Pritchard_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- AG-02NV-S-15-0017
About this file
Project Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_01_Pritchard.Cover.Sheet.pdf | ||
| Amendment_01.pdf | ||
| Pritchard_Solicitation.pdf | ||
| Pritchard_Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
SNAKE
RIVER
HOBACK
JUNCTION
H
IG
H W
AY
HIGHWAY 26
TO ALPINE, WY
TO JACKSON, WY
THIS PROJECT CONSISTS OF RECONSTRUCTING THE EXISTING PRITCHARD BOAT RAMP AND PARKING AREA, INCLUDING: AGGREGATE ROADS, AGGREGATE PARKING AREA, CONCRETE BOAT RAMP, PLACING
OF LARGE BOULDERS, AND INSTALLING A NEW BUCK AND RAIL FENCE.
A. DEMOLITION WORK INCLUDES THE FOLLOWING:
1. SITE CLEARING AND GRUBBING.
B. NEW CONSTRUCTION WORK INCLUDES THE FOLLOWING:
1. CONSTRUCT 30' WIDE BY 90' LONG CONCRETE BOAT RAMP WITH A CAST-IN-PLACE UPPER
SECTION AND PRECAST CONCRETE PLANK LOWER SECTION. A STEEL RAIL SYSTEM WILL BE
UTILIZED TO INSTALL THE CONCRETE PLANKS. LARGE RIPRAP AND GEOTEXTILE MATERIALS
WILL BE INSTALLED ALONG THE PERIMETER OF THE BOAT RAMP.
2. PROJECT SITE PREPARATION AND GRADING.
3. CONSTRUCT NEW AGGREGATE ACCESS ROAD AND PARKING LOT WITH REGULATORY SIGNS.
4. CONSTRUCT 25' X 25' GROUP GATHERING AREA WITH A CONCRETE PICNIC TABLE.
5. INSTALL BARRIER ROCKS AND BUCK AND POLE FENCE.
PROJECT DESCRIPTION
PROJECT LOCATION
THE PROJECT IS LOCATED SOUTH OF JACKSON, WY ON FOREST SERVICE LAND, SECTION 6, T38N, R117W IN TETON COUNTY. THE LOCATION OF THIS SITE IS SOUTH OF HOBACK JUNCTION ALONG THE SNAKE RIVER OFF OF U.S. HIGHWAY 26. THE SITE IS APPROX. 18 MILES FROM JACKSON, WYOMING AND 19 MILES FROM ALPINE, WYOMING.
SCHEDULE OF ITEMS
SHT. DWG. LIST OF DRAWINGS
1 - G1 COVER SHEET
2 - P1 SITE PLAN & PROFILE
3 - P2 TYPICAL ROAD CROSS SECTIONS AND SIGN INSTALLATION DETAILS
4 - P3 CONCRETE BOAT RAMP SECTIONS
5 - P4 BOAT RAMP LAYOUT, EXPANSION JOINT, AND CUT OFF WALL DETAILS
6 - P5 PRECAST CONCRETE PLANK & RAIL SYSTEM PROFILE AND TYPICAL
DETAILS
7 - P6 RAIL SYSTEM CONNECTION DETAILS
8 - D1 BARRIER ROCK, TYPICAL GROUP AREA CROSS SECTION, AND
CONCRETE TABLE DETAILS
9 - D2 TREATED WOOD BOAT TIE AND BUCK POLE FENCE DETAILS
10 - S1 CONSTRUCTION SURVEY OVERVIEW
11 - S2 CONSTRUCTION SURVEY POINTS
PROJECT
LOCATION
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY
Base
010250 Construction Staking LSQ LS Lump Sum
011900 Mobilization LSQ LS Lump Sum
022040 Loose Rock Riprap DQ CY 75
023800 Earthwork Geotextiles DQ SY 750
024102 Removal and Disposal of Structures and Obstructions LSQ LS Lump Sum
033501-1 Boat Ramp - Cast-in-Place Concrete (Ramp & Cut Off Walls) DQ CY 46
033501-2 Boat Ramp - Precast Concrete Planks AQ EA 14
033501-3 Boat Ramp - Steel Rail System LSQ LS Lump Sum
033501-4 Boat Ramp - 3-Inch Minus Granular Base Material (Under Precast Planks) DQ CY 33
101400 Signs AQ EA 13
312100 Project Site Preparation and Grading LSQ LS Lump Sum
321204-1 Crushed Aggregate Surface Course - Grading G DQ CY 510
321204-2 Crushed Aggregate Base Course - Grading C (Under Boat Ramp) DQ CY 35
321720 Treated Wood Boat Ties AQ EA 4
322205 Barrier Rocks (Commercial Source) AQ EA 45
Option #1: Fence and Picnic Table
129410 Site Furnishings (Concrete Picnic Table) AQ EA 1
323151 Buck Pole Fencing AQ LF 550
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
.G
.B
-T .R am ps
.C ov er .d w g, 7/ 2/
:1
5:
AM
16'
5'
5'
48.7'
108.4'
.0
.0
1+75
0+00
1+00
55.7' 104.4'
0+00 1+00 1+80
-3.0%
-10.0%
LVC: 20.00
BVCS: 0+70.3
BVCE: 5849.1
EVCS: 0+90.3
EVCE: 5847.8
AGGREGATE SURFACE BOAT RAMP
ELEV = 5842.70
DESIGN LOW WATER LEVEL
ELEV = 5847.00
DESIGN HIGH WATER LEVEL
STA = 1+74.7
ELEV = 5839.38
TOE OF RAMP
STA = 0+70.3
ELEV = 5849.12
TOP OF RAMP
AND BEGINNING OF
VERTICAL CURVE STA = 1+19.0
ELEV = 5844.95
CAST-IN-PLACE TO PLANK TRANSITION
CAST-IN-PLACE
PRECAST PLANKS
(14 REQ.)
BOAT RAMP PROFILE
HORIZ: 1" = 30'
VERT: 1" = 6'
STA = 0+00.0
ELEV = 5851.20
STA = 0+30.0
ELEV = 5850.31
WATER ELEVATION 5842.70'
AS OF 11/12/13
CONSTRUCT NEW BOAT
RAMP 30' WIDE X 90' LONG
(SEE SHEET P3-P6)
EXISTING ASPHALT
APRON TO REMAIN
IN PLACE
EXISTING VAULT TOILETS
TO REMAIN IN PLACE
20' WIDE TWO-WAY
ENTRANCE
16' WIDE
ONE-WAY LOOP
16' WIDE
ONE-WAY EXIT
CONSTRUCT TRAILER
PARKING, (11) STALLS
10' WIDE X 40' LONG
EXISTING TREES AND
ISLAND TO REMAIN IN
PLACE
CONSTRUCT 25' X 25' GROUP
GATHERING AREA AND INSTALL
NEW PICNIC TABLE (SEE SHEET D1)
30' WIDE BOAT
LAUNCH AREA
EXISTING EDGE OF
HIGHWAY 26
INSTALL
SIGN #1
INSTALL SIGN #8
(2 TOTAL)
INSTALL SIGN #3
(2 TOTAL)
INSTALL
SIGN #4
INSTALL
SIGN #5
INSTALL SIGN #6
(2 TOTAL)
INSTALL
SIGN #7
INSTALL
SIGN #2
INSTALL
SIGN #9
INSTALL
SIGN #10
FINISHED GRADE OF NEW
AGGREGATE ROAD AND
CONCRETE BOAT RAMP
EXISTING GRADE
EXISTING BUCK AND POLE FENCE (SOUTH SIDE),
TO BE REMOVED IF OPTION #1 IS AWARDED. DO
NOT REMOVE IF OPTION #1 IS NOT AWARDED
NEW BUCK AND
POLE FENCE, TYP.
(SEE SHEET D2)
NEW BUCK AND
POLE FENCE, TYP.
(SEE SHEET D2)
END DRAINAGE SWALE
BEGIN DRAINAGE SWALE
CONSTRUCT 10' X 10'
AGGREGATE PAD FOR
FUTURE CLEANING STATION
REMOVE EXISTING KIOSK AND
FEE TUBE AND REINSTALL AT
NEW LOCATION DESIGNATED BY
THE CONTRACTING OFFICER,
SEE NOTE 7
PRITCHARD BOAT RAMP
CENTERLINE ALIGNMENT
INSTALL 4' WIDE X 2' DEEP
CLASS 4 RIPRAP AROUND
NEW BOAT RAMP, TYP.
SEE SHEET P5.
INSTALL TREATED WOOD
POST BOAT TIES, 4 TYP.
(SEE SHEET D2)
CAST-IN-PLACE
CONCRETE RAMP
PRECAST CONCRETE
PLANK RAMP
CONSTRUCT 5'
AGGREGATE PATHS
MATCH EXISTING
ASPHALT APRON
CONSTRUCT OVERFLOW
PARKING, (9) STALLS
10' WIDE X 20' LONG
CONSTRUCT AGGREGATE PATH TO VAULT
TOILETS, MATCH EXISTING CONCRETE
CUT CATCHLINE, (TYP.)
FILL CATCHLINE, (TYP.)
BUS UNLOADING AREA 100' LONG X 12' WIDE
R20' R60'
R20'
R15'
R20'
R160'
R15' R20'
R10'
R86.5'
R46'
R18.6'
R30'
R30'
R58'
NOTES:
1. ALL CLEARING AND GRUBBING SHALL CONFORM TO SECTION 311000 IN THE SPECIFICATIONS. ALL NON-SALVAGEABLE MATERIAL SHALL
BE DISPOSED OF AT AN APPROVED LANDFILL.
2. THE CONTRACTOR NEEDS THE APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE BEFORE CUTTING ANY TREES WITHIN
THE CONSTRUCTION SITE.
3. ALL CUT AND FILL SLOPES SHALL BE SLOPED AT A MAXIMUM OF 2:1.
4. SEE SHEET P2 FOR TYPICAL ROAD TEMPLATES AND REGULATORY SIGNS.
5. SEE SHEET S1 & S2 FOR SURVEY POINTS.
6. THIS PROJECT HAS NO PAVEMENT MARKINGS. ROAD CENTERLINES, PARKING LINES, AND DIRECTIONAL ARROWS ARE SHOWN FOR
REFERENCE.
7. WHEN REINSTALLED, THE EXISTING KIOSK AND FEE SHALL BE PLUMB, SOLID AND STABLE. ALL EXCAVATED OR DISTURBED SOIL
SURROUNDING THESE ITEMS SHALL BE COMPACTED TO PREVENT MOVEMENT.
8. RESERVE TOPSOIL FROM NEW PARKING AND GROUP MEETING AREAS. RESERVED TOPSOIL TO BE PLACED AS SHOWN ON THIS
DRAWING AND ACCORDING TO THE SPECIFICATIONS..
9. AREAS TO BE RECLAIMED: REMOVE TOP 6 INCHES OF EXISTING ROAD BASE, RIP SUBGRADE TO A DEPTH OF 12 INCHES AND PLACE
RESERVED TOPSOIL IN DESIGNATED AREAS. PERIMETER SHOULD MATCH EXISTING GRADES. AREA SHALL BE FREE OF LOW SPOTS TO
PREVENT PONDING OF WATER.
EXISTING EDGE OF
ROAD, TYP.
END DRAINAGE SWALE
BEGIN
DRAINAGE
SWALE
CLASS 4 RIPRAP
INSTALL NEW BARRIER ROCK,
TYP. (SEE SHEET D1)
PARKING AND PATHS - AGGREGATE SURFACE (GRADING G)
CONCRETE BOAT RAMP
CLASS 4 RIPRAP
SNAKE RIVER
RECLAIM OLD PARKING
AREA, SEE NOTE 9 (TYP)
AREA TO BE RECLAIMED, SEE NOTE 9
APPROX. 18 MILES
TO JACKSON
APPROX. 19 MILES
TO ALPINE
HIG
HW
AY
EXISTING BUCK AND POLE FENCE (NORTH SIDE), TO
BE REMOVED REGARDLESS OF OPTION #1 AWARD
R30'
135°
FLO
W
SNAKE RIVER
PRECAST PLANK (TYP)
FILL ANY VOIDS WITH COMPACTED
CRUSHED GRAVEL, GRADING C
AGGREGATE BASE PER DETAILS
CAST-IN-PLACE
CONCRETE RAMP
EXISTING BUCK AND POLE FENCE (NORTH SIDE), TO
BE REMOVED REGARDLESS OF OPTION #1 AWARD
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\ x_ si te _p
.d w g, 7/
2/
:1 7:
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
.P
2.
R oa d_ se ct io n.
S ig n_ in st al l.d w g, 7/
2/
:1 6:
V-GROOVE FINISH (TYP)
SEE SHEET P5
CLASS 4 RIP RAP NOT
TO EXTEND ABOVE
RAMP SURFACE
CLASS 4 RIP RAP NOT
TO EXTEND ABOVE
RAMP SURFACE
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
-0
7.
P3
-P 6.
Bo at
_R am p.
dw g, 7/
2/
:1 6:
EXPANSION JOINT
EXPANSION JOINT
INSTALL TRANSVERSE
CONTROL JOINT
EVERY 12.5'
INSTALL CUT-OFF WALL,
SEE DETAIL ON THIS SHEET
INSTALL CUT-OFF WALL,
SEE DETAIL ON THIS SHEET
INSTALL CUT-OFF WALL,
SEE DETAIL ON THIS SHEET
8"
#4 BENT BARS AT 12" ON CENTER (TYP)
#4 BENT BARS CONTINUOUS (TYP)
V-GROOVE FINISH (TYP)
V-GROOVE FINISH (TYP)
CONTROL OR COLD JOINT
12.5' (TYP)
DIMENSION OF LAST PLANK MAY VARY
SLIGHTLY DUE TO SLOPE AND
CONSTRUCTION TOLERANCES. GAP
BETWEEN LAST PLANK AND CAST-IN-PLACE
SLAB SHALL BE LESS THAN 3/4-INCH
1/2" X 24" SMOOTH GREASED DOWELS AT
2' O.C. TYP. FULL LENGTH/WIDTH OF
SLAB AT CONTROL JOINTS
6'-0"
9-'0"
9'-0"
6'-0"
20'-0" MAX. (TYP) 16'-0"
CONNECT RAILS TO
CAST-IN-PLACE CONCRETE.
SEE DETAILS ON SHEET P5 (TYP)
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
-0
7.
P3
-P 6.
Bo at
_R am p.
dw g, 7/
2/
:1 6:
1'-0"
30'-0"
4'-0"
1'-0"
2'-0"
PER PLANK
MANUFACTURER (TYP)
RIVER FLOW
MIN. 2 TON GALV. LIFTING
INSERT (4 REQUIRED)
PRECAST PLANK NOTES:
1. THE PRECAST CONCRETE PLANK DESIGN SHALL BE PERFORMED BY THE PLANK
MANUFACTURER TO THE GEOMETRY SHOWN ON THESE DRAWINGS AND SHALL BE
IN ACCORDANCE WITH THE CURRENT EDITION OF AASHTO LRFD BRIDGE DESIGN
SPECIFICATIONS. THE PLANKS SHALL BE DESIGNED FOR THE HL-93 DESIGN
VEHICLE. SEE SPECIFICATIONS FOR SUBMITTAL REQUIREMENTS.
2. PLANKS SHALL BE MANUFACTURED IN A PURPOSE-BUILT FORM WITH THE
V-GROOVES CAST DURING CONSTRUCTION. HAND FINISHING IS NOT ALLOWED.
30°
GROOVE
TONGUE
RAMP
SLOPE
V-GROOVE
FINISH
DO NOT FABRICATE TONGUE FOR LAST PLANK.
INSTALL EXPANSION JOINT BETWEEN LAST
PLANK AND CAST-IN-PLACE SLAB
CAST-IN-PLACE
CONCRETE RAMP
1" 8"
NOTE:
BOTH THE PRE-CAST PLANKS AND THE CAST-IN-PLACE SLAB
SHALL HAVE A MINIMUM THICKNESS OF 8 INCHES WHEN
MEASURED FROM THE MID-POINT OF THE V-GROOVE TO
THE BASE OF THE PLANK OR SLAB. ACTUAL HEIGHT FROM
BOTTOM OF SLAB TO TOP OF V-GROOVE SHALL BE 8-1/2
INCHES AFTER V-GROOVE IS FORMED.
1"
8-1/2"
1/4"
1/4"
DO NOT FABRICATE TONGUE FOR LAST PLANK.
INSTALL EXPANSION JOINT BETWEEN LAST
PLANK AND CAST-IN-PLACE SLAB
3-1/4" 3"
8"
1/2"
REBAR REINFORCEMENT PER
MANUFACTURER, SEE SPECIFICATIONS
CLASS 4 RIP RAP NOT
TO EXTEND ABOVE
RAMP SURFACE
PRECAST GROOVES TO LINE UP AND MATCH
CAST-IN PLACE GROOVES AT TRANSITION.
CAST-IN-PLACE REBAR
HOOP INTO ANCHOR WALL
ANCHOR WALL
V-GROOVES PER DETAILS
ON THIS SHEET
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
-0
7.
P3
-P 6.
Bo at
_R am p.
dw g, 7/
2/
:1 6:
1/4" X 3" STEEL PLATE
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
-0
7.
P3
-P 6.
Bo at
_R am p.
dw g, 7/
2/
:1 6:
6" THICK COMPACTED AGGREGATE
SURFACE AS SPECIFIED
COMPACTED SUBGRADE
AS SPECIFIED
2:1 OR FLATTER CUT SLOPE
PROVIDE 4" DEEP DRAINAGE SWALE
IF NEEDED TO PREVENT WATER PONDING
2% OUTSLOPE
2:1 OR FLATTER FILL SLOPE
3:1 SLOPE
NOTES:
1. SET FRACTURED OR SOILED SIDE OF ROCK INTO
EARTH. WEATHERED SIDE SHOULD FACE UP.
2. PLACE BARRIER ROCKS SO THEY APPEAR AS NATURAL
AVOID PLACING IN LONG ROWS WITH EQUAL SPACING.
3. ROCKS WITHIN CONSTRUCTION AREA FOR SALVAGE
AND USE SHALL BE APPROVED BY THE CONTRACTING
OFFICER.
4. SEE SPECIFICATION 322205 FOR BARRIER ROCK SIZE.
24" MAX.
1/3 DEPTH MIN.
30" (MIN. SPACING)
48" (MAX. SPACING)
4'-0" (MIN. SPACING)
4'-9" (MAX. SPACING)
ROAD SHOULDER
18" MIN.
18" MIN.
ACTUAL SPACING SHALL
BE AS STAKED
EXISTING TREES
EXISTING TREES
30" (MIN. SPACING)
48" (MAX. SPACING)
36" MAX.
NOTES:
1. MINIMUM TABLE WEIGHT IS 2,450 LBS.
2. THE TABLE SHALL MEET FSORAG ACCESSIBILITY REQUIREMENTS.
3. TABLE COLOR SHALL BE "PADRE BROWN" OR APPROVED EQUAL
4. TABLE SHALL BE MODEL NO. 104FSS, AVAILABLE FROM OUTDOOR
CREATIONS INC,. 2270 BARNEY ROAD, ANDERSON CA 96007, 530-337-6674
OR APPROVED EQUAL.
5. PLACE TABLE ON AGGREGATE GROUP GATHERING AREA AS SHOWN ON
SHEET P1.
WOODGRAIN TEXTURE TABLE TOP
WOODGRAIN
TEXTURE
SEATS
FOREST SERVICE SHIELD CAST
IN FULL RELIEF IN
BOTH LEG SURFACES
PLAN VIEW
BARRIER ROCK DETAILS (NO SCALE)
TYPICAL GROUP GATHERING AREA AND TRAIL CROSS SECTION (NO SCALE) CONCRETE TABLE DETAILS (NO SCALE)
PLAN VIEW
SECTION VIEW
SECTION VIEW
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
.D
1.
Ba rri er
R oc k.
Ag gr eg at eC ro ss
Se ci tio n.
P ic ni cT ab le
.D et ai ls
.d w g, 7/
2/
:1 7:
ELEVATION SHOWING BRACE
CUTS FOR BUCK STICKS
NOTE:
EVERY 10TH PANEL TO BE FITTED WITH A DURABLE BRACE AND ON
STEEP GROUND EVERY 5TH PANEL SHALL BE SO BRACED. ALTERNATE
BRACE DIRECTION EVERY BRACED PANEL.
BRACE 4" MIN. DIA.
NOTE:
BOTH BUCK STICKS TO BE CUT THE SAME.
SECTION
3" MIN. DIA., 12'
TO 18' LONG
MAX
60 D SPIKES (TYP.) RUB POLE 3"
MIN. DIA.
NOTE:
POLE & BUCK STICKS SHALL BE OF SOUND
MATERIAL TRIMMED FREE OF KNOTS & SHAGS.
60 D SPIKES (TYP.)
RUB POLE
BUCK AND POLE FENCE DETAILS (NO SCALE) TREATED WOOD BOAT TIE DETAIL (NO SCALE)
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\
.D
2.
Bu ck .A nd .P ol e.
Fe nc in g.
dw g, 7/ 2/
:1
7:
NOTES:
1. ALL CUT AND FILL SLOPES SHALL BE SLOPED AT 2:1.
2. ALL CONSTRUCTION SURVEY ELEVATIONS WITHIN THE SHEET "S1" ARE FINISHED
GRADE ELEVATIONS.
3. CONTROL POINTS CAN BE IDENTIFIED BY REBAR IN THE GROUND WITH FLAGGING.
4. THE CONTRACTOR SHALL EXTEND THE SUBGRADE OF THE ROAD TO THE POINTS
LABELED "DAY". GRADING TO THESE POINTS WILL PREVENT UNWANTED DITCHES
OR WATER PONDING.
5. SEE SHEET S2 FOR POINT TABLE.
6. SEE SHEET P1 FOR VERTICAL CURVE ELEVATIONS.
CONTR
OL
POIN
T #2
25' GRID
25' GRID
EXISTING BOAT RAMP ROAD
CONCRETE BOAT RAMP
CLASS 4 RIPRAP
SNAKE RIVER
2% M
IN
. S
LO
PE
2% M
IN
. S
LO
PE
2% M
I N
. SLO
PE
2%
M I N
. SLO
PE
SLOPE
SLOPE
SLOPE
2% M
IN
. SLO
PE
2% M
IN
. S
LO
PE
GRADE
BREAK
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\ x_ si te _p
.d w g, 7/
2/
:1 7:
POINT TABLE
POINT
NORTHING
1346116.1
1346116.8
1346116.5
1346116.8
1346117.4
1346146.8
1346158.8
1346168.2
1346199.8
1346188.2
1346176.1
1346165.9
1346110.4
1346075.7
1346060.7
1346056.3
1346050.8
1346060.6
1346064.9
1346074.6
1346075.5
1346080.3
1346084.7
1346093.3
1346109.6
1346121.1
1346142.8
1346131.8
1346156.8
1346106.8
1346081.8
1346056.8
1346196.1
1346181.8
1346156.8
1346131.8
1346106.8
1346081.8
1346056.8
1346172.3
1346156.8
1346131.8
1346106.8
1346081.8
1346156.8
EASTING
2436084.6
2436109.6
2436134.6
2436159.6
2436184.6
2436059.6
2436063.7
2436060.2
2436144.5
2436148.8
2436159.6
2436209.6
2436255.1
2436234.6
2436184.6
2436169.4
2436162.7
2436063.1
2436059.6
2436044.1
2436034.6
2436007.7
2435996.2
2436000.5
2436006.5
2436021.8
2436049.3
2436159.6
2436159.6
2436159.6
2436159.6
2436159.6
2436134.6
2436134.6
2436134.6
2436134.6
2436134.6
2436134.6
2436134.6
2436184.6
2436184.6
2436184.6
2436184.6
2436184.6
2436209.6
ELEVATION
5852.91
5852.90
5852.94
5852.84
5852.70
5852.14
5852.00
5851.84
5851.23
5851.40
5851.65
5851.41
5850.60
5850.89
5851.57
5851.60
5851.54
5851.70
5851.65
5851.70
5851.75
5851.81
5851.85
5851.85
5851.85
5851.89
5852.04
5852.54
5852.04
5852.64
5852.14
5851.64
5851.30
5851.59
5852.09
5852.59
5852.79
5852.29
5851.79
5851.70
5851.91
5852.41
5852.49
5851.99
5851.60
DESCRIPTION
FG-C
FG-C
FG-C
FG-C
FG-C
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG
FG
FG
FG
FG-EDGE
FG
FG
FG
FG
FG
FG
FG-EDGE
FG
FG
FG
FG
FG
POINT TABLE
POINT
NORTHING
1346131.6
1346082.6
1346064.2
1346154.9
1346131.8
1346081.8
1346118.5
1346098.2
1346186.7
1346181.8
1346156.8
1346131.8
1346106.8
1346081.8
1346056.0
1346177.4
1346156.8
1346131.8
1346106.8
1346081.8
1346058.5
1346053.6
1346129.5
1346106.8
1346081.8
1346134.7
1346131.8
1346106.8
1346081.8
1346062.5
1346141.9
1346108.0
1346097.5
1346128.8
1346074.9
1346049.2
1346075.8
1346101.5
1346124.0
1346159.5
1346168.7
1346172.7
1346163.5
1346055.1
1346046.9
EASTING
2436209.6
2436209.6
2436209.6
2436234.6
2436234.6
2436234.6
2436234.6
2436234.6
2436109.6
2436109.6
2436109.6
2436109.6
2436109.6
2436109.6
2436109.6
2436084.6
2436084.6
2436084.6
2436084.6
2436084.6
2436084.6
2436134.6
2436059.6
2436059.6
2436059.6
2436034.6
2436034.6
2436034.6
2436034.6
2436379.4
2436259.6
2436259.6
2436279.9
2436284.6
2436323.1
2436372.5
2436386.4
2436337.0
2436293.8
2436225.5
2436229.4
2436220.2
2436216.3
2436242.3
2436265.9
ELEVATION
5852.10
5851.78
5851.41
5851.05
5851.20
5851.01
5851.68
5851.34
5851.45
5851.55
5852.05
5852.55
5852.70
5852.20
5851.66
5851.70
5852.11
5852.61
5852.71
5852.21
5851.74
5851.73
5852.49
5852.49
5851.99
5851.95
5852.03
5852.53
5852.03
5839.38
5850.40
5850.00
5849.12
5849.50
5844.95
5839.38
5839.38
5844.95
5849.12
5851.20
5851.00
5851.20
5851.40
5851.70
5851.20
DESCRIPTION
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG
FG
FG
FG
FG-EDGE
FG-EDGE
FG
FG
FG
FG
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG-EDGE
FG
FG
FG
FG-RAMP PLANK END
FG-EDGE
FG-EDGE
FG-RAMP
FG-EDGE
FG-RAMP/PLANK BEGIN
FG-RAMP PLANK END
FG-RAMP PLANK END
FG-RAMP/PLANK BEGIN
FG-RAMP
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG
FG
POINT TABLE
POINT
NORTHING
1346070.5
1346078.7
1346069.7
1346074.1
1346098.6
1346110.9
1346088.2
1346046.7
1346056.2
1346056.6
1346060.1
1346066.4
1346045.2
1346024.0
1346130.4
1346123.8
1346093.9
1346098.7
1346118.9
1346087.7
1346105.8
1346124.3
1346173.7
1346197.5
1346199.6
1346204.5
1346200.9
1346193.1
1346190.6
1346185.6
1346188.2
1346176.4
1346362.5
1346068.6
1346045.2
1346048.1
1346045.4
1346069.0
1346076.7
1346085.2
1346127.4
1346159.7
1346174.1
1346187.0
1346201.6
EASTING
2436274.1
2436250.5
2436239.6
2436264.8
2436277.7
2436286.6
2436330.0
2436163.9
2436177.4
2436189.6
2436210.0
2436226.1
2436245.4
2436264.6
2436068.4
2436069.7
2436052.0
2436041.1
2436040.8
2436185.8
2436186.9
2436197.8
2436174.9
2436178.6
2436160.6
2436161.2
2436189.2
2436188.0
2436204.6
2436203.8
2436187.3
2436305.6
2436363.4
2436039.8
2436109.3
2436133.8
2436267.5
2436275.6
2436279.2
2436281.5
2436019.6
2436042.1
2436058.0
2436084.4
2436104.8
ELEVATION
5851.20
5851.70
5851.30
0.00
0.00
5849.12
5844.95
5850.25
5850.00
5849.85
5849.75
5849.50
5849.25
5849.00
5852.35
5852.50
5852.20
5852.35
5852.50
5852.10
5852.55
5852.30
5851.70
5851.70
5851.70
5851.70
5851.70
5851.70
5851.70
5851.70
5851.70
5851.21
5851.72
5851.15
5851.15
5851.21
5851.00
5851.00
5850.00
5849.00
5851.34
5851.50
5851.30
5851.20
5850.95
DESCRIPTION
FG
FG
FG
FG
FG
FG-RAMP
FG-RAMP/PLANK BEGIN
FG-DITCH
FG-DITCH
FG-DITCH
FG-DITCH
FG-DITCH
FG-DITCH
FG-DITCH
FG
FG
FG
FG
FG
FG
FG
FG
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
FG-EDGE
CP1
CP2
DAY
DAY
DAY
DAY
DAY
DAY
DAY
DAY
DAY
DAY
DAY
DAY
POINT TABLE
POINT
NORTHING
1346215.3
1346187.2
1346034.2
1346053.9
1346073.6
1346071.4
1346069.2
1346055.8
1346050.7
1346045.6
1346055.0
1346059.2
1346043.4
1346115.9
1346140.8
1346152.8
1346171.1
1346191.4
1346211.7
EASTING
2436139.1
2436162.1
2435961.5
2435982.3
2436003.1
2436024.8
2436046.5
2436060.6
2436112.4
2436164.2
2436177.4
2436217.8
2436264.1
2436009.7
2436032.5
2436060.6
2436053.8
2436107.9
2436162.1
ELEVATION
5850.70
5851.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DESCRIPTION
DAY
DAY
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
FENCE
NOTES:
1. ALL CONSTRUCTION SURVEY ELEVATIONS WITHIN THE SHEETS "S1 AND S2" ARE
FINISHED GRADE ELEVATIONS.
2. CONTROL POINTS CAN BE IDENTIFIED BY REBAR IN THE GROUND WITH FLAGGING.
3. THE CONTRACTOR SHALL EXTEND THE SUBGRADE OF THE ROAD TO THE POINTS
LABELED "DAY". GRADING TO THESE POINTS WILL PREVENT UNWANTED DITCHES
OR WATER PONDING.
4. POINT DEFINITIONS:
4.1. FG = "FINISHED GRADE"
4.2. CP = "CONTROL POINT"
4.3. DAY = SEE NOTE 3 ABOVE.
4.4. FENCE = FENCE CENTERLINE
5. SEE SHEET P1 FOR VERTICAL CURVE ELEVATIONS.
X :\B rid ge rT et on \B oa tR am p
S ta bi liz at io n.
\d w g\ x_ si te _p
.d w g, 7/
2/
:1 7:
| G1 |
| P1 |
| P2 |
| P3 |
| P4 |
| P5 |
| P6 |
| D1 |
| D2 |
| S1 |
| S2 |
File details come from the government source that posted it. Updated .