J-3a_SwanCreek-StormCastle_WorklistItems-BaseItems.pdf
PDF 42 KB Posted
- Solicitation number
- AG-0398-S-13-0021
About this file
J-3a_SwanCreek-StormCastle_Worklist-BaseItems
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U p p e r S w a n T r a i l # 1 8 8 W o r k I t e m s - B A S E
Gallatin National Forest Page 1
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
0+00 Begin Project Work on Upper Swan Trail #188 at junction with Forest Road #479, near South Fork Swan Creek in section 27.
0+00 158+00 Clear trail for duration of contract 911-1 982 982(01) MI .95
0+00 158+00 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
0+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
0+00 50+00 Construct 5,000 LF of new trail as staked.
Includes clearing, grubbing, and excavation. 12’ tread.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
0+00 50+00 Construct 15 Drain Dips drained to daylight as staked.
912-5 912 912(06) EA 15
35+00 Install one 18”x 26’ PE culvert without headwalls 921 921(01)b LF 26
35+00 Wet area. Construct 40 LF Ditch to pipe. 912 912(09) LF 40
35+30 Install one 18”x 26’ PE culvert without headwalls 921 921(01)b LF 26
43+50 Install one 18”x 26’ PE culvert without headwalls 921 921(01)b LF 26
43+50 Wet area. Construct 20 LF Ditch to pipe. 912 912(09) LF 20
45+00 Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
Rehab old corduroy trail along creek bottom back up toward road #479 near beginning of project.
U p p e r S w a n T r a i l # 1 8 8 W o r k I t e m s - B A S E
Gallatin National Forest Page 2
Begin Station
End Station Work Item Reference
Drawing Standard
Spec Special Spec Pay Item UoM Qnty
50+00 295+07 Clear trail for duration of contract 911-1 982 982(01) MI 4.64
50+00 158+00 Numerous sections of surface rock may need blasting or hammering. Unclassified excavation incidental to 912(01).
912 912(01)
Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
50+00 158+00 Construct 10,800 LF of new trail as staked.
Includes clearing, grubbing, and excavation. 12’ tread.
911-1 912-1 912-2
911(02) 912(01)
LF
LF
10,800 10,800
50+00 158+00 Construct 20 Drain Dips drained to daylight as staked.
912-5 912 912(06) EA 20
51+00 Install one 18”x 26’ PE culvert without headwalls 921 921(01)b LF 26
74+00 Construct armored drain dip/crossing in dry gully. 912-6 912 912(06)a EA 1
133+00 Construct 50’ radius switchback, unclassified excavation, with max 8% grades throughout, including approaches, incidental to 912(01).
912-9 914 914(01) EA 1
158+00 Junction with existing road #6970.
158+00 295+07 Restoration of 1000 LF of existing tread, including any additional clearing.
915-1 915 915(01) LF 1000
Junction with fork in road. Install sign and post where staked, Gov’t furnished sign
952-1 952 952(01) 952(03)
EA
EA
158+00 295+07 Wet areas along existing road. Construct 300 LF Ditch to drain dips.
912 912(09) LF 300
158+00 295+07 Construct 15 Drain Dips drained to daylight as staked along existing road.
912-5 912 912(06) EA 10
295+07 Install sign and post where staked at gate, Gov’t furnished sign. END OF BASE PROJECT.
952-1 952 952(01) 952(03)
EA
EA