Fivemile_Creek_AOP_Culvert_Replacement.pdf
PDF 8 MB Posted
- Attached to
- Five Mile Creek AOP Culvert Federal contract opportunity
- Solicitation number
- AG-02RC-S-16-0076
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Nez_Perce-Clearwater_NF_5_Mile_AOP_Culvert_Replacement_(AG-02RC-S-16-0076).doc | DOC document | |
| 5Mile_FSSS_4_30_16.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDAHO
NEZ PERCE -
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
MOBILIZATION15101 Lump SumLSQ
SEEDING, DRY METHOD62503 Lump SumLSQ
REMOVAL OF EXISTING 48" DIA PIPE-ARCH CULVERT
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB62201 HourAQ 8
PRECAST CONCRETE MEMBER, CULVERT FOOTING553A02 AQ
20301 1EachAQ
CONSTRUCTION SURVEY AND STAKING15221 Lump SumLSQ 1
12' SPAN, 5'-0" RISE STRUCTURAL PLATE ARCH, 0.111" THICKNESS60304 AQ
GRADE CONTROL STRUCTURES, ROCK WEIR (CONTRACTOR FURNISHED)25150 EachAQ
STRUCTURE EXCAVATION20806 Lump SumLSQ
Linear Foot
EQUIPMENT RENTAL, LARGE DUMP TRUCK62202 HourAQ 8
DEWATERING & SOIL EROSION & POLLUTION CONTROL15730 Lump SumLSQ 1
UNCLASSIFIED BORROW (GOVERNMENT FURNISHED)20404 Cubic YardCQ
GEOCELL ABUTMENT STABILIZATION27201 Square YardCQ
PLACED RIPRAP, CLASS 3, MACHINE PLACED (CONTRACTOR FURNISHED)25101 Cubic YardCQ
CRUSHED AGGREGATE, SURFACING, GRADING F, COMACTION METHOD E (CONTRACTOR FURNISHED)30809 TonCQ
Linear Foot
In-place quantity, Not adjusted for shrink / swell
SUMMARY OF ESTIMATED QUANTITIES
GENERAL NOTES
DETOUR ROAD, CONSTRUCT, MAINTAIN, REMOVE68001 Lump SumLSQ
CQ= Contract Quantity (See SECTION 109.02(b) of the STANDARD SPECIFICATIONS)
AQ= Actual Quantity; LSQ = Lump Sum Quantity
Backfill over culverts must meet the requirements of FP-03 Section 704.03.
See Sheet 8.
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
LOOKING UPSTREAM
LOOKING DOWNSTREAMEXISTING CULVERT OUTLET
EXISTING CULVERT INLET
EXISTING PARKING AREA
LOOKING AHEAD ON ROADLOOKING BACK ON ROAD
CLEARWATER
FIVEMILE CREEK
AOP
ROAD TYPICAL SECTION
REGION ONE
SCALE IN FEET
0 15 30
F
I
V
E
M
I
L
E
C
R
E
E
K
LEGEND
IDAHO
NEZ PERCE -
CLEARWATER
FIVEMILE CREEK
AOP
PLAN
REGION ONE
UGP
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
SCALE IN FEET
0 15 30
F
I
V
E
M
I
L
E
C
R
E
E
K
LEGEND
PLAN
DETOUR ROAD TYPICAL SECTION
PROFILE
DETOUR ROAD NOTES
PLAN
SCALE IN FEET
0 5 10
FIV
EM
IL
E
CREEK
SECTION THRU CENTERLINE CULVERT
IDAHO
NEZ PERCE -
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
TYPICAL SECTION
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
ESTIMATED QUANTITIES
CULVERT END BEVEL
RIPRAP DETAIL
STRUCTURAL EXCAVATION & BACKFILL
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
STREAM SIDE
FILL SIDE
FOOTING DETAIL
INSTALLATION DETAIL
DETAIL A
FOUNDATION NOTES
INFORMATIONAL QUANTITIES
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
PLAN SECTION
ELEVATION
BOLTED ALTERNATE
ELEVATION
PLAN SECTION
WELDED ALTERNATE
ELEVATION
POST-INSTALLED ANCHORS ALTERNATE
MECHANICAL SPLICE DETAIL
PRECAST FOUNDATION ELEVATION
TYPICAL PRECAST SEGMENT
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
ROCK WEIR PLAN
STREAM PROFILE
SECTION
ROCK WEIR DETAIL
U
G
P
IDAHO
NEZ PERCE -
CLEARWATER
FIVEMILE CREEK
AOP
REGION ONE
PUMP
PUMP
F
IV
E M
IL
E
C R E E K
PUMP
SCALE IN FEET
0 10 20
PLAN
PUMP
File details come from the government source that posted it. Updated .