Bear_Gulch_Specs.pdf
PDF 354 KB Posted
- Solicitation number
- AG-0356-S-13-0018
About this file
Specifications- Bear Gulch
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0356-S-13-0018_Bear_Gulch_(Sections_B-M).pdf | ||
| Bear_Gulch_Drawings.pdf | ||
| SF_18_Bear_Gulch_ATV_Trail.pdf | ||
| Experience_Questionnaire.docx | DOCX document | |
| Wage_Determination_MT130076.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contents
DIVISION 100 GENERAL REQUIREMENTS
Section 101. – TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms
101.02 Specifications Format
101.03 Abbreviations
101.04 Definitions
Section 103. — SCOPE OF WORK
103.01 Intent of Contract
Section 104. — CONTROL OF WORK
104.03 Specifications and Drawings
104.05 Load Restrictions
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements
105.02 Government-provided material sources
105.03 Material Source Management
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
106.03 Certification
106.04 Measured or Tested Conformance
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed
107.02 Protection and Restoration of Property and Landscape
107.06 Contractor's Responsibility for Work
107.07 Furnishing Right-of-Way
107.08 Sanitation, Health, and Safety
107.10 Environmental Protection
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work
109.02 Measurement Terms and Definitions
109.05 Scope of Payment
DIVISION 150 – PROJECT REQUIREMENTS
Section 151. — MOBILIZATION
151.01 Description
151.02 Measurement
151.03 Payment
Section 152. — CONSTRUCTION SURVEY AND STAKING
152.01 Description and Material
152.02 General
152.05 Measurement
152.06 Payment
Section 153. — CONTRACTOR QUALITY CONTROL
153.01 -
153.02 Contractor Quality Control Plan
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
155.01 Description
155.02 General
155.06 Schedule Updates
155.07 Acceptance
155.08 Measurement
155.09 Payment
Section 156. — PUBLIC TRAFFIC
156.03 Accommodating Traffic During Work
156.04 Maintaining Trailways During Work
156.05 Maintaining Trailways During Non-Work Periods
156.09 Acceptance
156.10 Measurement and Payment
DIVISION 200 – EARTHWORK
Section 201. — CLEARING AND GRUBBING
201.01 Description
201.02 Material
201.03 General
201.04 Clearing
201.05 Grubbing
201.06 Disposal
201.07 Acceptance
201.08 Measurement
201.09 Payment
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
203.01 Description
203.02 Material
203.03 Salvaging Material
203.04 Removing Material
203.05 Disposing of Material
203.06 Acceptance
203.07 Measurement
203.08 Payment
Section 204. — EXCAVATION AND EMBANKMENT
204.01 Description
204.02 Definitions
204.03 Material
204.04 Preparation for Trailway Excavation and Embankment Construction
204.05 Conserved Topsoil
204.06 Trailway Excavation
204.08 Borrow Excavation
204.10 Embankment Construction
204.11 Compaction
204.12 Ditches. Slope, grade, and shape ditches
204.13 Sloping, Shaping, and Finishing
204.14 Check Dams, Drain Dips, Waterbars
204.15 Acceptance
204.16 Measurement
204.17 Payment
Section 205. — ROCK BLASTING
205.01 Description
205.02 Material
205.03 Regulations
205.04 Blaster-in-Charge
205.05 Blasting Plans
205.08 Blasting
205.11 Measurment
205.12 Payment
Section 207. — EARTHWORK GEOTEXTILES
207.01 Description
207.02 Material
207.03 General
207.04 Separation and Stabilization Applications
207.06 Acceptance
207.07 Measurement
207.08 Payment
Section 209. — STRUCTURE EXCAVATION AND BACKFILL
209.01 Description
209.02 Material
209.03 Preparation for Structure Excavation
209.04 General
209.05 Channel Preservation
209.08 Foundation Preparation
209.09 Bedding
209.10 Backfill
209.11 Compacting
209.12 Acceptance
209.13 Measurement and Payment
Section 211. — TRAILWAY OBLITERATION
211.01 Description
211.03 Waterbars and Barriers
211.04 Acceptance
211.05 Measurement
211.06 Payment
DIVISION 300 AGGREGATE COURSES
Section 303. — TRAIL RECONDITIONING
303.01 Description
303.03 Drainage Reconditioning
303.04 Turnpike Reconditioning
303.05 Trailbed Reconditioning
303.09 Acceptance
303.10 Measurement
303.11 Payment
DIVISION 550 BRIDGE CONSTRUCTION
Section 557. — TIMBER STRUCTURES
557.01 Description
557.02 Material
557.03 General
557.04 Treated Timber
557.05 Holes for Bolts, Dowels, Rods, and Lag Screws
557.06 Bolts and Washers
557.07 Countersinking
557.08 Framing
557.09 Framing Bents
557.12 Stringers
557.13 Plank Floors
557.14 Turnpike
557.15 Wheel Guards and Railings
557.18 Painting
557.19 Acceptance
557.20 Measurement
557.21 Payment
Section 563. — PAINTING
563.01 Description
563.02 Material
563.03 Protection of Public, Property, and Workers
563.04 Protection of the Work
563.05 Surface Preparation, General
563.06 Paint Application, General
563.09 Painting Timber Structures
563.12 Measurment
563.13 Payment
DIVISION 600 INCIDENTAL CONSTRUCTION
Section 602. — CULVERTS AND DRAINS
602.01 Description
602.02 Material
602.03 General
602.06 Laying Plastic Pipe
602.08 Acceptance
602.09 Measurement
602.10 Payment
Section 607. — CLEANING, RECONDITIONING, AND REPAIRING EXISTING DRAINAGE STRUCTURES
607.01 Description
607.02 General
607.04 Cleaning Culverts in Place
607.06 Reconditioning Drainage Structures
607.07 Acceptance
607.08 Measurement
607.09 Payment
Section 620. — ROCK STRUCTURES
620.01 Description
620.02 Material
620.03 General
620.04 Placing Rock
620.06 Constructing Walls
620.10 Acceptance
620.11 Measurement
620.12 Payment
Section 624. — TOPSOIL
624.01 Description
624.02 Material
624.03 Preparing Areas
624.04 Placing Topsoil
624.05 Acceptance
624.06 Measurment
624.07 Payment
Section 633. — PERMANENT TRAFFIC CONTROL
633.01 Description
633.02 Material
633.03 General
633.05 Panels
633.06 Posts
633.07 Bulletin Boards
633.07 Removing and Resetting Permanent Traffic Control Devices
633.08 Acceptance
633.09 Measurement
633.10 Payment
Section 635. — TEMPORARY TRAFFIC CONTROL
635.01 Description
635.02 Material
635.03 General
635.07 Construction Signs
635.25 Acceptance
635.26 Measurement
DIVISION 700 MATERIALS
Section 703 – Aggregate
703.06 crushed Aggregate
Section 704. — SOIL
704.02 Bedding Material
704.03 Backfill Material
704.04 Structural Backfill
704.07 Select Borrow
704.09 Bed Course
704.12 Crib Wall Backfill
Section 705. — ROCK
705.03 Rock for Masonry Structures
Section 706. — CONCRETE AND PLASTIC PIPE
706.08 Plastic Pipe
Section 708. – PAINT, STAIN AND PRIMER
Section 714. — GEOTEXTILE AND GEOCOMPOSITE DRAIN MATERIAL
714.01 Geotextile
Section 716. — MATERIAL FOR TIMBER STRUCTURES
716.02 Hardware
716.03 Treated Structural Timber and Lumber
716.04 Structural Glued Laminated Timber
Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL
718.01 Retro-reflective Sheeting
718.03 Plywood Panels
718.07 Routed Oak Panels
718.08 Signposts
718.10 Hardware
718.11 Letters, Numerals, Arrows, Symbols, and Borders
718.22 Temporary Traffic Control Devices
Section 725. — MISCELLANEOUS MATERIAL
725.25 Explosives and Blasting Accessories
DIVISION 100 GENERAL REQUIREMENTS
Section 101. – TERMS, FORMAT, AND DEFINITIONS
101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor," is implied. Also implied in this language are "shall," "shall be," or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.
Wherever "directed," "required," "prescribed," or other similar words are used, the "direction,"
"requirement," or "order" of the Contracting Officer is intended. Similarly, wherever "approved,"
"acceptable," "suitable," "satisfactory," or similar words are used, the words mean "approved by,"
"acceptable to," or "satisfactory to" the Contracting Officer.
The word "will" generally pertains to decisions or actions of the Contracting Officer.
101.02 Specifications Format. These specifications are divided into 10 Divisions.
Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.
Division 150 consists of project contract requirements that are applicable to all contracts. Work under
Division 150 is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.
Divisions 200 through 600 consist of construction contract requirements for specific items of work.
Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the
Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.
Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.
The first three digits of the pay item number in the Bid Schedule identify the Section under which the work is performed.
101.03 Abbreviations. Whenever these abbreviations are used in the specifications, they represent the following:
(a) Acronyms.
AASHTO – American Association of State Highway Transportation Officials
ACA – Ammoniacal Copper Arsenate
AITC – American Institute of Timber Construction
ANSI – American National Standards Institute
AQ – Actual Quantity
ASTM – American Standard Testing Methods
AWPA – American Wood Preserving Association
AWS – American Welding Society
CCA – Chromated Copper Arsenate
CFR – Code of Federal Regulations
CO – Contracting Officer
CQ – Contract Quantity
CY – Cubic Yard
EA – Each
FAR – Federal Acquisition Regulations
FSM – Forest Service Manual
GSA – General Services Administration
HR – Hour
LF – Linear Foot
LS – Lump Sum
LSQ – Lump Sum Quantity
MI – Mile
MPI – Master Painters Institute
MUTCD – Manual of Uniform Traffic Control Devices
NIST – National Institute of Standards and Technology
OSHA – Occupational Safety and Health Administration
PE -- Polyethylene
RCRA – Resource Conservation and Recovery Act
S4S – Surfaced Four Sides
SF – Standard Forms
SSPC – Society for Protective Coatings
STA – Station
SY – Square Yard
(b) Slope notation (vertical : horizontal). For slopes flatter than 1V:1H, express the slope as the ratio of one unit vertical to a number of units horizontal. For slopes steeper than 1V:1H, express the slope as the ratio of a number of units vertical to one unit horizontal.
101.04 Definitions. The following definitions apply to this contract:
Award — The written acceptance of a bid by the CO.
Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.
Base — The layer or layers of material placed on a subbase or subgrade to support a surface course.
Bid — A written offer by a bidder to perform work at a quoted price.
Bidder — Any individual or legal entity submitting a bid.
Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.
Bid Schedule — The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.
Bridge — A structure more than 20 feet long, including supports, spanning and providing passage over a depression, waterway, railtrail, highway, or other obstruction.
Commercial Certification — See Subsection 106.03.
Construction Limits — The limits on each side of the project that establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required.
Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.
Contracting Officer (CO) — An official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.
Contract Modification — Any written change in the terms of the contract. Contract modifications are of the following forms:
(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (e.g., a change in the paying office or the appropriation data).
(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-4 Changes authorizes the CO to order without the
Contractor's consent.
(c) Supplemental agreement. A contract modification that is accomplished by the mutual action of the parties.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work.
Contract Time — The specified time allowed for completion of all contract work.
Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the trailway or other work.
Culvert — Any structure, not classified as a bridge, that provides an opening under the trailway.
Day — Each and every day shown on the calendar, beginning and ending at midnight.
Density — Mass per unit volume of material. Specific gravity multiplied by the unit mass of water.
Drawings — Design sheets or fabrication, erection, or construction details submitted to the
Government by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Embankment – A structure of soil, aggregate, or rock material placed on the prepared ground surface and compacted to subgrade. In the trail world the term “embankment” is typically interchangeable with the term “trailbed”. Embankment also includes the fill material cast off the trail tread and used to make the trail shoulder.
Government — The Government of the United States of America.
Lift — Defined as follows:
(a) When placing and compacting soils and aggregates, a lift is any single, continuous layer of material that receives the same compactive effort throughout during a single work operation.
(b) When installing culvert pipe less than or equal to 48 inches in diameter, the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied tthe other, and the compactive effort is applied to both sides of the pipe in a continuous operation.
Material — Any substances specified or necessary to satisfactorily complete the contract work.
Measurement — The process of identifying the dimensions, quantity, or capacity of an item.
See Section 109 for measurement methods, terms, and definitions.
Notice to Proceed — Written notice to the Contractor to begin the contract work.
Pay Item — A specific item of work for which a unit and price is provided in the contract.
Payment Bond — The security executed by the Contractor and surety or sureties and furnished to the Government to ensure payments as required by law to all persons supplying labor or material according to the contract.
Performance Bond — The security executed by the Contractor and surety or sureties furnished to the Government to guarantee completion of the contract work.
Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.
Production Certification — See Subsection 106.03.
Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed trail construction located as shown on the plans, usually along the longitudinal centerline of the trailbed. Profile grade means either elevation or gradient of the trace according to the context.
Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Specifications — The written requirements for performing work.
Standard Forms — Numbered forms issued by the General Services Administration for use as contract documents.
Standard Plans — Detailed plans approved for repetitive use and included as part of the plans.
Station — (1) A measure of distance used for highways, railtrails and trails. A station is equal to
100 feet. (2) A precise location along a survey line.
Structures — Bridges, culverts, waterbars, check dams, turnpike, switchbacks, retaining walls, cribbing, and other constructed features that may be encountered in the work.
Subbase — The layer or layers of material placed on a subgrade to support a base.
Subcontract — The written agreement between the Contractor and an individual or legal entity prescribing the performance of a specific portion of the work.
Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes all subcontractors in any tier.
Subgrade — The top surface of a trailbed upon which the pavement structure, shoulders, and curbs are constructed.
Substantial Completion — The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments.
Substructure — All of the bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.
Suitable Material — Rock or earth material that will provide stable foundations, embankments, or trailbeds, and is reasonably free of organic matter, roots, muck, sod, or other detrimental material. Suitable material may require drying or adding water, root picking, and other methods of manipulation before use. Suitable material includes the classifications of materials for which the project was designed.
Superintendent — The Contractor's authorized representative in responsible charge of the work.
Superstructure — The entire bridge except the substructure.
Surety — An individual or corporation legally liable for the debt, default, or failure of a
Contractor to satisfy a contract obligation.
Traveled Way — The portion of the trailway designated for the movement of forest users.
Unsuitable Material — Material not capable of creating stable foundations, embankments, or trailbeds. Unsuitable material includes muck, sod, or soils with high organic contents.
Work — The furnishing of all labor, material, equipment, and other incidentals necessary to successfully complete the project according to the contract.
Section 103. — SCOPE OF WORK
103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
Section 104. — CONTROL OF WORK
104.03 Specifications and Drawings.
(a) General. Prepare drawings as necessary to construct the work. Drawings include, but are not limited to, layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed, fabrication details for manufactured items and assemblies, installation and erection procedures, details of post-tensioning and other systems, detailed trench and excavation procedures that conform to OSHA requirements, traffic control implementation drawings, and methods for performing work near existing structures or other areas to be protected. Show all the drawing dimensions in United States customary units.
Limit drawings to a maximum size of 24 by 36 inches. Include on each drawing and calculation sheet, the project number, name, and other identification as shown in the contract.
Furnish 2 sets of drawings and supporting calculations for acceptance before performing work covered by the drawings. If drawings are returned for revision, correct and resubmit for acceptance. Allow 30 days per submission for all structures. The review time as specified is applied separately to each drawing submitted. The CO may request additional specific drawings for unique situations in order to clarify layout, construction details, or methodology. If drawings must be resubmitted, the time for acceptance starts over. Obtain written approval before changing or deviating from the accepted drawings.
Edit list for individual project.
(1) Furnish drawings for the following:
Bridge, Puncheon
104.05 Load Restrictions. Follow the requirements of FAR Clause 52.236-10 Operations and Storage
Areas, paragraph (c).
Comply with all legal load restrictions when hauling material and equipment on public trails and roads to and from the project. A special permit does not relieve the Contractor of liability for damage resulting from the moving of material or equipment. Unless otherwise permitted, do not operate equipment or vehicles that exceed the legal load limits over new or existing structures, or pavements within the project except those pavements intended to be removed.
Section 105. — CONTROL OF MATERIAL
105.01 Source of Supply and Quality Requirements.
Select sources and provide acceptable material.
Material may be approved at the source of supply before delivery to the project. Approval does not constitute acceptance. If an approved source does not continue to supply acceptable material during the life of the project, further use of that source may be denied.
105.02 Government-provided material sources. The Government will acquire the permits and rights to remove material from provided sources identified in the contract.
Perform all work necessary to produce acceptable material including site development, preparation, erosion control, and restoration.
The quality of material in provided sources is acceptable in general, but may contain layers or pockets of unacceptable material.
Stockpile slash and overburden for use after the material has been removed. Spread the stockpiled overburden uniformly over the sides and bottom of the mined area. Shape the mined area to blend into the surrounding natural terrain. Place slash on the area. Do not seed.
105.03 Material Source Management. Control erosion so that sediment does not leave the work area.
Section 106. — ACCEPTANCE OF WORK
106.01 Conformity with Contract Requirements. Follow the requirements of FAR Clause 52.246-
12 Inspection of Construction. References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform work according to the contract requirements. Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is stricter. Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.04 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
As an alternative to removal and replacement, the Contractor may submit a written request to:
Have the work accepted at a reduced price; or
Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract and prevailing industry standards.
106.03 Certification. For material manufactured off-site, use a manufacturer with an ISO 9000 certification or an effective testing and inspection system. Require the manufacturer to clearly mark the material or packaging with a unique product identification or specification standard to which it is produced. Other than references in or to the FAR or Federal Law, when these Standard Specifications reference certifications; certificates; or certified documents, equipment, or individuals, these references are not certifications under Section 4301 of Public Law 104-106, National Defense Authorization Act for
Fiscal Year 1996. These references refer to documentation of non-regulatory, peripheral contract requirements that are required to be validated by an individual or organization having unique knowledge or qualifications to perform such validation.
Material accepted by certification may be sampled and tested at any time. If found not in conformance with the contract, the material will be rejected whether in place or not.
One of the following certifications may be required:
(a) Production certification. Material requiring a production certification is identified in the
Acceptance Subsection of each Section. Require the manufacturer to furnish a production certification for each shipment of material. Include the following with each production certification:
(1) Date and place of manufacture;
(2) Lot number or other means of cross-referencing to the manufacturer’s inspection and testing system; and
(3) Substantiating evidence that the material conforms to the contract quality requirements as required by FAR 46.105(a)(4), including all of the following:
(a) Test results on material from the same lot and documentation of the inspection and testing system;
(b) A statement from the manufacturer that the material complies with all contract requirements; and
(c) Manufacturer’s signature or other means of demonstrating accountability for the certification.
(b) Commercial certification. When a certification is required, but not a production certification, furnish one commercial certification for all similar material from the same manufacturer. A commercial certification is a manufacturer's or Contractor's representation that the material complies with all contract requirements. The representation may be labels, catalog data, stamped specification standards, or supplier's certifications indicating the material is produced to a commercial standard or specification. Produce certifications for pipe and geotextile and aggregate.
106.04 Measured or Tested Conformance. Provide all necessary production and processing of the work and control performance of the work so that all of the work complies with the contract requirements.
Results from inspection or testing shall have values within the specified tolerances or specification limits. When no tolerance values are identified in the contract, the work will be accepted based on customary manufacturing and construction tolerances.
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed. Comply with all applicable laws, ordinances, safety codes, regulations, orders, and decrees. Protect and indemnify the Government and its representatives against any claim or liability arising from or based on the alleged violation of the same.
Comply with all permits and agreements obtained by the Government for performing the work that is included in the contract. Obtain all additional permits or agreements and modifications to Government-obtained permits or agreements that are required by the Contractor's methods of operation. Furnish copies of all permits and agreements.
107.02 Protection and Restoration of Property and Landscape. Preserve public and private property, and protect monuments established for the purpose of perpetuating horizontal, vertical, cadastral, or boundary control. When necessary to destroy a monument, reestablish the monument according to applicable state statute or by the direction of the agency or individual who established the monument.
Do not disturb the area beyond the construction limits. Replace trees, shrubs, or vegetated areas damaged by construction operations as directed and at no cost to the Government.
Do not excavate, remove, damage, alter, or deface any archeological or paleontological remains or specimens. Control the actions of employees and subcontractors on the project to ensure that protected sites are not disturbed or damaged. Should any of these items be encountered, suspend operations at the discovery site, immediately notify the CO, and continue operations in other areas.
The CO will inform the Contractor when operations may resume at the discovery site.
107.06 Contractor's Responsibility for Work. Assume responsibility for all work until final acceptance. This includes periods of suspended work. Protect the work against injury, loss, or damage from all causes whether arising from the execution or nonexecution of the work.
Maintain public traffic according to Section 156. Rebuild, repair, restore, and make good all losses, injuries, or damages to any portion of the work. This includes losses, injuries, or damages caused by vandalism, theft, accommodation of public traffic, and weather that occurs during the contract. The
Government will only be responsible for losses, injuries, and damages to work put in place that was caused by declared enemies and terrorists of the Government and cataclysmic natural phenomenon such as tornadoes, earthquakes, major floods, and other officially declared natural disasters. The
Government will only be responsible for costs attributable to repairing or replacing damaged work. The
Government will not be responsible for delay costs, impact costs, or extended overhead costs.
107.07 Furnishing Right-of-Way. The Government will obtain all right-of-way.
107.08 Sanitation, Health, and Safety. Follow the requirements of FAR Clause 52.236-13 Accident
Prevention.
Observe rules and regulations of Federal, State, and local health officials. Do not permit any worker to work in surroundings or under conditions that are unsanitary, hazardous, or dangerous.
Admit any OSHA inspector or other legally responsible official involved in safety and health administration to the project work site upon presentation of proper credentials.
Report accidents on forms furnished by the Government or, with prior approval, on forms used to report accidents to other agencies or insurance carriers. Maintain a "Log of Work Related Injuries and
Illnesses," OSHA Form 300, and make it available for inspection.
107.10 Environmental Protection. Do not operate mechanized equipment or discharge or otherwise place any material within the wetted perimeter of any waters of the U.S. within the scope of the Clean Water Act (33 USC § 1251 et seq.). This includes wetlands unless authorized by a permit issued by the U.S. Army Corps of Engineers according to 33 USC § 1344, and the Montana State 124
Permit. In the event of an unauthorized discharge:
(a) Immediately prevent further contamination;
(b) Immediately notify appropriate authorities; and
(c) Mitigate damages as required.
Comply with the terms and conditions of any permits that are issued for the performance of work within the wetted perimeter of the waters of the U.S. Separate work areas, including material sources, by the use of a dike or other suitable barrier that prevents sediment, petroleum products, chemicals, or other liquid or solid material from entering the waters of the U.S. Use care in constructing and removing the barriers to avoid any discharge of material into, or the siltation of, the water. Remove and properly dispose of the sediment or other material collected by the barrier.
Repair leaks on equipment immediately. Do not use equipment that is leaking. Keep a supply of acceptable absorbent materials at the job site in the event of spills. Acceptable absorbent materials are those that are manufactured specifically for the containment and clean up of hazardous materials.
Section 109. — MEASUREMENT AND PAYMENT
109.01 Measurement of Work. Take and record measurements and perform calculations to determine pay quantities for invoicing for work performed. Take or convert all measurements of work according to United States customary measure. Unless otherwise specified, measure when the work is in place, complete, and accepted.
Submit the final measurement when the installation is completed.
Use an acceptable format for measurement records. As a minimum, include the following information in all records of measurement:
(a) Project name and number;
(b) Contract item number;
(c) Date the work was performed;
(d) Location of the work;
(e) Measured quantity;
(f) Calculations made to arrive at the quantity;
(g) Signed certification statement by the persons taking the measurements, performing the calculations, and submitting them for payment that the measurement and calculations are correct to the best of their knowledge and that the quantity being measured is subject to direct payment for the identified item under the contract.
109.02 Measurement Terms and Definitions. Unless otherwise specified, the following terms are defined as follows:
(b) Design quantity. The quantity to be paid is the quantity shown in the bid schedule. The contract quantity will be adjusted for authorized changes that affect the quantity or for errors made in computing this quantity. If there is evidence that a quantity specified as a contract quantity is incorrect, submit calculations, drawings, or other evidence indicating why the quantity is in error and request, in writing, that the quantity be adjusted when the quantity in error is 15% from the original amount.
(c) Cubic yard. Cubic yard in place. Compute the quantity using the average end areas multiplied by the horizontal distance along a centerline or reference line between the end areas.
Deduct any quantity outside the designed or staked limits.
(d) Each. One entire unit. The quantity is the actual number of units completed and accepted.
(e) Hour. Measure the actual number of hours ordered by the CO and performed by the
Contractor.
(f) Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
(g) Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "All." Estimated quantities of lump sum work shown in the contract are approximate.
109.05 Scope of Payment. Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
(a) Direct payment. Payment is provided directly under a pay item shown in the bid schedule when one of the following applies:
(1) The work is measured in the Measurement Subsection of the Section ordering the work, and the bid schedule contains a pay item for the work from the Section ordering the work.
(2) The Measurement Subsection, of the Section ordering the work, references another
Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.
(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement
Subsection of the Section ordering the work.
Compensation provided by the pay items included in the contract bid schedule is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or prosecution of the work is included in the compensation provided by the contract pay items. Work measured and paid for under one pay item will not be paid for under any other pay item.
The quantities shown in the bid schedule are approximate unless designated as a contract quantity.
Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
DIVISION 150 – PROJECT REQUIREMENTS
Section 151. — MOBILIZATION
151.01 Description - This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Mobilization includes the obtaining of permits, insurance, and bonds.
151.02 Measurement. Measure mobilization according to Subsection 109.02.
151.03 Payment. The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule.
Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) Bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments Under Fixed-
Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Section 152. — CONSTRUCTION SURVEY AND STAKING
Description
152.01 Description and Material This work consists of furnishing qualified personnel and necessary equipment and material to survey, stake, calculate, and record data for the control of work. See FAR
Clause 52.236-17 Layout of Work.
Material
Furnish acceptable tools, supplies, and stakes of the type and quality normally used in trail work and suitable for the intended use. Furnish stakes to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.
Construction Requirements
152.02 General. The Government will set initial reference lines, will set horizontal and vertical control points, and will furnish the data for use in establishing control for completion of each element of the work.
Preserve all initial reference and control points. After beginning construction, replace all destroyed or disturbed initial reference or control points necessary to the work.
Place all stakes on the cutslope of the trail just outside of the construction limits prior to construction.
Leave the stakes in place until after final acceptance of the work.
Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete.
Measurement
152.05 Measurement - Measure the Section 152 items listed in the bid schedule according to
Subsection 109.02.
Payment
152.06 Payment - The accepted quantities, as provided above, will be paid at the contract price per unit of measurement for the Section 152 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Payment for lump sum items will be prorated based on the total work completed.
Bridge and retaining wall surveying is considered incidental to pay items under Section 557 and Section
620. Borrow and waste site surveying is considered incidental to pay items under Sections 204, 303, 557 and 620.
Section 153. — CONTRACTOR QUALITY CONTROL
Description
153.01 - This work consists of obtaining samples for Contractor quality control testing, performing tests for Contractor quality control, providing inspection, and exercising management control to ensure that work conforms to the contract requirements. See FAR Clause 52.246-12 Inspection of Construction.
Construction Requirements
153.02 Contractor Quality Control Plan. Before the start of the work, submit a written quality control plan for acceptance. With prior approval, submission of a quality control plan for items of work not immediately scheduled to begin may be deferred.
Submit the following with the quality control plan:
(a) Inspection/control procedures. Address each of the following subjects in each phase of construction.
1) Preparatory phase.
(a) Review all contract requirements.
(b) Ensure compliance of component material to the contract requirements.
(c) Coordinate all submittals including certifications.
(d) Ensure capability of equipment and personnel to comply with the contract requirements.
2) Start-up phase.
(a) Review the contract requirements with personnel performing the work.
(b) Inspect start-up of work.
(c) Establish standards of workmanship.
(d) Provide training as necessary.
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS
Description
155.01 Description - This work consists of scheduling and monitoring all construction activities. See
FAR Clause 52.236-15 Schedules for Construction Contracts.
Construction Requirements
155.02 General. Submit 2 copies of a preliminary construction schedule at the prework meeting.
A preliminary construction schedule is a written narrative with a detailed breakdown of all contract activities for the first 45 days after the notice to proceed is issued. During the prework meeting, the preliminary construction schedule will be accepted or rejected. If rejected, submit a revised schedule within 3 days. Do not begin work, except mobilization, without an accepted preliminary construction schedule.
Preface each construction schedule as follows:
(a) Project name;
(b) Contract number;
(c) Contractor;
(d) Original contract time allowed or completion date;
(e) Effective date of the schedule;
(f) Percent work complete; and
155.06 Schedule Updates. Review the construction schedule to verify finish dates of completed activities, remaining duration of uncompleted activities and time estimate revisions. Keep the CO informed of the current construction schedule and all logic changes.
Submit 2 copies of an updated construction schedule for acceptance at least every 8 weeks.
155.07 Acceptance. Construction schedules will be evaluated under Subsection 106.02.
Measurement
155.08 Measurement - Measure the Section 155 items listed in the bid schedule according to
Subsection 109.02.
Payment
155.09 Payment - The accepted quantities will be paid at the contract price per unit of measurement for the Section 155 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05. Progress payments for construction schedule will be paid as follows:
(a) 25 percent of the item amount, not to exceed one percent of the original contract amount, will be paid after the construction schedule is accepted.
(b) Payment of the remaining portion of the lump sum will be prorated based on the total work completed.
Section 156. — PUBLIC TRAFFIC
Description
156.01 Description - This work consists of controlling and protecting public traffic adjacent to and within the project. See FAR Clause 52.236-13 Accident Prevention.
Material
156.02 Material - Conform to the following Section: Temporary traffic control 635
Construction Requirements
156.03 Accommodating Traffic During Work. Perform work in a manner that ensures the safety and convenience of the public and protects the residents and property adjacent to the project.
Accommodate public traffic on trails adjacent to and within the project until the project is accepted according to Subsection 106.07(b).
156.04 Maintaining Trailways During Work. Keep access to forest users on trail reconditioning projects throughout the construction activities. New construction projects do not require allowance for public access.
156.05 Maintaining Trailways During Non-Work Periods. Maintain trailways for public traffic during all periods when work is not in progress. Do not leave equipment on the trail during reconstruction activities. Equipment may be left in the trail during new trail construction.
156.09 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.10 Measurement and Payment - See Subsection 109.05.
DIVISION 200 – EARTHWORK
Section 201. — CLEARING AND GRUBBING
201.01 Description - This work consists of clearing and grubbing within the clearing limits designated on the plans.
Material
201.02 Material - Conform to the following Subsections:
Backfill material 704.03
Construction Requirements
201.03 General. Perform work within designated limits. Do not damage vegetation designated to remain. Where possible, preserve all vegetation adjacent to bodies of water. Cut vegetation shall be placed downhill of trail tread, outside of the clearing limits. Do not pile brush and downed timber. If cutting above a stream place material between the stream and trail to create a slash filter.
When constructing sections of trail with multiple turns or switchbacks, place slash parallel not perpendicular to trail where possible to prevent users and animals from cutting turns or switchbacks.
Keep branches attached to downed trees between switchbacks to create more of a barrier between the trail sections.
201.04 Clearing. Within the clearing limits, clear trees, brush, downed timber, and other vegetation as follows:
(a) In areas outside the excavation and embankment, cut stumps to within 6 inches of the ground.
(b) Trim tree branches that extend over the trail surface and shoulders to attain a clear height of
10 feet. If required, remove other branches to present a balanced appearance. Cut branches flush.
(c) Cut dead and dying trees that lean into the clearing limits.
201.05 Grubbing. Grub deep enough to remove stumps, roots, buried logs, moss, turf, or other vegetative debris as follows:
(a) Grub all areas to be excavated.
(b) Grub all embankment areas.
(c) Grub pits, drainage structures and ditches only to the depth necessary for the excavation.
(d) Backfill stump holes and other grubbing holes with backfill material to the level of the surrounding ground according to Subsection 209.10. Compact backfill according to Subsection
209.11.
201.06 Disposal. Dispose of clearing and grubbing debris according to Subsection 203.05.
201.07 Acceptance. Clearing and grubbing will be evaluated under Subsection 106.02. Backfilling and compacting of stumps and grubbing holes will be evaluated under Section 209.
Measurement
201.08 Measurement - Measure the Section 201 items listed in the bid schedule according to
Subsection 109.02 and the following as applicable. Do not make deductions from the area computation unless excluded areas are identified in the contract.
Do not measure clearing and grubbing of borrow or material sources.
Payment
201.09 Payment - The accepted quantities will be paid at the contract price per unit of measurement for the Section 201 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Description
203.01 Description - This work consists of salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, signs and other obstructions.
Material
203.02 Material - Conform to the following Section and Subsection:
Backfill material 704.03
Construction Requirements
203.03 Salvaging Material. Salvage, with reasonable care, all material designated to be salvaged.
Salvage in readily transportable sections or pieces. Replace or repair all members, pins, nuts, plates, and related hardware damaged, lost, or destroyed during the salvage operation. Stockpile salvaged material at a designated area on the project.
203.04 Removing Material. Do not permit debris to enter waterways or areas designated not to be disturbed. Except in excavation areas, backfill and compact cavities left by structure removal with backfill material to the level of the finished ground. Backfill excavated areas according to Subsection
209.10. Compact backfill according to Subsection 209.11.
203.05 Disposing of Material. Dispose of debris and unsuitable and excess material as follows:
(a) Remove from project. Recycle or dispose of material legally off the project.
(b) Burn. Obtain necessary burning permits. Furnish a copy of the burning permits before burning begins. When burning is complete, extinguish the fire so no smoldering debris remains.
Dispose of unburned material according to (a) above.
(c) Bury. Bury debris in trenches or pits in approved areas within the right-of-way. Do not bury debris beneath drainage ditches, or in any areas subject to free-flowing water. Cover the top layer of buried debris with at least 1 foot of compacted earth. Grade and shape the area.
(d) Hazardous material. Furnish a copy of all disposal permits. Dispose of material according to
Federal, State, and local regulations.
203.06 Acceptance. Removal of structures and obstructions will be evaluated under Subsection
106.02. Backfilling and compacting…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .