amendment.docx
DOCX document 23 KB Posted
- Solicitation number
- AG-02RC-S-13-0058
About this file
Section B C-4 G and Construction Notes
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend4a.docx | DOCX document | |
| Amend_4.doc | DOC document | |
| Amend_3.doc | DOC document | |
| Amend3b.docx | DOCX document | |
| Amend_2.doc | DOC document | |
| loop_straight_line.doc | DOC document | |
| Rolling_Dip_(2).pdf | ||
| Amend_1.doc | DOC document | |
| connector_straight_line.doc | DOC document | |
| RFQ.doc | DOC document | |
| Glade_Creek_Trails_Project_Map.JPG | JPG image | |
| Glade_Creek_Trails_Project_Vicinity_Map.JPG | JPG image | |
| Dispersed_Sites.docx | DOCX document | |
| Straightline_Diagrams0001.pdf | ||
| Drawings0001.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES
Part I - The Schedule
SECTION B - SERVICES AND PRICES
Glade Creek Trails - Accessible Construction Nez Perce – Clearwater National Forests Idaho County, Idaho
B- 1 - BID SCHEDULE (Prices must be entered for all Items in both schedules; do not round the total extended prices.)
| ITEM NO. |
| DESCRIPTION |
| MTHD |
of
MEAS*
| PAY UNIT |
| EST. QTY. |
| UNIT PRICE |
| TOTAL PRICE |
| 911(02) |
| Clearing and Grubbing |
| DQ |
| LF |
| 5405 |
| $ |
| $ |
| 912(01) |
| Excavation |
| DQ |
| LF |
| 5405 |
| $ |
| $ |
| 912(04) |
| Trail Turnout (resting area) |
| AQ |
| LF |
| 40 |
| $ |
| $ |
| 912(09) |
| Ditch |
| AQ |
| LF |
| 110 |
| $ |
| $ |
| 915(01) |
| Trail Restoration |
| DQ |
| LF |
| 830 |
| $ |
| $ |
| 921(03) |
| Culvert, Gov’t. furnished (8”x6’) |
| AQ |
| EA |
| 3 |
| $ |
| $ |
| 932(02) |
| Install Puncheon Bridge, with Curb rails, Gov’t Furnished (30’ and 10’) |
| DQ |
| EA |
| 2 |
| $ |
| $ |
| 934(01) |
| Rock Retaining Wall |
| AQ |
| SY |
| 10 |
| $ |
| $ |
| 941(02) |
| Aggregate Surfacing, Grading B, Compaction Method B |
| DQ |
| CY |
| 550 |
| $ |
| $ |
| Install Constructed Trail Benches |
| DQ |
| EA |
| 4 |
| $ |
| $ |
| 951(01) |
| Mobilization |
| LSQ |
| LS |
| 1 |
| $ |
| $ |
3 Dispersed Sites – Decompaction, Revegetation and Recontouring
LSQ
LS
| Rental Equipment Hydraulic Excavator, w/Thumb |
| CQ |
| HR |
| 8 |
| TOTAL BID PRICE |
| $ ______ |
*Method of Measurement AQ - Actual Quantity, DQ - Designed Quantity, CQ – Contract Quantity, LSQ - Lump Sum Quantity
SECTION G – CONTRACT ADMINISTRATION
G-1 - GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following items of Government Furnished Property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause 52.245-4, contained in Section I of the contract.
(a) Puncheon bridge materials, hardware, preservative and culverts will be delivered to the project location upon seven days’ notice.
(b) Government furnished crushed gravel, rock and native soil will be obtained by the contractor from one of two sources:
1) From the Powell gravel site located in Township 37 N, Range 14 E, Section 28. Access is approximately 11 miles southwest of Lolo Pass on Highway 12 to junction Road #111 and approximately ¼ mile on Road #111 to junction Road #5910 (gated road) and then approximately ½ mile to the Powell gravel pit.
2) From the Brushy Fork rock pit. Access is approximately 7 miles east of Lolo Pass on Road #373 to junction Road #373C and approximately 1 mile to Brushy Fork rock pit.
(c) Four constructed trail benches will be delivered to the project location upon several days’ notice.
C-4 - DRAWINGS
The following drawings are a part of this solicitation and any resulting contract:
Number
Title
Date
Page(s)
911-1
Clearing Limits
3/05
| 912-1 |
| Typical Trail Cross Sections |
| 4/96 |
| 1 |
| 912-2 |
| Trailbed and Slope Finish |
| 4/96 |
| 1 |
| 912-6 |
| Turnout and Passing Section |
| 4/96 |
| 1 |
| 912-10 |
| Outsloped Climbing Turn |
| 4/96 |
| 921-2 |
| Culvert Without Headwalls |
| 4/96 |
| 1 |
| SPD 932-1 |
| Puncheon Bridge |
| 4/13 |
| 1 |
| 935-1 |
| Rock Retaining Wall |
| 6/96 |
| 1 |
| 941-1 |
| Aggregate Surfacing |
| 3/97 |
| 1 |
| 912-5 |
| Rolling Dip |
| 3/02 |
| 1 |
Straightline Diagram
Trail #791
4/13
| Straightline Diagram |
| Trail #791-A |
| 4/13 |
| 1 |
NOTE: DRAWINGS ARE FILED IN SEPARATE DOCUMENTS ON FEDBIZOPPS.
GLADE CREEK TRAILS – CONSTRUCTION NOTES
1) Puncheon 932(02) – Pre-drill holes in decking, stringers, sills and curbs. Also pre-drilled holes will be treated with government supplied preservative. For decking there will be 6 spikes total – 2 per stringer.
2) Install a trail dip on Trail 791A 20’ south of the puncheon in a small gully. Payment will be incidental to Excavation.
3) Install 2 rolling dips on Trail #791 as staked at STA 7+70 the other at STA 10+70. Payment will be incidental to Trail Restoration.
4) Trail 791, Station 25+95 at the downhill edge of Road 5670. At this point begin a 60’ fill section as staked. The intent is to maintain a 5% grade for 60 feet as the trail approaches the road from below. An estimated 27 yards of native fill material and rocks need to be hauled to the site from either designated pit. Do not excavate the fill slope on Road 5670. Compact native fill material in 1 foot layers as the approach is constructed. This approach section can initially be constructed wider than 48” so as to allow the passage of equipment. Narrow the tread closer to 48” when finishing. Payment will be incidental to Excavation.
5) A log bench will be installed at each of the four turnouts. The benches are fully constructed. They are too heavy to carry to the turnouts by hand. They can be transported by machine using a raised bucket and sling or can be hauled to the turnouts by trail-width trailer. The benches will be placed to one side of the turnout – not centered.
6) Blackfoot Telephone will be called three days before digging between STA 25+25 & STA 25+65. The phone number is posted on a pedestal at the site. The line is most likely buried 4 foot deep.
7) At either puncheon location, only with COR approval, permission may be given to construct a temporary corduroy trail structure. The corduroy would be used before the puncheon is built to allow machinery to pass through the wet area. The corduroy would be placed with the travelway (not to the side).