B-029_CRYSTAL_CREEK_BRIDGE_REPLACEMENT.pdf
PDF 2 MB Posted
- Solicitation number
- AG-02NV-S-17-0022
About this file
Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment03.pdf | ||
| Crystal_Ck_Geotech_report.pdf | ||
| Amendment02.pdf | ||
| Gros_Ventre_Flow_Statistics_at_Kelly.pdf | ||
| Amendment01.pdf | ||
| UPDATED_Crystal_Creek_Spec.pdf | ||
| solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
/s/ Chad Porter, PE 05/8/2017
Item No. Description Method of
Measurement Unit Quantity 15101 Mobilization LSQ Lump Sum 1
15221 Construction Survey and Staking LSQ Lump Sum 1
15713 Soil erosion and pollution control LSQ Lump Sum 1
20102 Clearing and Grubbing LSQ Lump Sum 1
20305 Removal and Disposal of Existing Structure
LSQ Lump Sum 1
20401 Roadway Excavation and Embankment (Commercial Supplied)
CQ Cubic Yard 1000
20402 Roadway Excavation and Embankment (Government Supplied)
CQ Cubic Yard 1963
20806 Structure Excavation LSQ Lump Sum 1
20808 Structural Backfill and Compaction Testing
LSQ Lump Sum 1
25101 Type 4 Placed Riprap and Bed Class 20 Stream Simulation Material
CQ Cubic Yard 159
30801 Roadway Aggregate, Compaction Method 2 (Commercial Source)
AQ Ton 227
40401 Minor Hot Asphalt Concrete, (Commercial Source)
CQ Ton 88
55201 Structural Concrete, Class (AE) CQ Cubic Yard 186
55601 Bridge Railing, Type II, Class B (Included with Prefab Bridge)
CQ Foot 0
55602 Bridge Approach Railing, Type II, Class A
CQ Foot 150
55603 Terminal Section, BTC End, CQ Each 4
57102 Prefabricated Bridge Superstructure, Design, Fabricate, Transport, and
LSQ Lump Sum 1
62503 Seeding, Dry Method (Government Supplied Seed)
LSQ Lump Sum 1
63306 Object Markers CQ Each 4
| CrystalCreek |
| 01 TITLE SHEET & INDEX |
| 02 VICINITY MAP |
| 03 SPECIFICATIONS & SOI (2) |
| 04 SITE PLAN |
| 05 SITE PLAN & PROFILE |
| 06 ROAD SECTIONS |
| 07 Layout & Details |
| 08 ABUTMENT ELEVATION DETAILS |
| 09 BRIDGE RAILING LAYOUT |
| 10 BRIDGE APPROACH |
| 11 SECTIONS |
| 12 SECTIONS |
File details come from the government source that posted it. Updated .