AG-0398-S-14-0004.pdf
PDF 449 KB Posted
- Attached to
- GALLATIN NATIONAL FOREST: Sixmile Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-0398-S-14-0004
About this file
AG-0398-S-14-0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-0398-S-14-0004-0001.pdf | ||
| J-4_SixmileBridge_Plans-Drawings.pdf | ||
| J-6_SF-1413.pdf | ||
| J-5_GNF_Food_Storage_Order.pdf | ||
| J-3_Special_Project_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
684244
GALLATIN NATIONAL FOREST
PO BOX 130, 10 EAST BABCOCK AVENUE
BOZEMAN MT 59771
EAST SIDE ACQUISITION TEAM (ESAT)
ATTN: ALANE FITZPATRICK
GALLATIN NATIONAL FOREST
PO BOX 130, 10 E BABCOCK, BOZEMAN, MT 59771
ALANE FITZPATRICK 406-587-6920
104/15/2014
AG-0398-S-14-0004
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
GNF: Sixmile Bridge Replacement
Part I-The Schedule
1. Section A: SF-1442
2. Section B: The Schedule-Supplies or Services & Prices/Costs
3. Section C: Description/Specifications/Work Statement
4. Section E: Inspection & Acceptance
5. Section F: Deliveries or Performance
6. Section G: Contract Administration Data
7. Section H: Special Contract Requirements
Part II: Contract Clauses
8. Section I: Contract Clauses
Part III: List of Documents, Exhibits & Other Attachments
9. Section J: List of Attachments
Part IV: Representations & Instructions
10. Section K: Representations, Certifications & Other Statements to Offerors
11. Section L: Instructions, Conditions & Notices to Offerors
12. Section M: Evaluation Factors for Award
Contractor DUNS#:
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 calendar days and complete it within ________________ ________________ calendar days after receiving
Section F
05/05/2014
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
GALLATIN NATIONAL FOREST
PO BOX 130, 10 EAST BABCOCK AVENUE
BOZEMAN MT 59771
ALANE FITZPATRICK
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 39
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-0398-S-14-0004
Gallatin National Forest: Sixmile Bridge Replacement Yellowstone Ranger District; Park County, MT Delivery: 06/30/2014 Delivery Location Code: 0398
GALLATIN NATIONAL FOREST
PO BOX 130, 10 EAST BABCOCK AVENUE
BOZEMAN MT 59771 US
FOB: Destination
001 Replace undersized Sixmile Road Bridge #348.00.9 following Miner Paradise Fire Complex Product/Service Code: Y1LB Product/Service Description: CONSTRUCTION OF
HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG‐0398‐S‐14‐0004
GALLATIN NATIONAL FOREST
Sixmile Bridge Replacement
SIXMILE BRIDGE REPLACEMENT
TABLE OF CONTENTS
SECTION B ‐ SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION C ‐ DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SECTION D ‐ PACKAGING AND MARKING
SECTION E ‐ INSPECTION AND ACCEPTANCE
SECTION F ‐ DELIVERIES OR PERFORMANCE
SECTION G ‐ CONTRACT ADMINISTRATION DATA
SECTION H ‐ SPECIAL CONTRACT REQUIREMENTS
SECTION I ‐ CONTRACT CLAUSES
SECTION J ‐ LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION K ‐ REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
SECTION L ‐ INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
SECTION M ‐ EVALUATION FACTORS FOR AWARD
Sixmile Bridge Replacement
PART I – THE SCHEDULE
SECTION B ‐ SUPPLIES OR SERVICES AND PRICES/COSTS
B ‐ 1 SCHEDULE OF ITEMS: Sixmile Bridge Replacement; Park County, Montana; Yellowstone Ranger District, Gallatin National Forest.
ITEM DESCRIPTION
MEASUMENT ESTIMATED
QTY
UNIT TOTAL
METHOD* UNIT** PRICE PRICE
151(01) Mobilization LSQ LS 1 $ XX.XX $
152(21) Construction Survey and Staking LSQ LS 1 $ XX.XX $
157(13) Soil Erosion and Pollution Control LSQ LS 1 $ XX.XX $
201(05) Clearing and Grubbing LSQ LS 1 $ XX.XX $
203(04) Removal of Bridge, Disposal Method A LSQ LS 1 $ XX.XX $
204(20) Drain Dip Construction AQ EA 1 $ $
208(01) Structure Excavation LSQ LS 1 $ XX.XX $
208(02) Structural Backfill CQ CY 60 $ $
251(01) Placed Riprap, Class 4 (Contractor Furnished Portion) CQ CY 40 $ $
272(50) Geocell Abutment Stabilization, 6" Depth (Contractor Furnished) CQ SY 29 $ $
324(01)
Aggregate Surface Course, 4" Compacted Depth (Contractor Furnished) CQ CY 33 $ $
553A(01) Precast Concrete Member, Footings AQ EA 2 $ $
557(03)
Bridge Superstructure Timber Member Replacement (Government Furnished) CQ MBF 2.82 $ $
561(01) Bridge Superstructure Transport and Install LSQ LS 1 $ XX.XX $
622(01) Equipment Rental, Hydraulic Excavator with Thumb AQ HR 8 $ $
622(02) Equipment Rental, Motor Grader AQ HR 4 $ $
633(05) Posts, Wood AQ EA 4 $ $
633(06) Object Markers (Type 3) AQ EA 4 $ $
TOTAL PRICE – ALL ITEMS: $
*DESIGNATED METHOD OF MEASUREMENT **PAY UNIT ABBREVIATIONS
LSQ ‐‐‐‐‐ Lump Sum Quantity LS ‐‐‐‐‐‐‐‐Lump Sum
CQ‐‐‐‐‐‐‐ Contract Quantity CY‐‐‐‐‐‐‐‐Cubic Yard
SY ‐‐‐‐‐‐‐‐Square Yard
MBF ‐‐‐‐‐1,000 Board Feet
AQ ‐‐‐‐‐‐ Actual Quantity EA ‐‐‐‐‐‐‐Each
HR ‐‐‐‐‐‐‐Hour
Sixmile Bridge Replacement
Special Notes
The bidder must bid on all items. Round to the nearest cent.
1. In the event of an error in extending the bid prices, unit prices will govern, unless otherwise determined by the Contracting Officer, in accordance with applicable regulations.
2. Offers for Quantities less than those listed in the numbered items may be rejected.
3. Items located in the Schedule of Items may have suffixes that do not appear on the Items in the specifications.
These suffixes pertain only to sizes, classes, and/or types indicated in the Item ‘Descriptions,’ and are used by the Government for computer tabulation of bid schedules.
4. Payment for bond premiums in accordance with FAR 52.232‐5. Payments under Fixed‐Price Construction Contracts shall not be in addition to the contract price but can be included under Mobilization.
5. One contract will be awarded to the responsive and responsible bidder offering the best value to the Government (see Section M – Evaluation Factors for Award).
6. The successful Contractor must be registered in the System for Award Management (SAM) data base (reference Section I, FAR 52.204‐7) before an award is issued.
7. This is a Request for Quotation (RFQ); no public opening will be held. Results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned and will be retained by the U.S. Forest Service for official record purposes. This RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of a quote, or to make any award.
8. Vendors are urged to thoroughly read the solicitation and to review all attachments prior to preparing and submitting a quote. Instructions for submitting a quote are located in Section L. Questions regarding quote submission may be directed to Alane Fitzpatrick, Contracting Officer, at 406‐587‐6920.
Price quotation furnished by:
Name: _____________________________________ Phone: ________________________________
Address: _____________________________________ Cell: ________________________________
_____________________________________ FAX: ________________________________
DUNS: _____________________________________ E‐Mail: ________________________________
Sixmile Bridge Replacement
SECTION C ‐ DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C ‐ 1 PROJECT DESCRIPTION AND LOCATION
a. Description of Work: This project consists of replacing a 25‐foot wood bridge with a 50‐foot, salvaged wood bridge along with the associated site work. The work will involve replacing worn portions of the bridge with new (Government provided), treated timbers. The successful Contractor shall furnish all labor, materials, equipment, supervision, transportation, supplies, and incidentals necessary to complete the work.
b. Project Location: The project is located on the Gallatin National Forest, Yellowstone Ranger District, in Park County, Montana. The site is situated approximately 12 miles north of Gardiner, MT along Sixmile Road #348 and is roughly 0.8 miles from the junction with Dailey Lake Road. The project area is located in T6S, R7E.
d. Subcontractors: All subcontractors must be identified by the time of the postaward conference and must be approved prior to the issuance of the Notice to Proceed. Contractors shall submit a completed SF‐1413 form to the Contracting Officer for each subcontractor (an SF‐1413 form is attached in Section J‐6).
e. Price Range: Between $25,000 and $100,000
f. Pre‐bid Tour: No pre‐bid tour will be conducted. Interested parties may contact Grant Morrison at the Gallatin
National Forest, Supervisor’s Office, 406‐587‐6724, for additional information or for directions to view the project site on their own. Contractors are urged to inspect the sites where the work will be performed.
Interested parties shall take reasonable steps to ascertain the nature and location of the project area and the work to be completed, as well as the general and local site conditions which can affect the work and cost of performance. Failure to take the actions described in this paragraph will not relieve the Contractor from the responsibility of properly estimating the difficulty and cost to successfully perform the work, or from successful completion of the work without additional expense to the Government.
g. Start Work Date: Estimated start date for this project is 19 May 2014. Work may begin as soon as conditions are satisfactory, but not until then.
h. Performance Period: All work shall be completed, including clean‐up, final inspection, and Government acceptance, no later than 30 June 2014. The Contractor shall maintain progress at a rate that will assure completion of work within the time specified above.
C ‐ 2 GENERAL SPECIFICATIONS
a. Existing Utilities: There are no known underground utilities at the project site.
b. Pollution and Erosion Control: During all operations under this contract, the Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance‐free manner.
Refuse shall be disposed of in State‐approved containers.
Throughout the work performance period, the Contractor shall make every reasonable effort to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to minimize soil erosion and water pollution.
c. Noxious Weed Control: In order to prevent the potential spread of noxious weeds, the Contractor shall clean equipment in accordance with Section 151, Special Project Specifications.
Sixmile Bridge Replacement
d. Submittals: Submit two copies to the Contracting Officer (CO) for approval on all construction materials and items required herein. Literature shall be marked or otherwise designated to indicate identifying information such as the exact model, size, etc., of the item(s) the Contractor proposes to use. The information provided shall be adequate to determine compliance with the specifications without additional research by the CO. One copy of the approved submittals will be returned to the Contractor. The Contractor must submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item(s). The Contractor shall allow five calendar days for processing of submittals by the Government.
e. Public Use of Facilities: The Contractor shall be allowed to close the road for a period of two weeks past the Lower
Sixmile Trailhead. The Contractor shall notify the Government 30 days prior to closure.
f. Quarry operation and rehabilitation: Conduct quarry operations so as to cause minimum impact on air quality, noise levels, and surrounding natural resources. Do not disturb vegetation or the ground surface outside of the limit of disturbance designated in the field by the CO. At the finish of quarry operations, restore disturbed surfaces to pre‐contract conditions.
g. Waste site operation and rehabilitation: Waste site locations for disposal of excess excavated material, shall be identified. The CO will designate areas for waste placement within these sites. Operate only within CO‐delineated limits of disturbance in waste sites. Where directed by the CO, salvage and stockpile all topsoil prior to waste placement. For measurement purposes, take initial cross‐sections of the ground surface after stripping topsoil (where topsoil stripping is required). Upon completion of the waste placement, retake cross‐sections before replacing topsoil. Place waste by end dumping or similar means and shape as directed by the CO. Shape slopes to gradually transition into the natural ground without noticeable breaks. Spread topsoil uniformly over waste and other disturbed areas.
h. Construction Staking: The Contractor will be responsible for all staking.
i. Storage and Stockpiling of Equipment and Materials: Storage and stockpiling shall take place only within areas approved by the CO.
j. Maintenance of Clean Worksite Conditions: The Contractor will maintain the project work area in a clean and orderly condition throughout the period of performance.
k. Work Done by Others: It is anticipated that work will be performed by other contractors at the site during the period of performance. Other work may include:
Project: Sixmile Road ERFO Repairs – 2 sites near the end of the road Contractor: Cat Tracks, Inc.
The Contractor shall make reasonable accommodations for other work at the project site. The Government will notify the Contractor in advance when this work is planned to occur.
C ‐ 3 STANDARD SPECIFICATIONS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP‐03, U.S. Customary Units) are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant Contract.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP‐03) can be downloaded at the following website: http://www.wfl.fha.dot.gov/design/specs/fp03.htm.
C ‐ 4 SPECIAL PROJECT SPECIFICATIONS
Sixmile Bridge Replacement
The following Special Project Specifications (SPS) supplement the Standard Specifications, and are a part of this solicitation and any resultant contract. The Special Project Specifications are attached in Section J – 3.
SPECIAL PROJECT SPECIFICATIONS
Number Description
‐ *Preface
101 Terms, Format, and Definitions
102 Bid, Award, and Execution of Contract
103 Scope of Work
104 Control of Work
105 Control of Material
106 Acceptance of Work
107 Legal Relations and Responsibility to the Public
108 Prosecution and Progress
109 Measurement and Payment
151 Mobilization
152 Contractor Survey and Staking
153 Contractor Quality Control
155 Schedules for Construction Contracts
156 Public Traffic
157 Soil Erosion Control
201 Clearing and Grubbing
203 Removal of Structures and Obstructions
204 Excavation and Embankment
208 Structure Excavation and Backfill for Selected Major Structures
251 Riprap
272 Geocell Abutment Stabilization
324 Minor Aggregate Courses – Commercial Source
553A Precast Concrete Structures
561 Superstructure Transport and Installation
622 Rental Equipment
625 Turf Establishment
703 Aggregate
736 Geocell
*Preface. Delete all but the first paragraph and add the following: The Forest Service, US Department of Agriculture, has adopted FP‐03 for construction of National Forest System Roads.
C ‐ 5 PROJECT PLANS/DRAWINGS
The following project plans/drawings are hereby made part of this solicitation and any resultant contract, and are attached in Section J – 4.
Sheet No. DESCRIPTION
1 Title Sheet
2 General Notes, Estimated Quantities, & Typical Road Section
3 Existing Conditions Site Map
4 Roadway Plan and Profile
5 Bridge General Layout
6 Foundation and Riprap Details and Construction Notes
7 Bridge Superstructure Work Items
8 Bridge Superstructure Work Item Pictures
Sixmile Bridge Replacement
Sheet No. DESCRIPTION
9 Abutment Details
10 Optional Field Splice Details
11 Curb and Object Marker Details
12 Drain Dip Details
13 Roadway Sections (STA 1+00 to STA 2+40)
14 Roadway Sections (STA 2+50 to STA 3+10)
Note: All references in the Specifications to “Shown on Plans/Drawings” refer to the above numbered drawings.
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.211‐72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
452.211‐73 Attachments to Statements of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
(End of Clause)
SECTION D ‐ PACKAGING AND MARKING
SECTION E ‐ INSPECTION AND ACCEPTANCE
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246‐12 Inspection of Construction (APR 1996)
52.252‐2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm;
http://www.dm.usda.gov/procurement/policy/agar.html.
(End of clause)
SECTION F ‐ DELIVERIES OR PERFORMANCE
52.242‐14 Suspension of Work (APR 1984)
52.211‐10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 June 2014. The time stated for completion shall include final cleanup of the premises.
52.252‐2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm;
http://www.dm.usda.gov/procurement/policy/agar.html.
SECTION G ‐ CONTRACT ADMINISTRATION DATA
G ‐ 1 GOVERNMENT FURNISHED PROPERTY
The Government will provide the following items of Government Furnished Property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with FAR 52.245‐1, Government Property, located in Section I.
a. Refer to Section 105, Special Project Specifications, located in Section J‐3.
452.215‐73 Postaward Conference (NOV 1996)
A postaward conference with the successful offeror is required. It will be scheduled within seven days after the date of contract award. The conference will be held at the Gallatin National Forest, Supervisor’s Office, 10 E Babcock, Bozeman, MT 59715 or at another location agreed to by the parties.
(End of Clause)
SECTION H ‐ SPECIAL CONTRACT REQUIREMENTS
H‐1 CAMPING
a. Contractors are expected to keep a clean camp at all times and to adhere to all applicable National Forest/Ranger
District policies in effect.
b. Before camping, the Contractor shall obtain a District Camping Permit from the Yellowstone Ranger District through the Contracting Officer.
(1) The Contractor shall bring a proposed campsite location to the pre‐work meeting for review and approval, and prior to camping.
c. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the
Contractor.
d. The Government will make no special camping allowances for the Contractor within or near the project area.
Arrangements with the local private landowners will be at the discretion of the Contractor.
H‐2 FOOD STORAGE
a. Within bear country, there is a special order in effect for food storage and camping (see the attached Gallatin National Forest Food Storage Order, located in Section J‐5). The special order states that all food, beverages, and scented or flavored toiletries must be stored unavailable to bears at night and when unattended during the day.
Attractants include canned food, pop, beer, garbage, grease, processed livestock or pet food, toothpaste, and
Sixmile Bridge Replacement chapstick. These items must be hung at least 10‐feet off the ground and 4‐feet from any vehicle support, or stored inside a bear resistant container or vehicle. Cars, pick‐up cabs, enclosed horse trailers, hard sided campers or camper shells are all considered bear resistant. Food should be stored out of sight in vehicles. Coolers, pop‐up campers, backpacks, and tents are not considered bear resistant.
Sixmile Bridge Replacement
PART II – CONTRACT CLAUSES
SECTION I ‐ CONTRACT CLAUSES
52.252‐2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/vffara.htm;
http://www.dm.usda.gov/procurement/policy/agar.html.
(End of clause)
52.204‐7 System for Award Management (JUL 2013) 52.209‐6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or
Proposed for Debarment (AUG 2013) 52.211‐18 Variation in Estimated Quantity (APR 1984) 52.219‐6 Notice of Total Small Business Set‐Aside (NOV 2011) 52.222‐3 Convict Labor (JUN 2003) 52.222‐6 Davis‐Bacon Act (JUL 2005) 52.222‐7 Withholding of Funds (FEB 1988) 52.222‐8 Payrolls and Basic Records (JUN 2010) 52.222‐9 Apprentices and Trainees (JUL 2005) 52.222‐10 Compliance with Copeland Act Requirements (FEB 1988) 52.222‐11 Subcontracts (Labor Standards) (JUL 2005) 52.222‐12 Contract Termination ‐ Debarment (FEB 1988) 52.222‐13 Compliance with Davis‐Bacon and Related Act Regulations (FEB 1988) 52.222‐14 Disputes Concerning Labor Standards (FEB 1988) 52.222‐15 Certification of Eligibility (FEB 1988) 52.222‐21 Prohibition of Segregated Facilities (FEB 1999) 52.222‐26 Equal Opportunity (MAR 2007) 52.222‐27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222‐36 Affirmative Action for Workers with Disabilities (OCT 2010) 52.223‐2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) 52.223‐5 Pollution Prevention and Right‐to‐Know Information (MAY 2011) 52.223‐6 Drug‐Free Workplace (MAY 2001) 52.224‐1 Privacy Act Notification (APR 1984) 52.224‐2 Privacy Act (APR 1984) 52.225‐13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227‐4 Patent Indemnity‐‐Construction Contracts (DEC 2007) 52.228‐2 Additional Bond Security (OCT 1997) 52.228‐5 Insurance ‐ Work on a Government Installation (JAN 1997) 52.228‐11 Pledges of Assets (JAN 2012) 52.228‐14 Irrevocable Letter of Credit (DEC 1999) 52.232‐5 Payments under Fixed‐Price Construction Contracts (SEP 2002) 52.232‐18 Availability of Funds (APR 1984) 52.232‐23 Assignment of Claims (JAN 1986) 52.232‐27 Prompt payment for construction contracts (JUL 2013) 52.232‐33 Payment by Electronic Funds Transfer ‐ System for Award Management (JUL 2013) 52.233‐1 Disputes (JUL 2002) 52.233‐3 Protest after Award (AUG 1996) 52.233‐4 Applicable Law for Breach of Contract Claim (OCT 2004)
Sixmile Bridge Replacement
52.236‐2 Differing Site Conditions (APR 1984) 52.236‐3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236‐5 Material and Workmanship (APR 1984) 52.236‐6 Superintendence by the Contractor (APR 1984) 52.236‐7 Permits and Responsibilities (NOV 1991) 52.236‐8 Other Contracts (APR 1984) 52.236‐9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236‐10 Operations and Storage Areas (APR 1984) 52.236‐11 Use and Possession Prior to Completion (APR 1984) 52.236‐12 Cleaning Up (APR 1984) 52.236‐13 Accident Prevention (NOV 1991) 52.236‐17 Layout of Work (APR 1984) 52.236‐21 Specifications and Drawings for Construction (FEB 1997) 52.236‐26 Preconstruction Conference (FEB 1995) 52.243‐5 Changes and Changed Conditions (APR 1984) 52.245‐1 Government Property (APR 2012) 52.245‐9 Use and Charges (APR 2012) 52.246‐21 Warranty of Construction (MAR 1994) 52.249‐1 Termination for Convenience of the Government (Fixed‐Price) (Short Form) (APR 1984) 52.249‐10 Default (Fixed‐Price Construction) (APR 1984) 52.253‐1 Computer Generated Forms (JAN 1991)
452.232‐70 Reimbursement for Bond Premiums ‐ Fixed‐Price Construction Contracts (NOV 1996) 452.236‐70 Additive or Deductive Items (FEB 1988) 452.236‐71 Prohibition Against the Use of Lead‐Based Paint (NOV 1996) 452.236‐72 Use of Premises (NOV 1996) 452.236‐73 Archaeological or Historic Sites (FEB 1988) 452.236‐74 Control of Erosion, Sedimentation, and Pollution (NOV 1996) 452.236‐76 Samples and Certificates (FEB 1988)
52.225‐9 Buy American Act ‐ Construction Materials (SEP 2010)
(a) Definitions. As used in this clause‐
"Commercially available off‐the‐shelf (COTS) item"‐
(1) Means any item of supply (including construction material) that is‐
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site
Sixmile Bridge Replacement preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Cost of components" means‐
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty‐free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means‐
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if‐
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a‐10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE
[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that‐
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material
Sixmile Bridge Replacement would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including‐
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty‐free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Sixmile Bridge Replacement
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty‐free entry certificate is issued).
52.228‐13 Alternative Payment Protections (JUL 2000)
(a) The Contractor shall submit one of the following payment protections:
A Payment Bond; or An Irrevocable Letter of Credit (ILC); or A Certificate of Deposit.
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within seven days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one‐year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
52.232‐40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
52.244‐6 Subcontracts for Commercial Items (DEC 2013)
Commercial item has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.
Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.203‐13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110‐252, Title VI, Chapter 1 (41 U.S.C. 251 note)), if the subcontract exceeds $5,000,000 and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203‐15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111‐5), if the subcontract is funded under the Recovery Act.
(iii) 52.219‐8, Utilization of Small Business Concerns (JUL 2013) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219‐8 in lower tier subcontracts that offer subcontracting opportunities.
(iv) 52.222‐26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222‐35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212(a));
(vi) 52.222‐36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793).
(vii) 52.222‐40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222‐40.
(viii) 52.222‐50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
(ix) 52.225‐26, Contractors PerformingPrivate Security Functions Outside the United States JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;
10 U.S.C. 2302 Note).
(x) 52.232‐40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232‐40.
(xi) 52.247‐64, Preference for Privately Owned U.S.‐Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d)
Sixmile Bridge Replacement of FAR clause 52.247‐64.
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
(End of clause)
452.236‐77 Emergency Response (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236‐9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243‐4.
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J ‐ LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
J ‐ 1 Experience Questionnaire (pages 21‐22)
J ‐ 2 Wage Determination – Davis Bacon; General Decision Number MT140080 03/07/2014 MT80 (pages 23‐29)
J ‐ 3 Special Project Specifications (Attached as a separate document; 40 pages)
J ‐ 4 Project Plans/Drawings (Attached as a separate document; 14 pages)
J ‐ 5 Food Storage Special Order (Attached as a separate document; 8 pages)
J ‐ 6 SF‐1413 Statement and Acknowledgment (Attached as a separate document; 1 page)
Sixmile Bridge Replacement
J – 1 EXPERIENCE QUESTIONNAIRE
1. CONTRACTOR NAME, ADDRESS, & TELEPHONE NUMBER:
2. BUSINESS TYPE
COMPANY
INDIVIDUAL
CORPORATION
CO-PARTNERSHIP
NON-PROFIT
ORGANIZATION
3. HOW MANY YEARS DOES YOUR BUSINESS HAVE IN THE LINE OF
WORK CONTEMPLATED BY THIS SOLICITATION?
4. HOW MANY YEARS EXPERIENCE IN CONTRACTING HAS YOUR BUSINESS HAD AS AN (a) PRIME CONTRACTOR __________ AND/OR (b) SUB-CONTRACTOR __________? IS THIS TIME
CONCURRENT? YES NO
5a. LIST BELOW SIMILAR PROJECTS YOUR BUSINESS HAS COMPLETED WITHIN THE LAST THREE
YEARS:
CONTRACT
AMOUNT
TYPE OF PROJECT DATE
COMPLETED
NAME, ADDRESS & TELEPHONE NUMBER OF
OWNER/PERSON TO CONTACT FOR INFO.
5b. LIST BELOW THE PROJECTS THAT ARE INCOMPLETE:
CONTRACT
NUMBER
DOLLAR AMT.
OF AWARD
NAME, ADDRESS & PHONE
NO. OF AGENCY INVOLVED
PERCENT
COMPLETED
DATE
COMPLETED
UNITS
AWARDED
6a. HAVE YOU EVER FAILED TO COMPLETE ANY WORK AWARDED TO YOU? YES
NO
6b. HAS WORK EVER BEEN COMPLETED BY PERFORMANCE BOND? YES
NO
6c. IF “YES” TO EITHER ITEM 6a OR 6b, SPECIFY LOCATION(S) AND REASONS(S) WHY:
Sixmile Bridge Replacement
7. ORGANIZATION AND WORK THAT WILL BE AVAILABLE FOR THIS PROJECT:
a. (1) MINIMUM NO. OF EMPLOYEES: __________
AND
b. (2) MAXIMUM NO. OF EMPLOYEES: __________
b. ARE EMPLOYEES REGULARLY ON YOUR PAYROLL: YES NO
c. SPECIFY EQUIPMENT AVAILABLE FOR THIS CONTRACT:
d. ESTIMATE RATE OF PROGRESS BELOW (SUCH AS 2.0 ACRES/MAN/DAY:
(1) MINIMUM PROGRESS RATE:
AND
(2) MAXIMUM PROGRESS RATE:
8. LIST BELOW THE EXPERIENCE OF THE PRINCIPAL INDIVIDUALS OF YOUR BUSINESS:
INDIVIDUALS NAME PRESENT POSITION
YEARS
OF EXP.
MAGNITUDE AND TYPE OF WORK
9. REMARKS – SPECIFY BOX NUMBERS (also use this area to address any problems with past performance not noted in item 6):
(Vendor may attach additional pages if extra space is needed.)
10. THE BIDDER SHALL INDICATE WHETHER OR NOT HE/SHE HAS EXAMINED THE AREAS FOR WHICH
THIS BID IS SUBMITTED: YES NO
IF YES, THE DATE AREA WAS EXAMINED:
CERTIFICATION: I CERTIFY THAT ALL OF
THE STATEMENTS MADE BY ME ARE
COMPLETE AND CORRECT TO THE BEST OF
MY KNOWLEDGE AND THAT ANY PERSONS
NAMED AS REFERENCES ARE AUTHORIZED
TO FURNISH THE FOREST SERVICE WITH
INFORMATION NEEDED TO VERIFY MY
CAPABILITY TO PERFORM THIS PROJECT.
11a. CERTIFYING OFFICIAL’S NAME & TITLE
11b. SIGNATURE (Sign in ink)
11c. DATE
Sixmile Bridge Replacement
J ‐ 2 WAGE DETERMINATION – Davis Bacon (www.dol.gov)
General Decision Number: MT140080 03/07/2014 MT80 State: Montana Construction Type: Highway Counties: Montana Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/07/2014
SUMT2014-001 02/19/2014
Rates Fringes
CARPENTER
Carpenter/Piledriverman.....$ 25.21 10.82 Millwright..................$ 27.78 10.82 Zone 1: 0 to 30 miles - Free
Zone 2: 30 to 50 miles - Base Pay +$3.00
Zone 3: Over 50 miles - Base Pay +$4.80
The Zone hourly rate applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the City Center of the following towns to the center of the job:
Billings, Bozeman, Butte, Great Falls, Helena, Missoula, Kalispell, Lewistown, Miles City
CEMENT MASON/CONCRETE FINISHER...$ 23.87 9.80
TRAVEL PAY:
Zone 1: 0 to 45 miles - Free
Zone 2: 45 to 85 miles - $45.00 per day
Zone 3: Over 85 miles - $75.00 per day
ELECTRICIAN (LINE
CONSTRUCTION)
Equipment Operator..........$ 30.12 12.71 Groundman...................$ 24.30 11.99 Lineman.....................$ 40.63 13.78
TRAVEL PAY:
Zone 1: $30.00 day - 25 Mile radius around and including the following cities from the County Courthouse: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell and Missoula
Zone 2: $60.00 day - All other areas
ELECTRICIAN
Sixmile Bridge Replacement
Area 1 Beaverhead, Deer Lodge, Granite, Jefferson, Madison, Silver Bow and Powell Counties............$ 27.60 12.98 Area 2 Big Horn, Carbon, Carter, Custer, Dawson, Fallon, Garfield, Golden Valley, Musselshell, Powder River, Prairie, Rosebud, Stillwater, Treasure, Wibaux and Yellowstone Counties...................$ 30.73 12.54 Area 3 Blaine, Cascade, Chouteau, Daniels, Fergus, Glacier, Hill, Judith Basin, Liberty, McCone, Petroleum, Pondera, Phillips, Richland, Roosevelt, Sheridan, Teton, Toole, Valley and Wheatland Counties...................$ 30.73 12.54 Area 4 Broadwater, Lewis and Clark and Meagher Counties.$ 29.06 11.36 Area 5 Flathead, Lake, Lincoln, Mineral, Missoula, Ravalli and Sanders Counties...................$ 27.02 12.59 Area 6 Gallatin, Park and Sweet Grass Counties.............$ 27.68 11.84 TRAVEL PAY: Zone 1: 0 to 10 miles - Free
Zone 2: 10-50 miles - Federal mileage both ways/day
Zone 3: Over 50 miles - $75.00 per day
IRONWORKER
Flathead, Glacier, Lake, Lincoln, Mineral, Missoula, Ravalli and Sanders County..............$ 25.90 19.98 Remaining Counties..........$ 26.00 19.08
TRAVEL PAY:
Zone 1: 0 to 45 miles - Free
Zone 2: 45-85 miles - $45.00 per day
Zone 3: Over 85 miles - $75.00 per day
LABORER
Group 1.....................$ 18.90 8.05
Sixmile Bridge Replacement
Group 2.....................$ 21.97 8.05 Group 3.....................$ 22.19 8.05 Group 4.....................$ 23.18 8.05 GROUP 1: Flag Person
GROUP 2: All General Labor work; Burning Bar; Bucket Man;
Carpenter Tender; Caisson Worker; Cement Mason Tender; Cement Handler (dry); Chuck Tender; Choker Setter; Concrete Worker;
Curb Machine-Lay Down; Crusher and Batch Plant Worker; Fence Erector; Form Setter; Form Stripper; Heater Tender;
Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender; Rail and Truck Loaders and Unloaders; Riprapper; Sealants for Concrete and other materials; Sign Erection, Guard Rail and Jersey Rail;
Stake Jumper; Spike Driver; Signalman; Tail Hoseman; Tool Checker and Houseman; Traffic Control Worker
GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment Handler; Geotextile and Liners; High-Pressure Nozzleman;
Jackhammer (Pavement Breaker); Laser
Equipment; Non-riding Rollers; Pipelayer; Posthole Digger (power); Power Driven Wheelbarrow; Rigger; Sandblaster; Sod- Cutter-power; Tampers
GROUP 4: Asphalt Raker; Cutting Torch; Grade Setter; High- Scaler; Power Saws (Faller & Concrete); Powderman ($1.00 per hour above Group 4 rate); Rock & Core Drill; Track or Truck Mounted Wagon Drill; Welder including Air Arc
LABORERS ZONE PAY:
The hourly wage rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Court House of the following towns only to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,
KALISPELL, LEWISTOWN, MILES CITY, MISSOULA
ZONE 1: 0 to 25 miles - Free
ZONE 2: 25 to 50 miles - Base Pay +$2.50
ZONE 3: Over 50 miles - Base Pay +$3.00
PAINTER (Pavement Marking/Milling and related work. Includes operating marking and all other equipment and all work
Sixmile Bridge Replacement involved in application of pavement markings including epoxies, paints,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .