Fenn_PhaseII_Final_Plans.pdf
PDF 7 MB Posted
- Solicitation number
- AG-02RC-S-15-0111
About this file
Attachment J-3 Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PicnicTableDetails.pdf | ||
| FennSiteImprovementsAmendment1Pgs2_3.docx | DOCX document | |
| Amend1Page1FennPondSiteImprovements.doc | DOC document | |
| FinalFennPhaseIIFSSS.docx | DOCX document | |
| Exhibit1_FennSeeding.pdf | ||
| FennPondSiteImproveRFPdocx.docx | DOCX document | |
| SignedCoversheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE, REGION 1
MOOSE CREEK RANGER DISTRICT
NEZ PERCE-CLEARWATER NATIONAL FORESTS
FISHING POND SITE IMPROVEMENTS
FENN RANGER STATION
IDAHO COUNTY, IDAHO
CONSTRUCTION PLANS FOR:
FOREST ENGINEER
RECOMMENDED:
RECOMMENDED:
DATE
DATE
NEZ PERCE-CLEARWATER NATIONAL FOREST
FOREST SUPERVISOR
APPROVED:
DATE
NEZ PERCE-CLEARWATER NATIONAL FOREST
DISTRICT RANGER
MOOSE CREEK RANGER DISTRICT
NEZ PERCE-CLEARWATER NATIONAL FOREST
T32N T33N
IDAHO LOCATION MAP
R 8E
R 7E
L
O
L
O
M
T
INDEX TO SHEETS
1 TITLE SHEET
SUMMARY OF QUANTITIES &
GENERAL NOTES
3 PROJECT COORDINATES
4 SITE PLAN
5 GRAVEL PATH PLAN & PROFILE
6 GRAVEL PATH SECTIONS
7 - 8 14' x 24' FISHING PLATFORM
DETAILS
9 - 11 14' x 24' FISHING PLATFORM
FOUNDATION DETAILS
12 TRAIL BRIDGE GENERAL LAYOUT
TRAIL BRIDGE FOUNDATION PLAN
AND DETAILS
14 TRAIL BRIDGE ABUTMENT DETAILS
15 - 16
TRAIL BRIDGE SUPERSTRUCTURE
DETAILS
17 - 19 BOARDWALK DETAILS
12' x 14' FISHING PLATFORM
DETAILS
21 - 22 12' x 14' FISHING PLATFORM
FOUNDATION DETAILS
23 RAILING DETAILS
24 PLANTING PLAN
MATERIAL SOURCES
GOVERNMENT FURNISHED:
Waste Site
Crushed Aggregate Surfacing
R 7E
R 6E m i
T31N T32N
O'HARA
PIT
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
SUMMARY OF ESTIMATED QUANTITIES
AND GENERAL NOTES
2 24
SUMMARY OF ESTIMATED QUANTITIES
CQ= Contract Quantity
AQ= Actual Quantity
LSQ = Lump Sum Quantity
See SECTION 109.10 of the FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS)
ITEM NO. ITEM DESCRIPTION
MEASUREMENT
QUANTITY
METHOD UNIT
15101 MOBILIZATION LSQ
Lump Sum
15221 CONSTRUCTION SURVEY AND STAKING LSQ
Lump Sum
15713 SOIL EROSION & POLLUTION CONTROL LSQ
Lump Sum
20450 GRAVEL PATH EXCAVATION CQ Cubic Yard 460
30809
CRUSHED AGGREGATE, SURFACING (GOVERNMENT FURNISHED)
CQ Cubic Yard 25
553A01A
PRECAST CONCRETE MEMBER, BRIDGE GRADE BEAM
CQ Each 2
553A01B
PRECAST CONCRETE MEMBER, FISHING PLATFORM GRADE BEAM
CQ Each 2
55701A
UNTREATED STRUCTURAL TIMBER AND LUMBER, BRIDGE
RAILING (WITH HARDWARE)
CQ Lineal Foot 70
55701B
UNTREATED STRUCTURAL TIMBER AND LUMBER, FISHING
PLATFORM RAILING (WITH HARDWARE)
CQ Lineal Foot 110
55703A
TREATED STRUCTURAL TIMBER, DECKING, RUNNING PLANK &
BACKING PLANKS (BOARDWALK, BRIDGE & FISHING PLATFORMS)
CQ MBF 7.90
55703B
TREATED STRUCTURAL TIMBER, BOARDWALK (WITH HARDWARE)
CQ MBF 5.70
55703C
TREATED STRUCTURAL TIMBER, FISHING PLATFORMS
(WITH HARDWARE)
CQ MBF 2.1
55705
TREATED STRUCTURAL TIMBER, GLUED LAMINATED, BRIDGE
SUPERSTRUCTURE (WITH HARDWARE)
CQ MBF 1.52
56901
HELICAL ANCHORS, GROUTED PULL-DOWN, CASED
AQ Each 8
62201
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB
AQ Hour 8
62202
EQUIPMENT RENTAL, LARGE DUMP TRUCK
AQ Hour 8
62601
PLANTING, TREES (GOVERNMENT FURNISHED)
AQ Each 12
62602
PLANTING, WETLAND PLANTS (GOVERNMENT FURNISHED)
AQ
Square Yard
62801 FURNISH AND INSTALL PICNIC TABLE AQ Each 2
GENERAL NOTES
DESIGN NOTES
X
FENN POND IMPROVEMENTS
PROJECT COORDINATES
3 24
CONTROL POINT LAYOUT
VIEW OF POND JUST AFTER CONSTRUCTION - NOVEMBER, 2014
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
SITE PLAN
4 24
LEGEND
SCALE IN FEET
0 25 50
SELWAY
RIVER
SITE PLAN
PLAN
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
GRAVEL PATH PLAN & PROFILE
5 24
SCALE IN FEET
0 15 30
PATH TYPICAL SECTION
FENN POND IMPROVEMENTS
GRAVEL PATH SECTIONS
6 24
SECTION
SECTION
FENN POND IMPROVEMENTS
14' x 24' FISHING PLATFORM DETAILS 7 24
14' x 24' FISHING PLATFORM PLAN 14' x 24' FISHING PLATFORM FRAMING PLAN
ELEVATION
A
VIEW
A
A
A
2 8
1 8
2 8
A
FENN POND IMPROVEMENTS
FISHING PLATFORM DETAILS
8 24
PLAN SECTIONPLAN SECTION AT CORNER
A
A
SECTION A-A
A
Scale: 1" = 1'-0"
SECTION
SECTION
B
Scale: 1" = 1'-0"
PLAN SECTION
SECTION
PLAN SECTION
A
B
FENN POND IMPROVEMENTS
14' x 24' FISHING PLATFORM
FOUNDATION PLAN
AND DETAILS 9 24
FOUNDATION PLAN SCALE IN FEET
0 2.5 5
SECTION
FENN POND IMPROVEMENTS
14' x 24' FISHING PLATFORM
PRECAST CONCRETE GRADE BEAM DETAILS 10 24
ABUTMENT NO. 1 GRADE BEAM PLAN
ABUTMENT NO. 1 GRADE BEAM ELEVATION
SECTION
FENN POND IMPROVEMENTS
HELICAL PILE DETAILS
11 24
PILE CAP DETAIL
HELICAL PILE DETAIL
A
A
HOLD DOWN BAR DETAIL
CROSS BEAM TO PILE CONNECTION DETAIL
SECTION A-A
RETAINER ANGLE DETAIL
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
TRAIL BRIDGE GENERAL LAYOUT
12 24
SCALE IN FEET
0 5 10
PLAN
TYPICAL SECTION
ELEVATION
F
E
N
N
P
O
N
D
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
TRAIL BRIDGE FOUNDATION PLAN
AND DETAILS 13 24
FOUNDATION PLAN
SCALE IN FEET
0 5 10
F
E
N
N
P
O
N
D
UPSTREAM
END
DOWNSTREAM
END
UPSTREAM
END
DOWNSTREAM
END
FENN POND IMPROVEMENTS
TRAIL BRIDGE ABUTMENT DETAILS
Scale: 3/8" = 1'-0"
Scale: 3/8" = 1'-0"
A
PLAN
ELEVATION
USDA FOREST SERVICE
NEZ PERCE - CLEARWATER NFs
FENN POND IMPROVEMENTS
TRAIL BRIDGE
SUPERSTRUCTURE PLAN AND ELEVATION
FABRICATE GLUED-LAMINATED STRINGERS WITH
CAMBER BASED ON AN 1800 FOOT RADIUS
Scale: 3/4" = 1'- 0"
A
SECTION A-A
PLAN
ELEVATION
Scale: 1-1/2" = 1'- 0"
Typ
USDA FOREST SERVICE
NEZ PERCE - CLEARWATER NFs
FENN POND IMPROVEMENTS
SUPERSTRUCTURE DETAILS
CL Boardwalk
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
BOARDWALK PLAN & PROFILE
17 24
SCALE IN FEET
0 10 20
PLAN
FENN POND IMPROVEMENTS
BOARDWALK FRAMING PLAN
18 24
FRAMING PLANSCALE IN FEET
0 5 10
FRAMING PLAN
SCALE IN FEET
0 5 10
FENN POND IMPROVEMENTS
BOARDWALK DETAILS
19 24
TYPICAL BOARDWALK SECTION
PLAN
ELEVATION
CURB DETAIL
FENN POND IMPROVEMENTS
12' x 14' FISHING PLATFORM DETAILS 20 24
12' x 14' FISHING PLATFORM PLAN
B
A
12' x 14' FISHING PLATFORM FRAMING PLAN
2 8
ELEVATION
A
VIEW
A
A
FENN POND IMPROVEMENTS
12' x 14' FISHING PLATFORM
FOUNDATION PLAN
AND DETAILS 21 24
FOUNDATION PLAN
SCALE IN FEET
0 2.5 5
SECTION
FENN POND IMPROVEMENTS
12' x 14' FISHING PLATFORM
PRECAST CONCRETE GRADE BEAM DETAILS 22 24
ABUTMENT NO. 1 GRADE BEAM PLAN
ABUTMENT NO. 1 GRADE BEAM ELEVATION
SECTION
FENN POND IMPROVEMENTS
RAILING DETAILS
TRAIL BRIDGE RAILING
TYPICAL SECTION
TRAIL BRIDGE RAILING
EXTERIOR ELEVATION
TRAIL BRIDGE RAILING
INTERIOR FACE
SECTION THRU POST SECTION THRU RAIL
FISHING PLATFORM RAILING
INTERIOR FACE
FISHING PLATFORM RAILING
EXTERIOR ELEVATION
B
B
SECTION A-A
A
A
SECTION B-B
FISHING PLATFORM RAILING
TYPICAL SECTION
USDA FOREST SERVICE
NEZ PERCE-CLEARWATER NFs
FENN POND IMPROVEMENTS
PLANTING PLAN
24 24
SCALE IN FEET
0 20 40
SELWAY
RIVER
PLANTING PLAN
File details come from the government source that posted it. Updated .