Bear_Gulch_Drawings.pdf

PDF 2 MB Posted

Attached to
BEAVERHEAD-DEERLODGE NATIONAL FOREST- Bear Gulch ATV Trail Construction
Solicitation number
AG-0356-S-13-0018
Issued by

About this file

Drawings- Bear Gulch

View the file

Other files

File Type Posted
AG-0356-S-13-0018_Bear_Gulch_(Sections_B-M).pdf PDF
SF_18_Bear_Gulch_ATV_Trail.pdf PDF
Experience_Questionnaire.docx DOCX document
Bear_Gulch_Specs.pdf PDF
Wage_Determination_MT130076.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service--Region 1 Beaverhead-Deerlodge National Forest

Butte Ranger District

BEAR GULCH

Trail Construction and Reconditioning

Index to Sheets Page Description 1 Cover Sheet 2 Project Map 3-8 Summary of Quantities and Notes 9-13 Trail Log 14 Illustration of Terms 15 Clearing and Grubbing 16 Excavation 17 Obliteration and Sash 18 Boulder Barrier 19 PE Culvert and Ditch 20 Rolling Drain Dip 21 Grade Reversal 22-23 Rock Turnpike 24 Puncheon 25 Switchback 26 Trail Re-construciton 27 Sign Post 28 Signs 29 Bulletin Board 30-31 Bridge cjmurphy Map4 cjmurphy North_Arrow

Sheet 2

Sheet 3

TABLE OF ABBREVIATIONS

Barr Barrier

Min Minimum

Brdg Bridge

Oblit Obliteration

BS Backslope

PE Polyethylene

CDT Continental Divide Trail

PRJ Project

CON Construct

Pun Puncheon

CT Climbing Turn

Recon Reconstruction

Equip Equipment

Rev Reversal

EX Excavation

RK Rock

Exist Existing

SB Switchback

Geotext Geotextile

TM

Travel Management

HDWLL Headwall

TP Turnpike

INSTL Install

TR Trail

JCT Junction

TRHD Trailhead

Maj Major

WB Water Bar

Sheet 4

SUMMARY OF ESTIMATED QUANTITIES

Item A

Item No. Description Measurement Bear Gulch

Totals Method Unit

151.01 Mobilization LSQ LS 1

151.02 Equip. Washing LSQ LS 1

152.02 Stake Cleanup LSQ LS 1

201.01 Clearing and Grubbing DQ LF 745

203.02 Removal of Structures LSQ LS 1

204.01 Excavation DQ LF 745

204.03 Drain Dip AQ EA 12

204.04 Ditch AQ LF 350

204.20 Rock Turnpike AQ LF 175

204.25 Boulder Placement AQ EA 6

204.26 Rock Headwall AQ SF 96

205.01 Rock Excavation DQ LF 300

207.01 Placed Geotextile AQ SF 1225

303.01 Trail Reconditioning AQ LF 4072

557.02 Construct Puncheon AQ LF 130

602.12 12 inch PE Pipe AQ LF 48

633.02 8 foot x 6 inch Post AQ EA 2

633.03 CDT Placard AQ EA 2

633.05 Treated Timber Bulletin Board AQ EA 1

633.09 Motorized Guide Sign AQ EA 2

Sheet 5

Items B

Item No. Description Measurement

Item B Totals Method Unit

151.01 Mobilization LSQ LS 1

151.02 Equip. Washing LSQ LS 1

152.02 Stake Cleanup LSQ LS 1

201.01 Clearing and Grubbing DQ LF 1600

204.01 Excavation DQ LF 6575

204.03 Drain Dip AQ EA 6

204.04 Ditch AQ LF 160

204.10 Grade Reversal AQ EA 33

204.20 Rock Turnpike AQ LF 80

204.26 Rock Headwall AQ SF 16

204.30 ATV Switchback AQ EA 4

204.31 CT AQ EA 1

205.01 Rock Excavation DQ LF 677

207.01 Placed Geotextile AQ SF 560

211.04 Trailway Oblit Method 4 DQ LF 6761

557.02 Construct Puncheon AQ LF 15

557.30 Bridge, Fabricated and Erected AQ LF 30

633.02 8 foot x 6 inch Post AQ EA 2

633.05 Treated Timber Bulletin Board AQ EA 1

633.09 Motorized Guide Sign AQ EA 1

Sheet 6

GENERAL NOTES

1. ITEM 201.01 Clearing and Grubbing. The level of brushing is indicated in the trail log as either medium or heavy. If neither heavy nor medium brushing is indicated assume there is light brushing. Note that the level of brushing is an estimation and the contractor should still conduct his/her own site investigations to verify this estimation.

2. ITEM 204.01 Excavation. The levels of excavation will vary with the percent grade of the side hill.

Typical Cross Sections, sheet 19, illustrates the level of excavation required for various sections of trail. The level of excavation 10-30% or 30-60% is noted in the trail log under 204.01. Note that the level of excavation is an estimation and the contractor should still conduct his/her own site investigations to verify this estimation. Also note that slash barriers to prevent trail cutting is incidental to excavation where it is specified in the trail log. The slash barriers should be the minimum required to channel motorized users onto the trail and can be constructed from rocks and trees unearthed in the excavation process.

3. New construction includes clearing and grubbing (ITEM 201.01) and excavation (ITEM 204.01).

4. ITEM 204.76 Rock Excavation. The level of rock excavation is indicated in the trail log as either minor (•), major (••), or severe (•••). Minor - the surveyor could walk almost entirely on grade without scrambling. Major - Many large diameter rocks were present and scrambling was required to stay on flagline. Severe - Impassable or surveyor had to climb, not scramble, over rocks. Note that the level of rock excavation is an estimation and the contractor should still conduct his/her own site investigations to verify this estimation

5. A blasting plan is required for all project bids (Item B only).

6. No construction will be permitted during regular rifle hunting season.

7. ITEM 204.11 All fill and tread sections must be compacted with suitable equipment. Operate compaction equipment over full width of tread until visible deformation of the layer ceases or, when using a sheepsfoot roller, the roller “walks out” of the layer. Make at least three passes.

8. ITEM 204.30 ATV Switchback.. Insloped turn grade throughout will be measured. Contractors must make every attempt to reduce the grade throughout the turn to less than 12%. Clearing and Grubbing, and Excavation are incidental to switchback construction.

9. ITEM 204.31 CT (Climbing Turn). A turn in the trail without a level landing to achieve a gain in elevation. The uphill tread approach to the turn will be inlsoped for at least 15 ft. and the downhill approach will be outsloped for at least 15 ft. The grade of the inlsoped and outsloped

Sheet 7 tread must be at least 3%. Clearing and Grubbing, and Excavation are incidental to climbing turn construction.

10. ITEM 204.20 Rock Turnpike. Contractor shall locate all stockpiles for turnpike construction. The stockpile must be approved by the COR prior to any hauling of material. Clearing and Grubbing and Excavation are incidental to the turnpike construction. Note that in some instances the haul distance could exceed 4,000 feet. In the event of no suitable rock within 200 feet of the turnpike location, the contractor may submit in writing a request to use the treated 10 inch diameter logs for retainers.

11. ITEM 557.05 Bridge, Fabricated and Erected

a. TIMBER & LUMBER: Solid Solid sawn timber members shall conform to the requirements of the grading rules agency for the species. GLUED-LAMINATED STRINGERS shall be Combination Symbol 24F-V4, Species - DF/DF wet condition use and industrial appearance.

b. TREATMENT: For all members preservative treatment shall be in accordance with the current AWPA Specification. Treatment will comply with the requirements of the current edition of WWPI's "Best Management practices for the Use of Treated Wood in Aquatic Environments". All Glued-Laminated members shall be in accordance with AWPA C28. All Solid Sawn Members must be in accordance with AWPA C2.

c. FIELD TREATMENT: Copper Napthenate (2% solution) shall be furnished for field treating of wood. All abrasions and field cuts - approved by the C.O. - shall be carefully trimmed and given three brush coats of the field treatment solution. Field drilling of bolt and nail holes, as approved by the COR, shalll be poured full of preservative prior to inserting the fasteners. COR or Inspector must be on site for all field treatment.

d. HARDWARE: All hardware shall be galvanized and shall meet the requirements of AASHTO M270, Grade 36, with nuts and bolts conforming to ASTM A307, Grade A. Use malleable iron washers against wood unless otherwise noted.

e. FABRICATION: Submit shop drawings for all bridge components. Show all dimensions and fabrication details for all cut or bored timber. Field drilling of holes shall not be allowed unless otherwise noted on the plans.

f. LAG BOLT INSTALLATION: Pre-bore lag bolt holes using two diameters, one for the shank and one for the threads. The lead hole for the shank is to be 1/16" larger than the shank diameter and is to be bored to the depth of penetration diameter as shown on the PLANS and is to be bored at least to the length of the threads. Do not drive lag bolts with a hammer.

12. Contractors shall wash all equipment to be used on the job prior to mobilizing to the site. The CO, COR, or inspector shall inspect equipment at either the Dillon or Butte or Jefferson Forest Service Offices. Contractors shall call ahead to arrange for inspection at least on day in advance.

Sheet 8

13. The contractor is responsible for cleaning up all stakes and flagging at the end of the project and hauling them off National Forest Land. Stakes shall not be removed until after the final inspection.

14. Contractors have the flexibility to leave the flagline for 5 feet in either direction without approval from the COR. Changes greater than 5 feet require approval. Inspectors cannot approve location changes or any other contract changes.

15. Forest Service personnel not authorized on the project cannot accept, delete or add any work to the project.

16. Removal of structures includes all items specified for removal in the trail logs and said items must be removed from Forest Service land. Bid as lump sum. If removed culverts are still functional deliver to Jocelyn Dodge at the Butte Ranger District

17. Project Submittals Required with Bid:

Submittal Log

Item

Incident al to Pay

Item(s) Description of Submittal Type of

Submittal

Requirement found in

Specification No.

/Drawings

Additional Specification References

1 151 Contractor Quality Control Plan Plan 153.02 NA

2 151 Preliminary Construction Schedule Plan 155.02 NA

Med Hvy 10-30% 30-60% • •• •••

0+00

ST PRJ

INSTL TRHD SIGN

INSTL BOULDER 2

0+40 REPLACE DIRECTIONAL SIGN 1

INSTL 10 FOOT X 6 INCH

POST

2+35

ST PUN

REMOVE PIPES FROM FS

LAND

2+75 END PUN •

3+00 ST SPOT RESURFACE TR 500

8+00 END SPOT RESURFACE TR •

8+75 ST RK TP 90

INSTL GEOTEXT • 630

ST DITCH 180 •

INSTL PE PIPES AT STAKED

LOCATIONS

INSTL HEADWALLS 48

9+65 END RK TP • •

END DITCH •

13+65 ST RK TP 60

INSTL GEOTEXT • 420

ST DITCH 120 •

INSTL PE PIPES AT STAKED

LOCATIONS

INSTL HEADWALLS 32

14+25 END RK TP • •

END DITCH •

17+20 ST RK TP 25

INSTL GEOTEXT • 175

ST DITCH 50 •

INSTL PE PIPE AT STAKED

LOCATION

INSTL HEADWALL 16

17+45 END RK TP • •

END DITCH •

22+00 ENTER TIMBER

25+25 CREST

26+00 ENTER MEADOW

32+25 REPLACE CDT PLACARD 1

REMOVE ROUTE MARKER

38+00 REMOVE TM SIGN

INSTL BOULDER 2

39+80

STRUCTURE REMOVAL

REMOVE PIPES AND

GEOTEXT FROM FS LAND

ST PUN 90

40+70 END PUN •

42+46

REMOVE TM SIGN FROM FS

LAND

REPLACE CDT PLACARD 1

INSTL BOULDER 2

ITEM

633.09

Motor

Sign

ITEM

557.02

Con

Pun

ITEM

12"

ITEM

633.02

Post

ITEM

633.03

CDT

ITEM

633.05

Bulletin

Brd

ITEM

303.01

Tr Recon

ITEM

204.20

Rock

TP

ITEM

204.25

Boulder

ITEM

20426

HDWLL

ITEM 205.01

Rock Ex

ITEM

207.01

Geotext

ITEM

204.03

Drain

Dip

STA Description

ITEM

201.01

Brushing

ITEM

204.01

% Sideslope

ITEM

204.04

Ditch

Sheet 9

Med Hvy 10-30% 30-60% • •• •••

ITEM

633.09

Motor

Sign

ITEM

557.02

Con

Pun

ITEM

12"

ITEM

633.02

Post

ITEM

633.03

CDT

ITEM

633.05

Bulletin

Brd

ITEM

303.01

Tr Recon

ITEM

204.20

Rock

TP

ITEM

204.25

Boulder

ITEM

20426

HDWLL

ITEM 205.01

Rock Ex

ITEM

207.01

Geotext

ITEM

204.03

Drain

Dip

STA Description

ITEM

201.01

Brushing

ITEM

204.01

% Sideslope

ITEM

204.04

Ditch

47+00

ENTER TIMBER

ST RECON

51+00

REMOVE ROOTS IN TR

OUTSLOPE TR

51+60 REMOVE EXISTING SIGN •

52+00 RECON WB AS DRAIN DIP 1 •

53+60

EXIST JCT W/ CDT

INSTL DIRECTIONAL SIGN

• 1

55+25 RECON WB AS DRAIN DIP 1 •

56+00 GRADE INCREASES •

57+30 RECON WB AS DRAIN DIP 1 •

64+15 RECON WB AS DRAIN DIP 1 •

64+45 INSTL DRAIN DIP 1 •

65+40

INSTL DRAIN DIP

INCLUDE OUTLET DITCH

1 •

72+75

RECON WB AS DRAIN DIP

EXISTING GATE

1 •

76+30 RECON DRAIN DIP 1 •

77+20 RECON DRAIN DIP 1 •

79+00

FIX BS, KNOCK OFF BERM

AT RECENT REROUTE

80+15 RECON DRAIN DIP 1 •

82+72

END TR RECON

EXIST SB

84+45 INSTL DRAIN DIP 1

REMOVE OLD SIGN

85+35

INSTL DRAIN DIP

AT OLD JCT

89+30 ST NEW CON 745 745

92+00 ST RK EX • • 300

95+00 END RK EX • • •

96+75 END NEW CON • •

REJOIN OLD TRAIL

101+00 END PRJ

Sheet 10

Med Hvy 10‐30% 30‐60% • •• •••

101+00 ST PRJ

ST NEW CON

LIGHT BRUSHING

SIDESLOPE 10‐30%

102+00 •

103+00 INSTL GRADE REV • 1

104+00 INSTL GRADE REV • 1

105+00 SIDESLOPE INCREASE • 110

105+35 ST MIN RK EX • 75

106+00 • •

106+10

END MIN RK EX

SIDESLOPE DECREASE

385 • •

107+15 ENTR MDW •

108+00 •

109+00 INSTL DRAIN DIP • 1

109+65 ST BRIDGE • 30

109+95

END BRIDGE

SIDESLOPE INCREASE

• 105 •

INSTL 12FT RADIUS TURN • 1

111+00

INSTL DRAIN DIP

SIDESLOPE DECREASE

300 • 1

112+00 INSTL DRAIN DIP • 1

113+00 INSTL SB • 1

114+00

INSTL DRAIN DIP

SIDESLOPE INCREASE

• 100 1

115+00

CREST RIDGE

SIDESLOPE DECREASE

900 •

115+35 ST MIN RK EX • 105

116+00 INSTL GRADE REV • 1 •

116+40 INSTL GRADE REV • 1 •

END MIN RK EX • •

117+00 INSTL GRADE REV • 1

118+00 •

119+00 INSTL GRADE REV • 1

120+00 •

121+00 INSTL GRADE REV • 1

122+00 •

123+00 INSTL GRADE REV • 1

124+00

MED BRUSHING

SIDESLOPE INCREASE

200 • 450

125+00 INSTL GRADE REV • • 1

125+25 ST MAJ RK EX • • 20

INSTL GRADE REV • • 1 •

125+45 END MAJ RK EX • • •

126+00 INSTL GRADE REV • • 1

127+00 LIGHT BRUSHING •

128+00 INSTL GRADE REV • 1

128+50

INSTL SB

SIDESLOPE DECREASE

450 • 1

129+00 •

DescriptionSTA

ITEM

201.01

Brushing

ITEM

204.01

% Sideslope

ITEM

204.04

Ditch

ITEM

204.03

Drain

Dip

ITEM

204.10

Grade

Rev

ITEM

204.20

Rock TP

ITEM

204.26

Hdwll

ITEM

204.30

ATV SB

ITEM

204.31

CT

ITEM 205.01

Rock Ex

ITEM

207.01

Geotext

ITEM

211.04

Oblit

ITEM

63305

Bulletin

Brd

ITEM

633.09

Motor

Sign

ITEM

557.30

Brdg

ITEM

557.02

Con Pun

ITEM

602.12

12" PE

Pipe

ITEM

633.02

Post

Sheet 11

DescriptionSTA

ITEM

201.01

Brushing

ITEM

204.01

% Sideslope

ITEM

204.04

Ditch

ITEM

204.03

Drain

Dip

ITEM

204.10

Grade

Rev

ITEM

204.20

Rock TP

ITEM

204.26

Hdwll

ITEM

204.30

ATV SB

ITEM

204.31

CT

ITEM 205.01

Rock Ex

ITEM

207.01

Geotext

ITEM

211.04

Oblit

ITEM

63305

Bulletin

Brd

ITEM

633.09

Motor

Sign

ITEM

557.30

Brdg

ITEM

557.02

Con Pun

ITEM

602.12

12" PE

Pipe

ITEM

633.02

Post

130+00 ST MIN RK EX • 10

INSTL GRADE REV • 1 •

130+10 END MIN RK EX • •

130+90 INSTL SB • 1

131+40 •

132+00 •

133+00

ST MIN RK EX

SIDESLOPE INCREASE

• 10 10

133+10

END MIN RK EX

SIDESLOPE DECREASE

690 • •

134+00 INSTL GRADE REV • 1

135+00 MED BRUSHING 100 •

136+00 INSTL GRADE REV • • 1

136+50

ST MIN RK EX

LIGHT BRUSHING

• 50

137+00

END MIN RK EX

MED BRUSHING

255 • •

INSTL GRADE REV • • 1

137+67 ST MIN RK EX • • 33

138+00 END MIN RK EX • • •

INSTL GRADE REV • • 1

139+00 ST MIN RK EX • • 55

INSTL GRADE REV • • 1 •

139+55

END MIN RK EX

HVY BRUSHING

• 145 • •

140+00

INSTL GRADE REV

SIDESLOPE INCREASE

• • 1600 1

141+00 • •

142+00

INSTL GRADE REV

MED BRUSHING

100 • 1

ST MIN RK EX • • 25

142+25 END MIN RK EX • • •

143+00 • •

144+00 LIGHT BRUSHING •

144+40 INSTL SB • 1

146+00 INSTL GRADE REV • 1

148+00

INSTL GRADE REV

MED BRUSHING

800 • 1

149+00 • •

149+27 INSTL GRADE REV • • 1

150+00 ST MIN RK EX • • 10

150+10 END MIN RK EX • • •

151+00 ST MAJ RK EX • • 10

151+10 END MAJ RK EX • • •

152+00 ST MIN RK EX • • 100

153+00 END MIN RK EX • • •

INSTL GRADE REV • • 1

153+90 ST MAJ RK EX • • 30

154+20 END MAJ RK EX • • •

Sheet 12

DescriptionSTA

ITEM

201.01

Brushing

ITEM

204.01

% Sideslope

ITEM

204.04

Ditch

ITEM

204.03

Drain

Dip

ITEM

204.10

Grade

Rev

ITEM

204.20

Rock TP

ITEM

204.26

Hdwll

ITEM

204.30

ATV SB

ITEM

204.31

CT

ITEM 205.01

Rock Ex

ITEM

207.01

Geotext

ITEM

211.04

Oblit

ITEM

63305

Bulletin

Brd

ITEM

633.09

Motor

Sign

ITEM

557.30

Brdg

ITEM

557.02

Con Pun

ITEM

602.12

12" PE

Pipe

ITEM

633.02

Post

154+67 ST MIN RK EX • • 33

155+00 END MIN RK EX • • •

156+00

SIDESLOPE DECREASE

LIGHT BRUSHING

• 400 •

157+80 ST RK TP • 70

INSTL PE PIPE AT STAKED LOCATION • • 8

INSTL HEADWALL • • 16

INSTL GEOTEXT • • 490

ST DITCH • 140 •

158+50 END RK TP • • •

END DITCH • •

ST PUN • 15

158+65 END PUN • •

ST RK TP • 10

INSTL GEOTEXT • • 70

ST DITCH • 20 •

158+75 END RK TP • • •

END DITCH • •

160+00 SIDESLOPE INCREASE • 435

160+30 ST MIN RK EX • 86

161+16 END MIN RK EX • •

162+00 •

163+00 •

163+70 INSTL GRADE REV • 1

164+20 ST MIN RK EX • 15

164+35

END MIN RK EX

SIDESLOPE DECREASE

140 • •

165+00 INSTL GRADE REV • 1

165+75 END NEW CON •

REJOIN OLD TR

RECON WB AS DRAIN DIP 1

167+00 INSTL DRAIN DIP 1

168+00

ST NEW CON

LIGHT BRUSHING

SIDESLOPE 10‐30%

169+38 ST MIN RK EX • 10

169+48 END MIN RK EX • •

170+00 END NEW CON •

ST RECON

370+60 DIRECTIONAL SIGN 1

INSTL 10 FOOT X 6 INCH POST 2

INSTL TRHD SIGN AT STAKED LOCATION 1

END PRJ

Sheet 13

Shoulder Tread

Trailway

Clearing Width

Vertical Clearing Limit

Trailbed

Hinge Point

Fill slope

Ground Line

Catch Point

Ditch

Backslope

Catch Point

Ground Line

Surface Course Base Course

Embankment

ILLUSTRATION OF

TRAIL STRUCTURE TERMS

SHEET 14

ILLUSTRATION OF

TRAIL STRUCTURE TERMS

BEAR GULCH

Shoulder Tread

Trailway

Clearing Width

Vertical Clearing Limit

Trailbed

Hinge Point

Fill slope

Ground Line

Catch Point

Ditch

Backslope

Catch Point

Ground Line

Surface Course Base Course

Embankment

ILLUSTRATION OF

TRAIL STRUCTURE TERMS

SHEET 14

ILLUSTRATION OF

TRAIL STRUCTURE TERMS

CLEARING AND GRUBBING

ITEM 20101

SHEET 15CLEARING AND GRUBBING

BEAR GULCH

2'

3'

Avoid cutting live trees over 10 inches in diameter ouside of the clearing limits; instead cut branches flush with tree.

Grub out entire bush if branches reach into clearing limits.

Cut stumps within 6" of ground.

2'

3'

Cut trees less than 4" in diameter, or any diameter dead/dying if within clearing limits.

Cut previously cleared logs to clearing limits.

10'

Vertical clearing limit is 10 feet on centerline.

Downhill clearing limit is 2 feet from the edge of tread.

Uphill clearing limit is 3 feet from the edge of the cut.

Amount of bench varies with % of sideslope.

Full Bench

Trailbed

EXCAVATION

ITEM 20401

SHEET 16EXCAVATION

BEAR GULCH

NOTES:

1- Remove loose rock on the trailbed surface over 6 inches in the smallest dimension. To the extent probable remove loose rock greater than 2 inches in diameter.

2- Remove or reduce embedded rock that protrudes more than 4 inches above the trailbed.

3- Remove or reduce rock that protrudes into the traibed width from the side.

4- Roots and all other woody material, decomposed or not, shall be removed from the surface of the trailbed, and cut and removed 3 inches below the trailbed surface.

5- Compact and rake all finished tread by hand in accordance with Section 204 of the Specifications.

Outslope all sections 5%.

Above 30% sideslope Trailbed shall be 50", Unless

% Sideslope Exceeds 45%, then Trailbed shall be 60", or as noted on the trail log.

10-30% Sideslope Trailbed Width Shall be 50".

0-10% Sideslope Trailbed Width Shall be 50".

Fill Slope

Backslopes shall be no steeper than 1H:1V except in solid rock the backslopes shall be no steeper than 1H:2V.

Conserve and place topsoil to the extent possible on the fill slope.

TRAIL OBLITERATION AND SLASH BARRIER

ITEMS 21104 and 21110

SHEET 17TRAIL OBLITERATION and SLASH BARRIER

BEAR GULCH

TRAIL OBLITERATION METHOD 4 CROSS SECTION

Low StumpCut Limbs to Achieve 50% Contact with Trail

If Necessary, Buck Logs to Achieve 50%

Contact with Trail

Trail Tread 25 Feet Max.

Place Slash Perpendicular to Trail

25 Feet

2 Feet Min. Height

SLASH BARRIER

NOTES:

1- For Obliteration Method 4 place trees with a DBH of 12-18 inches a maximum of 10 feet apart along entirety of trail to be obliterated.

2- Do not cut trees greater than 25 feet from the edge of the trail.

3- Low stump all cut trees.

4- For Obliteration Method 4 ensure that the trail tread has contact with the felled tree for a minimum of 50%.

5- Wasted slash from felling and bucking can be placed on or adjacent to abandoned trail. Clearing limit specifications do not apply.

6- Remove all old structures from obliterated trail bed.

SHEET 18BEAR GULCH

Note:

1. Boulders must be at least 3ftx3ftx3 feet.

2. Embed rocks into ground at least 4 inches.

Trailbed

3 '

3 '

3 '

BOULDER BARRIER

BOULDER BARRIER

ITEM 20425

Not to Scale

FRONT VIEW SIDE VIEW

DITCH AND CULVERT AND HEADWALL

ITEMS 20404, 20425 and 60212

SHEET 19DITCH AND CULVERT AND HEADWALL

BEAR GULCH

PIPE ELEVATION VIEW

Header rocks shall be a minimum of 18" long by 12" wide by 4" thick.

Key in base rocks 1/4 their height.

Rock headwall should hide pipe so that forest users cannot see the pipe from the trail.

12-inch Polyethelene Dual Wall Pipe

4-inch Layer Bedding Material

8-12"

2" Min

Approved Fill Material

96"

Geotextile

12-inch Polyethelene Dual Wall Pipe

4-inch Layer Bedding Material

PIPE SECTION VIEW

4'

2'

DITCH

12"9"12"

12"

Drain ditch to daylight.

If spill point of dip is not to daylight, construct leadoff ditch to daylight. Slope of leadoff ditch must match dip.

Backslope

Fillslope

Outslope 3-5%

SHEET 20DRAIN DIP

BEAR GULCH

TRAIL BEFORE DRAINAGE

TRAIL AFTER DRAINAGE

Crown and downgrade approach are compacted material.

18" Min

Excavated Material

Compacted Fill Material

20' Min

6' Min

18" Min

Blend excavated material into original tread.

CROSS SECTION DRAIN DIP

DRAIN DIP

ITEM 20403

GRADE REVERSAL ITEM 20410

Not to Scale

BEAR GULCH SHEET 21

Backslope

Edge of Trail

Outslope 3-5%

~200'

10' Min at -5%

Approximate grade revewsal locations are marked on survey stakes, however, contractor shall use his/her discretion as to best placement for rolling dips. Dips shall be spaced at 200-foot intervals for duration of project.

GRADE REVERSAL

ROCK TURNPIKE

ITEM 20420

SHEET 22ROCK TURNPIKE

BEAR GULCH

Ditch

Rock Retainer Fill

Culvert

6'

Blend approach of turnpike to make for a smooth transition from trail.

Slope uphill ditches to drain to culvert.

Slope outlet of ditch to drain to daylight.

Geotextile

Construct catch basin for culvert.

Header

NOTES:

1- Crowned, compacted fill material shall be obtained from a source approved by the COR. Fill material shall meet the requirements of Subsection 704.07 of the Specifications 2- Crowned material at centerline must be at least 3" above the top edge of the retaining walls.

3- Minimum rock retainer size shall be 3/4 of a cubic foot. Bury retainers a minimum of 1/4 their height.

4- Ditches are required on both sides of the trail where sideslopes are less than 10%. Ditches are required only on the uphill side where sideslopes exceed 10%.

5- Ditches shall measure a minimum of 12 inches deep, 9 inches wide, and shall have sloped sides no greater than 1V:1H.

Hand work may be required on ditches to achieve a 1:1. Do not place picked rocks from turnpike fill into ditches.

6- Ditches shall drain to daylight.

7- 72-inch wide layer of geotextile shall be placed under fill material. Anchor geotextile under rock retainers. Geotextile shall meet the requirements of Subsection 714.01 of the Specifications. Submittals for geotextile are required prior to installation.

8- If ample rock for turnpike is not available, notify the COR immediately. Do not substitute native log turnpike prior to consultation with COR.

9- Turnpike width shall be 6 feet inside rock to inside rock.

10- If live water is present do not place excavated material near stream banks. Offset piled material 10 feet.

11- See Sheet 27 for cross section view.

12- Turnpike for bridge approaches shall be gradually become crib wall. See Section 254 and Subsection 705.03 for more details.

Side Ditch

CROSS SECTION

Compacted Select Borrow

Depth as Needed to Drain

Outlet Ditch

Outlet Ditch Drain to Daylight

Rock Retainer 3/4-cubic foot minimum rock size. Embed 1/4 of rock.

SECTION A-A

OUTLET DITCH

Crown surface a minimum 3" higher than top of retainer

Ground Line

If using logs leave adequate undisturbed ground to support stakes or rock retainers.

Side Ditch

6'

84" Wide Geotextile Fabric

Log alternative per COR approval. If approved:

1. 8" Minimum Diameter Retainer Logs are Required.

2. 2"d X 24" Minimum Treated Wooden Stakes

3. Install Stakes 6" from each log end and at 4' to 5' intervals outside trail tread.

4. Drive logs to refusal and cut flush with top of log.

9" 12"*

Compacted Select Borrow

9"

ROCK TURNPIKE

ITEM 20420

Not to Scale

1:1

1:1 1:1

SHEET 23ROCK TURNPIKE

Puncheon 4" d Minimum Treated Timber.

2" x 4" Spacer. Treated Timber.

2" x 6" Decking. Treated Timber.

Countersink (2) 3/8 - 7 X 9 Hex Head Lag Screws Into Curbs so that Heads are Flush with Surface of Curb Log.

8"d Minimum Treated Stringer. 8" x 8" x 60" Sill.

Treated Timber.

Lay Stringer End to End Between Double Mud Sill.

8"d Tie Stringer.

#6 Rebar Through All Members.

Embed 3" Into Sill

4'-0"

40" Max Spacing 8' o/c

1' Min

Notch Stringer and Tie Stringer to Accommodate Sill with a 4"

Bearing Seat

Maintain 1-inch Maximum Gap Between Decking.

2" x 6" x 50" Bulkead.

Secure to Stringer with

(2) 7" Ring Shank Nails.

Attach Decking to Stringers Using (2) 5" Ring Shank Nails.

0'-10"

1'-8" 1'-8"

0'-10"

Spacer

Curb

Backfill

Place Sill on Undisturbed Ground.

0 1 2 feet

0 0.5 1 feet

0 0.5 1 feet

PUNCHEON ITEM 55702

SHEET 24

PUNCHEON

BLACKTAIL TRAILS

DECK SECTION

PLAN

ELEVATION

NOTES:

1- All treated timber shall be treated with pentacholophenol, ACZA, or ACQ.

2 - All treated timber shall be douglas fir No.1 3- All stringers must be without bark.

4- All stringers must be milled before treat.

5- COR or Inspector must be present for any field treatment of the structure.

Inslope 5%

15' Lower Approach 5% Max Grade

15' Upper Approach 5% Max Grade

Construct grade reversal to remove water on trail surface.

Inslope trail throughout turn.

Construct grade reversal to remove water on trail surface.

Use existing brush and rocks to form switchback barrier.

Inslope 5%

Minimum Rock Size 3/4 Cubic Foot

ATV SWITCHBACK

ITEM 20431

SHEET 25ATV SWITCHBACK

BEAR GULCH

Existing 30% sideslope shown as an example for cut and fill depths.

Excavated Material

Compacted Fill Material

A

A

SECTION A-A

NOTES:

1- Depths vary for excavation and fill material depending on sideslope. 30% is an average, some switchbacks will require more work.

2- Dimensions are measured from centerline.

3- Radius varies with % sideslope.

Maximum grade throughout turn shall be 12%.

Use lower approach to transition from inslope to outslope.

1'-6"

1'-4"

TRAIL RECONDITIONING

ITEM 30301

SHEET 26TRAIL RECONDITIONING

BEAR GULCH

AFTER RECONDITIONING

BEFORE RECONDITIONING

Berm Slough

Place compacted berm and slough material in tread creating a smooth outsloped riding surface.

NOTES:

1- All usable soil shall be placed in tread and compacted by a minimum of three passes with the excavator bucket, or 3 passes with a dozer blade.

2- If voids are over 14 inches in depth, rock may be used to first fill the hole, soil shall be placed a minimum depth of 4 inches above the rock.

3- Remove loose rock on the trailbed surface over 6 inches in the smallest dimension. To the extent probable remove loose rock greater than 2 inches in diameter.

4- Remove or reduce embedded rock that protrudes more than 4 inches above the trailbed.

5- Remove or reduce rock that protrudes into the traibed width from the side.

6- Roots and all other woody material, decomposed or not, shall be removed from the surface of the trailbed, and cut and removed 3 inches below the trailbed surface.

7- Compact and rake all finished tread by hand in accordance with Section 204 of the Specifications.

8- Clearing limits as shown on sheet 8 are considered incidental to Trail Reconditioning.

Xref C:\Documents and Settings\cjmurphy\Desktop\Recondition.dwg

2"

Galvanized Lag Bolts 3 16" x 4" with Washer

3'

12"

Trail

Staked Location

10'x6"Ø Treated Post

5-6'

4'

42"Compacted Suitable Material

ELEVATION

SECTION SIGN PLACEMENT

NO

MOTORIZED

VEHICLES

YEARLONG

TO PROVIDE A

NON-MOTORIZED

RECREATION EXPERIENCE

POST

ITEM 63302

SHEET 27POST

BEAR GULCH

NOTES:

1- Posts shall be lodgepole, western larch, douglas fir, or ponderosa treated with CCA, ACZA, Pentachlorophenol or ACQ.

2- Posts shall be 6" in diameter, and shall be buried a minimum of 42".

3- All directional and trailhead signs shall be provided by the contractor.

SIGNS AND CDT PLACARD

ITEMS 63309 AND 63303

Sign ID: Trail Sign #1 Sign Catalog Number: FRD-3-2 Substrate: Reflective White Letters

Reflective Brown BkGrnd HDO Plywood

Letter Size: 2" ASA Series C Approximate size: 12x44" Size and No. of Posts: 2-6" dia. Post Location: South Segment STA 00+40

Sign ID: Trail Sign #2 Sign Catalog Number: FRD-3-2 Substrate: Reflective White Letters

Reflective Brown BkGrnd HDO Plywood

Letter Size: 2" ASA Series C Approximate size: 12x44" Size and No. of Posts: 2-6" dia. Post Location: North Segment STA 370+60

BEAR GULCH TR. NO. 4108

JCT. CDNST TR. NO. 87 1

BASIN CREEK PARK 7

BEAR GULCH TR. NO. 4108

JCT. CDNST TR. NO. 87 6

BURTON PARK TRHD. 7

SHEET 28SIGNS

BEAR GULCH

Sign ID: CDNST MARKER Sign Catalog Number: N/A Substrate: White Oak with Scorched

Letters, Natural Finish Approximate size: 6X10" Location: STA 32+25 & 42+46

Sign ID: Trail Sign #3 Sign Catalog Number: TD-3-1 Substrate: White Oak with Scorched

Letters Natural Finish Letter Size: 1" ASA Series C Approximate size: 9x27" Size and No. of Posts: 1-6" dia. Post Location: STA 53+60

BEAR GULCH TR. NO. 4108

BURTON PARK TRHD. 1

BASIN CREEK PARK 6

ELEVATION

PLAN

DETAIL A

BULLETIN BOARD

ITEM 63305

SHEET 29BULLETIN BOARD

BEAR GULCH

NOTES:

1- Posts shall be lodgepole, western larch, douglas fir, or ponderosa treated with CCA, ACZA, Pentachlorophenol or

ACQ.

2- All posts, hardware, and plywood panel shall be painted brown (#20059).

3- The banner shall be painted yellow-cream (#23695) with brown letters. Letters on the banner shall be routed and painted.

4- Banner and panel shall have 3" radius rounded edges.

5- Attach lexcon 38mm thick to the front of the bulletin board. Do not attach the lexan with tamper resistant screws. The screws shall be attached to the outer edge of the lexan, not the center.

5'-0"

6'-10"

6"

3'-1"

2 5/8"

1'-31 2"

2 5/8"

1'-11 2"

6'-0"

3'-6"

1' 1'-6" 1'-6" 1'

2" 3" 1'-0"

1/4" X 3" X 5" X 5-1/2" Galvanized Angle Iron. Inset in pole to provide full bearing.

1/2" X 4" Galvanized carriage bolt with nut and flat washer. Remove and debur excess length after installation on nut end.

1/2" Ø X 5" Galvanized Lag screw and flat washer typ.

8" Ø Post. Chamfer top 1-1/4" 45°.

Drill 9/16" Ø hole as shown in both angle iron and wood member.

3/4" Marine Plywood

3" Crushed Gravel. Minimum particle size is 1-1/2". Compacted Subgrade

4" Marine Plywood

Facility name letter size 3", ASA Series C font.

1. BURTON PARK TRAILHEAD

2. BASIN CREEK PARK

Forest Name, letter size 2", ASA Series D font.

Banner

Rough Sawn Timber

Detail A

2"

2"

2 5/8"

*Timber sill may be either 12x12" solid sawn, 12-1/4x12" glued-laminated, or built up 3x12", 4x12", and 6x12".

(4) 3-1/8"x18"x30' Glu-Lam Stringer

3x12"x6' Decking. Sawn Timber. Maintain 1-inch Maximum Gap Between Decking.

Attach Decking to Stringers Using (2) 5/16"d x 6" Ring Shank Nails, Alternate Centers

BRIDGE ITEM 55730

3"x12"x2'-10-1/2" Backwall

3"x12"x10'-0" Backing Planks

Attach Stringer to Sill Using Bearing Shoe

Attach Backing Planks to Backwall Using (2) 1/2"d x 7 1/2" Bolt with Malleable Iron Washer and Hex Nuts

2"x4"x2'-0" Spacer Attach Spacer and Curb to Decking Using (3) 5/8"d Timber Bolt

6"x6" Curb

TYPICAL DECK SECTION W/CURBS

0 0.5 1 2 feet

5x5x3/8" Flat Washer

3/4" Standard Threaded Rod*

Standard Plain Washer

Tack Weld

Standard Heavy Hex Nut

Bearing Shoe. See Detail Next Sheet

(3) 3"x12"x10'-0" Backing Planks.

Attach Backing Planks to Deck Planks and Stringers Using 7" Ring Shank Nails

3"x12"x72" Decking Planks

7" 2'-101

2"

10'-0" Geocell and Backing Plank Length

30'-0" Stringer End to End

8'-0" Sill Length

6"

SHEET 30BEAR GULCH

BRIDGE

(2) 3/4" x 8" Lag Bolts

BEARING SHOE DETAILS

PLAN

SIDE VIEW

END VIEW

1/2"xVariesx6" Elastomeric Pad (50 Durometer)

7/8"Ø Holes for Anchor bolts

13/16"Ø x1" Slotted Hole for 3/4"Ø Bolt & Nut w/Standard Plain Washers

2"

8"

8"

2"

Stringer Width Minus 1/4"

Stringer Width Plus 1/4"

4"

4"

2"

Stringer Width Plus 1/4" 41

2"41 2"

Bearing & StringerCL

Bearing & Abutment

CL

StringerCL

1"

1/2" PL

1/2" PL

CP

DIAPHRAGM DETAILS

0 0.5 1 2 feet

3-1/8"x14" Glu-Lam Diaphragm. Stagger Diaphragms to Fit Hangars

Simpson Strong Tie HU212-2 Double 2x12 Heavy Duty Joist Hanger

0 0.5 1 foot

0.25

Install (6) Diaphragms at Mid Span and Near Abutments on ITEM 55730 only

SAWN CURB CONNECTION DETAILS

1 2

3"x6" x 2' Curb Block 16" d. Holes for 58"d.

Timber Bolts 5 8" Timber Bolt

Curb Block

Deck Planks

2"x6" Continuous Plate

Malleable Iron Washer typical

Under Nut

ELEVATION

TYPICAL CONNECTION

ELEVATION

CONNECTION @ SPLICE

CURB BLOCK PLAN @ SPLICECURB BLOCK PLAN

2"11

2" 101 2" 2"

1 2

"11

" 101

" 11

BRIDGE TYPICALS

BRIDGE TYPICALS

ITEM 55730

SHEET 31BEAR GULCH

GeneralNotes_Etc_AB.pdf
SUMMARY OF ESTIMATED QUANTITIES
GENERAL NOTES

File details come from the government source that posted it. Updated .