Pre-Bid_Tour_Jan_12_2016_Bluffs_F G _I.pptx
PPTX presentation 13 MB Posted
- Attached to
- Riley Pass Bluffs F, G, and I Removal Actions
- Solicitation number
- AG-0343-S-16-0003
About this file
Pre-bid PowerPoint Slides
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_ _Answers.pdf | ||
| Amendment_0001_SF30.pdf | ||
| Amendment_0001_Attachment.pdf | ||
| Questions_ _Answers.pdf | ||
| Pre-bid_sign-in.pdf | ||
| Sign-in.docx | DOCX document | |
| 20131126USFSReviewRiley_Pass_Borrow_Soil_Resources_Final.pdf | ||
| Riley_Pass_Final_Borrow_Soil_Resources_Bluffs_A_and_I.PDF | ||
| Riley_Pass_Drawing.pdf | ||
| RFP.pdf | ||
| Questions_ _Answers.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bluff G Bluff I Bluff F Repository
New Borrow Access Road - Location and Design up to Contractor
Borrow Area Reconstructed Channel
FSR 3130
N Scale: 1” = 350 ft
Tufte Road
FSR 3130
Ludlow Bluffs F, G & I
N FSR 3102, to Welch Fire Trail Brown’s Pond Scale: 1” = 0.3 mi
Top of Bluff I
Highly Erosive Mine Waste and Spoils Remove and Reshape
Looking from Bluff G Towards Bluff I with Repository in the Background
Looking From Bluff G Towards Bluff I with Repository in the Background
Bluff G from the Borrow Area Mine Waste and Spoils Remove and Reshape
Looking Towards Bluff G Bluff G Waste and Spoils Retain Intact Rock Bluff Top
Looking Down at Borrow Areas from Top of Bluff I Borrow Areas to Borrow Area Existing road to be obliterated General area of new haul road route. Location to be determined by Contractor Borrow Area Haul Road image1.jpg image2.jpg image3.png image4.emf image5.emf image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.png image12.jpeg image13.jpeg image14.jpeg
File details come from the government source that posted it. Updated .