Attachment C.doc
DOC document 31 KB Posted
- Solicitation number
- AG-02NV-S-09-0016
About this file
Attachment C
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 01.doc | DOC document | |
| Attachment D.xls | XLS spreadsheet | |
| Attachment E.xls | XLS spreadsheet | |
| Attachment F.xls | XLS spreadsheet | |
| Attachment B.doc | DOC document | |
| Attachment A.doc | DOC document | |
| Specifications.doc | DOC document | |
| RFP Solicitation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C Sample TASK For Technical EVALUATION SAMPLE TASK: Model Job Order Projects – As part of the evaluation, the Offeror shall complete the model Job Orders as noted below. The Offeror will address the criteria cited herein and develop sample Job Order proposals which would demonstrate the Offeror’s understanding and comprehension of Job Order construction tasks as well as the ability to effectively use the Unit Price Books. The Offeror shall submit two samples of Firm-Fixed Price Job Orders and one sample proposal for a Time-and-Equipment Job Order which are responsive to the respective hypothetical work requirements shown below. Each proposal shall use a stipulated coefficient of 1.20% and not the actual coefficients being offered.
(a) Firm Fixed Price Job Order: Requirement to reconstruct 4 miles of road including culvert replacement. Road is single lane 16 ft wide. Reconstruct as indicated: .5 miles hot mix asphalt pavement overlay, 2 .5 miles of Asphalt Surface Treatment, single chip seal, and 1 mile of crushed aggregate surface course 4 in thick. The project also includes minor road realignment with the construction of one 4 ft by 50 ft MSE retaining wall with guardrail. Install road underdrain systems in two locations. Replace (4) 24” dia CMP culverts and replace one 36” culvert with an open bottomed 10 ft span multi-plate structure. Assume 25 ft culvert lengths. Also extend one 8 ft by 8 ft concrete box culvert by 8 ft. All costs shall be determined using the FSCC Unit Price Book. All minor construction details are at the Contractor’s discretion. The construction schedule shall identify materials submittals, a construction timeline, and the earliest date the Contractor can complete the reconstruction.
(b) Firm Fixed Price Job Order: Requirement to realign a segment of road by removing and disposing a 5 ft by 50 ft metal bin retaining wall, and constructing a 10 ft by 25 ft sheet piling system. Project includes excavation, load, haul (2.5 miles), and stockpile of 500 CY of material. Installation of 250 lf of 6 in PVC water main with two valves is also included within this project. All costs may be determined using the RS Means Unit Price Book. The construction schedule shall identify materials submittals, a construction timeline, and the earliest date the Contractor can complete the reconstruction.
(c) Time and Equipment Job Order: Requirement to provide excavation including equipment, operator, and labor for the replacement of a box culvert. The order shall require the following:
| Work or Materials |
| Quantity |
| Unit |
| Semi-Truck & Lowboy trailer w/operator |
| 25 |
| Hours |
| 3/4 Ton Pickup Company Truck |
| 40 |
| Hours |
| Labor Group I |
| 40 |
| Hours |
| Equipment Operator, Group VIII |
| 35 |
| Hours |
| 325 Caterpillar Track Hoe |
| 35 |
| Hours |
| XXX Dump Truck |
| 40 |
| Hours |