DBWageDeterm_ID12_dvb.htm
HTM file 18 KB Posted
- Solicitation number
- AG-0281-S-09-0030
About this file
Wage Determination Rates - ID080012
Text of this file
General Decision Number: ID080012 03/13/2009 ID12
Superseded General Decision Number: ID20070017
State: Idaho
Construction Type: Heavy
Counties: Adams, Bear Lake, Benewah, Bingham, Blaine, Boise, Bonner, Bonneville, Boundary, Butte, Camas, Caribou, Cassia, Clark, Clearwater, Custer, Elmore, Franklin, Fremont, Gem, Gooding, Idaho, Jefferson, Jerome, Kootenai, Latah, Lemhi, Lewis, Lincoln, Madison, Minidoka, Nez Perce, Oneida, Owyhee, Payette, Power, Shoshone, Teton, Twin Falls, Valley and Washington Counties in Idaho.
HEAVY CONSTRUCTION PROJECTS
Superseeds General Decision ID020030001
Modification Number Publication Date 0 02/08/2008 1 06/06/2008 2 06/13/2008 3 06/27/2008 4 08/08/2008 5 09/19/2008 6 12/05/2008 7 02/20/2009 8 03/06/2009 9 03/13/2009
CARP0001-010 06/01/2007
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
COUNTIES
Rates Fringes
CARPENTER (Including Cement Form Work).......................$ 25.01 9.30
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
PASCO (2819 W. SYLVESTER) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee.
WENATCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
MOSCOW (302 N. JACKSON) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
CARP0808-004 01/01/2009
ADAMS, BEAR LAKE, BINGHAM, BOISE, BUTTE, BONNEVILLE, CAMAS,
CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,
GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,
LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,
POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES
ZONE 1
CARPENTER (Including Cement Form Work).......................$ 25.27 9.10
If a project is located in more than one zone the lower zone rate shall apply
Zone Differential (Add to Zone 1 rates):
Zone 2 - $1.50
Zone 1: That area within the state of Idaho located within 30 miles on either side of 1-84 from the Oregon-Idaho state line on the west to the intersection of 1-84 and 1-86 in Cassia County, then following I-86 to Pocatello, then following 1-15 norht to Idaho falls, then following U.S.
Highway 20 10 miles south from the City of Pocatello to a point 10 miles south of the southern boundary of Bannock County extending to the West.
Zone 2: The remaining area of theat portion of the state of Idaho south of Parallel 46 (the Washington-Oregon line extended eastward to Montana) that is not included in Zone 1 described above.
ELEC0073-007 01/01/2009
IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY
Rates Fringes
CABLE SPLICER....................$ 28.22 3%+12.48
ELECTRICIAN......................$ 27.82 3%+12.48
ELEC0073-008 01/01/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
Cable Splicer....................$ 28.22 3%+12.48
ELECTRICIAN......................$ 27.82 3%+12.48
* ELEC0291-007 01/01/2009
ADAMS, BOISE, ELMORE, GEM, PAYETTE, VALLEY AND WASHINGTON
CABLE SPLICER
Adams, Valley and Washington Counties.........$ 35.79 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 32.50 3%+$10.00
ELECTRICIAN
Adams, Valley and Washington Counties.........$ 32.54 3%+$10.00 Boise, Elmore, Gem and Payette Counties............$ 29.54 3%+$10.00
ELEC0449-001 06/01/2008
BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER,
FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA, POWER AND
TETON COUNTIES
ELECTRICIAN......................$ 26.80 5%+$9.50
ELEC0449-006 12/01/2008
BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND
TWIN FALLS COUNTIES
ELECTRICIAN......................$ 23.00 5% + $8.25
ENGI0370-013 01/01/2009
ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,
CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN, FREMONT, GEM,
GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME,
LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA, OWYHEE, PAYETTE,
POWER, TETON, TWIN FALLS, VALLEY AND WASHINGTON COUNTIES
(Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)
Power equipment operator -bulldozer Including all attachments...$ 24.94 8.95 Power equipment operator -crane Over 50 tons................$ 25.31 8.95 Tower Crane Operator........$ 25.31 8.95 Up to and including 50 tons.$ 24.94 8.95 Power equipment operator -oiler............................$ 23.92 8.95 Power equipment operator -scraper
ALL SCRAPERS UP TO AND
INCLUDING 40 YARDS..........$ 24.94 8.95
All scrapers, pulling wagons, belly dumps and attachments, over 40 yards to and including 60 yards...$ 25.31 8.95 Elclid and similar, pulling wagons, belly dumps and attachments, over 60 yards to and including 80 yards..........$ 25.54 8.95 Euclid and similar, pulling wagons, belly dumps and attachments, over 80 yards to and including 100 yards.........$ 25.77 8.95 Euclids and similar, pulling wagons, belly dumps and attachments, over 100 yards..............$ 26.02 8.95
If a project is located in more than one zone the lower zone rate shall apply
Zone Differential (Add to Zone 1 rate): Zone 2 - $1.50
Zone 1: That area within the State of Idaho located within 30 miles on either side of I-84 from the Oregon-Idaho State Line on the West to the Intersection of I-84 and I-86 in Cassia County, then following I-86 to Pocatello, then following I-15 to Idaho Falls, then following State Highway #20 - 10 miles north to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock County extended to the West.
Zone 2: The remaining area of that portion of the State of Idaho south of Parallel 46 (the Washington-Oregon State Line extended eastward to Montana) that is not included in Zone 1 as described
BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale
NOTE: When the crane operator receives additional pay for long boom, the Oiler Shall also receive such additional pay. In computing the length of the boom on Tower Cranes, they shall be measured from the base of the tower to the point of the boom.
ENGI0370-014 06/01/2008
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
ZONE 1: (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)
Power equipment operator -bulldozer (D-6 & equilvalent and over).......................$ 25.29 9.80 (To D-6 or equivalent)......$ 24.69 9.80 Power equipment operator -crane
25 TONS AND UNDER (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE)........$ 25.01 9.80
85 TONS AND OVER, AND ALL
CLIMBING, OVERHEAD, RAIL
AND TOWER...................$ 26.66 9.80
OVER 25 TONS UP TO AND
INCLUDING 45 TONS (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE)........$ 25.29 9.80
OVER 45 TONS TO BUT NOT
INCLUDING 85 TONS (ALL
ATTACHMENTS INCLUDING
CLAMSHELL, DRAGLINE)........$ 25.56 9.80
Power equipment operator -oiler............................$ 24.85 9.80 Power equipment operator -scraper (All, Rubber-Tired).........$ 25.29 9.80 (Multiple engine with three or scrapers)..........$ 25.56 9.80
Zone Differential (Add to Zone 1 rate): Zone 2- $2.00
BASE POINTS: Spokane, Pasco, Washington; Lewiston, Idaho
Zone 1: Within 45 radius miles from the main post office Zone 2: Outside 45 radius miles from the main post office
BOOM PAY: (All Cranes, including Tower) 180' to 250' $.50 over scale Over 250' $.80 over scale
NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
IRON0014-009 07/01/2008
ADAMS (REMAINDER OF COUNTY), IDAHO (SOUTH OF THE 46TH
PARALLEL), LEMHI (NORTHWEST CORNER), VALLEY (NORTHEASTERN 1/3)
AND WASHINGTIN (NORTHWESTERN 1/2) COUNTIES
Ironworkers: Rebar, Structural, Fence Erector........$ 29.52 17.87
IRON0014-010 07/01/2008
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
Structural, Fence Erector........$ 29.52 17.87
IRON0732-005 06/01/2008
ADAMS (EAST CORNER), BEAR LAKE, BINGHAM, BLAINE, BOISE, BUTTE,
BONNEVILLE, CAMAS, CARIBOU, CASSIA, CLARK, CLUSTER, ELMORE,
FRANKLIN, FREMONT, GEM, GOODING, JEFFERSON, JEROME, LINCOLM,
LEMHI (REMAINDER OF COUNTY), MADISON, MINIDOKA, ONEIDA, OWYHEE,
PAYETTE, POWER, TETON, TWIN FALLS, VALLEY (SOUTHEAST 2/3), AND
WASHINGTON (SOUTHEAST 1/2) COUNTIES
Structural, Fence Erector........$ 23.69 12.65
LABO0155-003 01/01/2009
ADAMS, BEAR LAKE, BINGHAM, BLAINE, BOISE, BONNEVILLE, BUTTE,
CAMAS, CARIBOU, CASSIA, CLARK, CUSTER, ELMORE, FRANKLIN,
FREMONT, GEM, GOODING, IDAHO (SOUTH OF THE 46TH PARALLEL),
JEFFERSON, JEROME, LEMHI, LINCOLN, MADISON, MINIDOKA, ONEIDA,
OWYHEE, PAYETTE, POWER, TETON, TWIN FALLS, VALLEY AND
WASHINGTON COUNTIES
ZONE 1 (Anyone working on HAZMAT jobs working with supplied air shall receive $1.00 per hour above classification)
Laborer: General/Cleanup.........$ 22.13 10.15
If a project is located in more than one zone the lower zone rate shall apply
Zone Differential (Add to Zone 1 rate): Zone 2 - $1.50
Zone 1: That area within the State of Idaho located within 30 miles on either side of I-84 from the Oregon-Idaho State Line on the West to the Intersection of I-84 and I-86 in Cassia County, then following I-86 to Pocatello, then following I-15 to Idaho Falls, then following State Highway #20 - 10 miles north to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock County extended to the West.
Zone 2: The remaining area of that portion of the State of Idaho south of Parallel 46 (the Washington-Oregon State Line extended eastward to Montana) that is not included in Zone 1 as described above.
LABO0238-013 06/01/2008
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH
PARALLEL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
Laborer: General/Cleanup.........$ 22.66 7.70
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
SUID2003-007 09/03/2003
Rates Fringes
Cement Mason/Finisher............$ 20.22 7.98
LABORER: Tamper.................$ 8.00 2.84
Pipe layer.......................$ 14.26 0.00
Power equipment operator -backhoe..........................$ 18.96 4.42
Power Equipment Operator (Gradall)........................$ 22.84 3.62
Power Equipment Operator (Loader).........................$ 21.33 3.43
Power Equipment Operator Excavator...................$ 20.24 0.00
TRUCK DRIVER (6 Axle Dump).......$ 24.70 3.90
Truck Driver, Dump...............$ 17.82 0.00
TRUCK DRIVER: Water Truck.......$ 20.89 4.06
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Other files
| File | Type | Posted |
|---|---|---|
| Amend1_Sheets 7 thru 9.pdf | ||
| Beehive_RFP.doc | DOC document | |
| Beehive Trail Bridge.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .