Survey_Log.pdf
PDF 55 KB Posted
- Attached to
- Highwood-Hoover Trails Phase II Federal contract opportunity
- Solicitation number
- AG-03K0-S-09-0023
About this file
Survey Log
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Experience_Questionnaire.doc | DOC document | |
| SF24_Bid_Bond.pdf | ||
| Special_Project_Spec.pdf | ||
| AG-03K0-S-09-0023 Highwood OHV Grant Trails and Hoover Complex Phase II Trails.pdf | ||
| J-1HighwoodHooverDrawings.pdf | ||
| Construction_Log.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Staked Trail Survey Log
Windy Mountain Trail No. 454
Preliminary Line (P-Line)
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
0+00 013 13 15
Begin P Line approx. 1.5 miles north of Thain Cr. C.G. on existing Windy Mountain Trail. P Line exits to the left (west) of existing trail.
0+35 028 9 15
0+89 022 12 20
1+57 029 12 25
1+82 031 8 33
2+41 037 5 11
2+78 070 14 5 Crossing existing trail
2+94 087 17 18
3+28 067 9 33
3+65 047 12 18
4+19 059 12 28
4+82 047 6 38
5+37 066 15 35
5+74 066 12 15
5+95 071 14 30
6+10 075 16 27
6+20 072 16 35 Point of curvature, 12 foot radius switchback left.
6+28 037 20 20
6+35 002 21 9
6+42 328 10 20
6+50 295 -12 35
6+57 275 -19 30 Point of tangency, end 12’ radius
6+65 276 -10 27
6+76 275 -9 25
7+01 270 -12 28
7+16 262 14 25
7+43 245 15 40
7+79 262 9 40
8+04 299 5 40
8+38 316 12 30
8+80 300 11 30 Begin climbing turn right, 15’ radius
8+95 342 21 25
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
9+02 005 25 2
9+09 044 20 8
9+20 074 3 27
9+26 068 13 28 Point of tangency; end turn right.
9+62 055 4 29
9+92 026 7 30
10+29 031 13 27
10+81 047 4 30
11+08 093 -5 21
11+40 109 8 28
11+90 107 12 36
12+43 110 -3 34
12+88 112 1 32
13+05 088 2 18 Point of curvature 15’ radius climbing turn left.
13+16 045 10 19
13+26 010 16 10
13+35 329 17 2
13+46 295 17 28 Point of tangency; end cl. Turn left.
13+63 310 13 20
14+15 318 11 33
14+86 318 10 48
15+47 323 12 45
15+89 350 12 30
16+26 016 14 31
16+80 339 6 42 Center of drainage, dry
17+05 327 14 46
17+38 345 6 48
18+02 324 -1 45
18+60 279 8 38
19+03 251 -2 42
19+26 238 5 42
19+93 289 -2 25 Rocky knob
20+11 307 10 35
20+72 266 6 48
21+20 253 6 49
21+72 293 -5 33
22+10 300 -2 31
22+49 319 5 29
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
22+98 319 3 23
23+25 332 12 20
23+48 360 11 4
23+62 10 P Line joins existing trail.
Kirby Creek Trail No. 426
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
0+00 077 0 10
Begin P Line at junction with Marie Springs Trail No. 412, hydrologic divide between Kirby Cr. and North Fk.
Highwood Cr.
0+31 095 2 10
0+72 098 6 10
1+32 084 8 6
1+58 045 13 10
1+78 004 -9 10 Crossing rocky rib – needs excavated.
2+09 000 -11 4
2+54 000 -23 2
2+82 322 -20 13
3+06 281 -11 18
3+36 267 -9 18
3+92 285 -11 5
4+23 294 -21 17 Begin gradual curve right
4+36 343 -31 3
4+47 013 -20 28
4+56 048 -11 28
4+70 059 -9 31
5+04 061 -5 32
5+38 060 -17 28
5+92 042 -8 25 Center of drainage
6+15 034 9 36
6+42 070 -10 36
6+80 084 -13 32
7+27 085 -8 48
7+75 039 -2 37 Center of drainage, dry.
8+01 032 7 38
8+47 071 -1 28
8+69 051 -9 20 Point of curvature, 15’ radius left turn
8+81 012 -17 8
8+89 334 -14 3
9+00 290 -13 20
9+12 255 -21 11
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
9+19 232 -9 20 Point of tangency, end turn left
9+50 236 -18 38
9+81 215 -10 34
10+15 239 5 37 Center of drainage, dry
10+32 275 2 35
10+46 297 -3 40
10+81 286 -9 55
11+27 275 -7 35
11+47 262 -5 43
11+83 257 -14 45
12+16 275 -10 43 Center of drainage, dry
12+41 288 -18 33
12+67 286 -4 34
13+01 286 -12 29
13+27 303 -29 25 Point of curvature, 15’ radius turn to right
13+38 340 -35 9
13+47 022 -29 9
13+60 17 15 P Line ties to existing trail and ends.
STAKED TRAIL SURVEY LOG
Hoover Ridge Trail No. 736
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
40+67 121 10 20
Begin survey for Phase 2 construction. Continue stationing from Phase 1 construction completed in 2007. P Line leaves to left of existing trail. Point of curvature - begin 13' radius to left.
40+75 086 20 10
40+83 055 23 3
40+90 023 9 12
40+97 001 6 25
41+19 356 6 14
41+48 351 11 29
41+78 356 13 34 Leave meadow, enter timber
42+02 002 10 28
42+47 015 10 29
43+10 029 9 30
43+69 028 2 27
44+26 047 10 34 Heavy new growth
44+81 053 9 28
Rocky
45+49 055 11 40
46+14 057 11 45
46+84 057 11 40
47+53 046 8 33
48+33 051 11 29
48+98 061 12 28
49+47 077 7 28
49+91 135 10 26 X-ing old & abandoned Bender Cr. trail
50+10 152 12 25
50+48 153 13 30
51+08 151 13 28
51+76 135 12 32
52+35 128 12 27
53+00 122 10 26
53+70 103 2 37
54+11 097 0 39
54+59 097 - 7 39
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
54+78 095 -9 37
54+88 096 -6 40
54+96 101 -10 40
55+03 128 4 35 Point of curvature, 12’ radius to right.
55+09 157 20 28
55+17 192 24 15
55+25 229 20 8
55+33 262 8 24
55+40 277 2 34 Point of tangency; end 12’ radius curve.
55+47 280 2 34
55+55 275 5 33
55+72 277 7 32
56+13 264 9 40
56+59 264 9 38
57+16 268 9 36
57+70 258 9 30
58+16 252 7 32
58+50 222 5 28
Begin gentle curve left; rocky knoll.
58+69 187 2 20
58+87 152 5 24
59+04 130 18 24
59+29 14 Tie to existing Hoover Ridge Trail.
STAKED TRAIL SURVEY LOG
Pioneer Ridge Trail No. 734
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
0+00 174 6 1
Begin survey on existing Tr. No.734 approximately one quarter mile south of its junction with Trail No.
732 - exit to the left.
0+51 171 5 9 Meadow
0+99 179 7 9
Entering new growth
1+39 165 8 25
1+96 163 9 35
2+59 162 8 25
3+16 164 4 43
3+90 168 9 54
4+56 164 8 30
5+11 156 3 47
5+77 160 8 48
6+39 169 11 48 Entering heavy Alder
6+94 152 8 38
7+42 136 8 46
7+95 145 11 48
8+49 144 7 45
8+99 138 10 54 Center of drainage; Heavy Alder
9+42 143 11 51
9+91 146 10 30
10+46 141 7 50
11+06 147 2 66 Rocky
11+53 165 5 33
12+07 170 0 30
12+61 187 8 55
13+17 191 3 52
13+60 204 10 38 Edge of small meadow
14+24 205 4 37
15+51 209 3 37
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
16+25 228 9 30
16+79 204 11 22 Entering thick new growth
17+14 184 4 44
17+78 188 7 31
18+24 180 6 29
18+76 185 10 34
19+30 195 9 33
19+99 210 9 31 Entering open ridge; meadow
20+65 210 3 20
21+25 201 - 5 19
21+73 187 -10 16
21+98 156 0 19 Joins existing Trail No. 734
22+57 156 - 5 11
23+49 158 1 1
24+47 162 0 1
25+43 164 10 1
26+28 164 12 1
Leave existing trail; P-line leaves to left.
26+74 136 12 2
27+03 110 6 11 Leave open ridge; enter new growth
27+55 114 13 18 Rocky
27+98 098 11 31
28+46 101 12 42
28+97 108 11 45
29+83 111 9 42
30+51 115 8 42
31+17 120 8 38
31+77 125 9 38
32+49 147 13 39
33+05 147 11 37
33+54 145 10 40
34+27 151 11 37
34+62 160 18 38
34+92 167 9 28
35+11 176 10 29
35+26 185 6 31
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
35+40 189 7 30
35+54 188 -2 38 Point of curvature; 13’ radius to right.
35+62 217 17 35
35+70 248 25 27
35+77 280 30 11
35+84 309 13 6
35+91 342 4 25
Rocky, Equation station, 35+91 back = 35+94 ahead
36+02 344 5 34
36+10 342 0 32
36+22 339 -1 35
36+33 323 -2 29
36+44 306 1 33
36+64 287 9 33
37+06 292 9 35
37+62 291 10 32
38+15 290 9 37 Rocky; new growth
38+76 280 10 25
39+32 276 7 32
39+85 270 10 34
40+24 264 9 36
40+65 246 11 33
41+22 223 14 29
41+58 220 11 32
42+08 220 6 41
42+56 215 9 36
43+05 212 10 38
43+45 202 12 37
43+97 198 12 37
44+35 208 8 36
44+55 204 11 35 Crossing of old trail to be put to bed.
45+13 202 11 31
45+56 219 12 31
46+06 217 14 41
46+47 223 15 35 Large rocks 2-4' dia; center of drainage.
46+73 222 9 35
47+48 213 9 44
48+05 215 10 40
48+57 219 7 30 Rocky
48+97 217 14 42
49+48 207 10 53
49+86 209 10 40
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor’s Field Notes
50+43 196 15 38
50+85 190 10 44
51+37 186 10 31
51+85 179 10 38
52+05 183 7 32
52+22 190 6 32
52+33 190 9 30
52+40 193 13 34
52+47 180 11 35 Point of curvature; 12’ radius left
52+54 145 23 16
52+61 111 21 7
52+68 077 21 14
52+75 044 0 27
52+82 033 0 32 Point of tangency; end 12' radius
52+90 029 3 35
53+03 031 -1 39
53+15 025 0 38
53+39 029 7 29
53+61 029 7 34
53+91 029 3 28
54+24 035 -2 25
54+67 044 1 32
55+07 040 -17 64
55+18 042 0 56 Large boulders; 6'x5'; Center of drainage; boulder 2' lt of centerline
55+48 047 -3 45
55+91 054 -3 50 Large Rock Wall 14' rt
56+10 072 8 32
Rock Formation 15’ rt
56+38 090 6 31
56+82 086 -5 33
57+05 116 11 30 Start curve to rt to join existing trail
57+15 157 -1 6
Rock formation 6' left
57+34 157 0 15
57+50 186 20 1
P-line joins old trail. P-line stakes ahead are offset right or left of trail to be reconstructed.
Station
Magnetic Azimuth Ahead
(Degrees) Trail Grade Ahead (%)
Percent Sideslope Surveyor Field Notes
57+90 189 19 Sideslope ahead is not recorded on existing trail.
58+35 172 15
59+39 161 2
60+16 145 -1
60+69 155 19
60+95 134 -3 Large rock center of trail
61+25 148 5
61+60 162 16
61+95 176 16 Large rock splits trail
62+80 183 23
63+19 178 7
64+06 198 11
64+52 172 -13
64+75 221 23
64+95 208 13
65+37 227 15
66+17 202 2
67+19 220 14
68+13 201 19
68+63 167 16 Junction abandoned trail on right
69+07 157 -8
69+67 187 15
70+73 223 25
71+54 200 9 Junction abandoned trail on right.
72+28 196 2
74+00 183 9
74+49 212 22
75+12 178 12
75+86 168 7
76+78 210 7
77+98 199 -10
78+65 191 -13
79+88 189 -6
81+10 162 -4
82+28 186 1
82+94 165 6
83+61 196 8
84+13 146 8
85+14 166 9
85+79 Jct 733 & 734 – End P-line.
North Fork Hoover/Oti Park Trail No. 732
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
0+00 251 -15 3
P-line exits in meadow to west of existing Trail No. 736 approx. 0.4 miles north of Jct. Trails No. 732/734.
0+16 270 -15 10
0+46 288 -10 15
0+89 300 -2 20
1+47 290 -3 16 Leave meadow, entering timber
1+88 276 -9 25
2+34 279 -9 28
2+92 283 -9 26
3+49 280 -7 32
4+18 279 -11 31
4+83 279 -9 38
5+56 280 -7 41 Rocky
6+15 277 -9 41
6+72 286 -7 33
7+20 294 -9 31
7+68 320 -7 26
8+41 331 -5 26 Thick new growth, 2"-5"; rocky
9+12 335 -8 40
9+92 333 -9 38
10+56 324 -9 38
11+32 323 -5 32
12+07 319 -5 32
12+75 309 -10 40
13+45 308 -11 30
14+18 308 -10 38
14+89 309 -6 38
15+71 308 -10 23
16+48 308 -8 13
17+18 320 -10 18
17+58 326 -17 15
17+75 296 -20 21 Begin descending curve to the left
17+86 255 -11 25
17+96 224 -9 22
18+08 207 -10 30
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
18+21 196 -12 37
18+31 187 -12 36
18+50 172 -10 36
18+77 166 -8 33
19+25 166 -12 25
19+49 150 -11 38
20+08 145 -13 43
20+78 138 -10 45
21+48 148 -12 48
22+17 150 -10 52
22+91 158 -12 47
23+68 161 -9 43
24+45 167 -8 44
25+26 186 -14 61
25+93 191 -10 55 Not as rocky; scattered
26+64 200 -10 43
27+35 198 -8 49
28+07 195 -10 45
28+39 191 -10 45
28+96 190 -9 44
29+42 206 -12 49
30+18 208 -11 46
30+90 211 -11 50
31+57 203 -7 48 Rocky ridge
32+23 189 -11 44
32+52 170 -12 42
32+82 157 -11 38
33+19 148 -13 53
33+66 137 -14 50
34+23 124 -10 52
34+88 124 -12 52 Rocky
35+47 126 -13 49
36+09 115 -6 50
36+65 106 0 47
37+19 103 -5 37
37+66 102 -1 54 X-ing existing trail
37+78 155 -5 40
Center of drainage
37+87 181 1 40
38+04 170 -7 59
38+31 198 1 45 Center of drainage
38+57 196 -7 54
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
39+15 203 -12 50
39+75 212 -12 23 Entering older growth; not as rocky
40+31 217 -11 45
41+09 221 -10 37
41+97 218 -10 37
42+80 225 -9 40
43+65 232 -10 32
44+45 230 -9 33 Heavy dead fall 3"-6"
45+20 253 -13 33
45+95 258 -11 36
46+69 263 -11 27
47+52 258 -17 39
48+06 265 -13 23
48+81 259 -9 40
49+58 258 -13 35 Entering thick new growth 3"-6" ; rocky
49+81 251 -18 40
Begin descending curve lt
49+96 224 -25 27
50+04 203 -18 39
50+14 186 -11 41
50+56 181 -13 46
50+94 182 -12 43
51+57 196 -13 40
52+06 154 -7 47
52+47 158 -10 65
52+83 206 10 46 Wet, center of drainage
52+96 208 -18 53
53+06 249 0 52 Center of drainage
53+24 252 -7 70
53+60 245 -10 66
54+56 251 -21 60
54+81 241 -12 65
55+45 245 -12 55
56+25 250 -11 42
57+02 251 -8 33
57+81 235 -11 30
58+28 218 -15 40
59+01 198 -9 35
59+53 197 -15 45
59+85 207 -11 40
60+53 206 -8 63
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
61+12 202 -14 70
61+78 194 -10 70
62+41 195 -12 65
63+05 192 -12 65
63+69 193 -12 50
64+41 195 -13 55
65+01 187 -10 55
65+57 184 -10 60 Rocky thick new growth 2"-4"
66+26 191 -12 60
67+01 190 -8 65
67+40 203 -13 60
68+13 194 -11 60
68+82 191 -11 58
69+56 190 -10 70
70+39 190 -5 65
71+14 199 -12 62 Heavy deadfall
71+82 205 -10 55
72+52 197 -14 50
73+18 195 -11 58
73+77 225 -14 42
74+01 234 0 23 Center of drainage
74+23 263 -6 20
74+54 269 -10 20
74+87 237 -17 25
75+05 191 -10 20
75+28 182 -14 28
75+47 225 -20 25 Point of curvature - begin 13' radius descending turn to right
75+64 287 -24 20
75+72 321 -17 2
75+84 354 -15
Point of tangency - joining existing trail ahead. No sideslope shown when on existing trail.
76+08 335 -21
76+34 012 -11
77+05 026 -13
77+80 031 3 Spring dip in trail; p-line moves to rt
78+06 024 -2 60
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
78+41 013 -12 55
78+76 358 -17 55
79+23 353 -13 P-Line joins existing trail ahead
80+23 354 -11
80+98 350 -11
82+14 343 -9
83+13 337 -10
84+25 350 -8
85+05 008 10 Center of drainage
85+17 355 -9
85+82 326 -11
86+33 334 -15
87+05 003 16
87+22 347 -14
87+65 326 -18
88+03 341 -16
88+22 329 -22 Top bank
88+32 295 15
Center creek (ford)
88+44 331 -8
Top bank
88+74 347 -12
88+96 349 0 Low spot; spring
89+29 326 -1
89+62 354 -10
90+72 337 -8
91+99 334 -9
92+72 335 -13
93+08 333 -11 P-Line moves left
93+28 339 -18 25
Begin descending curve
93+44 012 -34 30
93+53 061 -15 35
93+65 088 -20 35
93+74 111 -17 48
93+82 105 -20 46 Top of bank
93+98 050 21 7
Center Creek (ford)
94+11 351 9 24 Top of bank
94+41 349 -5 Join existing trail
95+28 346 -9
95+87 320 -10
96+61 348 -10
Station
Magnetic Azimuth Ahead
(Degrees)
Trail Grade Ahead
Percent
Sideslope Surveyor Field Notes
96+99 319 -18
97+49 358 -8 Boggy area
97+77 009 2 10 Center of Spring, Drain Dip
97+93 338 -12
98+34 320 -7
98+95 297 -6
99+71 319 -21
99+95 312 -9 Center of drainage
100+17
Tie to existing trail No.732 downstream.
End P line.