Amendment 1 pages 2-3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PicnicTableDetails.pdf | ||
| Amend1Page1FennPondSiteImprovements.doc | DOC document | |
| FinalFennPhaseIIFSSS.docx | DOCX document | |
| Exhibit1_FennSeeding.pdf | ||
| FennPondSiteImproveRFPdocx.docx | DOCX document | |
| SignedCoversheet.pdf | ||
| Fenn_PhaseII_Final_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION: AG-02RC-S-15-0111
Fenn Pond Restoration and Site Improvements Amendment 1, Page 2 Dated 9/9/15
4. Amend Section F-3, AGAR 452.211.74 to state the following: “The period of performance of this contract is from November 15, 2015 to July 1, 2016.
5. Add FSSS 628 – Picnic Tables and Picnic Pads to Attachment J-2 Forest Service Supplemental Specifications (supplied in full text below).
628 – PICNIC TABLES AND PICNIC PADS
628 Delete entire section and replace with the following:
Description
628.01 This work consists of furnishing and installing picnic tables and pads including all labor, materials, tools and equipment.
Materials
628.02 Picnic tables shall conform to the size and shape as shown on the drawings.
Pre-cast exposed aggregate concrete table with hardware, as manufactured by Salmon River Pre-cast, 2787 Salubria Rd., Cambridge, ID Phone 208-566-3243, or equal.
Aggregate used for table legs shall be smooth rounded stone, not crushed. The intent is, that it will not snag or be abrasive should something brush up against it (skin, clothing, etc.).
Table planks will be 3 x 12 Number 1 western red cedar planks. Structural steel (flat iron) shall be minimum size of 1/4 inch thick, 3 inches wide and 2 foot 11 inches long. Bolts, screws, washers and all required appurtenances to attach planks shall be hot dip galvanized Construction Requirements
628.03 General All site improvements shall be constructed with tight, smooth, firm connections and joints, as recommended by the manufacturer. Flat iron will be attached on the “long” end where there is no seating on the bottom of plank along the width of the table, so the planks will not bend and/or warp throughout the years. Attach flat iron on underside of table with a minimum of two lag screws per plank, as shown on the drawings. All table components shall be plumb and level and shall meet ADA requirement for table height.
Clearing and Grubbing shall be in accordance with section 201 and as described below.
Picnic pad areas size shall be as shown on drawings. Remove all organic, deleterious material larger than 4 inches from the top 6 inches of picnic table pad. Dispose of waste according to Section 201, Section 203 or as shown on the plans. Remove any rock larger than 4 inches exposed to the surface. Remove surface irregularities and shape to provide a uniform surface maintaining the existing or intended cross slope. Picnic table pads shall be compacted according to section 204. (Continued on page 3 of Amendment)
SOLICITATION: AG-02RC-S-15-0111
Fenn Pond Restoration and Site Improvements Amendment 1, Page 3 Dated 9/9/15
Areas outside of picnic table pads shall be graded according to drawings and is included with item 204.
All picnic areas shall be seeded according to section 625.
628.04 Acceptance Picnic table pad and picnic table installation will be evaluated under Subsections 106.02 and 106.04.
Measurement
628.05 Measure the Section 628 items listed in the bid schedule according to Subsection 109.02.
Payment
628.06 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 628 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
6. Add Picnic Table Details, 2 Sheets, to Attachment J-3 Drawings. (Sheets have been uploaded in a separate document in FBO).
7. Solicitation response deadline is hereby changed from September 14, 2015, 4:00 PM local time to October 1, 2015, 4:00 PM local time.