AG-0356-S-10-0023 Contractor Q_A.pdf
PDF 29 KB Posted
- Solicitation number
- AG-0356-S-10-0023
About this file
Questions/Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0356-S-10-0023-0001.pdf | ||
| Amended Konda Lowland Dwgs 05-28-10.pdf | ||
| AG-0356-S-10-0023 Konda-Lowland RFQ.pdf | ||
| Experience_Questionnaire.doc | DOC document | |
| Konda_Lowland_Specs.pdf | ||
| Konda_Lowland_Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-0356-S-10-0023
Questions/Answers
6/3/2010
1. Where does the borrow come from for the turnpike?
Turnpike borrow sources are designated on the ground with flagging. Additional sources may be designated on the ground with the approval of the CO.
2. Is the Jackleg Fence, Item 938(02) at the beginning of the trail and is it straight, slight bends or any 90 degree turns?
The fence is straight and is located beginning of the trail.
3. Do the sign post need to be provided for Item 952(03)S?
Contractor shall furnish and install both the signs and the posts.
4. Is the completion date for the project correct listed as October 15th, 2010.
Yes
File details come from the government source that posted it. Updated .