forest Service Construction Projects for details of item requirements.

END SECTION 2

May 2014 Timberline Boiler System Replacement Page 9 of 15

3. SECTION 3 – GOVERNMENT FURNISHED ITEMS

3.01 GENERAL INFORMATION

A. The Government will deliver to the selected A/E after award listed materials as stated in this Statement of Work. For hard copy data, the A/E shall be liable for loss or damage of this property until it is returned to the Government after completion and final acceptance of work required under this contract.

B. The A/E will keep Government working drawings, details, prints, originals, disks in a secure location, under supervised control, at all times. The A/E shall keep data and drawings in a confidential manner and shall not release this information to persons outside the A/E who are working on this project without the Government’s written approval.

C. Return original Government drawings and any other materials provided to the A/E at the end of the project unless otherwise instructed in writing by the Contracting Officer.

The Government will provide electronic drawings of original construction and the specifications of the room fixtures to the A/E. The files listed in the table below will be placed on a CD or thumb drive and provided to the A/E.

No. Description 1 As-Builts of Timberline Lodge 2 As-Builts of Wy’East Day Lodge 3 Room heating fixture specification

END SECTION 3

May 2014 Timberline Boiler System Replacement Page 10 of 15

4. SECTION 4 – DESIGN CRITERIA

4.01 APPLICABLE REGULATIONS, STANDARDS & CODES

A. The new design will meet or exceed all regulations and code requirements.

B. The new design will account for the historic elements of Timberline Lodge limiting negative impacts as much as feasible and replacing those elements impacted with elements that match existing historic character. Toward this the standard Historic Treatment Procedures and Historic Building Preservation Plan specifications shall be provided to the A/E to be referenced for the design and included in the design package.

C. All designs and selected equipment shall meet the requirements of recognized industry standards and current codes. They include, but are not limited to:

1. ANSI: American National Standards Institute.

2. ASHRAE: American Society of Heating, Refrigeration, and Air Conditioning, Engineers.

a. ASHRAE/IESNA 90.1 Compliance: Boilers shall have minimum efficiency according to "Gas and Oil Fired Boilers - Minimum Efficiency Requirements."

3. ASME: American Society of Mechanical Engineers.

4. ASME Boiler and Pressure Vessel Code (BPVC)

5. ASTM: American Society for Testing & Materials

a. ASTM D396 - 13c Standard Specification for Fuel Oils

6. CRSI: Concrete Reinforcing Steel Institute, “Manual of Standard Practice.”

7. Oregon Structural Specialty Code (IBC: International Building Code with Oregon

Supplements.)

8. Environmental Protection Agency (EPA)

9. Department of Environmental Quality (DEQ)

10. DOE Compliance: Minimum efficiency shall comply with 10 CFR 430, Subpart B, Appendix N, "Uniform Test Method for Measuring the Energy Consumption of Furnaces and Boilers."

11. IEEE: Institute of Electrical and Electronic Engineers

12. IFC: International Fire Code with State Supplement Specialty Code.

13. Oregon Mechanical Code (IMC: International Mechanical Code, with Oregon Supplements)

14. ISO: Insurance Services Office, Inc. Fire sprinkler system rating standards.

15. MSS: Manufacturers Standardization Society of the Valve and Fittings Industry.

16. National Electrical Safety Code.

17. NEC: National Electric Code, by the National Fire Protection Association.

18. NEMA: National Electrical Manufacturers Association.

19. NFPA (National Fire Protection Association), National Fire Codes. Including:

a. NFPA - Fire Protection Systems Inspection, Test and Maintenance Manual.

b. NFPA 54, ANSI Z223.1, National Fuel Gas Code

c. NFPA 58, Liquefied Petroleum Gas Code

20. Oregon State Energy Code.

21. OSHA: Occupational Safety & Health Administration.

May 2014 Timberline Boiler System Replacement Page 11 of 15

22. I=B=R Compliance: Boilers shall be tested and rated according to HI's "Rating Procedure for Heating Boilers" and "Testing Standard for Commercial Boilers," with I=B=R emblem on a nameplate affixed to boiler.

23. UL: Underwriters’ Laboratories Inc.

a. Test boilers for compliance with UL 726, "Oil-Fired Boiler Assemblies." Boilers shall be listed and labeled by a testing agency acceptable to authorities having jurisdiction.

24. Oregon Plumbing Code (UPC: Uniform Plumbing Code with State Supplements)

25. State of Oregon laws related to hotel and restaurant health and safety.

26. Adhere to the tenets of local, city, or county jurisdictions, where they enforce building, health, mechanical, electrical, plumbing or site requirements more stringent than those listed above.

4.02 GENERAL

A. The design must consider the impact to the continuous operations, public interface of the site complex, and future asset management.

B. Coordinate all work with the Contracting Officer Representative (COR).

4.03 HEATING DESIGN

A. Design a complete heating update for the Timberline complex. Update to include boilers, hot water production systems and associated piping, valves, condensate systems and accessories that provide heating and hot water to the buildings. Maximize the system efficiency through equipment and control selection. Controls must be able to utilize the Honeywell WebStation AX Software already in use.

B. Design shall encompass the best engineering solution for the buildings, taking into account cost (first and operating), climate, available fuels, type of construction and historic nature of the building. Preservation of the integrity of the historic structure is mandatory.

C. The employment of heat recovery systems, where practicable, is strongly encouraged.

D. Design the systems to provide comfort heating within ASHRAE Standards and sufficient hot water for restaurant and hotel operations.

E. Calculations to follow ASHRAE and Oregon Health code recommended procedures. Consider the occupancy profile of the facility during analysis.

F. Develop a way to zone the facilities, if possible, to better match supply to demand and employ energy conservation measures.

G. Submit design data and calculations to the Government as indicated in the review schedule.

Design concept must be approved by the Government prior to commencement of development of construction documents.

H. Mechanical equipment shall be anchored in all seismic zones.

I. Water Systems:

1. Refrigeration or ventilation systems having air streams which pass through water shall have the water treated with an EPA registered biocide to control etiological organisms.

2. Heating and/or refrigeration systems that use water as the heat transfer medium shall include a propylene glycol based freeze preventative and a corrosion inhibitor.

May 2014 Timberline Boiler System Replacement Page 12 of 15

J. Controls

1. Minimize the ‘human element’ in building management, maximize energy efficiency and automate building operation. Centralize HVAC controls with a computerized building management system, integrated control panel or equivalent devices. Components located in occupied spaces to consist of remote sensors.

2. Features to include: independent programmable seven day temperature settings; automatic setback; tamper resistant sensors and battery back-up. Include sequence of operations for HVAC controls on plan drawings and/or in mechanical specifications.

3. Electronic control system. All necessary electronic controls and wiring to operate the system, including possible remote access to the system to be installed in a location or locations designated during the design meeting. This includes the evaluation and modification of the existing electrical panels to be used.

K. Hotel, Restaurant, Lobby, Supply, Janitor, Shower & Special purpose Rooms

Address requirements for each room. Where possible, separately zone these spaces.

Provide automatic, countdown timer, or on/off switch controlled exhaust fans as appropriate. Fans to exhaust to the outside.

4.04 HOT WATER GENERATION. HOT WATER AND STEAM DISTRIBUTION

A. Design hot water generation systems for the Timberline Complex, providing sufficient hot water at the various temperatures needed for restaurant, hotel and other site uses. The existing Steam System ties into water heat exchangers that supply hot water needs to the Timberline lodge.

Evaluate the most efficient system to generate needed energy needs (steam or hot water boiler system) for both buildings utilizing the heating boilers or waste heat, as practicable. The only part of the existing system to be retained are the radiators already in use, all other components are to be considered part of the design.

B. Provide water, hot water, steam, drainage, pumping, waste, condensate disposal and vent piping plans. Piping plans to include corresponding riser (isometric) diagrams. Do not require installers in the field to size any pipes or size/locate cleanouts, etc.

C. Detail boiler feedwater equipment, accessories, and components. Boiler feedwater and blowdown sludge to be chemically treated to minimize corrosion and scaling. System are to employ automatic injectors of chemicals into the boiler and feed supply.

D. Provide equipment schedules, applicable notes and piping legend denoting all information necessary for ease of proper construction. Plans are to indicate locations and thicknesses of pipe insulation.

E. Provide special equipment details showing all installation procedures and accessory valving, etc., necessary for proper installation. Plans are to include detailed fabrication and assembly of pipe anchors and alignment guides, hangers and supports for multiple pipes, expansion joints and loops, and attachments of the same to the building structure. Detail locations of pipe anchors and alignment guides and expansion joints and loops, and firestopping for fire- and smoke-rated walls, floors and ceilings.

F. Coordinate and document in plans locations of and details for penetrations, including sleeves and sleeve seals for exterior walls, floors, basement, and foundation walls. Alterations to the Historic

May 2014 Timberline Boiler System Replacement Page 13 of 15

Fabric of the facility are prohibited without the written permission of the Government Contracting Officer.

G. The design temperature in potable water systems and recirculating lines are to be no less than 130oF, to minimize bacteria growth.

H. Where practical, employ waste heat recovery devices for water heating.

4.05 ELECTRICAL SERVICE

A. Electrical design on this project is to be provided to accommodate modifications in the mechanical systems. Minimize impact to the existing system.

B. Modifications to system shall comply with latest adopted edition of the National Electrical Code and National Electrical Safety Code, local codes and ordinances. The most stringent code or standard shall apply if requirements conflict. Designs to meet state energy conservation design requirements.

C. Drawings

1. Coordinate mechanical and electrical control requirements on mechanical and electrical drawings.

2. Show all controlled devices (motors, solenoids, etc.) and pilot devices (pressure switches, temperature switches, flow switches, overload devices, etc.) in their actual location on plans, sections, and detail views. Provide raceway and conduit legends using numbers to identify runs on the construction drawings.

3. Provide adequate details for installation and mounting of equipment.

D. Electrical System and Calculations

1. Limit voltage drop from feeders and branch circuits and controller to motors to 2% running, and also from branch circuits to outlets.

2. Submit calculations including load, fault, lighting and voltage drop.

3. Perform short circuit fault analysis on main and branch panels affected by this project.

Coordinate with local power company for available fault currents.

E. Panels

1. Provide the number of panels required to serve loads and number of circuits. All panels shall be Class I. All panels and disconnects shall utilize breakers. No fuses will be accepted except where circuit breaker protection is not adequate for proper fault current coordination, or where required by the mechanical equipment.

2. Do not connect mechanical or motorized equipment to panels with computer loads.

3. Balance single phase electrical loads on all modified panels.

4. Provide lightning arrestors on all modified services, on each service line voltage, and on each termination of control cable.

5. Provide special purpose outlets of the correct voltage, phase, and ampacity wires for large and/or special equipment.

F. Wiring

1. All new/replaced wiring and service entrances shall be copper. No aluminum will be allowed except for primary owned by serving utility. Minimum direct burial wires size #6

May 2014 Timberline Boiler System Replacement Page 14 of 15

AWG Cu. XLP-USE. Direct burial wire splices to be encapsulated and in a splice vault.

Wiring shall be concealed whenever possible.

2. Provide copper equipment ground conductor in all feeders and branch circuits. Do not use conduit for ground.

3. All conduit, rigid or flexible, shall be steel to minimize electromagnetic interference.

4. Show circuits with panel designation and circuit number. Show number of conductors in conduits with “hash” marks on home runs.

5. Show new control and power wiring to controlled and pilot devices, sizes of conduits or cables and wires.

4.06 STRUCTURAL REQUIREMENTS

A. The design of building structural modifications shall be performed in order to support the removal and installation of mechanical and electrical equipment required for this project.

B. Architect – Structural Engineer work includes, but is not limited to:

1. The alteration or moving of structural and non-structural walls

2. The design of structural slabs to support equipment

3. The modification of other structural elements of the building

4. The location and identification of fire corridors and refuge areas – work to be performed by a licensed Architect.

C. Design work shall be performed by or under the direct supervision of Architects or Structural Engineers licensed to practice in their particular professional fields in the State of Oregon.

D. All construction drawings for final review shall be stamped by these professionals.

4.07 REQUIREMENTS FOR CONSTRUCTION DOCUMENTS

A. Prepare construction documents as described in the document titled A/E Submission Instructions for Forest Service Construction Projects provided by the Government with this solicitation.

B. The construction documents will provide the Government complete project information for the Boiler System Replacement in logical phased pieces to enable the solicitation of bids for construction. The construction documents shall document all relevant design criteria, governing codes and standards, any assumptions that were made by the designer, as well as any other pertinent information to the project.

C. Design Calculations

1. Design calculations will include, but not be limited to:

a. Necessary Earthwork required.

b. Any structural elements

c. Electrical calculations

d. Mechanical calculations

END SECTION 4

End of Document

May 2014 Timberline Boiler System Replacement Page 15 of 15

1. SECTION 1 – GENERAL ITEMS
1.01 GENERAL REQUIREMENTS
A. This Statement of Work defines the requirements for the design of replacements for the hot water and steam heating systems in Timberline Lodge and the Wy’East Day Lodge at the Timberline Lodge Complex, Mt. Hood National Forest, Oregon.
B. The scope of work will consist of, but is not limited to, all aspects of site investigation services and professional services. Work includes: performing site investigations, writing engineering reports, system efficiency analysis, alternative an...
C. The scope of work includes 3 inspection visits of the work during construction and reporting findings to the Government. All other project management will be conducted by the Government.
D. The design will be in compliance with all the scope of work, pertinent governing codes, energy efficient, and within budgetary limitations.
E. The information contained within this document is not all inclusive and shall not be substituted for good engineering practices. It is the responsibility of the designers to check, verify and include architectural, civil, electrical and mechanical...
F. Compliance Requirements:
1. All designs shall comply with state and local building codes, national standards, and federal design requirements. The A/E is responsible for identifying all permits that will be required, and ensuring the construction documents comply with those ...
2. The Contractor will prepare the permit applications and make submissions to the agencies, except where a supplemental agreement between the Government and one or more entities associated with this project is enacted. The Contractor will pay all fee...
3. It is the responsibility of the A/E Contractor to identify prospectus items that, if incorporated into the design, will result in code violations. Submittals found to include engineering errors and/or code violations will be rejected by the Govern...
1.02 PROJECT BACKGROUND
A. Timberline Lodge is a National Historic Landmark located on Mt. Hood, Oregon. It has served as a ski lodge and mountain retreat since 1937 and today sees approximately 2 million visitors each year. The Lodge is located at timberline (6,000 feet) an...
1.03 PROJECT LOCATION
A. The project site is located on Mt. Hood approximately 6 miles north of Government Camp, Oregon, off State Highway 26.
1.04 aVAILABLE CONSTRUCTION FUNDING
A. The funding available for constructing this project is unknown. The Construction Design and Estimate will enable the Forest Service to budget for the project in upcoming fiscal years. It is anticipated that the construction costs will not exceed ...
1.05 GOVERNMENT RIGHTS
A. All physical and intellectual property submitted to the Government including drawings, documents, samples, software, reports and specifications, in physical or electronic format, becomes the property of the Government upon receipt, and the Governme...
B. The A/E liability for suitability of drawings, specifications, and other works developed under this contract is limited to the Scope of Work and project goals related to this contract.
1.06 Minor SERVICES
A. Reproduction: The cost of reproduction and distribution of submittals required under this contract shall be the responsibility of the A/E. After final acceptance of the submittal, reproduction and distribution costs shall be borne by the Government.
B. Other: The cost of all local and long distance telephonic and telegraphic communications initiated by the A/E in regard to the performance of his services under this contract and the cost of transporting from the office of the A/E all correspondenc...
C. The Government will deliver to the A/E Firm copies of any drawings, reports or documents related to the site that it has. This will include any architectural, site, and utility plans. The A/E Firm shall be liable for loss or damage of this propert...
D. The Government does not guarantee the accuracy or completeness of any documents or drawings. The A/E Firm shall perform site investigations and take applicable measurements.
1.07 DESIGN PERSONNEL QUALIFICATIONS
A. All design work, including preliminary work, shall be performed by or under the direct supervision of Oregon licensed professionals. Licensed professionals include licensed Architects; Civil; Industrial; Electrical; Mechanical; Fire Protection and...
B. All Contractors and Sub-Contractors shall be licensed in their specialties according to Oregon state regulations.
C. The A/E shall identify a Designer of Record for each area of analysis and/or design. The Designer of Record for each design discipline shall be responsible for ensuring the integrity of their design and design integration in all construction submit...
1.08 DESIGN WORK OVERSIGHT
A. The Contracting Officer [CO] or the Contracting Officer’s Representative [COR] will be responsible for reviewing design submittals for determining conformance with the terms of the contract. Government concurrence in this design review process does...
1.09 KEY FOREST SERVICE PERSONNEL
1.10 Definitions
A. CO – Contracting Officer. The Official with authority to bind the Government to Contracts. They have authority to enter into, administer, or terminate contracts and make related determinations and findings.
B. COR – Contracting Officer’s Representative. For the purposes of this contract, the Contracting Officer’s Representative is an Architect or Engineer with contracting authority and Work inspection responsibility, representing the Government. The te...
C. A/E, Contractor, Firm, Design Firm, Engineering Firm or Design Team. The members of the architectural and engineering professions (and individuals in their employ) providing “Architect and Engineer services” that are associated with research, plan...
D. Construction Documents: Construction drawings, specifications, schedule of items, construction estimate, and engineering calculations (including assumptions).
2. SECTION 2 - SUBMITTAL REVIEWS, FORMATS, AND SCHEDULE
2.01 REVIEW AND CONCURRENCE
A. The Government will meet with the A/E at mutually agreed upon times at the project site or other mutually agreed location for review of design submittals.
B. The Government will meet with the A/E for review of design work, drawings, and specifications as the work progresses. The A/E shall present all work accomplished and proposed direction of work. As requested, the A/E shall make copies of work acco...
C. The A/E Firm shall provide and maintain an effective quality control program which will assure that all services required by this design contract are performed and provided in a manner that meets professional architectural and engineering quality s...
D. Construction documents submitted to the Government for review, shall be considered preliminary submittals until approved by the Government. If the preliminary documents do not meet the requirements of this contract, or errors and omissions prevent...
E. Government review or approval of submittals shall not be construed as a complete check, but will indicate only that the design, general method of construction, materials, detailing and other information appear to meet the Solicitation and Accepted ...
F. Government review or approval will not relieve the A/E of the responsibility for any error which may exist, as the A/E is responsible for the design and the satisfactory construction of all work.
2.02 Project Alternatives Meeting
A. Engineering Investigation and Report.
1. Perform a comprehensive site investigation at the complex and perform a heat loss/water demand analysis of both facilities. Use the heat loss/water analysis as a basis for alternative selection and boiler sizing.
2. After performing the site investigation and providing the Government with an engineering report documenting findings, provide three alternatives, based upon experience, with anticipated performance and maintenance characteristics. Confirm alternat...
a. Provide 40 year life cycle cost analysis to support recommendation. Include first costs, equipment efficiencies, fuel and maintenance costs in analysis. Recommend an alternative as the “first choice” with justification statement. Rank remaining ...
b. Actual design will be based on equipment selected from these alternates for heating, cooling, humidification, ventilation, and filtration.
3. Provide Three Design Alternatives to Include
a. Description of Mechanical System (heating, steam, hot water, and distribution piping)
b. Energy Savings Analysis
c. Description of Electrical System
d. Description of likely Structural Modifications
e. Cost Estimate for each Alternative
f. Life Cycle Cost Estimate for Each Alternative
g. Disruption to Operations at the Lodge – how does each system impact the ability of the lodges to operate at full or partial service?
B. A Design Meeting shall be held within 15 calendar days after the site investigation report has been accepted. The purpose of the meeting is to utilize a collaborative approach, with input from all involved parties, to develop design options for th...
C. Specific outcomes of the process shall include:
1. Discussions of the summary of the design criteria
2. Information presented in a workshop format
3. Detailed summary of the specific strategies that will be included in the project design
4. Sketches and drawings that will be incorporated into the project construction plans
2.03 DESIGN DELIVERABLES
A. Deliverables shall be submitted as detailed in the document titled A/E Submission Instructions for Forest Service Construction Projects provided by the Government with this solicitation. Not all portions of this document are applicable to this pro...

2.04 SUBMITTAL SCHEDULE

3. SECTION 3 – GOVERNMENT FURNISHED ITEMS
3.01 GENERAL INFORMATION
A. The Government will deliver to the selected A/E after award listed materials as stated in this Statement of Work. For hard copy data, the A/E shall be liable for loss or damage of this property until it is returned to the Government after completio...
B. The A/E will keep Government working drawings, details, prints, originals, disks in a secure location, under supervised control, at all times. The A/E shall keep data and drawings in a confidential manner and shall not release this information to p...
C. Return original Government drawings and any other materials provided to the A/E at the end of the project unless otherwise instructed in writing by the Contracting Officer.
The Government will provide electronic drawings of original construction and the specifications of the room fixtures to the A/E. The files listed in the table below will be placed on a CD or thumb drive and provided to the A/E.
4. SECTION 4 – DESIGN CRITERIA
4.01 APPLICABLE REGULATIONS, STANDARDS & CODES
A. The new design will meet or exceed all regulations and code requirements.
B. The new design will account for the historic elements of Timberline Lodge limiting negative impacts as much as feasible and replacing those elements impacted with elements that match existing historic character. Toward this the standard Historic T...
C. All designs and selected equipment shall meet the requirements of recognized industry standards and current codes. They include, but are not limited to:
1. ANSI: American National Standards Institute.
2. ASHRAE: American Society of Heating, Refrigeration, and Air Conditioning, Engineers.
a. ASHRAE/IESNA 90.1 Compliance: Boilers shall have minimum efficiency according to "Gas and Oil Fired Boilers - Minimum Efficiency Requirements."
3. ASME: American Society of Mechanical Engineers.
4. ASME Boiler and Pressure Vessel Code (BPVC)
5. ASTM: American Society for Testing & Materials
a. ASTM D396 - 13c Standard Specification for Fuel Oils
6. CRSI: Concrete Reinforcing Steel Institute, “Manual of Standard Practice.”
7. Oregon Structural Specialty Code (IBC: International Building Code with Oregon Supplements.)
8. Environmental Protection Agency (EPA)
9. Department of Environmental Quality (DEQ)
10. DOE Compliance: Minimum efficiency shall comply with 10 CFR 430, Subpart B, Appendix N, "Uniform Test Method for Measuring the Energy Consumption of Furnaces and Boilers."
11. IEEE: Institute of Electrical and Electronic Engineers
12. IFC: International Fire Code with State Supplement Specialty Code.
13. Oregon Mechanical Code (IMC: International Mechanical Code, with Oregon Supplements)
14. ISO: Insurance Services Office, Inc. Fire sprinkler system rating standards.
15. MSS: Manufacturers Standardization Society of the Valve and Fittings Industry.
16. National Electrical Safety Code.
17. NEC: National Electric Code, by the National Fire Protection Association.
18. NEMA: National Electrical Manufacturers Association.
19. NFPA (National Fire Protection Association), National Fire Codes. Including:
a. NFPA - Fire Protection Systems Inspection, Test and Maintenance Manual.
b. NFPA 54, ANSI Z223.1, National Fuel Gas Code
c. NFPA 58, Liquefied Petroleum Gas Code
20. Oregon State Energy Code.
21. OSHA: Occupational Safety & Health Administration.
22. I=B=R Compliance: Boilers shall be tested and rated according to HI's "Rating Procedure for Heating Boilers" and "Testing Standard for Commercial Boilers," with I=B=R emblem on a nameplate affixed to boiler.
23. UL: Underwriters’ Laboratories Inc.
a. Test boilers for compliance with UL 726, "Oil-Fired Boiler Assemblies." Boilers shall be listed and labeled by a testing agency acceptable to authorities having jurisdiction.
24. Oregon Plumbing Code (UPC: Uniform Plumbing Code with State Supplements)
25. State of Oregon laws related to hotel and restaurant health and safety.
26. Adhere to the tenets of local, city, or county jurisdictions, where they enforce building, health, mechanical, electrical, plumbing or site requirements more stringent than those listed above.
4.02 GENERAL
A. The design must consider the impact to the continuous operations, public interface of the site complex, and future asset management.
B. Coordinate all work with the Contracting Officer Representative (COR).
4.03 Heating Design
A. Design a complete heating update for the Timberline complex. Update to include boilers, hot water production systems and associated piping, valves, condensate systems and accessories that provide heating and hot water to the buildings. Maximize th...
B. Design shall encompass the best engineering solution for the buildings, taking into account cost (first and operating), climate, available fuels, type of construction and historic nature of the building. Preservation of the integrity of the histor...
C. The employment of heat recovery systems, where practicable, is strongly encouraged.
D. Design the systems to provide comfort heating within ASHRAE Standards and sufficient hot water for restaurant and hotel operations.
E. Calculations to follow ASHRAE and Oregon Health code recommended procedures. Consider the occupancy profile of the facility during analysis.
F. Develop a way to zone the facilities, if possible, to better match supply to demand and employ energy conservation measures.
G. Submit design data and calculations to the Government as indicated in the review schedule. Design concept must be approved by the Government prior to commencement of development of construction documents.
H. Mechanical equipment shall be anchored in all seismic zones.
I. Water Systems:
1. Refrigeration or ventilation systems having air streams which pass through water shall have the water treated with an EPA registered biocide to control etiological organisms.
2. Heating and/or refrigeration systems that use water as the heat transfer medium shall include a propylene glycol based freeze preventative and a corrosion inhibitor.
J. Controls
1. Minimize the ‘human element’ in building management, maximize energy efficiency and automate building operation. Centralize HVAC controls with a computerized building management system, integrated control panel or equivalent devices. Components l...
2. Features to include: independent programmable seven day temperature settings; automatic setback; tamper resistant sensors and battery back-up. Include sequence of operations for HVAC controls on plan drawings and/or in mechanical specifications.
3. Electronic control system. All necessary electronic controls and wiring to operate the system, including possible remote access to the system to be installed in a location or locations designated during the design meeting. This includes the evalu...
K. Hotel, Restaurant, Lobby, Supply, Janitor, Shower & Special purpose Rooms
Address requirements for each room. Where possible, separately zone these spaces.
Provide automatic, countdown timer, or on/off switch controlled exhaust fans as appropriate. Fans to exhaust to the outside.
4.04 Hot Water Generation. Hot Water and Steam Distribution
A. Design hot water generation systems for the Timberline Complex, providing sufficient hot water at the various temperatures needed for restaurant, hotel and other site uses. The existing Steam System ties into water heat exchangers that supply hot ...
B. Provide water, hot water, steam, drainage, pumping, waste, condensate disposal and vent piping plans. Piping plans to include corresponding riser (isometric) diagrams. Do not require installers in the field to size any pipes or size/locate cleano...
C. Detail boiler feedwater equipment, accessories, and components. Boiler feedwater and blowdown sludge to be chemically treated to minimize corrosion and scaling. System are to employ automatic injectors of chemicals into the boiler and feed supply.