Amend1_ReederBay.docx
DOCX document 36 KB Posted
- Solicitation number
- AG-02RC-S-17-0128
About this file
Schedule of Items, Section H & J replacement pages
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30Amend2.doc | DOC document | |
| REEDER-SPECS-REV1-072717.pdf | ||
| ID170040_7_21_2017GenDecision.docx | DOCX document | |
| SF30Amend.doc | DOC document | |
| REEDER-PLANS-REV1-072717.pdf | ||
| REEDER_SignedDrawings_062617.pdf | ||
| FoodStorageOrder_IPNF.pdf | ||
| ReederSpecs06262017.pdf | ||
| GeneralWageDecision40.docx | DOCX document | |
| SF24BidBondFillForm.pdf | ||
| WorkersCompForm.docx | DOCX document | |
| ReederBayRFP.docx | DOCX document | |
| PAST_PERFORMANCE_SURVEY.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION AG-02RC-S-17-0128 Page
CONSTRUCTION AG-02RC-S-17-0128
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
REEDER BAY CAMPGROUND & LEDGEWOOD BAY PICNIC AREA
WATER & SEWER IMPROVEMENTS
Priest Lake Ranger District Idaho Panhandle National Forest Bonner County, Idaho
B- 1 – SCHEDULE OF BASE ITEMS
Base Item No.
DESCRIPTION
| METH. OF MEAS. |
| PAY |
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
013216.14A
Mobilization
LSQ
Lump Sum xx
022101A Construction Survey and Staking
LSQ
| Lump Sum |
| 1 |
023219
Exploratory Excavation
AQ
HR
033053A
Concrete Walkway
DQ
SF
311100(01)A
Clearing & Grubbing
LSQ
Lump Sum
311100(02)A Remove Existing Bathroom Facilities
AQ
EA
311100(03)A Remove Existing Water Hydrant Assemblies
AQ
EA
330516.13(01)A Bathroom Foundation & Utility Work
AQ
EA
331116(01)
2” HDPE DR 11 Water Pipe
DQ
LF
331116(02)A
1” HDPE DR 11 Water Service
DQ
LF
331116(03)A
1” Curb Stop with Curb Box
AQ
EA
331116(04)A
1” Water Service Connection
AQ
EA
331116(05)A
Cap Existing Water Line
AQ
EA
331220(01)A
Water Post Hydrant Assembly
AQ
EA
331223.1
Booster Station
LSQ
Lump Sum
331223.11
Pump House
LSQ
Lump Sum
331620
Refurbish Existing Water Tank
LSQ
Lump Sum
333101(01) 8” SDR 35 PVC Sanitary Sewer Main
DQ
LF
333101(02)A
4” SDR 35 PVC Sanitary Sewer Service
DQ
LF
333101(03)A 4” SDR 35 PVC Sanitary Sewer Service Connection
AQ
EA
333101(04)A 4” Sch. 40 PVC Cleanout, Complete
AQ
EA
333101(05) 4” Cast Iron Trailer Sewer Service Hookup
AQ
EA
333220(01) 60” Dia. Precast Concrete Sanitary Sewer Lift Station, Complete
LSQ
EA
333404(01) 3” Force Main Connection to Sewer District
LSQ
Lump Sum
333404(02)A 2” HDPE DR 11 Sewer Force Main
DQ
LF
333610(01) Abandon Precast Concrete Septic Tank (Host Site)
AQ
EA
333913 48” Dia. Precast Concrete Sanitary Sewer Manhole
DQ
EA
LEDGEWOOD PICNIC AREA
Base Item No
DESCRIPTION
METH. OF
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
013216.14B
LSQ
Lump Sum
311100(03)B Remove Existing Water Hydrant Assemblies
AQ
EA
331116(05)B
Cap Existing Water Line
AQ
EA
331220(01)B
Water Post Hydrant Assembly
AQ
EA
SCHEDULE C – Additive ALTERNATIVE 1, UPGRADE BATHROOM #3 (Additive Alt 1) BASE Item No.
DESCRIPTION
METH. OF
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
311100(02)B Remove Existing Bathroom Facilities*
AQ
EA
*NOTE: This specific item from Schedule C will be awarded with Base Items
Total ALL BASE Items
SCHEDULE C – Additive ALTERNATIVE 1
UPGRADE BATHROOM #3
REEDER BAY CAMPGROUND
Additive Alt 1 Item No.
DESCRIPTION
METH. OF
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
022101B Construction Survey and Staking
LSQ
Lump Sum
| $ |
| $ |
033053B
Concrete Walkway
DQ
SF
| $ |
| $ |
311100(01)B Clearing & Grubbing
LSQ
Lump Sum
| $ |
| $ |
330516.13(01)B Bathroom Foundation & Utility Work
AQ
EA
| $ |
| $ |
331116(02)B
DQ
LF
| $ |
| $ |
331116(03)B
AQ
EA
| $ |
| $ |
331116(04)B
AQ
EA
| $ |
| $ |
333101(02)B 4” SDR 35 PVC Sanitary Sewer Service
DQ
LF
| $ |
| $ |
333101(03)B 4” SDR 35 PVC Sanitary Sewer Service Connection
AQ
EA
| $ |
| $ |
333101(04)B 4” Sch. 40 PVC Cleanout, Complete
AQ
EA
| $ |
| $ |
TOTAL Additive Alt 1
SCHEDULE D – Additive ALTERNATIVE 2
ADDITIONAL WATER & SEWER IMPROVEMENTS
LEDGEWOOD PICNIC AREA
Additive Alt 2 Item 2
DESCRIPTION
METH. OF
MEAS.
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
013216.14C
LSQ
Lump Sum
XX
022101C Construction Survey and Staking
LSQ
Lump Sum
311100(01)C Clearing & Grubbing
LSQ
Lump Sum
311100(02)C Remove Existing Bathroom Facilities
AQ
EA
| $ |
| $ |
321123
Crushed Aggregate Trail
DQ
CY
| $ |
| $ |
330516.13(01)C Bathroom Foundation & Utility Work
AQ
EA
| $ |
| $ |
330516.13(02) Relocate Existing Well Pump Controls
LSQ
Lump Sump
331116(02)C
DQ
LF
| $ |
| $ |
331116(03)C
AQ
EA
| $ |
| $ |
331116(04)C
AQ
EA
| $ |
| $ |
333101(02)C 4” SDR 35 PVC Sanitary Sewer Service
DQ
LF
| $ |
| $ |
333101(04)C 4” Sch. 40 PVC Cleanout, Complete
AQ
EA
| $ |
| $ |
333404(02)B 2” HDPE DR 11 Pressure Pipe (Force Main)
DQ
LF
| $ |
| $ |
333404(03) 2” Force Main Connection to Sewer District
LSQ
Lump Sump
XX
333219(01)B
60” Dia. Precast Concrete Sanitary Sewer Lift Station
AQ
EA
| $ |
| $ |
Total Additive Alt 2
* Designated Method of Measurement:
DQ – Designed Quantities; AQ - Actual Quantities, LSQ - Lump Sum Quantities; SQ – Staked Quantities; CQ – Contract Quantities
NOTE:
Additive Items may be awarded after initial award of base items until November 30th, 2017, and the prices shall be guaranteed until said date.
H-10 Reference FAR 52.236-13, Accident Prevention.
Safety. Contractors shall comply with OSHA regulations and provide employees a work environment that is sanitary and not hazardous, which includes providing personal protective equipment. Contractors must maintain a health and safety plan and an accident prevention program, which includes frequent and regular inspections of the project site, materials, and equipment. Contractors are responsible for risk management regarding contractor/employee and public safety, which include experience of operator to handle road and terrain conditions, getting to the worksite, traffic control, and coordination with other users.
H-11 Idaho Worker’s Compensation Law
(a) Prior to award of any contract subject to Idaho Workers' Compensation Laws, the Contractor must provide a completed State of Idaho Certificate of Verification of Workers’ Compensation Insurance form to the Government. This form will be submitted to the Idaho Industrial Commission by the Government in order to assure that the Contractor in line for award has the required worker’s compensation coverage or is exempt from the requirement for coverage.
(b) A copy of the State of Idaho Certificate of Verification of Workers' Compensation Insurance form has been provided for use in Section J and shall be completed and submitted as part of the offer.
(c) This certificate of verification shall be fully executed by the Contractor and signed by the Industrial Commission Compliance Officer prior to award of the contract.
H-12 Tree Removal Reference Item 311100(01)A and Division 31, Specification 311100. The Contractor shall identify the trees to be removed while minimizing impact to the area. Tree shall be identified with flagging and approved by the Contracting Officer in writing before trees are cut.
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
The following attachments are a part of this solicitation and any resulting contract (see separate document(s)).
J- 1 Wage Rate Decision No. ID ID170040,dated 7/21/2017, 6 pages.
NOTE: THIS PROJECT IS LOCATED IN ZONE 2
J- 2 SUPPLEMENTAL SPECIFICATIONS
The following Supplemental Specifications are applicable to this contract and are physically included in this section:
000114 Measurement and Payment 011113 Work Covered by Contract
013216.14 Mobilization Payment Procedures
022101 Construction Surveying and Staking 023219 Exploratory Excavation 032112 Reinforcing Steel 033053 Miscellaneous Cast-in-Place Concrete 262010 Basic Electrical Requirements 262028 Codes and Standards 262030 Tests and Demonstration of the Complete Electrical System 262060 Electrical System 262090 Catalog Sheets 311100 Clearing and Grubbing and Removal of Obstructions 312300 Excavation and Embankment
312316.16 Structure Excavation and Compaction for Minor Structures 312333 Trenching and Backfilling 312500 Permanent Erosion Control (Seeding) 321123 Crushed Aggregates 321216 Asphaltic Paving (Commercial Sources)
330516.13 Pre-Cast Concrete Bathroom Foundation & Utility Work
330516.14 CXT (Ozark Style) Forest Service Provided Flush Toilet Building
330516.15 CXT (Montrose Style) Forest Service Provided Flush Toilet Building 331116 Site Water Utility Distribution Piping 331220 Campground Water Hydrants
331223.10 Booster Pump Station
331223.11 Pump House Structure
331243 Relocate Existing Well Pump, Controls, Tank & Bldg 331620 Refurbish Existing Water Tank 333101 Gravity Sewers and Appurtenances 333219 Sewer Lift Station Vault Structure 333220 Lift Station Effluent Pumping System 333404 Pressure Force Main Sewers 333610 Precast Concrete Septic Tanks 333913 Sewer Manholes CXT Montrose Style Supplied Specification CXT Ozark I Style Supplied Specification
Amendment No. 1, dated 7/27/2017 Amendment No. 1, dated 7/27/2017