CONSTRUCTION_RFQ.doc
DOC document 629 KB Posted
- Attached to
- Nez Perce N. F. - Farris Creek Culvert Replacement Federal contract opportunity
- Solicitation number
- AG-0295-S-10-0006
About this file
Solicitation Package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Farris Cr Part 1.pdf | ||
| Farris Cr Part 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION RFQ
AG-0295-S-10-0009
Clearwater R.D.; Nez Perce National Forest
Farris Creek Culvert Replacement Project
REQUEST FOR QUOTATION
PAGE OF PAGES
| (THIS IS NOT AN ORDER) |
| THIS RFQ |
| FORMCHECKBOX |
| IS |
| FORMCHECKBOX |
| IS NOT A HUBZONE SMALL BUSINESS SET- ASIDE |
| 1 |
| 93 |
| 1. REQUEST NO. |
| 2. DATE ISSUED |
| 3. REQUISITION/PURCHASE REQUEST NO. |
| 4. CERT. FOR NAT.DEF. |
| RATING |
| AG-0295-S-10-0006 |
| 6/9/10 |
| 420577 |
| UNDER BDSA REG. 2 |
AND/OR DMS REG. 1
| 5a. ISSUED BY |
| 6. DELIVER BY (Date) |
Bid Drawer, Idaho Montana Acquisition Team, Nez Perce National Forest, 104 Airport Road, Grangeville, ID 83530 See Section F: Deliveries and Performance
| 5b. FOR INFORMATION CALL (NO COLLECT CALLS) |
| 7. DELIVERY |
| FORMCHECKBOX |
FOB DESTINATION
| NAME |
| TELEPHONE NUMBER |
| FORMCHECKBOX |
OTHER (See Schedule)
| AREA CODE |
| NUMBER |
| 9. DESTINATION |
| KAREN RUKLIC; kruklic@fs.fed.us |
| 208 |
| 983-5144 |
| a. NAME OF CONSIGNEE |
| 8. TO: |
| a. NAME |
| b. COMPANY |
| b. STREET ADDRESS |
| c. STREET ADDRESS |
| c. CITY |
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| d. STATE |
| e. ZIP CODE |
| 10. PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5A ON OR BEFORE CLOSE OF BUSINESS |
| IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A. This request does not commit the Government to pay any costs incurred in the preparation of the |
| June 30, 2010; 4:00 PM Local Time |
| submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter. |
11. SCHEDULE (Include applicable Federal, State and local taxes)
*PLEASE NOTE THAT THIS ACQUISITION HAS BEEN SET-ASIDE FOR HUBZONE SMALL BUSINESS CONCERNS. See FAR 52.219-3 in Section I.
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (a) |
| (b) |
| (c) |
| (d) |
| (e) |
| (f) |
| FARRIS CREEK CULVERT REPLACEMENT |
| CLEARWATER R.D.; NEZ PERCE N.F. |
IDAHO COUNTY, IDAHO
| Complete and return SF-18, Schedule of Items (pg 2), Technical Proposal, Provision - FAR 52.204-8 (pgs 83-87) and Worker’s Comp Form (pgs 79-82). |
| Your quotation may be faxed to |
Bid Drawer, 208-983-4098 or mailed to address in block 5a.
| a. 10 CALENDAR DAYS (%) |
| b. 20 CALENDAR DAYS (%) |
| c. 30 CALENDAR DAYS (%) |
| d. CALENDAR DAYS |
12. DISCOUNT FOR PROMPT PAYMENT
| NUMBER |
| PERCENTAGE |
| NOTE: Additional provisions and representations |
| FORMCHECKBOX |
| are |
| FORMCHECKBOX |
are not attached.
| 13. NAME AND ADDRESS OF QUOTER |
| 14. SIGNATURE OF PERSON AUTHORIZED TO |
| 15. DATE OF |
| a. NAME OF QUOTER |
| SIGN QUOTATION |
| QUOTATION |
| b. STREET ADDRESS |
| 16. SIGNER |
| a. NAME (Type or print) |
| b. TELEPHONE |
c. COUNTY
AREA CODE
| d. CITY |
| e. STATE |
| f. ZIP CODE |
| c. TITLE (Type or Print) |
| NUMBER |
NSN 7540-01-152-8084
Previous edition not usable
| 18-121 |
| STANDARD FORM 18 (Rev. 6-95) |
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
FARRIS CREEK CULVERT REPLACEMENT PROJECT
NEZ PERCE NATIONAL FOREST
IDAHO COUNTY, IDAHO
B-1 SCHEDULE OF ITEMS
| Pay Item Number |
| Description |
| Method of |
Meas.
| Pay Unit |
| Est. Quantity |
Road 648 Est. Quantity Road 1851 Total
Quantities
| Unit Price |
| Amount |
| 15101 |
| Mobilization |
| LSQ |
| LS |
| All |
| All |
| 1 |
| $__________ |
| $__________ |
| 15701 |
| Soil Erosion and Pollution Control |
| LSQ |
| LS |
| 1 |
| -- |
| 1 |
| $__________ |
| $__________ |
| 20101 |
| Clearing and Grubbing |
| LSQ |
| LS |
| 1 |
| -- |
| 1 |
| $__________ |
| $__________ |
| 20401 |
| Roadway Excavation |
Compaction Method B
| LSQ |
| LS |
| 1 |
| -- |
| 1 |
| $__________ |
| $__________ |
| 20402 |
| Channel Excavation |
| LSQ |
| LS |
| 1 |
| -- |
| 1 |
| $__________ |
| $__________ |
| 25101 |
| Placed Riprap Class 2 |
Commercial Source
| DQ |
| CY |
| 25 |
| -- |
| 25 |
| $__________ |
| $__________ |
| 25102 |
| Grade Control Structure |
| AQ |
| EA |
| 4 |
| -- |
| 4 |
| $__________ |
| $__________ |
| 30101 |
| Aggregate Surface Course |
Grading E
Compaction Method B
| DQ |
| Ton |
| 40 |
| 1030 |
| 1070 |
| $__________ |
| $__________ |
| 30301 |
| Reconditioning of Roadbed |
| DQ |
| Mile |
| -- |
| 0.64 |
| 0.64 |
| $__________ |
| $__________ |
| 60201 |
| 72 Inch Corrugated Steel Culvert |
| DQ |
| LF |
| 58 |
| -- |
| 58 |
| $__________ |
| $__________ |
| 62201 |
| Equipment Rental |
Hydraulic Excavator w/Thumb
| AQ |
| Hour |
| 4 |
| -- |
| 4 |
| $__________ |
| $__________ |
| 62501 |
| Seeding, Dry Method |
| LSQ |
| LS |
| 1 |
| -- |
| 1 |
| $__________ |
| $__________ |
Total (All Items) $_________________________
* Designated Method of Measurement: DQ=Design Quantity; AQ= Actual Quantity LSQ=Lump Sum Quantity
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted. The above pay items are contract quantities unless noted.
B-3 - BASIS OF AWARD The Government shall make one contract award from this solicitation on the basis of the contractor's past performance; production schedule (work plan); experience and qualifications of the supervisor, lead employees (including equipment operators), and proposed subcontractors; and price. Technical and price proposals are required for evaluation of quotations. See Sections M for proposal instructions and evaluation/award information. Commitments made in proposals will become part of the requirements of the awarded contract. You may use the following form as your technical proposal.
***IMPORTANT: This acquisition has been set-aside for HUBZone Concerns (see FAR 52.219-3, Notice of Total HUBZone Set-Aside in Section I). Quoter must be a certified HUBZone Concern with the U.S. Small Business Administration. For information regarding the on-line application process, go to the following website at https://eweb1.sba.gov/hubzone/internet/. This process can take 120 days to complete.
TECHNICAL PROPOSAL FORM
Farris Creek Culvert Replacement
AG-0295-S-10-0006
CONTRACTOR NAME:
(1) Past Performance. List and briefly describe all similar contracts completed within the last 5 years, and supply names and current phone numbers of those contacts. We will assess your history of customer satisfaction, timely completion, quality performance, and compliance with contract requirements. If performance problems were experienced on any of these projects, describe the steps taken to prevent a recurrence. Those with no history of past performance will receive neither a positive nor a negative evaluation for this criterion.
(2) Production Schedule (Work Plan): Describe all significant work tasks, the sequence in which they are to be performed, and the workers and equipment to be assigned. Include the proposed time to be devoted to each task. We will assess the realism of proposed completion dates, given the resources to be devoted to the work.
Specifically address:
· Proposed starting and completion dates
· Type and size of equipment to be used
· Foreman, operators, and crew to be assigned to this contract
(3) Experience and qualifications of the supervisor, lead employees (including equipment operators), and proposed subcontractors: For each, list relevant licenses, certifications and experience in the type of work to be done under this contract. Specifically highlight large culvert and stream channel projects. If none, list similar projects where experience could be applied to this kind of job and briefly explain how the experience relates to the type of work to be done under this contract.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 – Project Description and Location
(a) Description of Work: Farris Creek Culvert Replacement- This project consists of replacing an existing 24” corrugated steel culvert with a 72” corrugated steel culvert on Forest Road 648 (Lower Cougar Road). Other types of work included in this project are placing riprap aprons, streambed simulation inside the new culvert, channel realignment and replacement of roadway and aggregate. Work also includes aggregate placement on 0.64 miles of Forest Road 1851. Furnish all labor, supervision, materials, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
(b) Project location: The project location is at M.P 1.5 on FS Road 648. Approximately 10 miles from the intersection of Forest Road 244 and State Route 13 near Harpster Idaho. The distance from Grangeville is approximately 20 miles.
(c) Price Range: $25,000 to $100,000.
(d) Pre bid Tour: none
(e) Pre bid Conference: no
(f) Start of Work: It is anticipated that the Notice to Proceed for this project will be issued no later than July 15, 2010. **In steam work on this project will be limited to the period between July 1, 2010 to August 15, 2010.
(g) Period of Performance (See Part I, Section F, Clause 52.211-10, Alt I)
(h) Government-Furnished Property None.
C-2 - STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03 U.S. Customary Units (U.S. DEPARTMENT OF TRANSPORTATION, Federal Highway Administration) (2003)
Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP-03) are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract.
Copies of the Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP-03) are available http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm.
C-3 – Supplemental Project Specifications The Supplemental Project Specifications listed on the Specification list are applicable to this contract and are physically included in this Section (C).
Note that the specification list includes the major specifications applicable to this project. Other specifications referred to within these specifications (even though not specifically listed herein) are also fully applicable to this invitation for bids and any resultant contract.
C-4 – Drawings (entitled “FARRIS CREEK CULVERT REPLACEMENT”). The following drawings are a part of this solicitation and any resulting contract. The drawings are found in an attachment to the solicitation.
| NO. |
| DESCRIPTION |
| DATE |
| 1 |
| TITLE SHEET |
| 05/2010 |
| 2 |
| SUMMARY OF QUANTITIES and GENERAL NOTES AND TYPICAL |
| 05/2010 |
| 3 |
| TYPICALS and WORKLIST |
| 05/2010 |
| 4 |
| CULVERT REPLACEMENT PLAN VIEW |
| 05/2010 |
| 5 |
| CULVERT PROFILE & CROSS SECTION |
| 05/2010 |
| 6 |
| CULVERT, CHANNEL & GRADE CONTROL DETAILS |
| 05/2010 |
| 7 |
| RIPRAP DETAILS |
| 05/2010 |
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
Supplemental PROJECT Specification List
FARRIS CREEK CULVERT REPLACEMENT
Nez Perce National Forest
| SPEC. No. |
| SPECIFICATION TITLE |
| FSSS101 |
| Terms, Format, and Definitions |
| FSSS102 |
| Bid, Award, and Execution of Contract |
| FSSS103 |
| Scope of Work |
| FSSS104 |
| Control of Work |
| FSSS105 |
| Control of Materials |
| FSSS106 |
| Acceptance of Work |
| FSSS107 |
| Legal Relations and Responsibility to the Public |
| FSSS108 |
| Prosecution and Progress |
| FSSS109 |
| Measurement & Payment |
| FSSS151 |
| Mobilization |
| FSSS156 |
| Public Traffic |
| FSSS157 |
| Soil Erosion Contol |
| FSSS201 |
| Clearing and Grubbing |
| FSSS203 |
| Removal of Structures and Obstructions |
| FSSS204 |
| Excavation and Embankment |
| FSSS209 |
| Structural Excavation and Backfill |
| FSSS251 |
| Riprap |
| FSSS301 |
| Untreated Aggregate Courses |
| FSSS303 |
| Road Reconditioning |
| FSSS602 |
| Culverts and Drains |
| FSSS622 |
| Rental Equipment |
| FSSS625 |
| Turf Establistment |
| FSSS648 |
| Native Streambed Material |
| FSSS703 |
| Aggregate |
| FSSS704 |
| Soil |
FARRIS CREEK CULVERT REPLACEMENT
Forest Service Supplemental Specifications
FP-03 U.S. Customary Units, FHWA 2003 Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms.
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.01 Conformity with Contract Requirements.
106.07 Partial and Final Acceptance
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions.
109.03 Weighing Procedures and Devices.
151 - Mobilization
151.01 Description
156 – Public Traffic
157 - Soil Erosion Control
157.02 Materials
157.03 General
201 - Clearing and Grubbing
203 - Removal of Structures And Obstructions
204 – Excavation and Embankment
209 - Structural Excavation and Backfill
209.04 General.
251 - Riprap
301 - Untreated Aggregate Courses
301.08(b) Plasticity Index.
303 - Road Reconditioning
303.01 Work.
303.05 Roadbed Reconditioning.
303.06 Aggregate Surface Reconditioning.
303.07 Roadway Reconditioning.
303.09 Acceptance
602 - Culverts and Drains
602.03 General.
622 - Rental Equipment
625 - Turf Establishment
648 - Native Streambed Material
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
703.10(e) Flakiness Index.
703.10(i) Adherent Coating.
704 - Soil
704.02 Bedding Material.
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.01_nat_us_02_17_2005
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR).
101.03_nat_us_02_17_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI Symbols:
| mp |
| Milepost |
| ppm |
| Part Per Million |
101.04_nat_us_02_22_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity-- “Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
101.04_nat_us_03_11_2005
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_02_17_2005
Deletions
Delete sections 104.01, 104.02, 104.03, and 104.04.
104.06 Use of Roads by Contractor
Add the following subsection:
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Haul may occur over roads under the jurisdiction of other agencies or highway districts and is subject to any restrictions imposed by these other jurisdictions.
105 - Control of Material
105.02_01_us_08_20_2004
105.02 Material Sources
Under (b) Contractor-located sources add the following:
Prior to any pit development or use of materials, the pit site shall be approved by the CO that the pit site is free of noxious weed as listed on the "All States Noxious Weeds List”.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_us_03_29_2005
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the Contractor upon request. Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_us_05_11_2004
106.07 Partial and Final Acceptance
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_04_27_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.09_nat_us_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection:
107.10_nat_us_02_23_2005
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_02_23_2005
109.02 Measurement Terms and Definitions.
Add the following to (b) Contract Quantity:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.03_0117_us_02_21_2006
109.03 Weighing Procedures and Devices.
Add the following to (c) Project weighing system:
For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 5 percent. Payment for aggregates having moisture content exceeding 5 percent will be adjusted by the percentage in excess of 5 percent. Moisture content will be determined in accordance with AASHTO T 255.
109.10_0117_us_02_21_2006
Add the following Subsection:
109.10 Methods of Measurement.
One of the following methods of measurement for determining final payment is designated in the bid schedule for each pay item:
(a) Designed Quantities (DQ). These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units designated in the bid schedule may be authorized under any of the following conditions:
1. Changes in the work authorized by the CO.
2. A determination by the CO that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
3. A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a pay item to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
151 - Mobilization 151.01_0117_us_02_17_2006
151.01 Description
Add the following at the end of the last sentence:
“Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area. Contractor shall give the Forest Service at least 24 hours advance notification when equipment is ready for inspection. Location for inspection shall be as agreed.”
“Work also includes the removal of all logs and windfall from within the roadway.”
156 – Public Traffic
156.03 Accommodating Traffic During Work.
Delete the following from the last paragraph:
according to Subsection 106.07(b)
Delete the first paragraph and replace with the following:
Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635.
Add the following project specific requirements:
The Contractor will be allowed to close Road No. 648 to through traffic for 2 continuous weeks, limited to only 1 weekend. (12 continuous days). It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the site can be substantially completed within the above specified construction period. The Contractor shall not begin excavation until all culvert materials are on-site, unless approved by the CO.
The Contractor is required to coordinate the closure of Forest Road 648 with the Forest Service. The Contractor shall notify the Forest Service 2 weeks before construction commences so that the Forest Service may advertise the road closure.
Work under this section is incidental to Section 151 – Mobilization.
157 - Soil Erosion Control
157.03_nat_us_02_24_2005
157.02 Materials
Add the following:
Provide bale, logs, wattles, and rolls from a certified noxious weed free source.
157.03 General
Delete the entire subsection and replace with the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Include methods to minimize disturbance to the stream and prevent runoff from the construction site entering directly into the stream. The “Erosion Control Plan” must address construction activities, including dewatering, that have the potential for stream sedimentation.
The Contractor’s Erosion Control Plan shall also include a proposal for erosion protection of the disturbed slopes above the inlet and outlet of the Farris Creek Culvert that utilizes erosion control mats.
All materials required to implement the Contractor’s Erosion Control Plan shall be incidental to Pay Item 15701, Soil Erosion and Pollution Control.
Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits shall be submitted 14 days before intended use.
Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
201 - Clearing and Grubbing
201.01 Description.
Delete the first sentence and replace with the following:
This work consists of clearing and grubbing within clearing limits and other designated areas. Clearing limits shall be limited to all construction areas necessary for roadway and stream work as well as areas necessary to process the clearing and grubbing slash. All clearing limits must be clearly delineated and then approved by the CO before any clearing and grubbing can take place.
203 - Removal of Structures And Obstructions
203.05 Disposing of Material.
Modify this subsection as follows:
(b) Burn. Delete this section
(c) Bury. Delete this section
(l) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Do not place slash closer than 2 feet below subgrade. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.
All work under this section shall be incidental to Pay Items 20401 and 20402, Roadway Excavation and Channel Excavation, respectively.
204 – Excavation and Embankment
Delete Section 204 in its entirety and replace with the following.
Description
204.01 This work consists of excavating material, constructing embankments and drainage excavation. This includes furnishing, hauling, stockpiling, placing, disposing, sloping, shaping, compacting, and finishing earthen and rocky material.
204.02 Definitions.
(a) Excavation. Excavation consists of the following:
(1) Roadway excavation. All material excavated from within the right-of-way or easement areas, except subexcavation covered in (2) below and structure excavation covered in Sections 208 and 209. Roadway excavation includes all material encountered regardless of its nature or characteristics.
(2) Subexcavation. Material excavated from below subgrade elevation in cut sections or from below the original groundline in embankment sections. Subexcavation does not include the work required by Subsections 204.05, 204.06(b), and 204.06(c).
(3) Borrow excavation. Material used for embankment construction that is obtained from outside the roadway prism. Borrow excavation includes unclassified borrow, select borrow, and select topping.
(b) Embankment construction. Embankment construction consists of placing and compacting roadway or borrow excavation. This work includes:
(1) Preparing foundation for embankment;
(2) Constructing roadway embankments;
(3) Benching for side-hill embankments;
(4) Constructing dikes, ramps, mounds, and berms; and
(5) Backfilling subexcavated areas, holes, pits, and other depressions.
(c) Conserved topsoil. Excavated material conserved from the roadway excavation and embankment foundation areas that is suitable for growth of grass, cover crops, or native vegetation.
(d) Waste. Excess and unsuitable roadway excavation and subexcavation that cannot be used.
Material
204.03 Conform to the following Subsections:
Backfill material
704.03
Select borrow
704.07
Select topping
704.08
Topping
704.05
Unclassified borrow
704.06
Water
725.01
Construction Requirements
204.04 Preparation for Roadway Excavation and Embankment Construction. Clear the area of vegetation and obstructions according to Sections 201 and 203.
204.05 Reserved.
204.06 Roadway Excavation. Excavate as follows:
(a) General. Do not disturb material and vegetation outside the construction limits.
Incorporate only suitable material into embankments. Replace any shortage of suitable material caused by premature disposal of roadway excavation
At the end of each day's operations, shape to drain and compact the work area to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
Retrieve material deposited outside of the clearing limits as directed by the CO.
(b) Rock cuts. Blast rock according to Section 205. Excavate rock cuts to 6 inches below subgrade within the roadbed limits. Backfill to subgrade with topping or with other suitable material. Compact the material according to Subsection 204.11 When blasting rock, use blasting methods according to Subsection 205.08.
(c) Earth cuts. Scarify earth cuts to 6 inches below subgrade within the roadbed limits. Compact the scarified material according to Subsection 204.11.
(d) Pioneer Roads. Road pioneering, slash disposal, and grubbing of stumps may proceed concurrently with excavation. Conduct excavation and placement operations so material to be treated under Section 201 will not be incorporated into the roadway unless specified in the slash treatment method. Maintain drainage during pioneering operations.
Remove snow and ice in advance of the work and deposit beyond the roadway limits in a manner that will not waste material or generate sediment. Do not incorporate snow and ice into embankments. Place snow or ice in a manner to prevent resource damage.
(e ) Drainage Excavation. Drainage excavation includes construction of all ditches, minor channel changes, drainage dips, catchbasins, surface water deflectors, and other minor drainage structures. Compact by Method (f) unless otherwise shown on the plans. Excavate on a uniform grade between control points.
204.07 Subexcavation. Excavate material to the limits as designated. Take cross-sections according to Section 152. Prevent unsuitable material from becoming mixed with the backfill. Dispose of unsuitable material according to Subsection 204.14. Backfill the subexcavation with topping, or other suitable material. Compact the material according to Subsection 204.11.
204.08 Borrow Excavation. Use all suitable roadway excavation in embankment construction. Do not use borrow excavation when it results in excess roadway excavation. Deduct excess borrow excavation from the appropriate borrow excavation quantity.
Obtain borrow source acceptance according to Subsection 105.02. Develop and restore borrow sources according to Subsection 105.03. Do not excavate beyond the established limits. When applicable, shape the borrow source to permit accurate measurements when excavation is complete.
204.09 Preparing Foundation for Embankment Construction. Prepare foundation for embankment construction as follows:
(a) Embankment less than 4 feet high over natural ground. Unless otherwise designated by the CO, remove topsoil. Break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
(b) Embankments over an existing asphalt, concrete, or gravel road surface. Scarify gravel roads to a minimum depth of 6 inches. Scarify or pulverize asphalt and concrete roads to 6 inches below the pavement. Reduce all particles to a maximum size of 6 inches and produce a uniform material. Compact the surface according to Subsection 204.11.
(c) Embankment across ground not capable of supporting equipment. Dump successive loads of embankment material in a uniformly distributed layer to construct the lower portion of the embankment. Limit the layer thickness to the minimum depth necessary to support the equipment.
(d) Embankment on an existing slope steeper than 1V:3H. Cut horizontal benches in the existing slope to a sufficient width to accommodate placement and compaction operations and equipment. Bench the slope as the embankment is placed and compacted in layers. Begin each bench at the intersection of the original ground and the vertical cut of the previous bench.
204.10 Embankment Construction. Incorporate only suitable roadway excavation material into the embankment. When the supply of suitable roadway excavation is exhausted, furnish unclassified borrow to complete the embankment. Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline. Construct embankments as follows:
(a) General. At the end of each day's operations, shape to drain and compact the embankment surface to a uniform cross-section. Eliminate all ruts and low spots that could hold water.
During all stages of construction, route and distribute hauling and leveling equipment over the width and length of each layer of material.
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
Where placing embankment on one side of abutments, wing walls, piers, or culvert headwalls, compact the material using methods that prevent excessive pressure against the structure.
Where placing embankment material on both sides of a concrete wall or box structure, conduct operations so compacted embankment material is at the same elevation on both sides of the structure.
Where structural pilings are placed in embankment locations, limit the maximum particle size to 4 inches.
(b) Embankment within the roadway prism. Place embankment material in horizontal layers not exceeding 12 inches in compacted thickness. Incorporate oversize boulders or rock fragments into the 12-inch layers by reducing them in size or placing them individually as required by (c) below. Compact each layer according to Subsection 204.11 before placing the next layer.
Material composed predominately of boulders or rock fragments too large for 12‑inch layers may be placed in layers up to 24 inches thick. Incorporate oversize boulders or rock fragments into the 24-inch layer by reducing them in size or placing them individually according to (c) below. Place sufficient earth and smaller rocks to fill the voids. Compact each layer according to Subsection 204.11 before placing the next layer.
(c) Individual rock fragments and boulders. Place individual rock fragments and boulders greater than 24 inches in diameter as follows:
(1) Reduce rock to less than 48 inches in the largest dimension.
(2) Distribute rock within the embankment to prevent nesting.
(3) Place layers of embankment material around each rock to a depth not greater than that permitted by (b) above. Fill all the voids between rocks.
(4) Compact each layer according to Subsection 204.11 before placing the next layer.
(d) Embankment outside of roadway prism. Where placing embankment outside the staked roadway prism, place material in horizontal layers not exceeding 24 inches in compacted thickness. Compact each layer according to Subsection 204.11.
204.11 Compaction. Compact the embankment using one of the following methods as specified:
(a) Compaction A. Use AASHTO T 27 to determine the amount of material retained on a Number 4 sieve. If there is more than 80 percent retained on the No. 4 sieve use procedure (1). If there is 50 to 80 percent retained on the No. 4 sieve use procedure (2). If there is less than 50 percent retained on the No. 4 sieve use procedure (3).
(1) Adjust the moisture content to a level suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width with one of the following and until there is no visible evidence of further consolidation.
(a) Four roller passes of a vibratory roller having a minimum dynamic force of 40,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
(b) Eight roller passes of a 20-ton compression-type roller.
(c) Eight roller passes of a vibratory roller having a minimum dynamic force of 30,000 pounds impact per vibration and a minimum frequency of 1000 vibrations per minute.
Increase the compactive effort for layers deeper than 12 inches as follows:
( For each additional 6 inches or fraction thereof, increase the number of roller passes in (a) above by four passes.
( For each additional 6 inches or fraction thereof, increase the number of roller passes in (b) and (c) above, by eight passes.
(2) Use AASHTO T 99 to determine the optimum moisture content of the portion of the material passing a No. 4 sieve. Multiply this number by the percentage of material passing a No. 4 sieve, and add 2 percent to determine the optimum moisture content of the material. Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A-6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type rollers at speeds less than 6 feet per second and vibratory rollers at speeds less than 3 feet per second. Compact each layer of material full width according to (1) above.
(3) Classify the material according to AASHTO M 145. For material classified A-1 or A-2-4, determine the maximum density according to AASHTO T 180, method D. For other material classifications, determine the optimum moisture content and maximum density according to AASHTO T 99, method C.
Adjust the moisture content of material classified A-1 through A-5 to a moisture content suitable for compaction. Adjust the moisture content of material classified A‑6 and A-7 to within 2 percent of the optimum moisture content.
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures. When required, use AASHTO T 224 to correct for coarse particles.
(b) Compaction B. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until there is no visible evidence of further consolidation or, if when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
(c) Compaction C. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(d) Compaction D. Hauling and Spreading Equipment. Adjust the moisture content to a level suitable for compaction. Compact the material by operating equipment over the full width of the roadway.
(e) Compaction E. Roller Compaction. Adjust the moisture content to a level suitable for compaction. Operate Rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
(4) Sheepsfoot, tamping, or grid rollers capable of exerting a force of 250 lbs/inch of width of roller drum.
(f) Compaction F. Mechanical Tamper. Adjust the moisture content of the backfill material to a moisture content suitable for compaction. Compact each 6 inch layer with a minimum of three complete passes with a mechanical tamper.
204.12 Ditches. Slope, grade, and shape ditches. Remove all projecting roots, stumps, rock, or similar matter. Maintain all ditches in an open condition and free from leaves, sticks, and other debris.
Form furrow ditches by plowing or using other acceptable methods to produce a continuous furrow. Place all excavated material on the downhill side so the bottom of the ditch is approximately 18 inches below the crest of the loose material. Clean the ditch using a hand shovel, ditcher, or other suitable method. Shape to provide drainage without overflow.
204.13 Sloping, Shaping, and Finishing. Complete slopes, ditches, culverts, riprap, and other underground minor structures before placing aggregate courses. Slope, shape, and finish as follows:
(a) Sloping. Leave all earth slopes with uniform roughened surfaces, except as described in (b) below, with no noticeable break as viewed from the road. Except in solid rock, round tops and bottoms of all slopes including the slopes of drainage ditches. Round material overlaying solid rock to the extent practical. Scale all rock slopes. Slope rounding is not required on tolerance class D though M roads.
If a slide or slipout occurs on a cut or embankment slope, remove or replace the material, and repair or restore all damage to the work. Bench or key the slope to stabilize the slide. Reshape the cut or embankment slope to an acceptable condition.
(b) Stepped slopes. Where required by the contract, construct steps on slopes of 1⅓V:1H to 1V:2H. Construct the steps approximately 18 inches high. Blend the steps into natural ground at the end of the cut. If the slope contains nonrippable rock outcrops, blend steps into the rock. Remove loose material found in transitional area. Except for removing large rocks that may fall, scaling stepped slopes is not required.
(c) Shaping. Shape the subgrade to a smooth surface and to the cross-section required. Shape slopes to gradually transition into slope adjustments without noticeable breaks. At the ends of cuts and at intersections of cuts and embankments, adjust slopes in the horizontal and vertical planes to blend into each other or into the natural ground.
(d) Finishing. Finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.Ensure that the subgrade is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed.
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than…