(x)
AG-0261-S-15-0084
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN-TANYA SPANFELLNER
SW IDAHO-NEVADA ACQUISITION CENTER
06/15/2015000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/15/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Holbrook Warehouse asbestos abatement and facility demolition
Purpose of the Amendment is to
1. Attached is the Sign in sheet from pre-bid meeting
2. Attached is pre bid questions and answers.
3. Attached as a separate document the Asbestos Demo Survey
4. Allow for the bid to remain valid for up to 60 days after closing/due date of bid.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TANYA SPANFELLNER
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-0261-S-15-0084/000002
001 Holbrook Warehouse asbestos abatement and facility demolition Place Pricing on attached Schedule of Items Holbrook Warehouse asbestos abatement and facility demolition Place Pricing on attached Schedule of Items Requisition No: 740490
Delivery: 45 Days After Notice to Proceed FOB: Destination
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No.:AG-0261-S-15-0084/Amendment #2
HOLBROOK WAREHOUSE ASBESTOS ABATEMENT AND DEMO
AG-0261-S-15-0084
PRE-BID QUESTIONS
Q: What happens to the power line that is strung between the building and the powerline?
A: Powerline strung from closest power pole to the building may be coiled up and attached to power pole.
Q: Is there an Asbestos Demo Survey?
A: Yes. Will send the Asbestos Demo Survey as an addendum
Q: Will the road improvements need to be returned to existing conditions?
A: Yes, as it is stated in the contract, all road improvements need to be returned to existing conditions
Q: What is the bid price?
A: No Price Range will be given; this is a service contract not a construction.
Q: Will the Forest Service provide 3rd Party Inspector?
A: 3rd Party Inspector is the contractor’s responsibility
Q: Is the Bid due date is June 30th?
A: Yes
Q: Does the well in the shed building need to be decommissioned?
A: There appears to be a domestic well head inside the shed building located on the property. The contract will continue as is and the shed building will be demolished but the well head will stay.
• We need to make it clear to the contractors that this project could be awarded but the Forest
Service can sit on it a couple months.
Solicitation No.:AG-0261-S-15-0084/Amendment #2