J-3 Special Project Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0398-S-14-0004-0001.pdf | ||
| J-6_SF-1413.pdf | ||
| AG-0398-S-14-0004.pdf | ||
| J-4_SixmileBridge_Plans-Drawings.pdf | ||
| J-5_GNF_Food_Storage_Order.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GALLATIN NATIONAL FOREST
Sixmile Bridge Replacement
J‐3 – Special Project Specifications
Special Project Specifications:
The following Special Project Specifications (SPS) supplement the Standard Specifications, and are a part of this solicitation and any resultant contract.
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
102 - Bid, Award, and Execution of Contract
103 - Scope of Work
104 - Control of Work
105 - Control of Material
106 - Acceptance of Work
107 - Legal Relations and Responsibility to the Public
108 - Prosecution and Progress
109 - Measurement and Payment
151 - Mobilization
152 – Construction Survey and Staking
153 – Contractor Quality Control
155 - Schedules for Construction Contracts
156 - Public Traffic
157 - Soil Erosion Control
201 – Clearing and Grubbing
203 - Removal of Structures and Obstructions
204 - Excavation and Embankment
208 - Structure Excavation and Backfill for Selected Major Structures
251 - Riprap
272 - Geocell Abutment Stabilization
324 - Minor Aggregate Coures - Commercial Source
553A – Precast Concrete Structures
561 – Superstructure Transport and Installation
J‐3 – Special Project Specifications
622 - Rental Equipment
703 - Aggregate
736 - Geocell
Preface
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
J‐3 – Special Project Specifications
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
J‐3 – Special Project Specifications
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
J‐3 – Special Project Specifications
Figure 101-1—Illustration of road structure terms.
J‐3 – Special Project Specifications
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
J‐3 – Special Project Specifications
103 - Scope of Work
Deletions
Delete all but subsection 103.01 Intent of Contract.
J‐3 – Special Project Specifications
104 - Control of Work
Deletions
Delete Sections 104.01, 104.02, and 104.04.
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
J‐3 – Special Project Specifications
105 - Control of Material
105.02 Material Sources
Add the following before the first paragraph.
Sources have been designated for this project as follows:
Riprap Source – Contractor Furnished – There is no available Government source for Riprap for this project.
Crushed Aggregate Source- Contractor Furnished. There is no available Government source for Crushed Aggregate for this project.
Coarse Granular Backfill – Contractor Furnished – There is no available Government source for Coarse Granular Backfill for construction of the geocell abutment stabilization.
Waste Site – Government Furnished – A waste site for excess and unsuitable material will be available within 1/2 mile of the project site and shall be designated by the COR.
This site is to be used for the disposal of unsuitable or excess excavated material only.
All other materials designated for removal and disposal must be disposed of per FSSS Section 203.
Unclassified Borrow for Embankment Construction – Government Furnished – Structure excavation material is anticipated to be suitable as Unclassified Borrow and may be used in the construction of the embankment.
Structural Backfill - Contractor Furnished. There is no available Government source for Structural Backfill for this project.
Materials Stockpile Site- Government Furnished – Prior to the closure of Road 348 the Contractor will be allowed to stockpile material, except crushed aggregate, but including riprap and bridge components, at the Sixmile Bridge site adjacent to the bridge.
Materials must be stockpiled in such a manner as to allow for safe passage of the general public along Road 348 and to avoid damage to any trees at the bridge site. Provide the CO 72 hours advance notification prior to stockpiling any materials at the bridge site.
Bridge Superstructure – Government Furnished – The Bridge Superstructure is located at the Snowbank Trailhead, at MP 11.5 on Mill Creek Road (#486). It is the Contractor’s responsibility to transport the structure from its location to the project site, as well as to furnish all components required for installation (Item 561(01)).
Bridge Superstructure Timber Member Replacements – Government Furnished – Replacement timber members for the Bridge Superstructure will be furnished by the Government, and will be stockpiled at Lower Sixmile Trailhead (along Daily Lake
J‐3 – Special Project Specifications
Road). It is the Contractor’s responsibility to transport materials from their location to the project site, field drill and treat all required holes, and furnish all required fasteners (Item 557(03)).
J‐3 – Special Project Specifications
106 - Acceptance of Work
106.07 Delete
Delete subsection 106.07.
J‐3 – Special Project Specifications
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
J‐3 – Special Project Specifications
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
J‐3 – Special Project Specifications
108 - Prosecution and Progress
108 Delete.
Delete Section 108 in its entirety.
J‐3 – Special Project Specifications
109 - Measurement and Payment
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Add the following Subsection:
109.10 Methods of Measurement
One of the following methods of measurement for determining final payment is DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(b) Contract Quantities (CQ). As defined in 109.02 (b) and supplemented above.
(c) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
J‐3 – Special Project Specifications
151 - Mobilization
151.01 Description
Add the following:
Noxious Weed Control Requirements:
All construction equipment to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance on to forest lands, whether they are owned, leased or borrowed by the Contractor or any subcontractors. “Construction equipment” does not include personal vehicles or support equipment that remains on the main travel route.
Cleaning shall occur off forest land.
Construction equipment shall be visually inspected by the COR and each one certified in writing to be reasonably clean and weed free. Inspections will take place at a forest administrative site with the Contractor providing at least 24 hours notice. The location of the administrative site is to be agreed upon in advance between the COR and the Contractor or Subcontractor. Equipment is expected to proceed directly to the job site following the inspection and to not leave the designated weed management district wherein the job site exists.
Certification shall remain valid for each identified piece of equipment for the duration of the specified project and only as long as the equipment remains at the job site or within the designated weed management district. Equipment leaving the designated weed management district will need to be recertified as weed free before being allowed to return to the job site.
151.03 Payment
Include all costs associated with the cleaning of equipment in the unit price for Mobilization.
J‐3 – Special Project Specifications
152 – Construction Survey and Staking
152.01(a) Personnel.
Conduct all construction staking under the direction of a licensed professional engineer or land surveyor who is closely associated and familiar with construction staking.
J‐3 – Special Project Specifications
153 – Contractor Quality Control
Add the following.
153.07. Project Submittals
At a minimum the contractor shall provide project submittals as shown on the below Submittal Log. Submittal requirements are listed in the Standard Specifications, Supplemental Specifications, and Plans.
Submittal Log
Log No.
Incidental to
Pay Item(s) Description of Submittal
Type of Submittal
Requirement found in
Specification No.
/Drawings
Additional Specification References
1 151 Weed Free Material Source Certification Material
Certification FSSS 105.02(b)
2 151 Hazardous Spill Plan Plan FSSS 107.10
3 151 Contractor Quality Control Plan Plan 153.02 552.09
4 151 Traffic Control Plan Plan FSSS 156.03
5 157 Soil Erosion and Pollution Control Plan Plan FSSS 157.03
6 208 Structural Backfill Material Material
Certification
FSSS 208 704.04
7 251 Riprap Material
Certification 251.07
106, 705, Drawings
8 272 Geocell Abutment Stabilization Material
Certification 272.06
106, FSSS 736,
Drawings
9 272 Geocell: Course Granular Backfill Material
Certification 272.06
106, FSSS 703.03,
Drawings
10 272 Geocell: Geotextile – Type II Material
Certification 272.06
106, 714, Drawings
11 324 Aggregate Gradation Material
Certification
FSSS 324.03
703.06, Drawings
12 552 Structural Concrete: Mix Design Mix Design 552.03 553, 553A, Drawings
13 552 Structural Concrete: Testing Test Results 552.19 106, Drawings
14 553A Precast Concrete Structures Shop
Drawing
FSSS 553A.03
104, 552, 553, 15 553A Precast Concrete Structures: PCI Certification
Fabrication Certification
FSSS 553A.02
16 553, 553A Reinforcing Steel Order List 554.03 553, 553A, 709, Drawings
17 622 Equipment Rental Equipment Approval
FSSS 622.02
J‐3 – Special Project Specifications
155 - Schedules for Construction Contracts
155 Delete.
Delete Section 155 in its entirety.
J‐3 – Special Project Specifications
156 - Public Traffic
156.03 Accommodating Traffic During Work.
Delete the first paragraph and replace with the following:
Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635.
Submit a traffic control plan for acceptance at least 30 days before intended use.
Add the following project specific requirements:
The Contractor will be allowed to close Road No. 348 at Sixmile Bridge to thru traffic for a maximum of 2 weeks. Contractor shall notify government 30 days prior to closure.
It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the bridge can be substantially completed within the specified contract time. The Contractor shall give the CO at least two weeks advanced written notice prior to any road closure. The Contractor shall be responsible for providing, installing, maintaining, and removal of warning signs and barricades required for the road closure period in accordance with MUTCD as submitted and approved in the traffic control plan.
Delete the following from the last sentence of the last paragraph:
according to Subsection 106.07(b)
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
J‐3 – Special Project Specifications
157 - Soil Erosion Control
157.02 Materials
Provide bales, wattles, logs and rolls from a certified noxious weed free source.
157.03 General.
Delete the first two paragraphs and replace with the following:
Submit an Erosion Control Plan detailing permanent and temporary control measures to minimize erosion and sedimentation during and after construction in accordance with the plans and storm water permits. Do not modify the type, size, or location of any control or practice without approval. Submit the erosion control plan proposal at least 7 days before operations begin to the CO for approval.
Reflect in the Erosion Control Plan special concerns and measures necessary to protect resources and government improvements. Include:
(a) The construction activities and sequence of implementation relating to specific erosion control measures.
(b) The location and type of permanent controls to be implemented during construction.
(c) The location and type of temporary controls to be implemented during construction.
(d) For work in stream channels with running water a detailed dewatering plan.
(e) For work in stream channels without flowing water describe level of ground and vegetative disturbance and measures to reduce potential sediment delivery.
(f) Description of the monitoring plan.
Add the following to the third paragraph:
Upon completion of construction at the site, remove all temporary erosion control devices, dewatering materials and equipment from Government property.
157.08 Water Crossings.
At any channel crossing where there is running water, dewater by rerouting water flow around the site before and during excavation and embankment operations.
J‐3 – Special Project Specifications
201 – Clearing and Grubbing
201.06 Disposal
Delete the first sentence of this subsection and substitute the following:
Deck merchantable timber cut on National Forest System land at approved clearing on site.
Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
J‐3 – Special Project Specifications
203 - Removal of Structures and Obstructions
203.03 Salvaging Material.
Delete the third paragraph and add the following:
Stockpile salvage material at site designated on drawings.
203.05 Disposing of Material.
Modify this subsection as follows:
(a) Remove from project. Add the following:
All materials designated for removal become the property of the Contractor, unless otherwise shown on plans, and are to be disposed of by removing off of Forest Service Lands in accordance with all local, state and federal requirements.
(b) Burn. Delete this section.
(c) Bury. Delete this section.
(e) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes or scatter as directed by the CO to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets. All slash material not suitable for embankment slopes shall be disposed off Forest Service Lands in accordance with all local, state and federal requirements or as approved by the CO.
J‐3 – Special Project Specifications
204 - Excavation and Embankment
204.11 Compaction.
Delete section and add the following:
Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites approved by the CO.
J‐3 – Special Project Specifications
208 - Structure Excavation and Backfill for Selected Major Structures
208.11 Compacting.
Delete this section and add the following:
Each layer to a depth of 2 feet over new structure shall be compacted with mechanical tampers until surface deformation is no longer visible. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Layers above 2 feet over the new structure shall be compacted in accordance with FSSS 204 – Excavation and Embankment.
208.12 Acceptance.
Delete reference to Table 208-1:
Delete Table 208-1:
J‐3 – Special Project Specifications
251 - Riprap
251.01 Description
Delete the first sentence and add the following:
This work consists of furnishing, hauling, and placing of riprap for bank protection, slope protection, drainage structures, erosion control, and other features shown on the plans.
251.07 Acceptance
Delete the fourth sentence and add the following:
Structure excavation and backfill will be evaluated under section 208.
J‐3 – Special Project Specifications
272 - Geocell Abutment Stabilization
Description
272.01 This work consists of constructing geocell abutment stabilization at each abutment using a cellular confinement system such as Presto Geoweb Cellular Confinement System or Webtec TerraCell in accordance with the plans and manufacturers recommendations.
Materials
272.02 Requirements. Ensure that material conforms to specifications in the following subsections:
Granular Backfill Type (a) 703.03
Geotextile, Type II (A, B, C) 714.01
Geocell 736
Construction Requirements
272.03 General. Perform the work specified in Section 208 or 209. Use ditches, grading or similar methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.
272.04 Storage and Handling of Material. During shipment and storage, wrap geotextile materials in heavy-duty protective covering. Protect the material from mud, soil, dust, debris and sunlight prior to installation.
272.05 Geotextile Installation. Place the geotextile according to Section 207. Have the surface approved by the CO prior to placing geotextile.
Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.
Have the installed geotextile approved by the CO prior to setting the geocells.
272.06 Geocell Installation. Furnish the CO with product literature and certification as required in Section 106.03 for review and approval 7 days prior to installation. When requested by the CO, furnish a sample of the geocell from each lot for verification testing.
Place the geocell sections directly on the prepared subgrade. Expand the geocell sections into position at the grades and lines as shown on the plans. Hold the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the manufacturer prior to filling. Ensure that the individual cells have expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines shown on the plans.
J‐3 – Special Project Specifications
Connect geocell panels in accordance with the manufacturer’s recommendations.
272.07 Infill Placement. Furnish the CO with the manufacturer’s specific recommendations for backfilling 7 days prior to placement of the geocells.
Place coarse granular backfill meeting Subsection 703.03 into the expanded cells with equipment appropriate for the site conditions such as a backhoe or a front-end loader. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls.
Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. A front-end loader may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material.
Compact the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell. Make at least three complete passes or until visible deformation of the infill ceases. Grade the surface to be ½ inch above the top of the cells.
Ensure that the cell walls are not exposed after fine grading is completed.
Use the geocell manufacturer’s specific recommendations for backfilling if they are more stringent than stated above.
272.08 Acceptance. Geotextile will be evaluated under Subsections 106.02 and 714.01.
Material for geocell will be evaluated under Subsections 106.2 and 106.03.
Granular backfill material will be evaluated under Section 106.02 and 106.04.
Measurement
272.09 Method. Measure the items listed in the bid schedule according to Subsection 109.02 and the following.
Measure geocell by the square yard in place, exclusive of wastage.
Payment
272.10 Basis. The accepted quantities will be paid for at the contract price per unit of measurement for the Section 272 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
The cost for furnishing and placing the granular backfill required in Sections 207, 208, and 209 for geocell infill is incidental to this pay item and no separate payment will be made.
The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.
J‐3 – Special Project Specifications
324 - Minor Aggregate Coures - Commercial Source
Description
324.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes furnishing aggregate from a commercial source.
Material
324.02 Conform to the following Subsections:
Aggregate 703.06 Water 725.01
Construction Requirements
324.03 General. Prepare the surface on which the aggregate course is placed according to Section 204.
Request approval of the roadbed in writing before placing aggregate.
Develop, haul, and apply water in accordance to Section 170.
Submit aggregate gradations for approval by the CO.
After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.
324.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness. Place the mixture in a maximum compacted layer thickness of 6 inches.
When more than one layer is necessary, compact each layer according to Subsection 324.05 before placing the next layer. Route hauling and leveling equipment uniformly over the full width.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
J‐3 – Special Project Specifications
324.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using the following method:
Compaction B. Operate rollers and compact as specified in FSSS 204.11.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface.
324.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.10 feet from staked line and grade elevation.
If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.
Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.
Ensure that the compacted thickness is not consistently above or below the specified thickness.
The maximum variation from the compacted specified thickness is ½ inch.
Ensure that the compacted width is not consistently above the specified width. The maximum variation from the specified width will not exceed +12 inches at any point.
324.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course.
Correct all defects according to Subsection 324.06.
324.08 Acceptance. See Table 324-1 for sampling and testing requirements.
Aggregate gradation and surface course plasticity index will be evaluated under Subsection 106.03 and 106.04. Other aggregate quality properties will be evaluated under Subsections 106.02 and
106.03. Placement of aggregate courses will be evaluated under Subsections 106.02 and 106.04.
Preparation of the surface on which the aggregate course is placed will be evaluated under Section 204 or 303 as applicable.
J‐3 – Special Project Specifications
Measurement
324.09 Measure the Section 324 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.
Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.
If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.
Measure thickness perpendicular to the grade of the travelway.
Measure width perpendicular to the centerline.
Payment
324.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 324 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
J‐3 – Special Project Specifications
T ab le
-1
S am p li n g an d T es ti n g
R eq u ir em en ts
R ep or ti n g
T im e
B ef or e us in g in w or k h ou rs p li t
S am le
Y es
, w he n re qu es te d
P oi n t of p li n g
S ou rc e m at er ia l
F ro m w in dr ow o r ro ad be d af te r pr oc es si ng o r fr om a pp ro ve d cr us he r sa m pl in g de vi ce p li n g
F re q u cy pe r ty so ur ce o f m at er ia l pe r da y
T es t M et h od s
S p ec if ic at io n s
A A
SH
T
O T
A A
SH
T
O T
A
SH
T
O T
T M
D
A A
SH
T
O T
C eg or y h ar ac te ri st ic
L a br as io n (c oa rs e)
So di um s ul fa te un dn es s lo ss
(c oa rs e f in
D ab il it y in de x (c oa rs e f
F ra ct ur ed f ac pl e
T yp cc ep ta n
(S u b se ct io n
M ea su re d an d te ed fo r co nf or m an
(1
.0
M ea su re d an d te co nf or m
.0 4)
M er ia l o r
P ro d ct gg re ga te s ou rc e qu al it y
3.
ub ba se
, B as e, a nd S ur co se s ab le
-1 co n ti nu ed
S am p li n g an d T es ti n g
R eq u ir em ts
R ep or ti n g
T im e
B ef or e us in g w or k
B ef or e pl ac in g ne xt la ye li t
S am le
, w he n re qu es te d
P n t p li n g
S ou rc e of m at er ia l
In -p la p li n g
F re q u cy r ty pe a nd ce o f m at er ia l pe r ay t M et h od s
S p ec if ic at io n s
A A
SH
T
O T
(1
R -1
M ar sh al l
A A
SH
T
O
0(1
R -1
M ar sh al l
A A
S H
T O
T o th er a pp ro ve d pr oc ed eg or y h ar ac te ri ic st ur e-de ns it y M et ho
D st ur e-de ns it y M et ho
E st ur e-de ns it y M et ho d F
M oi st ur e-de ns it y M et ho
G
In -p la ce d en si ty m oi st ur e co nt en t
T yp cc ep ta n
(S b se ct io n
M ea su re d an d te co nf or m
.0 4) er ia l o r
P ro d ct ub ba se
, B as e, a nd S ur
J‐3 – Special Project Specifications
553A – Precast Concrete Structures
Description
553A.01 Work. Construct precast concrete members. In addition, manufacture, test materials for, transport, store, and install all precast concrete portions except piling, and perform all necessary grouting, welding, or other connections. Furnish precast concrete members complete and in place, including all concrete reinforcing steel and incidentals connected therewith.
Materials
553A.02 Requirements. Provide materials that meet the requirements specified in the following subsections:
High-Strength Nonshrink Grout ……………………………… 725.40
Mortar ………………………………………………………… 725.40
Reinforcing Steel ……………………………………………… 709.01
Sealants, Fillers, Seals, & Sleeves …………………………….. 712.01
Structural Concrete ……………………………………………. 552
Structural Steel ………………………………………………… 717.01
Provide precast concrete members of the size, shape, strength, air content, and finish that are SHOWN ON THE DRAWINGS. Precast concrete members must be manufactured by a plant with one of the following certifications:
Precast / Prestressed Concrete Institute (PCI) o Bridge 1, Precast Bridge Products (no prestressed reinforcing).
o Commercial 1, Precast Concrete Products (no prestressed reinforcing).
National Precast Concrete Association (NPCA) o Precast
American Concrete Pipe Association (ACPA) o QCast
Submit a copy of the transmittal letter of the latest PCI , NPCA, or ACPA inspection/certification with the shop drawings.
In lieu of the above certification, Contractor shall retain a professional engineer to provide quality assurance for the work by inspecting and certifying in writing the concrete members are constructed in accordance to the specification and shall include but not limited to:
a) Shop drawing review.
b) Concrete member dimensions.
c) Concrete mix design.
d) Aggregate sources and test results.
e) Steel reinforcing placement.
f) Concrete curing and strength test results.
g) Concrete material certifications.
h) Placement mixing, delivery and sampling.
Certification of the above shall be received by the CO prior to shipment and installation at the job site.
Perform all sampling, testing, and inspection necessary to ensure quality control of the component materials and the concrete. Sample and test for quality control and acceptance testing in accordance with the AASHTO or ASTM test methods prescribed in Section 552.
Maintain adequate records of all inspections and tests. Keep records that indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected, and the nature of any corrective action taken.
Construction
553A.03 Performance. Construct precast concrete structural members in accordance with the following sections and subsections, as applicable:
Reinforcing Steel ………………………………………………... 554
Storing, Transporting, & Erecting ………………………………. 553.08
Structural Concrete ……………………………………………… 552
Submit four sets of shop drawings to the CO for approval, including the concrete mix design for each class of concrete proposed for use, a minimum of 21 days before fabrication of the precast member(s).
553A.05 Handling, Transporting, & Erecting. Provide additional reinforcement, as needed, to meet the requirements of handling, transporting, and erecting precast members.
553A.06 Acceptance. Reinforcing steel, anchor devices, elastomeric bearings, and material for concrete and grout will be evaluated under Subsection 106.03. Furnish production certifications for hydraulic cement, and reinforcing steel.
Concrete for precast concrete members will be evaluated under Subsections 106.02, 106.03, and 106.04.
J‐3 – Special Project Specifications
Construction of precast concrete members will be evaluated under Subsections 106.02 and 106.04.
Reinforcing steel will be evaluated under Section 554.
Falsework and forms will be evaluated under Section 562.
Measurement
553A.07 Measure the Section 553A items listed in the bid schedule according to Subsection
109.02 and the following as applicable.
Do not measure reinforcing steel, concrete, anchorages, plates, nuts, and other material contained within or attached to the unit for precast concrete structural members.
Payment
553A.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 553A pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
J‐3 – Special Project Specifications
561 – Superstructure Transport and Installation
Description
561.01 This work consists of transporting the existing bridge superstructure to the project site, installing all superstructure portions, and performing all necessary connections. Furnish all fasteners and other incidentals connected therewith.
Materials
561.02 Requirements. Ensure that material conforms to specifications as shown on the drawings. Match existing superstructure dimensions and spacings unless otherwise noted.
Construction Requirements
561.03 General. Load and transport the bridge superstructure from Mill Creek Road (#486), MP 11.5, to project site. Install the bridge superstructure as shown on drawings, and furnish all fasteners and other incidentals required for installation.
Measurement
561.04 Method. Measure the items listed in the bid schedule according to Subsection 109.02.
Payment
561.05 Basis. The accepted quantities will be paid for at the contract price per unit of measurement for the Section 561 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
The cost for furnishing fasteners and other subsidiaries necessary for installation are incidental to this pay item and no separate payment will be made.
J‐3 – Special Project Specifications
622 - Rental Equipment
622.02 Rental Equipment
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator, 1990 model year or newer, with at least 90 HP. The bucket must be equipped with a hydraulic “thumb.”
Motor Grader. Provide a motor grader, 1990 model year or newer, with a minimum weight of 30,000 lbs.
Provide equipment of the type listed in the Schedule of Items. Provide equipment of at least the minimum size needed to efficiently perform the work. Submit the model number of the equipment to the CO for approval before delivery to the project site. Equipment shall be no more than 15 years old and shall be reasonably free of leaks and other mechanical deficiencies.
J‐3 – Special Project Specifications
703 - Aggregate
703.03 Granular Backfill.
(c) Course Granular Backfill. Furnish backfill material that consists of clean, hard durable particles or fragments of crushed stone, crushed slag or crushed gravel meeting the gradation shown below.
Sieve Size Percent Passing
1 inch 100 ¾ inch 75 to 100 No. 4 0 to 60 No. 40 0 to 50 No. 200 0 to 5
J‐3 – Special Project Specifications
736 - Geocell
736.01 Geocell.
Furnish geocell material consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.), connected in series at off-set, full-depth ultrasonic seams aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill material is placed.
736.02 Requirements. Furnish geocells consisting of polyethylene material treated to resist ultraviolet degradation and conforming to the requirements shown in table 736-1.
Table 736-1 – requirements for geocells.
Density ASTM D 1505 0.935 to 0.965 g/cm3 (58.4 to 60.2 pounds per cubic foot).
Environmental Stress Crack Resistance
ASTM D 1693 3000 hour
Strip Sheet Thickness
ASTM D 5199 1.27 mm (50 mil), minus 5 percent, plus 10 percent.
Determine thickness in the flat before any surface texturing or other surface disruption.
Short-term peel strength
U.S. Army Corps of Engineers Technical Report GL-86-19, Appendix A
2000 N (450 pound) minimum for 203 mm (8.0 inch) depth cell
Seam Hang Strength 101.6 mm (4”) weld joint supporting load of 72.5 kg (160 pounds)
101.6 mm (4”) weld joint supporting load of 72.5 kg (160 pounds) while undergoing temperature change from 23O C to 54O C (74O F to 130O F) on 1 hour cycles.
30 days minimum
7 days minimum