ColletteConstructionRFP.docx
DOCX document 217 KB Posted
- Solicitation number
- AG-02RC-S-17-0062
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend1.doc | DOC document | |
| SiteTourNotes.docx | DOCX document | |
| AttachmentJ3_DrawingsColletteB_Sheets4.1to5.1.pdf | ||
| AttachmentJ3_DrawingsColletteB_Sheets1to4.pdf | ||
| AttachmentJ2_ColletteB_TECHNICAL_SPECIFICATIONS.docx | DOCX document | |
| AttachmentJ3_DrawingsColletteB_Sheets5.2_7.1.pdf | ||
| AttachmentJ3_DrawingsColetteB_Sheets7.2_8.4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION RFP thru FAC 2005-94B and 95B – 1/19/2017 | AG-02RC-S-17-0062 |
| Collette Mine (Project B) Stream Rehabilitation | |
| Page 3 of 67 |
| CONSTRUCTION RFP thru FAC 2005-94B and 95B – 1/19/2017 | AG-02RC-S-17-0062 |
| Collette Mine (Project B) Stream Rehabilitation | |
| Page 17 of 63 |
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Issuing Office:
USDA – Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
Offers Are Solicited For:
Collette Mine (Project B) Stream Rehabilitation
Lochsa-Powell Ranger District Nez Perce-Clearwater National Forests Idaho County, Idaho
| Solicitation No. RFP AG-02RC-S-17-0062 |
| HELP PREVENT FOREST FIRES |
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)
FS-6300-45 (11/79)
TABLE OF CONTENTS
PART I - THE SCHEDULE
| Page(s) | |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 - 2 |
SECTION B - SUPPLIES OR SERVICES AND PRICES 3 - 4
| B- 1 - Schedule of Items |
| B- 2 – Price Proposal Instructions |
| B- 3 - Offer Submittal |
| B- 4 – Payment for Bond Premiums |
| B- 5 – Additional Classification Required – Davis Bacon General Wage Decision ID170051 |
| B- 6 – Idaho Use Tax |
SECTION C - DESCRIPTION/SPECIFICATIONS 5- 7
| C- 1 – Project Description and Location |
| C- 2 - Government-Furnished Property |
| C- 3 – Technical Specifications |
| C- 4 - Drawings |
| C- 5 - Biobased Product Utilization |
SECTION E - INSPECTION AND ACCEPTANCE 8
E- 1 – Inspection of Construction
SECTION F - DELIVERIES OR PERFORMANCE 9
| F- 1 - Clauses Incorporated by Reference |
| F- 2 - Commencement, Prosecution, and Completion of Work Alternate I |
| F- 3 - Period of Performance |
SECTION G – CONTRACT ADMINISTRATION DATA 10
| G- 1 – Post Award Conference |
| G- 2 – Contracting Officer’s Representative |
| G- 3 – Government-Furnished Property |
SECTION H - SPECIAL CONTRACT REQUIREMENTS 11 - 20
| H- 1 - Clauses Incorporated by Reference |
| H- 2 – Key Personnel |
| H- 3 – Physical Data |
| H- 4 - Barricades, Warning Signs, and Other Devices |
| H- 5 - Conditions on Use of Premises (Camping) |
| H- 6 - Environmental Protection |
| H- 7 - Noxious Weed Control |
| H- 8 - Landscape Preservation |
| H- 9 - Fire Control |
| H- 10 - Loss, Damage, or Destruction |
| H- 11 - Incidental Payment Items |
| H- 12 - Conformity with Drawings and Specifications |
| H- 13 - Local Material Sources |
| H-14 - Samples, Tests, Cited Specifications |
H-15 - Invoice Processing Platform (IPP) H-16 - Idaho Worker’s Compensation Law
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES 21 - 36
| I- 1 - Clauses Incorporated by Reference |
| I- 2 – Addendum to Variation in Estimated Quantity |
| I-3 - Paid Sick Leave Under Executive Order 13706 |
| I-4 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts |
| I-5 - Buy American - Construction Materials |
| I-6 - Bid Guarantee |
| I-7 - Performance and Payment Bonds - Construction |
| I-8 - Alternative Forms of Security |
| I-9 - Federal, State, and Local Taxes |
| I-10 - Permits and Responsibilities |
| I-11 - Alterations In Contract |
| I-12 - Order of Precedence - Construction |
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 37 - 48
| J- 1 - Wage Determination |
| J- 2 – Forest Service Supplemental Specifications |
| J- 3 – Construction Drawings |
| J- 4 - State of Idaho Certificate of Verification of Workers’ Compensation Insurance |
PART IV - REPRESENTATIONS AND INSTRUCTIONS
| SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER | 49 - 53 |
| STATEMENTS OF OFFERORS AND RESPONDENTS |
K- 1 - Annual Representations and Certifications K- 2 - Incorporation by Reference of Representations and Certifications
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | 54 - 60 |
| AND RESPONDENTS |
| L- 1 - Solicitation Provisions Incorporated by Reference |
| L- 2 - System for Award Management |
| L- 3 - Inquiries |
L- 4 - Facsimile Proposals and E-Mail Proposals
| L- 5 - Instructions for the Preparation of Technical and Business Proposals |
| L- 6 - Amendments to Proposals |
| L- 7 - Type of Contract |
| L- 8 - Construction Wage Rate Requirements—Secondary Site of the Work |
| L-9 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity |
for Construction
| L-10 - Notice of Buy American Requirements - Construction Materials |
| L-11 - Service of Protest |
| L-12 - Site Visit (Construction) |
| L-13 - Preparation of Proposals – Construction |
SECTION M - EVALUATION FACTORS FOR AWARD 61 - 63
| M- 1 - Evaluation Criteria |
| M- 2 - Award Statement |
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
RFP AG-02RC-S-17-0062
2. TYPE OF SOLICITATION
|_| SEALED BID (IFB)
|_| NEGOTIATED (RFP)
3. DATE ISSUED
4/19/2017
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
841907
6. PROJECT NO.
| 7. ISSUED BY | CODE |
| 8. ADDRESS OFFER TO |
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
USDA - Forest Service Region 1, Acquisition Management Idaho Montana Acquisition Team Grangeville Office, 104 Airport Road Grangeville, ID 83530
| 9. FOR INFORMATION |
| CALL: |
| a. NAME |
KAREN RUKLIC
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
(208) 983-5144 or email: kruklic@fs.fed.us
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
Collette Mine (Project B) Stream Rehabilitation
Lochsa-Powell Ranger Station Nez Perce-Clearwater National Forests Idaho County, Idaho
Price Range: The Government’s estimate is between $250,000 and $500,000.
**FAXED OFFERS ARE NOT ACCEPTABLE. ORIGINAL BID BONDS ARE REQUIRED. OFFERS MUST BE MAILED OR HAND-CARRIED AND RECEIVED BY THURSDAY, MAY 18, 2017 AT 4:00 PM LOCAL TIME.
11. The Contract time shall begin upon receipt of contract |_| notice to proceed and shall be completed no later than September 30, 2017. This performance period is |_| mandatory, |_| negotiable. (See Section F, Clause 52.211-10, Alt I)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12b.)
| |_| YES | |_| NO | |
| 12b. CALENDAR DAYS |
| 13. ADDITIONAL SOLICITATION REQUIREMENTS: | |||
| a. | Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:00 pm local time Thursday, May 18, 2017. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due. | ||
| b. | An offer guarantee | |_| is, | |_| is not required. (If “is required” see AGAR Clause 452.228-70) |
| c. | All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference. | ||
| d. | Offers providing less than 45 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. |
| NSN 7540-01-155-3212 | 1442-101 | STANDARD FORM 1442 (REV. 4-85) |
| Computer Generated | Prescribed by GSA |
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
Duns No. _________________
CAGE Code (see FAR Provision 52.204-16) ____________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
PLEASE COMPLETE THIS BLOCK.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
| 24. SUBMIT INVOICES TO ADDRESS SHOWN IN |
| (4 copies unless otherwise specified) |
| ITEM |
| 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO | |
| |_| 10 U.S.C. 2304(c)( ) | |_| 41 U.S.C. 253(c)( ) |
| 26. ADMINISTERED BY | CODE |
| 27. PAYMENT WILL BE MADE BY |
USDA – Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NFs Grangeville Office - 104 Airport Road Grangeville, Idaho 83530
All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
| |_| | 28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract. |
| |_| | 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary. |
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
KAREN RUKLIC
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)
SECTION B - SUPPLIES OR SERVICES AND PRICES
COLLETTE MINE (PROJECT B) STREAM REHABILITATION
Lochsa Ranger District Nez Perce-Clearwater National Forests Idaho County, Idaho
B-1 SCHEDULE OF ITEMS (PROJECT B)
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| PAY UNIT |
| EST. |
QTY
UNIT PRICE
TOTAL PRICE
| 1 |
| MOBILIZATION & DEMOBILIZATION (1-001) |
| LSQ |
| LS |
| 1 |
| $ XXXXX |
| $ |
| 2 |
| CONSTRUCTION STAKING (1-002) |
| LSQ |
| LS |
| 1 |
| $ XXXXX |
| $ |
| 3 |
| WATER MANAGEMENT (1-003) |
| LSQ |
| LS |
| 1 |
| $ XXXXX |
| $ |
| 4 |
| SHRUB SALVAGE (1-004) |
| DQ |
| AC |
| 0.9 |
| $ |
| $ |
| 5 |
| SOD SALVAGE (1-005) |
| DQ |
| AC |
| 0.1 |
| $ |
| $ |
| 6 |
| SOIL SALVAGE FOR VEGETATIVE FILL (1-006) |
| DQ |
| CY |
| 2060 |
| $ |
| $ |
| 7 |
| EARTHWORK (1-007) |
| DQ |
| CY |
| 11,342 |
| $ |
| $ |
| 8 |
| HAUL EXCESS MATERIAL (1-008) |
| AQ |
| CY |
| 7340 |
| $ |
| $ |
| 9 |
| VEGETATED WOOD AND BRUSH FASCINE (1-009) |
| AQ |
| LF |
| 1030 |
| $ |
| $ |
| 10 |
| LARGE WOOD STRUCTURE |
(1-010)
| AQ |
| LF |
| 210 |
| $ |
| $ |
| 11 |
| RIFFLE CONSTRUCTION (1-011) |
| DQ |
| CY |
| 1800 |
| $ |
| $ |
| 12 |
| FLOODPLAIN ROUGHNESS (1-012) |
| DQ |
| AC |
| 2.0 |
| $ |
| $ |
| 13 |
| RATE FOR 300 CLASS EXCAVATOR AND OPERATOR |
(1-013)
| AQ |
| HR |
| 20 |
| $ |
| $ |
| 14 |
| RATE FOR DUMP TRUCK AND OPERATOR (1-014) |
| AQ |
| HR |
| 20 |
| $ |
| $ |
| 15 |
| RATE FOR BULLDOZER AND OPERATOR (1-015) |
| AQ |
| HR |
| 20 |
| $ |
| $ |
TOTAL (All Items)
* Designated Method of Measurement: DQ – Designed Quantities; AQ - Actual Quantities; LSQ - Lump Sum Quantities
** The number found in parentheses (i.e. 1-001) within the Description refers to how this item of work is referenced in the Technical Specifications.
B-2 PRICE PROPOSAL INSTRUCTIONS: Unit prices and total item amounts must be submitted for all items except those designated as Lump Sum. Do not round the extended item amounts and provide unit prices to the nearest dollar. In addition, the Contractor shall give a price per hour for Items: 13- Excavator and Operator, 14 - Dump Truck and Operator and15 - Bulldozer and Operator for additional work above the estimated quantities that is encountered during the contract performance. The Government does not guarantee that any hourly work shall be ordered and reserves the right to reduce or eliminate entirely the work under these items with no adjustment in contract unit price.
B-3 OFFER SUBMITTAL: As your offer, submit a completed and signed Standard Form 1442, a completed Schedule of Items (Section B-1), a Technical Proposal, an original bid bond, a completed Section K and a completed Verification of Worker’s Compensation Insurance Form (provided in Section J). Technical and price proposals are required for evaluation of offers. See Section L for proposal instructions and Section M for evaluation/award information.
Electronic or facsimile proposals are NOT acceptable.
B-4 PAYMENT FOR BOND PREMIUMS Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
B-5 ADDITIONAL CLASSIFICATION REQUIRED – DAVIS-BACON GENERAL WAGE DECISION ID170051, 12/17/2017: A wage rate for an Excavator Operator shall be conformed after award in accordance with FAR 52.222-6 Construction Wage Rate Requirements (MAY 2014) and direction provided in the subject Wage Decision. The most recent wage rate approved by the Department of Labor for this classification was $28.60 per hour rate with $11.85 fringe benefits (conformed 11/8/2016).
B-6 IDAHO USE TAX Under Clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491. See Section C-2 for a description of the GFP to be provided under this contract. Based on a legal interpretation provided 5/19/2015, the USFS does not have reason to believe that the State of Idaho will assess use tax on the large woody debris, small-medium trees and brush, vegetative cuttings or rooted planted being furnished under this contract.
SECTION C - DESCRIPTION/SPECIFICATIONS
C-1 - PROJECT DESCRIPTION AND LOCATION
a. Description of Work. This project is being performed on the Lochsa Ranger District of the Nez Perce-Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed program. This project is the second phase of a two phase construction plan. The work in Project B consists of construction of 1200 feet of new channel in the historic location; installing 210 linear feet of large wood habitat structure and 1030 linear feet of vegetated wood and brush fascines in the new channel; placing riverbed fill in the new channel to construct riffles and bedforms; activating the new channel and filling the old channel; excavating existing legacy mining tailings (approximately 11,300 CY of material), grading approximately 2.5 acres of floodplain, adding floodplain roughness and planting clump plants. In addition, trees and shrubs shall be salvaged and transplanted. Additional wood and slash will be hauled to the site from the Section 6 pit area 2.6 miles away and used to dress the floodplain and construct the large woody debris structures and vegetated wood and brush fascine. On-site soil deposits shall be salvaged for use during the current and future project implementation and sod shall be salvaged and transplanted in the newly constructed floodplain. Excess excavation will be hauled to the Section 6 rock pit. Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
b. Project Location. The project site is located approximately 40.7 miles from Orofino, Idaho in Clearwater County. From Orofino, go east on Highway 12 for approximately 8 miles to the junction with State Highway 11. Follow Highway 11 for 18 miles to Weippe. From Weippe follow the Musselshell Road east for 8.2 miles to Petersons Corner (at the bridge over Jim Brown Creek) and keep straight onto the paved FS Road 100. Travel 6.5 miles to the project site (2.4 miles from Musselshell Creek). If you approach the project site from Kamiah via FS Road 100, the site is located 3.5 miles past the Lolo Creek Campground.
c. Price Range. Government cost estimate, per FAR 36.204, is between $250,000 and $500,000.
d. Pre-Bid Tour. A pre-bid meeting will be held at the project site on Thursday, May 4, 2017 at 1:00 PM PST. See Section L-11 FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) for details.
e. Start Work. It is estimated that work will begin on July 1, 2017.
f. Period of Performance. All instream work must be performed between July 15, 2017 and September 15, 2017. All work must be completed by September 30, 2017. See Part I, Section F, Clause 52.211-10 Alt I.
C-2 - GOVERNMENT FURNISHED MATERIAL
· Large Woody Debris
· Small-Medium Trees and Brush
· Vegetative Cuttings and Rooted Plants
See Section G-3 and FAR 52.245-1 in Section I-1 for additional information.
C-3 - TECHNICAL SPECIFICATIONS
Stand-alone technical specifications have been prepared for the Collette Mine Rehabilitation project. They are entitled “Collette Mine Rehabilitation” and are located in a separate attachment in Section J. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
C-4 – DRAWINGS (entitled “COLLETTE MINE STREAM REHABILITATION –PROJECT B”). The following drawings are a part of this solicitation and any resulting contract and are found in a separate attachment in Section J. The requirements contained in these drawings are hereby made a part of this solicitation and any resultant contract.
Collette Mine Stream Rehabilitation – Project B
| Title |
| Page |
| Cover Page |
| 1.0 |
| Existing Conditions and Construction Limits |
| 2.0 |
| Rehabilitation Plan |
| 3.0 |
| Survey Control |
| 4.0 |
| Vegetation Preservation |
| 4.1 |
| Access and Staging |
| 4.2 |
| Water Management Plan |
| 4.3 |
| Materials Salvage Plan |
| 4.4 |
| Site Plan |
| 5.0 |
| Grading Plan and Profile |
| 5.1 |
| Site Plan |
| 5.2 |
| Grading Plan and Profile |
| 5.3 |
| Substrate Placement Plan |
| 5.4 |
| Revegetation Plan |
| 6.0 |
| Cross Sections |
| 7.0 |
| Cross Sections |
| 7.1 |
| Cross Sections |
| 7.2 |
| Typical Channel Cross Sections |
| 8.0 |
| Vegetated Wood and Brush Fascine |
| 8.1 |
| Large Wood Structure |
| 8.2 |
| Floodplain Roughness Detail |
| 8.3 |
| Riffle Construction Detail |
| 8.4 |
C- 5 Biobased Product Utilization
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
| Hydraulic Fluids | Penetrating Lubricants | Degreasers |
| Absorbents | Diesel Fuel Additives | Greases |
| Dust Suppressants | 2-Cycle Engine Oil | Sorbents |
| Adhesive and Mastic Removers | Cleaners | Concrete/Asphalt Release Fluids |
| Composite Panels | Sealers | Wood and Concrete Sealers |
| Graffiti and Grease Removers | Stain Removers | Metalworking Fluids |
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.
Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
SECTION E - INSPECTION AND ACCEPTANCE
E- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996)
SECTION F - DELIVERIES OR PERFORMANCE
F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than September 30, 2017. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by July 1, 2017. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
All stream work must occur between July 15, 2017 and September 15, 2017.
F- 3 AGAR 452.211.74 Period of Performance (FEB 1988)
The period of performance of this contract is from July 1, 2017 through September 30, 2017.
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 30 days of the commencement of work. The conference will be held at Nez Perce – Clearwater National Forest, North Fork Ranger District, in Orofino, ID. Another location may be approved if all parties agree.
G-2 CONTRACTING OFFICER'S REPRESENTATIVE
The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the prework conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the Specifications, shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.
G-3 - GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.
· Large Woody Debris - Full length trees with root balls are stored at the Section 6 Pit located in Section 6, T34N, R6E on FS Road 5150.
· Small–Medium Trees and Brush – The small and medium sized trees and brush are stored at the Section 6 Pit located in Section 6, T34N, R6E on FS Road 5150.
· Vegetative Cuttings and Rooted Plants – The vegetative cuttings and rooted plants shall be delivered by the government to the staging area. See Technical Specifications, Section – 01640 for notice requirements and other details
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.236-72 Use of Premises (NOV 1996)
H- 2 KEY PERSONNEL
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H-3 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the plans and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.
(b) Weather Conditions. Normal snow conditions indicate a work season from approximately June 1 to October 30.
(c) Transportation Facilities. Access from Orofino is US Highway 12 to State Highway 11 finishing on County Road 100. US Highway 12 is a two lane, asphalt highway with speed reduced corners and shoulders. Turnouts are spaced regularly along its length. State Highway 11 is a two lane, asphalt highway with shoulders but no turnouts. The first 6 miles of the highway are steeply graded. The Musselshell Road from Weippe to Peterson’s Corner is a two land gravel road. Road 100 is a two lane, asphalt road without shoulders or turnouts.
(d) Material Sources.
(a) Section 6 Pit
a. Location: T34 R6E S6 NE1/4. From project site, travel south on FS Road 100 for 2.6 miles, turn right on FS Road 5150 and travel north 0.5 miles to Section 6 pit.
b. Inventory:
| Description |
| Number of Pieces |
| Approximate Large End Diameter |
| Approximate length |
| Rootwad Attached |
| Limbs Attached |
| Large Logs |
| 64 |
| 15-24in |
| 15-20ft |
| Yes |
| No |
| Medium Logs |
| 32 |
| 12-15in |
| 25-30ft |
| No |
| No |
| Small Logs |
| 160 |
| 6-12in |
| 20ft |
| No |
| Yes |
| Small Logs with Root wad |
| 130 |
| 6-12in |
| 20ft |
| Yes |
| some |
| Brush/Slash |
| 600 cubic yards |
| 1-6in |
| Up to 8ft |
| Optional |
Yes
(d) Excess Excavation Disposal
(a) Section 6 Pit
a. Location: T34 R6E S6 NE1/4. From project site, travel south on FS Road 100 for 2.6 miles, turn right on FS Road 5150 and travel north 0.5 miles to Section 6 pit.
b. Disposal sites to be designated by CO.
H-4 BARRICADES, WARNING SIGNS, AND OTHER DEVICES
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTDC), published by the Federal Highway Administration and applicable safety codes. The MUTDC can be read or downloaded at http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/pdf_index.htm.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
As a minimum, it is anticipated that the following type and number of signs will be required:
For Collette Mine Rehabilitation Project B
| Location |
| Designation |
| Quantity |
| On NFSR 100, 500 feet on both sides of temporary site entrance |
| TRUCKS ENTERING ROADWAY |
| 2 |
H-5 CONDITIONS ON USE OF PREMISES (Camping)
(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the District Ranger.
(b) No improvements of a permanent nature shall be constructed without prior written approval of the C.O.R.
Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.
(c) Livestock will not be permitted without written approval from the Contracting Officer.
(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the COR.
(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the COR. All petroleum spills shall be immediately cleaned up. All spills will be reported immediately to the CO or COR. Spills over 25 gallons will be reported to CO and the Idaho State Department of Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.
(f) Chemical toilets are preferred for all campsites, however, the Contractor may be permitted to construct a slit trench when conditions warrant. Any slit trench constructed shall not be located closer than 400 feet to any live stream and is subject to approval of the COR. The trench shall be covered and the area restored to as natural a condition as possible when the camp is closed.
(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:
Garbage, trash, sewage waste, and other litter shall be kept in closed fly-proof containers and periodically hauled to an approved disposal facility located outside of the National Forest.
(h) Waste water shall be disposed of in a leach pit located at least 300 feet from springs, streams, and lakes. The pit shall be a minimum of 2 x 2 x 2 feet and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least two feet of compacted soil when the camp is closed.
(i) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.
Storage facilities for materials capable of causing water pollution, if accidentally discharged, shall be located so as to prevent any spillage into waters, or channels leading into water, that would result in substantial harm to fish and wildlife or to human water supplies.
(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked.
(k) The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.
H-6 ENVIRONMENTAL PROTECTION
The contractor is required to have a spill plan. The plan will contain a description of the specific hazardous materials, procedures, and spill containment that will be used, including inventory, storage, and handling.
All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site.
All pumps and generators used in or near streams will have appropriate spill containment structures and/or absorbent pads in place during use.
When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.
Service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Contractor shall ensure that all personnel involved in handling and packaging the hazardous materials are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous material according to 29 CFR 1910.120). Notify the Forest Service in writing of all hazardous material that may be brought onto the National Forest.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. When necessary provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
Equipment Fuel/Oil Leakage All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.
Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an area approved by the CO. When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.
Contractor is required to have a Spill Kit or equivalent that contains oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, available on-site during all phases of construction. For small streams with few pools or slack water, booms may not be effective. Use pads and straw bales to anchor booms if necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.
Fish-Friendly Hydraulic Fluids
In accordance with Technical Specification 01505, Mobilization and Demobilization, Subpart 1.1 - 4, equipment that will be used in live water shall utilize hydraulic fluid that is non-toxic to salmonids. The criteria used to determine if the hydraulic fluid is nontoxic to salmonids during acute exposure is found in footnote 1. According to guidance provided by the National Oceanic and Atmospheric Administration, the following products meet the required criteria:
· Chevron Clarity Hydraulic Oil A W
· Ecoterra Hydraulic Oil
· GreensCare Plus
· Mobil EAL 224H
· ENVIRON™ AW HYDRAULIC FLUIDS
The government does not endorse any of these specific products and urges contractors to perform independent research regarding the performance characteristics of each product.
H-7 NOXIOUS WEED CONTROL
In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment prior to entry on to national forest land. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the work area. Only clean construction equipment inspected by the Forest Service will be allowed to operate within the work area. All subsequent move-ins of construction equipment shall be treated in the same manner as initial move-in. "Construction equipment" does not include pickup trucks and personal vehicles.
Straw/Hay Bales shall be certified as “Weed Free”. The source field shall be inspected and certified by the county extension agent from the county that the straw/hay is grown. Each shipment onto the forest shall be accompanied by a certification tag stating that it is weed free. The contractor shall furnish the forest service with a statement of certification.
H-8 LANDSCAPE PRESERVATION
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
H-9 FIRE CONTROL (FS 236-1)
| (a) | Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations. |
| (b) | Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned. |
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area. An equitable adjustment in contract time may be made for this period.
| (c) | Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to his operation under the contract. | |
| (1) | Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service. | |
| (2) | Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows: | |
| One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with a 4 BC or higher rating. | ||
| One - shovel, round point #0 lady or equal. | ||
| One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski. | ||
| One - water container (at least 1-gallon capacity), not required with stationary equipment. | ||
| (3) | Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained. | |
| (4) | Powersaws. For each powersaw used in connection with this contract, the following will be provided: | |
| One - shovel, round point #0 lady or equal. Shovel must be immediately available for use. | ||
| One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times. |
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
| (5) | Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated. |
| (6) | Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot. |
| (7) | Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site when all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist. |
| (8) | Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires. Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended. |
| (9) | Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch. |
All stovepipes, inside and out, will not be closer than 2 feet from any wood or other flammable material or 1 foot if the combustible material is protected by a metal or asbestos shield.
| (10) | Welding. Welding or use of cutting torches will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum of 10 feet radius of all welding and cutting torch operations. A shovel and a 5-gallon standard backpack water container (filled) with handpump attached, shall be immediately available for use in the event of a fire start. |
| (11) | Fire Plan. Prior to initiating work on the contract area, during the closed fire season period, a fire prevention and suppression plan will be prepared. The Contractor and the Forest Service will jointly prepare this plan. Such plan shall include a detailed list of men and equipment at the Contractor's disposal for implementing the plan. The fire plan shall also specify additional measures and/or special requirements, such as Hoot Owl restrictions, necessary during periods of critical fire weather conditions. |
When Hoot Owl restrictions are invoked, the Forest Service may curtail or shut down all or portions of a Contractor's operations. The following requirements may be imposed:
| (i) | All high fire risk operations could be terminated at 1300 local time. | |
| (ii) | All burning could be stopped, including debris burning fires. | |
| (iii) | Patrolman may be required for a period of 2 hours after high fire risk operations and 1 hour after end of work shift. The Contractor shall provide the patrolman unless the contract is for equipment rental, in which case the Government will provide the patrolman. | |
| (12) | Pump and Trailer. NOT USED | |
| (13) | Burning. Before starting any open burning, the Contractor shall comply with the following: | |
| (i) | Submit a burning plan, subject to approval by the Contracting Officer, designed to minimize the impact on air quality and to lessen any fire damage. | |
| (ii) | Submit a burning permit from the District Ranger. | |
| (iii) | Use weather forecasts as far as possible in scheduling burning for more favorable dispersal of smoke. | |
| (iv) | Fuel shall be reasonably free of dirt and piled to facilitate rapid and complete combustion. Piles shall be tended during burning operations to maintain combustion and to eliminate unnecessary smudges. Piles shall be patrolled during off-work hours to avoid wildfires. | |
| (v) | Unless fire season controls dictate otherwise, burning shall be scheduled, as far as practicable, for the most favorable conditions during the burning period. | |
| (vi) | Under certain atmospheric conditions, smoke accumulations may become excessive and in these cases, the Regional Forester may, at his discretion, prohibit all open burning for definite periods within specific areas of the National Forest. |
H- 10 LOSS, DAMAGE OR DESTRUCTION
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H- 11 INCIDENTAL PAYMENT ITEMS
The intent of the contract is to provide for the complete construction of the project described in the contract.