Construction_Plans.pdf
PDF 4 MB Posted
- Solicitation number
- AG-02RC-S-13-0016
About this file
Construction Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_4.doc | DOC document | |
| Amend_3.doc | DOC document | |
| Amend_2.doc | DOC document | |
| Amend_1.doc | DOC document | |
| Amend_1_Specs.docx | DOCX document | |
| solicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DANIEL KARLIN, P.E.
BEAR CREEK TRAIL BRIDGE REPAIRS
TRAIL NO. 4 - M.P. 2.0
NO. DATEBYREVISION DESCRIPTION
SHEET NO.
SET NO.
PROJECT:
DATE:
SHEET INDEX
SHEET 1 COVER
SHEET 2 GENERAL NOTES & PHOTOS
SHEET 3 BRIDGE PLAN AND PROFILE
SHEET 4 MAIN SPAN ELEVATION AND PLAN
SHEET 5 MEMBER DETAILS
SHEET 6 HARDWARE DETAILS
SHEET 7 CURB DETAILS
SHEET 8 FOUNDATION REPAIR DETAILS
SHEET 9 BILL OF MATERIALS AND CAMBER ADJUSTMENT NOTES
SHEET 10-11 FLOOR BEAM AND STRINGER REPLACEMENT DETAILS
APRIL 27, 2012
1-11215
CONSTRUCTION PLANS FOR
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION ONE
REGION ONE REGION ONE
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PLANS PREPARED BY:
QA/QC BY:
KARL YAKAWICH, P.E.
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PLANS PREPARED BY:
QA/QC BY:
KARL YAKAWICH, P.E.
PROJECT
LOCATION
SECTION 16, TOWNSHIP 33 NORTH, AND RANGE 8 EAST
Falls
Twin
Boise
Home
Mountain
Lewiston
Grangeville
Meadows
New
St Maries
Coeur D'Alene
Sandpoint
Pocatello
Burley
Shoshone
Arco
Rigby
Idaho Falls
Salmon
Kooskia
Pierce
Bonners
Ferry
M
O
N
T
A
N
A
W A
S H
I N
G T
O N
O R
E G
O N
BEAR CREEK BRIDGE
TRAIL NO. 4 - M.P. 2.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
MOOSE CREEK RANGER DISTRICT
IDAHO COUNTY, IDAHO
DATE
DATE
DATE
REVIEWED:
RECOMMENDED:
APPROVED:
NOTE:
DRAWING SCALE IS ONLY ACCURATE
WHEN PLANS ARE PLOTTED ON 11" X 17"
(TABLOID)-SIZED PAPER.
APPROVED:
DATE
GENERAL NOTES & PHOTOS
TRAIL NO. 4 - M.P. 2.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION ONE
PREPARED BY:
GENERAL NOTES:
SPECIFICATIONS:
TIMBER AND LUMBER:
TREATMENT:
FIELD TREATMENT:
INSPECTION AND CERTIFICATION:
TIMBER FABRICATION:
FASTENERS:
HARDWARE AND STRUCTURAL STEEL:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
BRIDGE PLAN AND PROFILE
TRAIL NO. 4 - M.P. 2.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION ONE
PREPARED BY:
ITEM WORK DESCRIPTION
QUANTITY
LUMBER
FINISH
A
REMOVE ALL EXISTING RUNNING PLANKS FROM MAIN SPAN, AND INSTALL TREATED TIMBER RUNNING PLANKS (APPROXIMATELY 345
SF). INSTALL 3"x12" FULL SAWN TIMBER RUNNING PLANKS AS SHOWN ON TYPICAL DECK SECTION (3 LINES). REFER TO DETAIL 2 &
SECTION A-A ON SHEET 4.
ROUGH
B
REMOVE ALL EXISTING MAIN SPAN DECK PLANKS, AND INSTALL TREATED TIMBER DECK PLANKS . INSTALL 3"x12" FULL SAWN TIMBER
DECK PLANKS AS SHOWN ON TYPICAL DECK SECTION. REFER TO DETAILS 2 & 4 ON SHEET 4.
ROUGH
REPLACE ALL MAIN SPAN 6"x6" CURB ALONG BOTH SIDES OF BRIDGE. USE NEW HARDWARE FOR FASTENING. REFER TO DETAIL 2
AND SECTION A-A ON SHEET 4 AS WELL AS DETAILS ON SHEET 7.
S4S
REPLACE ALL MAIN SPAN STRINGERS WITH NEW GLULAM MEMBERS. USE 5"x12" STITCHED MEMBERS FOR REPLACEMENT. SUPPLY
NEW HARDWARE, INCLUDING NEW U-BOLTS, FOR FASTENING. REFER TO DETAILS ON SHEETS 4, 5 AND 6.
GLULAM
REPLACE ALL MAIN SPAN FLOOR BEAMS WITH NEW GLULAM MEMBERS. USE 7"x10
" STITCHED MEMBERS. SUPPLY NEW
HARDWARE, INCLUDING NEW U-BOLTS, FOR FASTENING. REFER TO DETAILS ON SHEETS 4, 5 AND 6.
GLULAM
REPLACE ALL MAIN SPAN 2x6 RAIL TOP PLATES, REFER TO DETAILS ON SHEET 4, 5 AND 6. USE NEW HARDWARE FOR FASTENING
NON-BOLTED CONNECTIONS.
S4S
REPLACE 6'-6
" 2x6 CHORD MEMBER AT BOTTOM CHORD ON DOWNSTREAM EDGE NEAR NORTH PEDESTAL. REFER TO DETAILS ON
SHEET 4 AND 5. USE NEW HARDWARE FOR BOLTED CONNECTIONS.
S4S
REPLACE ALL 3x6 RAIL BRACES. REFER TO DETAILS ON SHEET 4 AND 5. USE NEW HARDWARE FOR BOLTED CONNECTIONS. S4S
REPLACE DAMAGED 1x6 DIAGONAL LATTICE. REFER TO DETAILS ON SHEET 4 AND 5. USE NEW HARDWARE FOR BOLTED
CONNECTIONS. SUPPLY NEW HARDWARE FOR FASTENING NON-BOLTED CONNECTIONS.
S4S
INSTALL NEW EXPANSION JOINTS AT MIDSPAN. REFER TO DETAILS ON SHEET 6. USE NEW HARDWARE FOR EXPANSION JOINTS. S4S
PATCH CONCRETE SPALLS AND SEAL NORTH CONCRETE PEDESTALS. NA
SEAL SOUTH CONCRETE PEDESTALS. NA
REMOVE 3x12 SHIM AT MAINSPAN INTERMEDIATE BRACE SO APPROACH AND MAIN SPAN DECK ELEVATIONS ARE THE SAME. NA
LUBRICATE ALL MAIN SUSPENSION AND HANGER CABLES WITH PRELUBE 19 PRESERVATIVE LUBRICANT. APPLY AS RECOMMENDED
BY MANUFACTURER.
NA
ADJUST BRIDGE CAMBER. REFER TO SHEET 9. NA
F L
O W
US = UPSTREAM
DS = DOWNSTREAM
RT = RIGHT (LOOKING DOWNSTREAM)
LT = LEFT (LOOKING DOWNSTREAM)
GLULAM = GLUED-LAMINATED
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
MAIN SPAN ELEVATION AND PLAN
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION ONE
PREPARED BY:
BEAR CREEK TRAIL BRIDGE REPAIRS
TRAIL NO. 4 - M.P. 2.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
NOTE:
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
MEMBER DETAILS
TRAIL NO. 4 - M.P. 2.0
BEAR CREEK BRIDGE
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
NOTE:
HARDWARE DETAILS
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION ONE
PREPARED BY:
BEAR CREEK TRAIL BRIDGE REPAIRS
TRAIL NO. 4 - M.P. 2.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
CURB DETAILS
TRAIL NO. 4 - M.P. 2.0
BEAR CREEK BRIDGE
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
FOUNDATION REPAIR DETAILS
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
REGION ONE
PREPARED BY:
BEAR CREEK TRAIL BRIDGE REPAIRS
TRAIL NO. 4 - M.P. 2.0 - M.P. 0.0
NEZ PERCE - CLEARWATER NATIONAL FOREST
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
NOTES:
CEMENTITIOUS MATERIAL:
BILL OF MATERIALS AND CAMBER ADJUSTMENT NOTES
TRAIL NO. 4 - M.P. 2.0
BEAR CREEK BRIDGE
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
DESCRIPTION
QUANTITY
(PIECES)
WEIGHT*
EACH
(POUNDS)
TOTAL
WEIGHT
(POUNDS)
LUMBER/HARDWARE
6"X6" CURB RAILS, 8'-7" LENGTH
30 65.2 1955.25
6"X6" CURB RAILS, 9' LENGTH
4 79.2 316.80
2" x 6" x 2'-0" CURB BLOCKS 36 9.9 356.40
2" x 12" x 9'-0" RUNNING PLANKS 33 59.4 1960.20
2" x 12" x 6'-0" RUNNING PLANKS 6 39.6 237.60
2" x 12" x 4'-0" RUNNING PLANKS 3 26.4 79.20
3" x 12" x 9'-0" DECK PLANKS 112 89.1 9979.20
1 x 6 DIAGONAL LATTICE 16 7.9 127.05
½"X7" STITCH BOLTS W/ WASHERS & NUTS (LATTICE)
35 2.2 77.00
2 x 6 x 16'-0" TOP PLATE 12 36.3 435.60
2 x 6 x 9'-6" TOP PLATE 4 21.6 86.21
2 x 6 x 6'-6½" TRUSS CHORD MEMBER 1 14.8 14.84
2 x 6 x 16'-0" TRUSS CHORD MEMBER (EXPANSION JOINTS)
8 36.3 290.40
3" x 6" RAIL BRACES 18 37.2 669.50
3½" x 10½." x 8'-0" GLUED-LAMINATED FLOOR/NEEDLE BEAMS 27 80.9 2182.95
3½" x 10½" x 4'-0" GLUED-LAMINATED FLOOR/NEEDLE BEAMS 18 40.4 727.65
8D RING SHANK NAILS (FLOOR/NEEDLE BEAM ANCHORS)
264 - 2.78
¾"X8½" STITCH BOLTS W/ WASHERS & NUTS (FLOOR/NEEDLE BEAMS)
368 1.0 368.00
¾"X12" STITCH BOLTS W/ WASHERS & NUTS (FLOOR/NEEDLE BEAM-RAIL BRACES)
36 1.2 43.20
⅝"X10" STITCH BOLTS W/ WASHERS & NUTS (RAIL BRACES-TOP CHORD)
18 1.2 21.60
SPLICE PLATE ¼" X 7½" X 3'-3" (SUPPLIED BY MANUFACTURER)
27 20.7 559.71
2⅝" SHEAR PLATES (FLOOR/NEEDLE BEAM SPLICE PLATES)
324 0.31 100.44
SPLIT RINGS (FLOOR/NEEDLE BEAM SPLICE PLATES)
324 0.31 100.44
2½" x 12" x 8'-6" GLUED-LAMINATED STRINGERS 80 70.1 5610.00
2½" x 12" x 4'-0" GLUED-LAMINATED STRINGERS 80 33.0 2640.00
SPLICE PLATE ¼" X 8¾" X 3'-3" (SUPPLIED BY MANUFACTURER)
80 24.2 1936.00
2⅝" SHEAR PLATES (STRINGER SPLICE PLATES)
960 0.31 297.60
SPLIT RINGS (STRINGER SPLICE PLATES)
960 0.31 297.60
¾"X6½" STITCH BOLTS W/ WASHERS & NUTS (STRINGERS)
1360 0.8 1088.00
¾"X12" STITCH BOLTS W/ WASHERS & NUTS (STRINGERS)
36 1.4 50.40
SIMPSON STC ANGLES (STRINGERS)
88 0.15 13.20
4" x 6" x 9' SHORE BEAM (SUPPLIED BY FOREST)
2 59 118.80
4" x 6" x 14' SPREADER BEAM (SUPPLIED BY FOREST)
2 92 184.80
TOTAL WEIGHT =
32,928
ADDITIONAL HARDWARE
¾" U-BOLT WITH NUTS (CABLES)
18 - 85.69
BOLT PLATE ½" X 6" X 1'-2" 18 11.91 214.38
TRUSS CONNECTION ASSEMBLY, ¾" X 20" BOLTS WITH ⅜" PLATE (STIFFENING TRUSS)
18 - 90.20
3½" X 1½" X 2'-0" EXPANSION JOINT TUBE (STIFFENING TRUSS)
2 - 25.52
3½" X ⅛" X 2'-0" EXPANSION JOINT PLATE (STIFFENING TRUSS)
4 - 11.91
⅝" DIA. X 1'-2" MACHINE BOLTS WITH NUTS (CURBS)
108 - 118.80
MALLEABLE IRON WASHERS (⅝" DIA. BOLTS FOR CURBS)
216 - 61.37
⅝" DIA. X 7" BOLTS WITH CUT WASHERS AND NUTS (EXPANSION JOINT)
8 - 5.54
¼" X 2½" RUGGED STRUCTURAL SCREWS (TOP PLATE)
146 - 2.52
5/16" X 4" RUGGED STRUCTURAL SCREWS 765 - 30.60
5/16" X 5⅛" RUGGED STRUCTURAL SCREWS 908 - 45.40
MALLEABLE IRON WASHERS (¾" DIA. BOLTS)
1800 0.28 511.38
CABLE HANGER BOLT PLATE 18 11.91 214.38
SIKACRETE 211 8 80 640.00
REINFORCING STEEL (#3 TIE BARS FOR REPAIRS)
20 0.22 4.39
SIKATOP SEAL 107 (UNITS)
12 44 528.00
TOTAL WEIGHT =
2,590
CAMBER ADJUSTMENT PROCEDURES
*LUMBER BASED ON A UNIT WEIGHT OF 39.6 LB/FT ³
FLOOR BEAM AND STRINGER REPLACEMENT DETAILS
TRAIL NO. 4 - M.P. 2.0
BEAR CREEK BRIDGE
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
DRAWING CHECKED:
DATE: NO. DATEBYREVISION DESCRIPTION
FLOOR/NEEDLE BEAM, STRINGER, &
DECK REPLACEMENT PROCEDURES
FLOOR BEAM AND STRINGER REPLACEMENT DETAILS
TRAIL NO. 4 - M.P. 2.0
BEAR CREEK BRIDGE
1-11215
APRIL 27, 2012
SHEET NO.
DJK
DJK
KFY
KFY
engineering
2501 BELT VIEW DRIVE
HELENA, MT 59601
(406)449-8627
PREPARED BY:
REGION ONE
PROJECT:
DESIGNED:
DRAWN:
DESIGN CHECKED:
File details come from the government source that posted it. Updated .