J9_Construction_Work_Items.pdf
PDF 84 KB Posted
- Solicitation number
- AG-0398-S-17-0029
About this file
Construction Work Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 0029_SF-18_Request_for_Quotation.pdf | ||
| J4_Vicinity_Map.pdf | ||
| J6_Bridge_Plans.pdf | ||
| J3_Signed_Cover_Sheet.pdf | ||
| J8_Bridge_Supplemental_Specs.pdf | ||
| J5_Standard_Drawings.pdf | ||
| AG-0398-S-17-0029_Full_Solicitation.pdf | ||
| J7_Supplemental_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H y a l i t e L a k e L o o p T r a i l – P h a s e I I H y a l i t e C a n y o n T r a i l # 6 2
W o r k I t e m s
Custer Gallatin National Forest Page 1
Beginning Station
Ending Station
Task Drawing Standard Spec
Special Spec
Pay Item Unit Quantity
48+20 Begin Work on Trail #62
48+20 100+50 Additive #2 – Apply Aggregate Base Surfacing 941-1 941 301
941(02) CY 451
91+75 131+00 Construct 3930 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
100+50 146+50 Apply Aggregate Base Surfacing 941-1 941 301
941(02) CY 397
104+15 Install 36” x 26’ Corrugated Metal Culvert with Rock Headwalls
921-01 921 921 921(01)c LF 26
117+15 Install 18” x 20’ Corrugated Metal Culvert with Rock Headwalls
921-01 921 921 921(01)a LF 20
125+75 126+90 Construct 115 LF Turnpike, Rock Retainers 913-2 913 913(01)c LF 115
134+30 Install 18” x 20’ Corrugated Metal Culvert with Rock Headwalls
921-01 921 921 921(01)a LF 20
147+20 147+70 Install Bridge #62-2.78; Glulam Stringer Trail Bridge; Overall size 50’ long x 9’ wide
R1922 260
931(01)d LS 1
150+10 152+20 Construct 210’ long x 5’ high Rock Retaining Wall
935-1 935 914(06)a SF 1050
158+80 210+50 Apply Aggregate Base Surfacing 941-1 941 301
941(02) CY 446
210+50 End Work on Trail #62
Equipment Rental – Hydraulic Excavator with Thumb. Excavator will be used around the beginning of project to cleanup and prep the existing subgrade in preparation to surfacing as well as other minor unspecified work.
990(01) HR 8
W e s t s h o r e T r a i l # 4 3 1
Ending Station
Task Drawing Standard Spec
Special Spec
Pay Item Unit Quantity
0+00 Begin Work on Trail #431
0+00 19+30 Recondition 1930 LF of Trail 915-1 915 915(01)a LF 451
0+00 19+30 Apply Aggregate Base Surfacing 941-1 941 301
941(02) CY 167
26+90 28+20 Construct 130’ long x 4’ high Rock Retaining Wall
935-1 935 914(06)a SF 520
45+20 46+60 Construct 140’ long x 4’ high Rock Retaining Wall
935-1 935 914(06)a SF 560
46+60 End Work on Trail #431
Equipment Rental – Hydraulic Excavator with Thumb. Excavator will be used around the beginning of project to cleanup and prep the existing subgrade in preparation to surfacing as
990(01) HR 4
P a l i s a d e M o u n t a i n F o o t h i l l s T r a i l # 6 7 6
Ending Station
Task Drawing Standard Spec
Special Spec
Pay Item Unit Quantity
0+00 Begin Work on Trail #676
0+00 7+00 Construct 700 LF of new trail. Includes clearing, grubbing and excavation.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
0+00 15+00 Apply Aggregate Base Surfacing 941-1 941 301
941(02) CY 129
7+00 15+00 Recondition 800 LF of Trail 915-1 915 915(01)a LF 800
13+40 Install 18” x 20’ Corrugated Metal Culvert with Rock Headwalls
921-01 921 921 921(01)a LF 20
15+00 End Work on Trail #676
Equipment Rental – Hydraulic Excavator with Thumb. Excavator will be used around the beginning of project to cleanup and prep the existing subgrade in preparation to surfacing as
990(01) HR 4