Fenn_PhaseII_Final_Plans.pdf

PDF 7 MB Posted

Attached to
Nez Perce-Clearwater NFs - Fenn Pond Restoration and Site Improvements
Solicitation number
AG-02RC-S-15-0111
Issued by

About this file

Attachment J-3 Drawings

View the file

Other files

File Type Posted
PicnicTableDetails.pdf PDF
FennSiteImprovementsAmendment1Pgs2_3.docx DOCX document
Amend1Page1FennPondSiteImprovements.doc DOC document
FinalFennPhaseIIFSSS.docx DOCX document
Exhibit1_FennSeeding.pdf PDF
FennPondSiteImproveRFPdocx.docx DOCX document
SignedCoversheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE, REGION 1

MOOSE CREEK RANGER DISTRICT

NEZ PERCE-CLEARWATER NATIONAL FORESTS

FISHING POND SITE IMPROVEMENTS

FENN RANGER STATION

IDAHO COUNTY, IDAHO

CONSTRUCTION PLANS FOR:

FOREST ENGINEER

RECOMMENDED:

RECOMMENDED:

DATE

DATE

NEZ PERCE-CLEARWATER NATIONAL FOREST

FOREST SUPERVISOR

APPROVED:

DATE

NEZ PERCE-CLEARWATER NATIONAL FOREST

DISTRICT RANGER

MOOSE CREEK RANGER DISTRICT

NEZ PERCE-CLEARWATER NATIONAL FOREST

T32N T33N

IDAHO LOCATION MAP

R 8E

R 7E

L

O

L

O

M

T

INDEX TO SHEETS

1 TITLE SHEET

SUMMARY OF QUANTITIES &

GENERAL NOTES

3 PROJECT COORDINATES

4 SITE PLAN

5 GRAVEL PATH PLAN & PROFILE

6 GRAVEL PATH SECTIONS

7 - 8 14' x 24' FISHING PLATFORM

DETAILS

9 - 11 14' x 24' FISHING PLATFORM

FOUNDATION DETAILS

12 TRAIL BRIDGE GENERAL LAYOUT

TRAIL BRIDGE FOUNDATION PLAN

AND DETAILS

14 TRAIL BRIDGE ABUTMENT DETAILS

15 - 16

TRAIL BRIDGE SUPERSTRUCTURE

DETAILS

17 - 19 BOARDWALK DETAILS

12' x 14' FISHING PLATFORM

DETAILS

21 - 22 12' x 14' FISHING PLATFORM

FOUNDATION DETAILS

23 RAILING DETAILS

24 PLANTING PLAN

MATERIAL SOURCES

GOVERNMENT FURNISHED:

Waste Site

Crushed Aggregate Surfacing

R 7E

R 6E m i

T31N T32N

O'HARA

PIT

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

SUMMARY OF ESTIMATED QUANTITIES

AND GENERAL NOTES

2 24

SUMMARY OF ESTIMATED QUANTITIES

CQ= Contract Quantity

AQ= Actual Quantity

LSQ = Lump Sum Quantity

See SECTION 109.10 of the FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)

ITEM NO. ITEM DESCRIPTION

MEASUREMENT

QUANTITY

METHOD UNIT

15101 MOBILIZATION LSQ

Lump Sum

15221 CONSTRUCTION SURVEY AND STAKING LSQ

Lump Sum

15713 SOIL EROSION & POLLUTION CONTROL LSQ

Lump Sum

20450 GRAVEL PATH EXCAVATION CQ Cubic Yard 460

30809

CRUSHED AGGREGATE, SURFACING (GOVERNMENT FURNISHED)

CQ Cubic Yard 25

553A01A

PRECAST CONCRETE MEMBER, BRIDGE GRADE BEAM

CQ Each 2

553A01B

PRECAST CONCRETE MEMBER, FISHING PLATFORM GRADE BEAM

CQ Each 2

55701A

UNTREATED STRUCTURAL TIMBER AND LUMBER, BRIDGE

RAILING (WITH HARDWARE)

CQ Lineal Foot 70

55701B

UNTREATED STRUCTURAL TIMBER AND LUMBER, FISHING

PLATFORM RAILING (WITH HARDWARE)

CQ Lineal Foot 110

55703A

TREATED STRUCTURAL TIMBER, DECKING, RUNNING PLANK &

BACKING PLANKS (BOARDWALK, BRIDGE & FISHING PLATFORMS)

CQ MBF 7.90

55703B

TREATED STRUCTURAL TIMBER, BOARDWALK (WITH HARDWARE)

CQ MBF 5.70

55703C

TREATED STRUCTURAL TIMBER, FISHING PLATFORMS

(WITH HARDWARE)

CQ MBF 2.1

55705

TREATED STRUCTURAL TIMBER, GLUED LAMINATED, BRIDGE

SUPERSTRUCTURE (WITH HARDWARE)

CQ MBF 1.52

56901

HELICAL ANCHORS, GROUTED PULL-DOWN, CASED

AQ Each 8

62201

EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB

AQ Hour 8

62202

EQUIPMENT RENTAL, LARGE DUMP TRUCK

AQ Hour 8

62601

PLANTING, TREES (GOVERNMENT FURNISHED)

AQ Each 12

62602

PLANTING, WETLAND PLANTS (GOVERNMENT FURNISHED)

AQ

Square Yard

62801 FURNISH AND INSTALL PICNIC TABLE AQ Each 2

GENERAL NOTES

DESIGN NOTES

X

FENN POND IMPROVEMENTS

PROJECT COORDINATES

3 24

CONTROL POINT LAYOUT

VIEW OF POND JUST AFTER CONSTRUCTION - NOVEMBER, 2014

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

SITE PLAN

4 24

LEGEND

SCALE IN FEET

0 25 50

SELWAY

RIVER

SITE PLAN

PLAN

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

GRAVEL PATH PLAN & PROFILE

5 24

SCALE IN FEET

0 15 30

PATH TYPICAL SECTION

FENN POND IMPROVEMENTS

GRAVEL PATH SECTIONS

6 24

SECTION

SECTION

FENN POND IMPROVEMENTS

14' x 24' FISHING PLATFORM DETAILS 7 24

14' x 24' FISHING PLATFORM PLAN 14' x 24' FISHING PLATFORM FRAMING PLAN

ELEVATION

A

VIEW

A

A

A

2 8

1 8

2 8

A

FENN POND IMPROVEMENTS

FISHING PLATFORM DETAILS

8 24

PLAN SECTIONPLAN SECTION AT CORNER

A

A

SECTION A-A

A

Scale: 1" = 1'-0"

SECTION

SECTION

B

Scale: 1" = 1'-0"

PLAN SECTION

SECTION

PLAN SECTION

A

B

FENN POND IMPROVEMENTS

14' x 24' FISHING PLATFORM

FOUNDATION PLAN

AND DETAILS 9 24

FOUNDATION PLAN SCALE IN FEET

0 2.5 5

SECTION

FENN POND IMPROVEMENTS

14' x 24' FISHING PLATFORM

PRECAST CONCRETE GRADE BEAM DETAILS 10 24

ABUTMENT NO. 1 GRADE BEAM PLAN

ABUTMENT NO. 1 GRADE BEAM ELEVATION

SECTION

FENN POND IMPROVEMENTS

HELICAL PILE DETAILS

11 24

PILE CAP DETAIL

HELICAL PILE DETAIL

A

A

HOLD DOWN BAR DETAIL

CROSS BEAM TO PILE CONNECTION DETAIL

SECTION A-A

RETAINER ANGLE DETAIL

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

TRAIL BRIDGE GENERAL LAYOUT

12 24

SCALE IN FEET

0 5 10

PLAN

TYPICAL SECTION

ELEVATION

F

E

N

N

P

O

N

D

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

TRAIL BRIDGE FOUNDATION PLAN

AND DETAILS 13 24

FOUNDATION PLAN

SCALE IN FEET

0 5 10

F

E

N

N

P

O

N

D

UPSTREAM

END

DOWNSTREAM

END

UPSTREAM

END

DOWNSTREAM

END

FENN POND IMPROVEMENTS

TRAIL BRIDGE ABUTMENT DETAILS

Scale: 3/8" = 1'-0"

Scale: 3/8" = 1'-0"

A

PLAN

ELEVATION

USDA FOREST SERVICE

NEZ PERCE - CLEARWATER NFs

FENN POND IMPROVEMENTS

TRAIL BRIDGE

SUPERSTRUCTURE PLAN AND ELEVATION

FABRICATE GLUED-LAMINATED STRINGERS WITH

CAMBER BASED ON AN 1800 FOOT RADIUS

Scale: 3/4" = 1'- 0"

A

SECTION A-A

PLAN

ELEVATION

Scale: 1-1/2" = 1'- 0"

Typ

USDA FOREST SERVICE

NEZ PERCE - CLEARWATER NFs

FENN POND IMPROVEMENTS

SUPERSTRUCTURE DETAILS

CL Boardwalk

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

BOARDWALK PLAN & PROFILE

17 24

SCALE IN FEET

0 10 20

PLAN

FENN POND IMPROVEMENTS

BOARDWALK FRAMING PLAN

18 24

FRAMING PLANSCALE IN FEET

0 5 10

FRAMING PLAN

SCALE IN FEET

0 5 10

FENN POND IMPROVEMENTS

BOARDWALK DETAILS

19 24

TYPICAL BOARDWALK SECTION

PLAN

ELEVATION

CURB DETAIL

FENN POND IMPROVEMENTS

12' x 14' FISHING PLATFORM DETAILS 20 24

12' x 14' FISHING PLATFORM PLAN

B

A

12' x 14' FISHING PLATFORM FRAMING PLAN

2 8

ELEVATION

A

VIEW

A

A

FENN POND IMPROVEMENTS

12' x 14' FISHING PLATFORM

FOUNDATION PLAN

AND DETAILS 21 24

FOUNDATION PLAN

SCALE IN FEET

0 2.5 5

SECTION

FENN POND IMPROVEMENTS

12' x 14' FISHING PLATFORM

PRECAST CONCRETE GRADE BEAM DETAILS 22 24

ABUTMENT NO. 1 GRADE BEAM PLAN

ABUTMENT NO. 1 GRADE BEAM ELEVATION

SECTION

FENN POND IMPROVEMENTS

RAILING DETAILS

TRAIL BRIDGE RAILING

TYPICAL SECTION

TRAIL BRIDGE RAILING

EXTERIOR ELEVATION

TRAIL BRIDGE RAILING

INTERIOR FACE

SECTION THRU POST SECTION THRU RAIL

FISHING PLATFORM RAILING

INTERIOR FACE

FISHING PLATFORM RAILING

EXTERIOR ELEVATION

B

B

SECTION A-A

A

A

SECTION B-B

FISHING PLATFORM RAILING

TYPICAL SECTION

USDA FOREST SERVICE

NEZ PERCE-CLEARWATER NFs

FENN POND IMPROVEMENTS

PLANTING PLAN

24 24

SCALE IN FEET

0 20 40

SELWAY

RIVER

PLANTING PLAN

File details come from the government source that posted it. Updated .