SF30_Amendment_001.pdf

PDF 69 KB Posted

Attached to
BEAVERHEAD-DEERLODGE NATIONAL FOREST- Gorge Lake Trail Reconstruction
Solicitation number
AG-0356-S-15-0015
Issued by

About this file

SF30 Amendment 001

View the file

Other files

File Type Posted
Amended_Gorge_Lake_Drawings.pdf PDF
Experience_Questionaire.docx DOCX document
Photos.pdf PDF
AG-0356-S-15-0013.pdf PDF
Standard_Specs.pdf PDF
Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF

CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 001 March 20, 2015 AG-0356-S-15-0015

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

East Side Acquisition Team 420 Barrett Street Dillon, M T59725

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-0356-S-15-0015

9B. DATED (SEE ITEM 11)

March 13, 2015

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers { } is extended, { X } is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE

MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor { } is not, { X } is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

Amendment 001 changes a few details on the drawings/sign plan. Please see the attached new drawing sheets. It also changes the solicitation number listed in the headers and cover page. The correct solicitation number should be AG-0356-S-15-0015 to match the FBO posting #.

Sheet 24 states “Contractor Provided Directional Sign” no signs of this kind are required by the contractor. This sign is shown for bury depth and breakaway hole dimensions only. New Sheet 24 states “Sign shown not required in this contract.”

Sheets 25 and 26 have incorrect sign layouts. These sheets have been corrected to reflect the sign plan on sheets 21 and 22.

Sign plan on sheets 21 and 22 are accurate and have not changed.

Date and time for submission of quotes remains unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Lisa Rakich, Purchasing Agent

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

/s/ Lisa Rakich 3/20/15 (Signature of person authorized to sign) (Signature of Contracting Officer)

File details come from the government source that posted it. Updated .