Standard_Specs.pdf
PDF 471 KB Posted
- Solicitation number
- AG-0356-S-15-0015
About this file
Standard Specificatoins
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30_Amendment_001.pdf | ||
| Amended_Gorge_Lake_Drawings.pdf | ||
| Experience_Questionaire.docx | DOCX document | |
| Photos.pdf | ||
| AG-0356-S-15-0013.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gorge Lake Trail Standard Specifications
DIVISION 100 GENERAL REQUIREMENTS
Section 101 TERMS, FORMAT AND DEFINITIONS
101.01 Meaning of Terms
101.02 Specifications Format
101.03 Abbreviations
101.04 Definitions
Section 102 BID, AWARD, AND EXECUTION OF CONTRACT
102.01 Acquisition Regulations
102.02 Preparation of Bids
102.03 Bid Guarantee
102.04 Individual Surety
102.05 Public Opening of Bids
102.06 Performance and Payment Bonds
Section 103 SCOPE OF WORK
103.01 Intent of Contract
103.02 Disputes
103.03 Value Engineering
103.04 Contractor Records
103.05 Partnering
Section 104 CONTROL OF WORK
104.01 Authority of the Contracting Officer (CO)
104.02 Authority of Inspectors
104.03 Specifications and Drawings
104.04 Coordination of Contract Documents
104.05 Load Restrictions
Section 105 CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements
105.02 Material Sources
105.03 Material Source Management
105.04 Storing and Handling Material
105.05 Use of Material Found in the Work
Section 106 ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
106.03 Certification
106.04 Measured of Tested Conformance
106.05 Statistical Evaluation of Work and Determination of Pay Factor (Value of Work)
106.06 Inspection at the Plant
106.07 Partial and Final Acceptance
Section 107 LEGAL RELATION AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed
107.02 Protection and Restoration of Property and Landscape
107.03 Bulletin Board
107.04 Railtrail Protection
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.07 Furnishing Right-of-Way
107.08 Sanitation, Health, and Safety
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.11 Protection of the Forests, Parks, and Public Lands
Section 108 PROSECUTION AND PROGRESS
108.01 Commencement, Prosecution, and Completion of Work
108.02 Subcontracting
108.03 Determination and Extension of Contract Time
108.04 Failure to Complete Work on Time
108.05 Stop Order
Section 109 MEASUREMENT AND PAYMENT
109.01 Measurement of Work
109.02 Measurement Terms and Definitions
109.03 Weighing Procedures and Devices
109.04 Receiving Procedures
109.05 Scope of Payment
109.06 Pricing of Adjustments
109.07 Eliminating Work
109.08 Progress Payments
109.09 Final Payment
DIVISION 150 PROJECT REQUIREMENTS
Section 151 Mobilization Section 152 Construction Survey and Staking Section 153 Contractor Quality Control Section 154 Contractor Sampling and Testing Section 155 Schedules for Construction Contracts Section 156 Public Traffic
Accommodation for Traffic During Work Maintaining Trailways During Work Maintaining Trailways During Non-Work Periods Limitations on Construction Operations
Nighttime Operations Traffic and Safety Supervisor
Section 157 Soil Erosion Control
Section 158 Watering for Dust Control
DIVISION 200 EARTHWORK
Section 201 Clearing and Grubbing Section 202 Additional Clearing and Grubbing Section 203 Removal of Structures and Obstructions Section 204 Excavation and Embankment Section 205 Rock Blasting Section 206 Reserved Section 207 Earthwork Geotextiles Section 208 Structure Excavation and Backfill for Selected Major Structures Section 209 Structure Excavation and Backfill Section 210 Geocell Abutment Stabilization Section 211 Road or Trail Obliteration Section 212 Linear Grading Section 213 Subgrade Stabilization
DIVISION 250
Section 251 Riprap Section 252 Special Rock Embankment and Rock Buttress Section 253 Gabions and Revet Mattresses Section 254 Crib Walls Section 255 Mechanically-Stabilized Earth Walls Section 256 Permanently Ground Anchors Section 257 Alternate Retaining Walls Section 258 Reinforced Concrete Retaining Walls Section 259 Soil Nail Retaining Walls Section 260 Rock Bolts Section 261 Rock Dowels
Add to ToC the following as appropriate:
DIVISION 300 AGGREGATE COURSES
Page Section 301 Untreated Aggregate Courses 302 Treated Aggregate Courses 303 Road Reconditioning 304 Aggregate Stabilization 305 Aggregate-Topsoil Course
306 Dust Palliative 307 Reserved 308 Minor Crushed Aggregate 309 Emulsified Asphalt Treated Base Course
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS
Section 401 Superpave Hot Asphalt Concrete Pavement 402 Hot Asphalt Concrete Pavement By Hveem or Marshall Mix Design Method 403 Hot Asphalt Concrete Pavement 404 Minor Hot Asphalt Concrete 405 Open-Graded Asphalt Friction Course 406 Reserved 407 Reserved 408 Cold Recycled Asphalt Base Course 409 Asphalt Surface Treatment 410 Slurry Seal 411 Asphalt Prime Coat 412 Asphalt Tack Coat 413 Asphalt Pavement Milling 414 Asphalt Pavement Crack and Joint Sealing 415 Paving Geotextiles 416 Continuous Cold Recycled Asphalt Base Course 417 Minor Cold Asphalt Mix
DIVISION 500 RIGID PAVEMENTS
Section 501 Rigid Pavement 502 Rigid Pavement Restoration
DIVISION 550 BRIDGE CONSTRUCTION
Section 551 Driven Piles 552 Structural Concrete 553 Prestressed Concrete 554 Reinforcing Steel 555 Steel Structures 556 Bridge Railing 557 Timber Structures
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 601 Minor Concrete Structures 602 Culverts and Drains 603 Structural Plate Structures 604 Manholes, Inlets, and Catch Basins 605 Underdrains, Sheet Drains, and Pavement Edge Drains 606 Corrugated Metal Spillways 607 Cleaning, Reconditioning, and Repairing Existing Drainage Structures 608 Paved Waterways 609 Curb and Gutter 610 Horizontal Drains 611 Water Systems 612 Sanitary Sewer Systems
613 Simulated Stone Masonry Surface 614 Lean Concrete Backfill 615 Sidewalks, Drive Pads, and Paved Medians 616 Slope Paving 617 Guardrail 618 Concrete Barriers and Precast Guardwalls 619 Fences, Gates, and Cattle Guards 620 Stone Masonry 621 Monuments and Markers 622 Rental Equipment 623 General Labor 624 Topsoil 625 Turf Establishment 626 Plants, Trees, Shrubs, Vines, and Groundcovers 627 Sod 628 Reserved 629 Rolled Erosion Control Products and Cellular Confinement Systems 630 Reserved 631 Reserved.......................................................................................567632 Reserved 633 Permanent Traffic Control 634 Permanent Pavement Markings 635 Temporary Traffic Control 636 Signal, Lighting, and Electrical Systems 637 Facilities and Services 640 Geocell Abutment Stabilization
DIVISION 700 MATERIAL
Section 701 Cement
701.01 Hydraulic Cement
701.02 Masonry and Mortar Cement
Section 702 Asphalt Material
702.01 Asphalt Binder
702.02 Cut-Back Asphalt
702.03 Emulsified Asphalt
702.04 Application Temperatures
702.05 Material for Dampproofing and Waterproofing
Concrete and Masonry Surfaces
702.06 Recycling Agent
702.07 Asphalt Mastic
702.08 Antistrip Additive
702.09 Evaluation Procedures for Asphalt
702.10 Cold Asphalt Mix
Section 703 Aggregate
703.01 Fine Aggregate for Concrete
703.02 Coarse Aggregate for Concrete
703.03 Granular Backfill
703.04 Permeable Backfill
703.05 Subbase, Base, and Surface Course Aggregate
703.06 Crushed Aggregate
703.07 Hot Asphalt Concrete Pavement Aggregate
703.08 Open-Graded Asphalt Friction Course Aggregate
703.09 Reserved
703.10 Asphalt Surface Treatment Aggregate
703.11 Slurry Seal and Micro-Surfacing Aggregate
703.12 Choker Aggregate
703.13 Blotter
703.14 Aggregate for Aggregate-Topsoil Course
703.15 Sand
703.16 Aggregate for Lean Concrete Backfill
703.17 Superpave Asphalt Concrete Pavement Aggregate
703.18 Shotcrete Aggregate
703.19 Recycled Asphalt Pavement........................................................611Section 704 Soil
704.01 Foundation Fill
704.02 Bedding Material
704.03 Backfill Material
704.04 Structural Backfill
704.05 Topping
704.06 Unclassified Borrow
704.07 Select Borrow
704.08 Select Topping
704.09 Bed Course
704.10 Select Granular Backfill
704.11 Reserved
704.12 Crib Wall Backfill
Section 705 Rock
705.01 Gabion and Revet Mattress Rock
705.02 Riprap Rock
705.03 Rock for Masonry Structures
705.04 Rock for Special Rock Embankment
705.05 Rock for Buttresses
705.06 Stone Curbing
Section 706 Concrete And Plastic Pipe
706.01 Non-Reinforced Concrete Pipe
706.02 Reinforced Concrete Pipe
706.03 Perforated Concrete Pipe
706.04 Reinforced Arch-Shaped Concrete Pipe
706.05 Reinforced Elliptically-Shaped Concrete Pipe
706.06 Reinforced D-Load Concrete Pipe
706.07 Precast Reinforced Concrete Box Sections
706.08 Plastic Pipe
Section 707 Metal Pipe
707.01 Ductile Iron Culvert Pipe
707.02 Metallic-Coated Corrugated Steel Pipe
707.03 Aluminum-Alloy Corrugated Pipe
707.04 Asphalt-Coated Pipe
707.05 Steel Structural Plate Structures
707.06 Aluminum-Alloy Structural Plate Structures
707.07 Asphalt-Coated Structural Plate Structures
707.08 Polymer-Coated Steel Pipe
707.09 Fiber-Bonded Asphalt Coated Steel Pipe
707.10 Slotted Drain Pipe
707.11 Metallic-Coated Spiral Rib Pipe..................................................625Section Page
707.12 Aluminum-Alloy Spiral Rib Pipe
707.13 Concrete-Lined Corrugated Steel Pipe
707.14 Invert-Paved Corrugated Steel Pipe
Section 708 Paint
708.01 General
708.02 Paint for Timber Structures
708.03 Paint for Concrete and Masonry Block Structures
708.04 Paint for Steel Structures
708.05 Penetrating Stain
Section 709 Reinforcing Steel And Wire Rope
709.01 Reinforcing Steel
709.02 Wire Rope or Wire Cable
709.03 Prestressing Steel
Section 710 Fence And Guardrail
710.01 Barbed Wire
710.02 Woven Wire
710.03 Chain Link Fence
710.04 Fence Posts and Bollards
710.05 Fence Gates
710.06 Metal Beam Rail
710.07 Box Beam Rail
710.08 Steel-Backed Timber Rail
710.09 Guardrail Posts
710.10 Guardrail Hardware
710.11 Temporary Plastic Fence
Section 711 Concrete Curing Material And Admixtures
711.01 Curing Material
711.02 Air-Entraining Admixtures
711.03 Chemical Admixtures
711.04 Latex Modifier
711.05 Concrete Coloring Agent
Section 712 Joint Material
712.01 Sealants, Fillers, Seals, and Sleeves
712.02 Joint Mortar
712.03 Watertight Gaskets
712.04 Reserved
712.05 Mortar for Masonry Beds and Joints...........................................637 xiii PSection 713 Roadside Improvement Material
713.01 Topsoil
713.02 Agricultural Limestone
713.03 Fertilizer
713.04 Seed
713.05 Mulch
713.06 Plant Material
713.07 Cellular Confinement Systems
713.08 Miscellaneous Planting Material
713.09 Reserved
713.10 Sod
713.11 Pegs for Sod
713.12 Stabilizing Emulsion Tackifiers
713.13 Erosion Control Bales, Wattles, Logs, and Rolls
713.14 Sandbags
713.15 Erosion Control Culvert Pipe
713.16 Silt Fence
713.17 Temporary Rolled Erosion Control Products
713.18 Permanent Rolled Erosion Control Products
Section 714 Geotextile And Geocomposite Drain Material
714.01 Geotextile
714.02 Geocomposite Drains
714.03 Geocells
Section 715 Piling
715.01 Untreated Timber Piles
715.02 Treated Timber Piles
715.03 Concrete Piles
715.04 Steel Shells
715.05 Steel Pipes
715.06 Steel H-Piles
715.07 Sheet Piles
715.08 Pile Shoes
715.09 Splices
Section 716 Material For Timber Structures
716.01 Untreated Structural Timber and Lumber
716.02 Hardware
716.03 Treated Structural Timber and Lumber
716.04 Structural Glued Laminated Timber ...........................................664Section 717 Structural Metal
717.01 Structural Steel
717.02 Steel Forgings
717.03 Pins and Rollers
717.04 Castings
717.05 Welded Stud Shear Connectors
717.06 Steel Pipe
717.07 Galvanized Coatings
717.08 Sheet Lead
717.09 Steel Grid Floors
717.10 Bearings
717.11 Polyetrafluoroethylene (PTFE) Surfaces for Bearings
717.12 Structural Aluminum Alloy
717.13 Aluminum Alloy for Bridge Rail
717.14 Aluminum Bolt Heads and Nuts
717.15 Aluminum Welding Wire
717.16 Elastomeric Compression Joint Seals
Section 718 Traffic Signing And Marking Material
718.01 Retroreflective Sheeting
718.02 Reserved
718.03 Plywood Panels
718.04 Steel Panels
718.05 Aluminum Panels
718.06 Plastic Panels
718.07 Extruded Aluminum Panels
718.08 Signposts
718.09 Object Marker and Delineator Posts
718.10 Hardware
718.11 Letters, Numerals, Arrows, Symbols, and Borders
718.12 Delineator and Object Marker Retroreflectors
718.13 Conventional Traffic Paint
718.14 Waterborne Traffic Paint
718.15 Epoxy Markings
718.16 Polyester Markings
718.17 Thermoplastic Markings
718.18 Preformed Plastic Markings
718.19 Glass Beads
718.20 Raised Pavement Markers
718.21 Temporary Pavement Markings
718.22 Temporary Traffic Control Devices
718.23 Epoxy Resin Adhesives
Section 719 Reserved................................................................................................. 680Section 720 Structural Wall And Stabilized Embankment Material
720.01 Mechanically-Stabilized Earth Wall Material
720.02 Gabion and Revet Mattress Material
720.03 Metal Bin Type Crib Walls
Section 721 Electrical And Illumination Material
721.01 Electrical Material
721.02 Lighting Material
Section 722 Anchor Material
722.01 Anchorage Devices
722.02 Ground Anchors
722.03 Rock Bolts
722.04 Soil Nails
Section 723 Reserved Section 724 Reserved Section 725 Miscellaneous Material
725.01 Water
725.02 Calcium Chloride, Calcium Chloride Flakes, and Magnesium Chloride
725.03 Lime
725.04 Pozzolans
725.05 Mineral Filler
725.06 Precast Concrete Curbing and Wheelstops
725.07 Clay or Shale Brick
725.08 Concrete Brick
725.09 Concrete Masonry Units
725.10 Cellular Concrete Blocks
725.11 Precast Concrete Units and Accessories
725.12 Frames, Grates, Covers, and Ladder Rungs
725.13 Corrugated Metal Units
725.14 Protective Coatings for Concrete
725.15 Polyvinyl Chloride (PVC) Pipe for
Water Distribution Systems
725.16 Polyethylene (PE) Pipe for Water Distribution Systems
725.17 Cast Iron Soil Pipe and Fittings
725.18 Seamless Copper Water Tube and Fittings
725.19 Plastic Lining
725.20 Lignosulfonate
725.21 Epoxy Resin Adhesives
725.22 Grout
725.23 Reserved.......................................................................................699725.24 Color Coating
725.25 Explosives and Blasting Accessories
725.26 Mineral Slurry (Drillers Mud)
725.27 Form Liner
725.28 Aluminum-Impregnated Caulking Compound
725.29 Reinforcing Fibers
Section 101. – TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.
Wherever "directed," "required," "prescribed," or other similar words are used, the "direction," "requirement," or "order" of the Contracting Officer is intended. Similarly, wherever "approved," "acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by," "acceptable to," or "satisfactory to" the Contracting Officer.
The word "will" generally pertains to decisions or actions of the Contracting Officer.
101.02 Specifications Format. These specifications are divided into 10 Divisions.
Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.
Division 150 consists of project contract requirements that are applicable to all contracts. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.
Divisions 200 through 600 consist of construction contract requirements for specific items of work.
Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.
Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.
The first three digits of the pay item number in the Bid Schedule identify the Section under which the work is performed.
101.03 Abbreviations. Whenever these abbreviations are used in the specifications, they represent the following:
(a) Acronyms.
AASHTO – American Association of State Highway Transportation Officials ACA – Ammoniacal Copper Arsenate AITC – American Institute of Timber Construction ANSI – American National Standards Institute AQ – Actual Quantity ASTM – American Standard Testing Methods AWPA – American Wood Preserving Association AWS – American Welding Society AZCA – Ammoniacal Copper Zinc Arsenate BATF – Bureau of Alcohol Tobacco and Firearms
CCA – Chromated Copper Arsenate CFR – Code of Federal Regulations CO – Contracting Officer CQ – Contract Quantity CY – Cubic Yard DOT – Department of Transportation EA – Each °F – Degrees Fahrenheit FAR – Federal Acquisition Regulations FSM – Forest Service Manual GSA – General Services Administration HR – Hour LF – Linear Foot LS – Lump Sum LSQ – Lump Sum Quantity MI – Mile MPI – Master Painters Institute MUTCD – Manual of Uniform Traffic Control Devices NIST – National Institute of Standards and Technology OSHA – Occupational Safety and Health Administration PE -- Polyethylene RCRA – Resource Conservation and Recovery Act S4S – Surfaced Four Sides SF – Standard Forms SSPC – Society for Protective Coatings STA – Station SY – Square Yard USC – United States Code VECP – Value Engineering Change Proposal VOC – Volatile Organic Compound
(b) Slope notation (vertical : horizontal). For slopes flatter than 1V:1H, express the slope as the ratio of one unit vertical to a number of units horizontal. For slopes steeper than 1V:1H, express the slope as the ratio of a number of units vertical to one unit horizontal.
101.04 Definitions. The following definitions apply to this contract:
Award — The written acceptance of a bid by the CO.
Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.
Base — The layer or layers of material placed on a subbase or subgrade to support a surface course.
Bid — A written offer by a bidder to perform work at a quoted price.
Bidder — Any individual or legal entity submitting a bid.
Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.
Bid Schedule — The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.
Bridge — A structure more than 20 feet long, including supports, spanning and providing passage over a depression, waterway, railtrail, highway, or other obstruction.
Commercial Certification — See Subsection 106.03.
Construction Limits — The limits on each side of the project that establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required.
Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.
Contracting Officer (CO) — An official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Contract Modification — Any written change in the terms of the contract. Contract modifications are of the following forms:
(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (e.g., a change in the paying office or the appropriation data).
(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-4 Changes authorizes the CO to order without the Contractor's consent.
(c) Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work.
Contract Time — The specified time allowed for completion of all contract work.
Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the trailway or other work.
Culvert — Any structure, not classified as a bridge, that provides an opening under the trailway.
Day — Each and every day shown on the calendar, beginning and ending at midnight.
Density — Mass per unit volume of material. Specific gravity multiplied by the unit mass of water.
Drawings — Design sheets or fabrication, erection, or construction details submitted to the Government by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Embankment – A structure of soil, aggregate, or rock material placed on the prepared ground surface and compacted to subgrade. In the trail world the term “embankment” is typically interchangeable with the term “trailbed”. Embankment also includes the fill material cast off the trail tread and used to make the trail shoulder.
Government — The Government of the United States of America.
Layer — See "lift."
Lift — Defined as follows:
(a) When placing and compacting soils and aggregates, a lift is any single, continuous layer of material that receives the same compactive effort throughout during a single work operation.
(b) When installing culvert pipe less than or equal to 48 inches in diameter, the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied tthe other, and the compactive effort is applied to both sides of the pipe in a continuous operation.
Material — Any substances specified or necessary to satisfactorily complete the contract work.
Measurement — The process of identifying the dimensions, quantity, or capacity of an item.
See Section 109 for measurement methods, terms, and definitions.
Notice to Proceed — Written notice to the Contractor to begin the contract work.
Pay Item — A specific item of work for which a unit and price is provided in the contract.
Payment Bond — The security executed by the Contractor and surety or sureties and furnished to the Government to ensure payments as required by law to all persons supplying labor or material according to the contract.
Performance Bond — The security executed by the Contractor and surety or sureties furnished to the Government to guarantee completion of the contract work.
Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.
Production Certification — See Subsection 106.03.
Professional Engineer — Engineers who hold valid State licenses permitting them to offer engineering services directly to the public, who are experienced in the work for which they are responsible, who take legal responsibility for their engineering designs, and who are bound by a code of ethics to protect the public health.
Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed trail construction located as shown on the plans, usually along the longitudinal centerline of the trailbed. Profile grade means either elevation or gradient of the trace according to the context.
Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Special Contract Requirements — Additions and revisions to the standard specifications applicable to an individual project.
Specifications — The written requirements for performing work.
Standard Forms — Numbered forms issued by the General Services Administration for use as contract documents.
Standard Plans — Detailed plans approved for repetitive use and included as part of the plans.
Station — (1) A measure of distance used for highways, railtrails and trails. A station is equal to 100 feet. (2) A precise location along a survey line.
Structures — Bridges, culverts, waterbars, check dams, turnpike, switchbacks, retaining walls, cribbing, and other constructed features that may be encountered in the work.
Subbase — The layer or layers of material placed on a subgrade to support a base.
Subcontract — The written agreement between the Contractor and an individual or legal entity prescribing the performance of a specific portion of the work.
Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes all subcontractors in any tier.
Subgrade — The top surface of a trailbed upon which the pavement structure, shoulders, and curbs are constructed. Section 101
Substantial Completion — The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments.
Substructure — All of the bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.
Suitable Material — Rock or earth material that will provide stable foundations, embankments, or trailbeds, and is reasonably free of organic matter, roots, muck, sod, or other detrimental material. Suitable material may require drying or adding water, root picking, and other methods of manipulation before use. Suitable material includes the classifications of materials for which the project was designed.
Superintendent — The Contractor's authorized representative in responsible charge of the work.
Superstructure — The entire bridge except the substructure.
Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.
Surface Course — The top layer or layers of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.
Traveled Way — The portion of the trailway designated for the movement of forest users.
Unsuitable Material — Material not capable of creating stable foundations, embankments, or trailbeds. Unsuitable material includes muck, sod, or soils with high organic contents.
Work — The furnishing of all labor, material, equipment, and other incidentals necessary to successfully complete the project according to the contract.
Section 103. — SCOPE OF WORK
103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
103.03 Value Engineering. Follow the requirements of FAR Clause 52.248-3 Value Engineering — Construction. Before undertaking significant expenditures, provide the CO with a written description of the value engineering change proposal (VECP) concept. Within 14 days, the CO will inform the Contractor as to whether the concept appears to be viable or if the concept is unacceptable. If the CO indicates that the concept appears to be viable, prepare and submit the formal VECP proposal.
Section 104. — CONTROL OF WORK
104.03 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.
104.05 Load Restrictions. Follow the requirements of FAR Clause 52.236-10 Operations and Storage Areas, paragraph (c).
Comply with all legal load restrictions when hauling material and equipment on public trails and roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment. Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project except those pavements intended to be removed.
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements. Follow the requirements of FAR Clause 52.236-5 Material and Workmanship.
Select sources and provide acceptable material.
Material may be approved at the source of supply before delivery to the project. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.
105.02 Government-provided material sources. The Government will acquire the permits and rights to remove material from provided sources identified in the contract.
Perform all work necessary to produce acceptable material including site development, preparation, erosion control, and restoration.
The quality of material in provided sources is acceptable in general, but may contain layers or pockets of unacceptable material.
Stockpile slash and overburden for use after the material has been removed. Spread the stockpiled overburden uniformly over the sides and bottom of the mined area. Shape the mined area to blend into the surrounding natural terrain. Place slash on the area. Do not seed.
105.03 Material Source Management. Control erosion so that sediment does not leave the work area.
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements. Follow the requirements of FAR Clause 52.246-12 Inspection of Construction. References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform work according to the contract requirements. Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter. Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.04 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
As an alternative to removal and replacement, the Contractor may submit a written request to:
Have the work accepted at a reduced price; or
Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.
106.03 Certification. For material manufactured off-site, use a manufacturer with an ISO 9000 certification or an effective testing and inspection system. Require the manufacturer to clearly mark the material or packaging with a unique product identification or specification standard to which it is produced. Other than references in or to the FAR or Federal Law, when these Standard Specifications reference certifications; certificates; or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for Fiscal Year 1996. These references refer to documentation of non-regulatory, peripheral contract requirements that are required to be validated by an individual or organization having unique knowledge or qualifications to perform such validation.
Material accepted by certification may be sampled and tested at any time. If found not in conformance with the contract, the material will be rejected whether in place or not.
Bridge materials shall adhere to the Guide for Minimizing the Effect of Preservative-Treated Wood on Sensitive Environments, publication FPL−GTR−122.
One of the following certifications may be required:
(a) Production certification. Produce production certificates for all bridge materials. Material requiring a production certification is identified in the Acceptance Subsection of each Section.
Require the manufacturer to furnish a production certification for each shipment of material.
Include the following with each production certification:
(1) Date and place of manufacture;
(2) Lot number or other means of cross-referencing to the manufacturer’s inspection and testing system; and
(3) Substantiating evidence that the material conforms to the contract quality requirements as required by FAR 46.105(a)(4), including all of the following:
(a) Test results on material from the same lot and documentation of the inspection and testing system;
(b) A statement from the manufacturer that the material complies with all contract requirements; and
(c) Manufacturer’s signature or other means of demonstrating accountability for the certification.
(b) Commercial certification. When a certification is required, but not a production certification, furnish one commercial certification for all similar material from the same manufacturer. A commercial certification is a manufacturer's or Contractor's representation that the material complies with all contract requirements. The representation may be labels, catalog data, stamped specification standards, or supplier's certifications indicating the material is produced to a commercial standard or specification. Produce certifications for geocell and geotextile.
106.04 Measured or Tested Conformance. Provide all necessary production and processing of the work and control performance of the work so that all of the work complies with the contract requirements.
Results from inspection or testing shall have values within the specified tolerances or specification limits. When no tolerance values are identified in the contract, the work will be accepted based on customary manufacturing and construction tolerances.
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed. Comply with all applicable laws, ordinances, safety codes, regulations, orders, and decrees. Protect and indemnify the Government and its representatives against any claim or liability arising from or based on the alleged violation of the same.
Comply with all permits and agreements obtained by the Government for performing the work that is included in the contract. Obtain all additional permits or agreements and modifications to Government-obtained permits or agreements that are required by the Contractor's methods of operation. Furnish copies of all permits and agreements.
107.02 Protection and Restoration of Property and Landscape. Preserve public and private property, and protect monuments established for the purpose of perpetuating horizontal, vertical, cadastral, or boundary control. When necessary to destroy a monument, reestablish the monument according to applicable state statute or by the direction of the agency or individual who established the monument.
Do not disturb the area beyond the construction limits. Replace trees, shrubs, or vegetated areas damaged by construction operations as directed and at no cost to the Government.
Do not excavate, remove, damage, alter, or deface any archeological or paleontological remains or specimens. Control the actions of employees and subcontractors on the project to ensure that protected sites are not disturbed or damaged. Should any of these items be encountered, suspend operations at the discovery site, immediately notify the CO, and continue operations in other areas.
The CO will inform the Contractor when operations may resume at the discovery site.
107.06 Contractor's Responsibility for Work. Assume responsibility for all work until final acceptance.
This includes periods of suspended work. Protect the work against injury, loss, or damage from all causes whether arising from the execution or nonexecution of the work.
Maintain public traffic according to Section 156. Rebuild, repair, restore, and make good all losses, injuries, or damages to any portion of the work. This includes losses, injuries, or damages caused by vandalism, theft, accommodation of public traffic, and weather that occurs during the contract. The Government will only be responsible for losses, injuries, and damages to work put in place that was caused by declared enemies and terrorists of the Government and cataclysmic natural phenomenon such as tornadoes, earthquakes, major floods, and other officially declared natural disasters. The Government will only be responsible for costs attributable to repairing or replacing damaged work. The Government will not be responsible for delay costs, impact costs, or extended overhead costs.
107.07 Furnishing Right-of-Way. The Government will obtain all right-of-way.
107.08 Sanitation, Health, and Safety. Follow the requirements of FAR Clause 52.236-13 Accident Prevention.
Observe rules and regulations of Federal, State, and local health officials. Do not permit any worker to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous.
Admit any OSHA inspector or other legally responsible official involved in safety and health administration to the project work site upon presentation of proper credentials.
Report accidents on forms furnished by the Government or, with prior approval, on forms used to report accidents to other agencies or insurance carriers. Maintain a "Log of Work Related Injuries and Illnesses," OSHA Form 300, and make it available for inspection.
107.10 Environmental Protection. Do not operate mechanized equipment or discharge or otherwise place any material within the wetted perimeter of any waters of the U.S. within the scope of the Clean Water Act (33 USC § 1251 et seq.). This includes wetlands unless authorized by a permit issued by the U.S. Army Corps of Engineers according to 33 USC § 1344, and the Montana State 124 Permit. In the event of an unauthorized discharge:
(a) Immediately prevent further contamination;
(b) Immediately notify appropriate authorities; and
(c) Mitigate damages as required.
Comply with the terms and conditions of any permits that are issued for the performance of work within the wetted perimeter of the waters of the U.S. Separate work areas, including material sources, by the use of a dike or other suitable barrier that prevents sediment, petroleum products, chemicals, or other liquid or solid material from entering the waters of the U.S. Use care in constructing and removing the barriers to avoid any discharge of material into, or the siltation of, the water. Remove and properly dispose of the sediment or other material collected by the barrier.
Repair leaks on equipment immediately. Do not use equipment that is leaking. Keep a supply of acceptable absorbent materials at the job site in the event of spills. Acceptable absorbent materials are those that are manufactured specifically for the containment and clean up of hazardous materials.
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work. Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert all measurements of work according to United States customary measure. Unless otherwise specified, measure when the work is in place, complete, and accepted.
Submit the final measurement when the installation is completed.
Use an acceptable format for measurement records. As a minimum, include the following information in all records of measurement:
(a) Project name and number;
(b) Contract item number;
(c) Date the work was performed;
(d) Location of the work;
(e) Measured quantity;
(f) Calculations made to arrive at the quantity;
(g) Signed certification statement by the persons taking the measurements, performing the calculations, and submitting them for payment that the measurement and calculations are correct to the best of their knowledge and that the quantity being measured is subject to direct payment for the identified item under the contract.
109.02 Measurement Terms and Definitions. Unless otherwise specified, the following terms are defined as follows:
(a) Contract quantity. The quantity to be paid is the quantity shown in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request, in writing, that the quantity be adjusted when the quantity in error is 15% from the original amount.
(b) Cubic yard. Cubic yard in place. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas.
Deduct any quantity outside the designed or staked limits.
(c) Each. One entire unit. The quantity is the actual number of units completed and accepted.
(e) Hour. Measure the actual number of hours ordered by the CO and performed by the Contractor.
(d) Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
(e) Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "All." Estimated quantities of lump sum work shown in the contract are approximate.
(f) Station. 100 linear feet. Measure horizontally along centerline or reference line of each trailway, approach trail, or ramp.
109.05 Scope of Payment. Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
(a) Direct payment. Payment is provided directly under a pay item shown in the bid schedule when one of the following applies:
(1) The work is measured in the Measurement Subsection of the Section ordering the work, and the bid schedule contains a pay item for the work from the Section ordering the work.
(2) The Measurement Subsection, of the Section ordering the work, references another Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.
(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement Subsection of the Section ordering the work.
Compensation provided by the pay items included in the contract bid schedule is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract pay items. Work measured and paid for under one pay item will not be paid for under any other pay item.
The quantities shown in the bid schedule are approximate unless designated as a contract quantity.
Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
Division 150 – PROJECT REQUIREMENTS Section 151. — MOBILIZATION
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the obtaining of permits, insurance, equipment washing and bonds.
Measurement
151.02 Measure mobilization according to Subsection 109.02.
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed- Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
(e) Equipment washing will be paid at the end of the project. If equipment has not been inspected and arrives onsite, the contractor must remove the equipment from National Forest Lands and wash immediately. If this occurs the Contractor shall forfeit 50% of the equipment washing fee. If a second piece of equipment is found not inspected, 100% forfeiture will occur, a notice of noncompliance will be issued, and it will affect past performance ratings for future projects.
Section 152. — CONSTRUCTION SURVEY AND STAKING
Description
152.01 This work consists of furnishing qualified personnel and necessary equipment and material to survey, stake, calculate, and record data for the control of work. See FAR Clause 52.236-17 Layout of Work.
Material
Furnish acceptable tools, supplies, and stakes of the type and quality normally used in trail work and suitable for the intended use. Furnish stakes to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.
Construction Requirements
152.02 General. The Government will set initial reference lines, will set horizontal and vertical control points, and will furnish the data for use in establishing control for completion of each element of the work.
Preserve all initial reference and control points. After beginning construction, replace all destroyed or disturbed initial reference or control points necessary to the work.
Place all stakes on the cutslope of the trail just outside of the construction limits prior to construction.
Leave the stakes in place until after final acceptance of the work.
Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete.
152.03 Survey and Staking Requirements. Perform all survey, staking, recording of data, and calculations as necessary to construct the project from the initial layout to final completion. Reset stakes as many times as necessary to construct the work. Edit list according to project.
(a) Bridges. Set adequate horizontal and vertical control and reference points for all bridge substructure and superstructure components. Establish and reference the bridge chord or the bridge tangent. Also establish and reference the centerline of each pier, bent, and abutment.
(b) Borrow and waste sites. Stake all borrow sites prior to Contracting Officer’s approval.
Measurement
152.05 Measure the Section 152 items listed in the bid schedule according to Subsection 109.02.
Payment
152.06 The accepted quantities, as provided above, will be paid at the contract price per unit of measurement for the Section 152 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Payment for lump sum items will be prorated based on the total work completed.
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
155.01 This work consists of scheduling and monitoring all construction activities. See FAR Clause 52.236-15 Schedules for Construction Contracts.
Construction Requirements
155.02 General. Submit 2 copies of a preliminary construction schedule at the prework meeting.
A preliminary construction schedule is a written narrative with a detailed breakdown of all contract activities for the first 45 days after the notice to proceed is issued. During the prework meeting, the preliminary construction schedule will be accepted or rejected. If rejected, submit a revised schedule within 3 days. Do not begin work, except mobilization, without an accepted preliminary construction schedule.
Preface each construction schedule as follows:
(a) Project name;
(b) Contract number;
(c) Contractor;
(d) Original contract time allowed or completion date;
(e) Effective date of the schedule;
(f) Percent…
This is the start of the file's text. The full file is on GovTribe.