Attachment A.doc

DOC document 161 KB Posted

Attached to
Road and Bridge Maintenance and Construction (IDIQ) Job Order Contract for Region 4
Solicitation number
AG-02NV-S-09-0016
Issued by

About this file

Attachment A

View the file

Other files

File Type Posted
Amend 01.doc DOC document
Attachment D.xls XLS spreadsheet
Attachment E.xls XLS spreadsheet
Attachment F.xls XLS spreadsheet
Attachment C.doc DOC document
Attachment B.doc DOC document
Specifications.doc DOC document
RFP Solicitation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Forest Service Construction Cost UPB

Attachment A

Forest Service Construction Cost – Unit Price Book

Primary Unit Price Book

Item No.
Description
Method & Unit of Measure
Unit Price
150
Project requirements
157.31
Soil erosion and pollution control @ road - stream crossings: measure per area distrubed
CQ - SY
$ 10.00
157.02
Silt fence 3ft wood stakes
CQ – LF
$ 5.00
158.01
watering for dust control
CQ – MGallon
$ 35.00
200
earthwork
201.31
clearing and grubbing- Light

Dispose by scattering

CQ - ACRE
$ 350.00
201.32
clearing and grubbing- heavy

dispose by scattering

CQ - ACRE
$1150.00
203.30
removal of structures and obstructions
CQ - CY
$ 100.00
204.80
EXCAVATION AND EMBANKMENT – COMMON AND LOOSE ROCK COMPACTION METHOD B
CQ – CY
$ 3.25
207.01
EARTHWORK GEOTEXTILES:TYPE IV
CQ – SY
$ 2.00
208.03
STRUCTURAL EXCAVATION AND BACKFILL
CQ – CY
$ 35.00
209.03
STRUCTURAL BACKFILL-PIPE BEDDING
CQ – CY
$15.00
211.01
ROADWAY OBLITERATION:ripping 8” to 12” depth
CQ – LANE MILE
$950.00
212.01
LINEAR GRADING
CQ – LANE MILE
$350.00
230.01
ROADSIDE BRUSHING- MEDium
CQ - ACRE
$400.00
251.01
RIPRAP: Machine placed Class 5
CQ – CY
$55.00
252.05
rOCK EMBANKMENT AND ROCK BUTTRESS: cLASS 6
CQ – CY
$55.00
252.51
rOCK: bOULDER PLACEMENT
CQ - EACH
$50.00
253.01
Gabions:wELDED wIRE: galvanized
CQ – CY
$75.00
255.01
MECHANICALLY STABILIZED EARTH WALLS – measure Per area of wall face, excavation and backfill excluded
CQ – SF
$30.00
259.01
SOIL NAIL RETAINING WALLS: PER SOIL NAIL PLACED 20 ft depth
CQ – EACH
$300.00
259.11
SOIL NAIL RETAINING WALLS: SHOT CRETE FACE
CQ – CY
$200.00
262.01
reinforced soil embankment: GEOGRID: Category 3. excavation and embankent excluded
CQ – SY
$5.00
300
Aggregate
301.01
Crushed aggregate: Gradation C

compaction method b fURNISH AND PLACE, EXCLUDE HAUL

AQ – Ton
$ 17.00
301.02
Crushed aggregate surface course: with 2% bentonite

compaction method b fURNISH AND PLACE, EXCLUDE HAUL

AQ – Ton
$ 20.00
306.01
dust palliative: magnesium chloride
CQ – sY
$ 0.75
303.01
Road reconditioning: includes SCARIFY 6 IN DEPTH, SURFACe blading, and COMPACTION
CQ – MILE
$2300.00
303.05
Road Reconditioning: surface blading only
CQ – MILE
$350.00
324.01
Minor crushed aggregate:

quantities LESS THAN 100 cy fURNISH AND PLACE, EXCLUDE HAUL

CQ – CY
$50.00
400
Asphalt
403.01
Hot asphalt concrete pavement

fURNISH AND PLACE, EXCLUDE HAUL

AQ - Ton
$110.00
404.01
Minor Hot asphalt concrete pavement: (less than 50 ton)

fURNISH AND PLACE, EXCLUDE HAUL

AQ - Ton
$150.00
408.01
cold recycled asphalt base course
CQ – SY
$ 3.50
409.01
Asphalt surface treatment – CRS2P Asphalt
AQ - Ton
$650.00
409.02
Asphalt surface treatment – Aggregate chips – ½ IN, 30#/SY

fURNISH AND PLACE, EXCLUDE HAUL

CQ – sy
$ 2.25
410.01
Asphalt surface treatment – slurry seal, type II CSS-1h
CQ – SY
$ 3.50
411.01
Asphalt prime coat
CQ - gallon
$ 2.50
411.05
Asphalt fog coat
CQ – sy
$ 1.50
413.01
Asphalt pavement milling: 3 in depth
CQ – sy
$ 1.00
414.01
Asphalt pavement crack and joint sealing, Polymer or rubber modified
AQ –gallon
$ 3.50
414.31
Asphalt pavement: Saw cutting
AQ –LF
$ 1.50
430.01
Asphalt pavement Patching: full depth hot asphalt concrete mix
aQ –SY
$ 25.00
500
rigid pavements
501.01
Reinforced Portland Cement concrete slabs
CQ – cy
$250.00
550
Bridge repair
552.01
Structural concrete Class A(AE)
CQ – CY
$500.00
553.01
precast, prestressed concrete structural member CLASS p(ae)
CQ – CY
$750.00
556.01
Bridge Railing type II class B
CQ – LF
$60.00
556.02
Remove and reset bridge railing
CQ – LF
$35.00
556.01
aPPROACH GUARDRAIL type II
CQ – LF
$60.00
557.01
treated structural timber and lumber
CQ – MBF
$3000.00
557.02
treated structural timber and lumber - glulam
CQ – MBF
$3500.00
561.01
Bridge curb: remove and replace
CQ – LF
$35.00
600
incidental construction
602.01
CMP cULVERT-18 INCH – 16 GA
AQ – LF
$ 35.00
602.02
CMP cULVERT-24 INCH – 14 GA
aQ – LF
$ 45.00
602.03
CMP cULVERT-36 INCH – 12 GA
aQ – LF
$ 60.00
603.11
sTRUCTURAL pLATE CULVERTS – MEASURED BY SPAN TIMES LENGTH OF STRUCTURE
CQ – SF
$ 35.00
605.01
Underdrain system: includes all geosnthetic, pipe, and backfill materials
CQ – sy
$ 40.00
607.01
remove, clean, and reset existing culvert
aQ – LF
$ 20.00
614.01
lEAN CONCRETE BACKFILL
aQ – CY
$150.00
615.01
cONCRETE PAVEMENTS: SIDEWALKS AND PADS
aQ – CY
$200.00
617.01
gUARDRAIL type II, class a
aQ – LF
$50.00
617.01
gUARDRAIL terminal section
CQ – each
$400.00
617.01
gUARDRAIL replace post
CQ – each
$50.00
624.01
tOPSOIL: furnish and place
CQ – cY
$30.00
624.02
tOPSOIL: place conserved
CQ – cY
$15.00
629.01
erosion control mat: type 2.D
CQ – sY
$ 8.00

permanent traffic control

633.01
sign system – HDO plywood
CQ – sF
$ 50.00
633.05
Posts: 4X4 treated wood
CQ – each
$ 25.00
633.06
object marker
CQ – EAch
$150.00
633.07
delineator
CQ – EAch
$ 25.00
633.11
remove and reset Sign or object
CQ – EAch
$ 50.00
634.01
Permanent pavement marking:

4” wide stripe, thermoplastic type H

CQ – LF
$ 1.00
648.01
sTREAM SIMULATION MATERIAL PLACEMENT
CQ – CY
$ 30.00
648.02
sTREAM SIMULATION MATERIAL placement- furnish and place class 14
CQ – CY
$ 60.00
648.51
bOULDER PLACEMENT: size 4
CQ – each
$ 50.00
648.52
bOULDER placement– Furnish and place size 4
CQ – each
$150.00
800
MATERIAL HAUL
801.1
MATERIAL SHORT HAUL < 5 Mile
Aq – cY mile
$ 1.80
801.2
MATERIAL LONG HAUL > 5 Mile
Aq – cY mile
$ 0.40
801.3
wEIGHED MATERIAL HAUL
Aq–tON mile
$ 0.25

File details come from the government source that posted it. Updated .