AG03K0S150004Drawings.pdf
PDF 1 MB Posted
- Solicitation number
- AG-03K0-S-15-0004
About this file
Maps and Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG03K0S150004ExperienceQuestionnaire.pdf | ||
| AG03K0S150004.pdf | ||
| AG03K0S150004WD.pdf | ||
| AG03K0S150004FSSS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION NOTES
151: ALL CONSTRUCTION EQUIPMENT SHALL BE WASHED AND INSPECTED PRIOR TO ENTERING THE PROJECT AREA. EQUIPMENT IS EXPECTED TO PROCEED DIRECTLY TO THE JOB SITE FOLLOWING THE INSPECTION AND TO NOT LEAVE THE DESIGNATED WEED MANAGEMENT DISTRICT WHEREIN THE JOB SITE EXISTS. EQUIPMENT LEAVING THE DESIGNATED WEED MANAGEMENT DISTRICT WILL NEED TO BE RECERTIFIED AS WEED FREE BEFORE BEING ALLOWED TO RETURN TO THE JOB SITE.
156: THE TRAIL MAY BE CLOSED FOR A PERIOD OF UP TO 21 CONSECUTIVE DAYS. FURNISH PROPER CLOSURE DEVICES FOR THE TRAIL
CLOSURE AS APPROVED BY THE CO.
203: UNLESS OTHERWISE SHOWN ON PLANS OR DESIGNATED BY CO, REMOVE ALL DESIGNATED MATERIAL FROM THE PROJECT, DISPOSAL METHOD A.
204: ALL EXCESS EXCAVATION SHALL BE HAULED OFF SITE, USING SECTION 203 DISPOSAL METHOD A.
ALL EXCAVATION MATERIAL INCORPORATED INTO THE PROJECT UNDER THIS SECTION SHALL BE MECHANICALLY TAMPED IN 6
INCH LAYERS.
208: ALL BACKFILL MATERIAL SHALL CONFORM TO SECTION 704.04. ALL EXCAVATION MATERIAL FROM THIS SECTION INCORPERATED INTO THE PROJECT SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY ACCORDING TO AASHTO T 99, METHOD C. MATERIAL
EXCAVATED UNDER THIS PAY ITEM MAY BE USED AS BACKFILL MATERIAL.
619: DISPOSE OF ALL EXCESS MATERIAL USING SECTION 203 DISPOSAL METHOD A.
GENERAL NOTES
1. MATERIALS AND CONSTRUCTION FOR THIS PROJECT SHALL BE IN ACCORDANCE WITH 2003 STANDARD SPECIFICATIONS FOR
CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAYS (FP-03).
2. THE CONTRACTOR SHALL PROVIDE CONSTRUCTION STAKING FOR THE PROJECT.
3. THE CONTRACTOR IS RESPONSIBLE FOR MINIMIZING SEDIMENT AND DEBRIS CAUSE BY CONSTRUCTION ACTIVITY FROM ENTERING THE STREAMBED. NO WHEELED OR TRACKED EQUIPMENT SHALL BE USED IN STREAMBEDS WITHOUT PRIOR APPROVAL OF CO.
4. ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL
QUANTITIES, VOLUMES AND LENGTHS.
5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ANY BURIED UTILITIES PRIOR TO BEGINNING WORK.
6. ACCESS TO THE PROJECT SHALL BE OVER EXISTING TRAILS. COORDINATE ACCESS WITH THE CO AT LEAST 10 DAYS BEFORE THE DESIRED
ACCESS DATE NEED.
ESTIMATE OF QUANTITIES
NOTE - ESTIMATE OF QUANTITIES ARE FOR CONTRACTOR CONVENIENCE ONLY, CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL QUANTITIES, VOLUMES AND LENGTHS.
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 82
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
ESTIMATE OF QUANTITIES
PROJECT NOTES &
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
LEWIS & CLARK NATIONAL FOREST
R. STOVALL 05/2015
ITEM DESCRIPTION
METHOD OF
MEASURE PAY UNIT MEASURE
15101 Mobilization LSQ Lump Sum 1 20304A Asphalt and Fence Removal, Disposal Method A LSQ Lump Sum 1 20474 Excavation, Compaction Method F CQ CY 48 20701 Earthwork Geotextile Type II-A CQ SY 255 20801 Structure Excavation CQ CY 3 32203 Aggregate Base, Grading D, Compaction Method D CQ CY 43 40401 Minor Hot Asphalt Concrete CQ Tons 28 60505 Geocomposite Sheet Drain System CQ SY 124 60551 6 Inch Outlet Pipe AQ LF 32 61906A Remove and Reset Fence, 4' Height AQ LF 35 61906B Remove and Reset Fence, Posts, 2' Height AQ EA 76
BEGIN PROJECT
END PROJECT
PROJECT ACCESS ROAD
SEE NOTES ON SHEET 2
GIANT SPRINGS ROAD
TO RIVER DRIVE
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 83
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
MAP
AREA
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
LEWIS & CLARK NATIONAL FOREST
R. STOVALL 05/2015
PROJECT ACCESS ROAD
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 84
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLEWORKLIST
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
LEWIS & CLARK NATIONAL FOREST
R. STOVALL 05/2015
STATION (FEET) PAY ITEM WORK DESCRIPTION
0+00 BEGIN PROJECT
20701 BEGIN EARTHWORK GEOTEXTILE TYPE II-A
20801 BEGIN STRUCURAL EXCAVATION
32203 BEGIN AGGREGATE BASE
40401 BEGIN MINOR HOT ASPHALT CONCRETE
61906A BEGIN REMOVE AND RESET FENCE, 4' HEIGHT
0+02 20474 BEGIN EXCAVATION
0+08 20801 END STRUCTURAL EXCAVATION
20304A BEGIN ASPHALT REMOVAL
0+28 60505 BEGIN GEOCOMPOSITE SHEET DRAIN SYSTEM
0+35 61906A END REMOVE AND RESET FENCE, 4' HEIGHT
20304A BEGIN REMOVAL EXISTING FENCE
61906B BEGIN REMOVE AND RESET FENCE, POSTS, 2' HEIGHT
0+92 PROTECT CONCRETE SURFACE DRAIN
1+13 BEGIN ELIMINATE EXISTING TURNOUT FROM NEW CONSTRUCTION
1+24 PROTECT BENCH.
1+37 END ELIMINATE EXISTING TURNOUT FROM NEW CONSTRUCTION
2+77 60505 END GEOCOMPOSITE SHEET DRAIN SYSTEM
60551 BEGIN 6 INCH OUTLET PIPE
4+41 20304A END REMOVAL ASPHALT
20304A END FENCE REMOVAL
20701 END EARTHWORK GEOTEXTILE TYPE II-A
32203 END AGGREGATE BASE
40401 END MINOR HOT ASPHALT CONCRETE
20474 END EXCAVATION
61906B END REMOVE AND RESET FENCE, POSTS, 2' HEIGHT
END PROJECT
WORKLIST
LEGEND:
EXISTING FENCE
EXISTING EDGE OF TRAIL
GEOCOMPOSITE SHEET DRAIN
00 20' 40'
EXISTING ROCK RETAINING WALL,
DO NOT DISTURB
CONCRETE SURFACE DRAIN,
DO NOT DISTURB
PAY ITEM 61906A
OUTLET PIPE AS
STAKED BY COR
ACCESS ROUTE TO PROJECT
PAY ITEM 61906B
EXISTING BENCH
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 85
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
VIEW
PLAN
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
LEWIS & CLARK NATIONAL FOREST
CL
TYPICAL TRAIL SECTION
NO SCALE
1.5:1
1.5:1
EXISTING
BACK SLOPE
EXISTING
FILL SLOPE
2% OUTSLOPE
5 FT
6 FT
EXISTING
GROUND
3:1 3:13:1
3:1
40401 MINOR HOT ASPHALT
CONCRETE, 2 INCH DEPTH
32203 AGGREGATE
BASE, 5 INCH DEPTH
2% OUTSLOPE
61906 FENCE
SEE SHEET 6 AND 7 FOR DETAILS
60505 GEOCOMPOSITE SHEET DRAIN SYSTEM,
SEE SHEET 6 FOR DETAILS
AS STAKED
6 FT OC 6 FT OC
2 FT
1 FTEXISTING
GROUND
4" X 4"
POST
TYPICAL 2' FENCE PROFILE
NO SCALE
NOTES:
THIS TYPICAL
CORRESPONDS TO PAY
ITEM 61906B.
A
A
SECTION A-A
NO SCALE
2 FT
1 FT
4" X 4"
POST
4"
FENCE NOTES:
1. ITEMS INCLUDED IN 61906B: MODIFYING EXISTING POSTS TO 3' HEIGHT, TREATING FIELD
CUTS AND ABRASIONS, STAINING, AND SETTING REUSED POSTS.
2. EXISTING POSTS CAN BE REUSED FOR NEW FENCE. ANY CUTS SHALL BE FIELD TREATED AND
STAINED TO MATCH EXISTING STAIN.
3. POST SHALL BE PLACED AND COMPACTED USING SPECIFICATION 619.
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 86
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
FENCE DETAILS
TRAIL DETAILS
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
5 FT OC
2 FTEXISTING
GROUND
4" X 4"
POST
TYPICAL 4' FENCE PROFILE
NO SCALE
NOTES:
THIS TYPICAL
CORRESPONDS TO PAY
ITEM 61906A.
4 FT
5"
5"
38"
EXISTING METAL
RAIL B
B
SECTION B-B
NO SCALE
4 FT
2 FT
5"
4" X 4"
POST
4"
EXCAVATION DETAILS
NO SCALE
NOTES:
THIS TYPICAL
CORRESPONDS TO PAY
ITEM 20474 AND 20801.
EXISTING
GROUND
EXCAVATION
AND BACKFILL
UNDER ITEM
20801
STATION 0+00
EDGE OF
AGGREGATE BASE
18"
18"
EXCAVATION
AND BACKFILL
UNDER ITEM
20474
STATION 0+10
EXCAVATION
UNDER ITEM
20474
BRIDGE ABUTMENT
FENCE NOTES:
1. ITEMS INCLUDED IN 61906A: FIELD TREATING, STAINING, AND SETTING REUSED POSTS,
PLACING REUSED METAL RAILS, AND ASSOCIATED WORK.
2. EXISTING POSTS CAN BE REUSED FOR NEW FENCE. ANY CUTS SHALL BE FIELD TREATED AND
STAINED TO MATCH EXISTING STAIN.
3. POST SHALL BE PLACED AND COMPACTED USING SPECIFICATION 619.
4. LEG SCREWS SHALL BE REUSED TO ATTACH THE RAILS TO THE POST.
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 87
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
EXCAVATION DETAILS
FENCE DETAILS
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
LEWIS & CLARK NATIONAL FOREST
R. STOVALL 05/2015
EXCAVATION NOTES:
1. FROM STATION 0+00 TO STATION 0+10, EXCAVATE MATERIAL 4 FEET DEEP AND 5 FEET
WIDE. BACKFILL WITH MATERIAL THAT CONFORMS TO THE APPROPRIATE SECTION, 208
AND 204.
2. FROM STATION 0+10 TO THE END OF THE PROJECT, EXCAVATE BASE MATERIAL AND
DISPOSE OF OFF SITE ACCORDING TO SECTION 203.
NOTES:
1. PERFORATED AND NON-PERFORATED PIPE SHALL BE 6-INCH
CORRUGATED POLYETHYLENE
2. ELBOWS, CAPS, AND TEES ARE INCIDENTAL TO ITEM 60505.
3. OUTLET PIPE SHALL BE BURIED TO POINT OF TERMINATION,
AND SLOPED TO DRAIN. THE OUTLET PIPE SHALL BE
NON-PERFORATED CORRUGATED POLYETHYLENE.
4. LOCATION OF THE OUTLET PIPE SHALL BE DESIGNATED BY
ENGINEER.
5. THE CONTRACTOR SHALL EXERCISE CARE TO AVOID
DAMAGING THE PREFABRICATED UNDERDRAIN DURING
CONSTRUCTION.
6" N
0N -P
ER
FO
RA
TE
D
PI
PE
AT
S
TA
TI
O
N
+7
6" P
ER
FO
RA
TE
D
DR
AI
N
P
IP
E W
RA
PP
ED
BY
G
EO
CO
M
PO
SI
TE
0+28
GEOCOMPOSITE SHEET DRAIN
SIDE VIEW
1 FT
OVERLAP OF FABRIC SHALL
NOT BE LESS THAN 1 FOOT
COMPACT TO 85% OF
AASHTO T-99 WITHIN
1 FT OF GEOCOMPOSITE
DRAIN AND PIPE
CONFORMING TO 605.04
PREFABRICATED
GEOCOMPOSITE
DRAIN SYSTEM
WITH FABRIC
ON BOTH SIDES
PERFOREATED PIPE,
TYPE CORRUGATED
POLYETHYLENE
SEE SHEET 6 FOR
ASPHALT AND BASE
TYPICAL
COMPACTED
BACKFILL
BACKFILL AS
SPECIFIED IN
SECTION 605
OF THE
SUPPLEMENTAL
SPECIFICATIONS
4 FT
GEOCOMPOSITE SHEET DRAIN
FRONT VIEW
PLACE PREFABRICATED
GEOCOMPOSITE DRAIN
TO FOLLOW REPLACED
FILL EDGES
PIPE END CAP
PREFABRICATED
DRAIN
SYSTEM
COMPACTED
BACKFILL
GEOCOMPOSITE SHEET DRAIN
TOP VIEW
DRAIN OUTLET,
SEE DETAILS
BACKFILL AS
SPECIFIED IN
SECTION 605
OF THE
SUPPLEMENTAL
SPECIFICATIONS
DRAIN OUTLET
SCREEN
NO SCALE1
" MESH, 19 GAGE
GALVANIZED HARDWARE
CLOTH 12"x12"
CUT
10 GAGE WIRE GALVANIZED
2+77
NO SCALE
NO SCALE
NO SCALE
PIPE CONNECTION
WIDTH AS
NEEDED FOR
INSTALLATION
DRAIN OUTLET
PROFILE VIEW
NO SCALE
EXISTING GROUND
OUTLET PIPE
CLASS 2 RIPRAP
1 FT
4 FT DRAIN OUTLET
PLAN VIEW
NO SCALE
4 FT
3 FT
OUTLET PIPE
CLASS 2 RIPRAP
SHEET OF
FILENAME:
DRAWN:
DESIGNED:
CHECKED:
DATE:
DATE:
DATE:
REVISIONDATE BYU.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REVIEWED: DATE: 88
CLIFFBLUFF.DWG
05/2015 05/2015 05/2015
J. NOLAND
J. NOLAND
S. VANSICKLE
DRAIN DETAILS
GEOCOMPOSITE SHEET
ASPHALT REPLACEMENT
CLIFF BLUFF TRAIL
GREAT FALLS, MT
| cover |
| CliffBluffDrawingFinal |
File details come from the government source that posted it. Updated .