Amend_1_Specs.docx

DOCX document 14 KB Posted

Attached to
IMAT, Nez Perce-Clearwater NF's, Supplies for Bear Creek Trail Bridge
Solicitation number
AG-02RC-S-13-0016
Issued by

About this file

Amendment 1 Clarification of Specs

View the file

Other files

File Type Posted
Amend_4.doc DOC document
Amend_3.doc DOC document
Amend_2.doc DOC document
Amend_1.doc DOC document
solicitation.doc DOC document
Construction_Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The out to out lengths of the curb rail sections are 8’-7” and 9’-0”, but that isn’t all timber. See curb member detail on sheet 7 of the plans.

The 8’-7” rail has a 4’-7” solid 6”x6” section with a 2’ long section that is half depth on both ends, essentially making it an 6’-7” ‘solid’ member.

The 9’-0” rail has a 7’-0” solid 6”x6” section with ONE 2’ long section that is half depth, essentially making it an 8’-0” ‘solid’ member.

They compute as such. (30) x .5’ x.5’ x 79” = 592.5 BF = .592 MBF

(4) x .5 x .5’ x 96” = 96 BF = .096 MBF

There is a typo on the bill of materials though – drawings are correct. The Curb blocks are listed as 2” thickness, whereas they should be 3” thickness. The Quantity shown is correct, but the description is wrong.

These compute to (36) x .5’ x .25’ x 24” = 108 BF = .108 MBF

Total MBF for Curbs is 0.592+0.096+0.108 =.796 MBF

Schedule B does include more hardware than is needed for the project in case of loss during repair of the bridge.