B-029_CRYSTAL_CREEK_BRIDGE_REPLACEMENT.pdf

PDF 2 MB Posted

Attached to
Crystal Creek Bridge Replacement Project on the Bridger-Teton National Forest
Solicitation number
AG-02NV-S-17-0022
Issued by

About this file

Project Drawings

View the file

Other files

File Type Posted
Amendment03.pdf PDF
Crystal_Ck_Geotech_report.pdf PDF
Amendment02.pdf PDF
Gros_Ventre_Flow_Statistics_at_Kelly.pdf PDF
Amendment01.pdf PDF
UPDATED_Crystal_Creek_Spec.pdf PDF
solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

/s/ Chad Porter, PE 05/8/2017

Item No. Description Method of

Measurement Unit Quantity 15101 Mobilization LSQ Lump Sum 1

15221 Construction Survey and Staking LSQ Lump Sum 1

15713 Soil erosion and pollution control LSQ Lump Sum 1

20102 Clearing and Grubbing LSQ Lump Sum 1

20305 Removal and Disposal of Existing Structure

LSQ Lump Sum 1

20401 Roadway Excavation and Embankment (Commercial Supplied)

CQ Cubic Yard 1000

20402 Roadway Excavation and Embankment (Government Supplied)

CQ Cubic Yard 1963

20806 Structure Excavation LSQ Lump Sum 1

20808 Structural Backfill and Compaction Testing

LSQ Lump Sum 1

25101 Type 4 Placed Riprap and Bed Class 20 Stream Simulation Material

CQ Cubic Yard 159

30801 Roadway Aggregate, Compaction Method 2 (Commercial Source)

AQ Ton 227

40401 Minor Hot Asphalt Concrete, (Commercial Source)

CQ Ton 88

55201 Structural Concrete, Class (AE) CQ Cubic Yard 186

55601 Bridge Railing, Type II, Class B (Included with Prefab Bridge)

CQ Foot 0

55602 Bridge Approach Railing, Type II, Class A

CQ Foot 150

55603 Terminal Section, BTC End, CQ Each 4

57102 Prefabricated Bridge Superstructure, Design, Fabricate, Transport, and

LSQ Lump Sum 1

62503 Seeding, Dry Method (Government Supplied Seed)

LSQ Lump Sum 1

63306 Object Markers CQ Each 4

CrystalCreek
01 TITLE SHEET & INDEX
02 VICINITY MAP
03 SPECIFICATIONS & SOI (2)
04 SITE PLAN
05 SITE PLAN & PROFILE
06 ROAD SECTIONS
07 Layout & Details
08 ABUTMENT ELEVATION DETAILS
09 BRIDGE RAILING LAYOUT
10 BRIDGE APPROACH
11 SECTIONS
12 SECTIONS

File details come from the government source that posted it. Updated .