J-3b_SwanCreek-StormCastle_Worklist_AdditionalItems.pdf
PDF 38 KB Posted
- Solicitation number
- AG-0398-S-13-0021
About this file
J-3b_SwanCreek-StormCastle_Worklist-AdditionalItems
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-5_GNF_Food_Storage_Order.pdf | ||
| AG-0398-S-13-0021.pdf | ||
| J-4_SwanCreek-StormCastle_Plans-Drawings.pdf | ||
| J-6_SF-1413.pdf | ||
| J-3a_SwanCreek-StormCastle_WorklistItems-BaseItems.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U p p e r S w a n A D D I T I O N A L I T E M S - T R A I L # 9 0 7 , T i m b e r B u t t e - W o r k I t e m s
Gallatin National Forest Page 1
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Timber Butte #907 at trailhead and end of Storm Castle Road #132, in section 12.
0+00 200+00 Clear trail for duration of contract 911-1 982 982(01) MI 5.59
0+00 200+00 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 Install 2 signs and posts where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 53+40 Follow existing road. 2000 LF of light clearing/pruning on existing road.
911-1 911 911(05) LF 2000
53+40 55+40 Construct 200 LF of new trail as staked. Includes clearing, grubbing, and excavation. 12’ tread.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
55+40 74+70 Follow existing road. 1000 LF of light clearing/pruning on existing road.
911-1 911 911(05) LF 1000
74+70 101+20 Construct 2650 LF of new trail as staked.
Includes clearing, grubbing, and excavation. 12’ tread.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
74+70 101+20 Construct 15 Drain Dips drained to daylight as staked.
912-5 912 912(06) EA 15
76+00 Install one 18”x 40’ steel culvert without headwalls
921 921(01)b LF 40
82+50 Install one 18”x 40’ steel culvert without headwalls
921 921(01)b LF 40
94+00 Install one 18”x 40’ steel culvert without headwalls
921 921(01)b LF 40
295+07 Junction with forest road #6985. END OF
OPTIONAL 1 PROJECT
File details come from the government source that posted it. Updated .