ag0261s150084.pdf
PDF 1 MB Posted
- Solicitation number
- AG-0261-S-15-0084
About this file
Solicitation Package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment_2.pdf | ||
| Asbestos_Demo_Survey.pdf | ||
| amendment_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN-TANYA SPANFELLNER
SW IDAHO-NEVADA ACQUISITION CENTER
93BR CODE 16. ADMINISTERED BYCODE
X
X
X
238910
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR0261
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
06/30/2015 1630 MT
06/16/2015
208-373-4130TANYA SPANFELLNER
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
AG-0261-S-15-0084
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 51740490OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
SPARKS NV 89431
1200 FRANSLIN WAY
HUMBOLT-TOIYABE NATIONAL FOREST
USDA FOREST SERVICE
15. DELIVER TO
BOISE ID 83709-1663
1249 S VINNELL WAY STE 200
ATTN-TANYA SPANFELLNER
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$15.0
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
SW IDAHO-NEVADA ACQUISITION CENTER
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
Holbrook Warehouse asbestos abatement and facility demolition Delivery: 45 Days After Notice to Proceed
001 Holbrook Warehouse asbestos abatement and facility demolition Place Pricing on attached Schedule of Items
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
TANYA SPANFELLNER
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
512 of
USDA Forest Service
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY PRICE TOTAL
1 Mobilization LSQ LS 1
2 Asbestos Demolition LSQ LS 1
3 Building Demolition and Disposal LSQ LS 1
4 Material Recycling Credit AQ LS 1
5 Access Road Improvement LSQ LS 1
6 Perimeter Fence and Culvert Removal LSQ LS 1
7 Material Recycling Credit AQ LS 1
8 Site Recontouring LSQ LS 1
OPTION 1
OPTION 2
OPTION 3
TOTAL
SCHEDULE OF ITEMS
ASBESTOS ABATEMENT, BUILDING DEMOLITION AND DISPOSAL OF HOLBROOK WAREHOUSE
2015 - SO Engineering
BASE BID
Solicitation No.: AG-0261-S-15-0084
Contract Terms and Conditions
CLAUSES INCORPORATED BY REFERENCE
52.212-4 Contract Terms and Conditions - Commercial Items (MAY 2015)
ADDENDUM TO FAR CLAUSE 52.212-4, CONTRACT TERMS AND CONDITIONS- COMMERCIAL
ITEMS (INCORPORATED BY REFERENCE ON STANDARD FORM 1449)
The Following are added to the terms and conditions in FAR 52-212-4
52.204-13 System for Award Management Maintenance. (JUL 2013) 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
CLAUSES INCORPORATED BY FULL TEXT
AGAR 452.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants (FEB 2012) Alternate I (FEB 2012)
(a) This award is subject to the provisions contained in sections 433 and 434 of the Consolidated Appropriations
Act, 2012 (P.L. No. 112-74), Division E, as amended and/or subsequently enacted, regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434, amended and/or subsequently enacted
(End of Clause) (End of Addendum)
52.212-5 -- Contract Terms and Conditions Required to Implement Statutes or Executive Orders -- Commercial Items. (May 2015)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Dec 2014)
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub L. 111-5) (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009).
_X_ (4) 52.204-10, Reporting Executive compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).
_X_ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Aug 2013) (31 U.S.C. 6101 note).
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).
___ (10) [Reserved]
___ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).
___ (ii) Alternate I (Nov 2011) of 52.219-3.
___ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).
___ (ii) Alternate I (Jan 2011) of 52.219-4.
___ (13) [Reserved]
X_ (14) (i) 52.219-6, Notice of Total Small Business Aside (Nov 2011) (15 U.S.C. 644).
___ (ii) Alternate I (Nov 2011).
___ (iii) Alternate II (Nov 2011).
___ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
___ (ii) Alternate I (Oct 1995) of 52.219-7.
___ (iii) Alternate II (Mar 2004) of 52.219-7.
___ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).
___ (17) (i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637 (d)(4)).
___ (ii) Alternate I (Oct 2001) of 52.219-9.
___ (iii) Alternate II (Oct 2001) of 52.219-9.
___ (iv) Alternate III (Oct 2014) of 52.219-9.
___ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011) (15 U.S.C. 644(r)).
___ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).
___ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
___ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657f).
X_ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C.
632(a)(2)).
___ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (Jul 2013) (15 U.S.C. 637(m)).
___ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (Jul 2013) (15 U.S.C. 637(m)).
X_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
___ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).
X_ (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X_ (28) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
__ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).
X_ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
__ (31) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).
___ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
X_ (33) (i) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O.
13627).
___ (ii) Alternate I (Mar 2015) of 52.222-50, (22 U.S.C. chapter 78 and E.O. 13627).
__ (34) 52.222-54, Employment Eligibility Verification (Aug 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
___ (35) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
___ (36) (i) 52.223-13, Acquisition of EPEAT® -Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514
___ (ii) Alternate I (Jun 2014) of 52.223-13.
___ (37) (i) 52.223-14, Acquisition of EPEAT® -Registered Television (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-14.
___ (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
___ (39) (i) 52.223-16, Acquisition of EPEAT® -Registered Personal Computer Products (Jun 2014) (E.O.s 13423 and 13514).
___ (ii) Alternate I (Jun 2014) of 52.223-16.
X_ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging while Driving (Aug 2011) (E.O. 13513).
___ (41) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
___ (42) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C.
chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
___ (ii) Alternate I (May 2014) of 52.225-3.
___ (iii) Alternate II (May 2014) of 52.225-3.
___ (iv) Alternate III (May 2014) of 52.225-3.
__ (43) 52.225-5, Trade Agreements (Nov 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X_ (44) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
___ (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
___ (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
___ (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
___ (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505), 10 U.S.C. 2307(f)).
___ (49) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C.
2307(f)).
X_ (50) 52.232-33, Payment by Electronic Funds Transfer— System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (51) 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management (Jul 2013) (31 U.S.C. 3332).
___ (52) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).
___ (53) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
___ (54) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
___ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:
[Contracting Officer check as appropriate.]
___ (1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495)
X___ (2) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67.).
X___ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage -- Fringe Benefits Laborer, WG-02 $14.85
(End of Clause)
___ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (Multiple Year and Option Contracts) (May 2014) (29 U.S.C.206 and 41 U.S.C. chapter 67).
___ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
___ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67).
___ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67).
X_ (8) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).
___ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C.
1792).
___ (10) 52.237-11, Accepting and Dispensing of $1 Coin (Sep 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)
(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (Apr 2015) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) X___ (A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
___ (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Aug 2013).
(xv) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2014) (E.O. 13658).
(xvi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008;
10 U.S.C. 2302 Note).
(xvii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xviii) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of Clause)
Asbestos Abatement, Building Demolition and Disposal of Holbrook Warehouse, Bridgeport Ranger District, Humboldt-Toiyabe National Forest, NV
SCOPE OF WORK
Project Background and Objective: The intent of this contract is to complete asbestos abatement, demolition and disposal of the Holbrook Warehouse and shed building. The warehouse with bays encompasses nearly 1,250 ft2 and the shed is 40 ft2. The warehouse is of metal frame, shed is of wood frame and both include asbestos panel walls and roof, and are on concrete foundations or pads. All concrete pads and foundations should be broken apart and disposed of at a concrete recycling center.
There are no utilities onsite. The power meter and service lines have been disconnected from the buildings. The perimeter chain link fence will be removed as well. There is a power pole located within the perimeter fencing that shall remain.
Both buildings have friable asbestos containing materials (ACM) (surfacing), non-friable (joint compound) and potentially friable asbestos ACMs (roof and wall panels) that should be segregated (removed, bagged and tagged) from the larger waste stream prior to the structure demolition. The Warehouse also has non friable ACMs (floor tile and mastic) in the west side of the building.
Location and Access: The USDA Forest Service Holbrook Warehouse is located 0.5 mile north of Holbrook Junction, Topaz, NV, between addresses 1380 and 1386 South Highway 395 Gardnerville, NV. The site is approximately 35 miles south of Carson City, NV where the nearest landfill (Douglas Disposal) for construction wastes is located. The legal description for this site is SWSW 1 16� section
7, T10N R22E, MDM.
The following table depicts the real property included in this solicitation:
Structure Use Size Special Considerations
Warehouse Truck bays, storage, office 1150 ft2 Asbestos floor tiles 210 ft2; floor tile mastic, wall surfacing and joint compound, roof and wall panels;
concrete foundation and metal frame
Shed Storage 40 ft2 Asbestos wall surfacing and joint compound, roof and wall panels;
concrete foundation and wood frame
The buildings contain some left over office furniture and scrap material that shall be disposed of with the construction wastes. Access to Holbrook Site is through private land, permission from the Forest Service is needed prior to any site visit or commencing of contract.
Contract is to begin on or after July 26, 2015. Contract is to be completed by: Base bid 45 calendar days, each option is an addition 3 working days.
Pre-Bid site visit: A pre-bid walkthrough of the site and Q&A session has been scheduled for June 24th, 2015 at 10:30 am, meet at Holbrook Warehousd contact Sierra Brewer 775-352-1265 or sierrabrewer@fs.fed.us with any questions. High clearance vehicle is recommended.
GENERAL
Scope: Work shall consist of furnishing all labor, material, equipment and supervision to perform asbestos removal and disposal in accordance with these specifications, EPA (AHERA, Asbestos NESHAPS), OSHA, NIOSH, State and County Jurisdictions and other applicable federal, state, or local regulations.
Description of Work:
Mobilization
1. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
Asbestos Demolition
1. Abatement and disposal of all asbestos components according to all Federal and state requirements. The contractor should address all Federal, State and County regulations. All OSHA-related worker safety protocols should be followed during asbestos abatement and demolition activities. The contractor will generate EPA NESHAPS documentation if required.
Bill of lading or other manifest documentation shall be developed, as needed.
2. Asbestos products should be bagged and tagged and taken to the nearest licensed disposal facility.
3. Waste streams should be segregated to take advantage of various disposal options, including recycling those materials that can be. All HAZMAT waste should be disposed of consistent with applicable laws and regulations.
Building Demolition and Disposal
1. Buildings and foundations should be demolished. Waste streams should be segregated to take advantage of various disposal options, including recycling those materials that can be. All HAZMAT waste should be disposed of consistent with applicable laws and regulations (e.g.
fluorescent tubes, mercury switches, etc.). All construction waste other than recyclable and ACM shall be delivered to a nearby legal landfill.
Material Recycling Credit
1. All known material that can be recycled including but not limited to metal building frame, chain link fence, culvert, etc., shall be recycled. Provide legible copies of weigh tickets, receipts, or invoices that specifically identify the material, quantity, project generating the material and revenue. Said documentation must be from recyclers and/or disposal site operators that can legally accept the materials for the purpose of recycling. Revenue generated by recycling is to be deducted from price of Contract.
Access Road Improvement
1. Prior to asbestos abatement and building demolition and disposal, minor road repairs are needed to provide access for equipment other than high clearance vehicles. These improvements will need to be returned to existing conditions at completion of project.
Perimeter Chain link Fencing and Culvert Removal
1. 2- 18” culverts, 30’ long and 50’ long to be removed and disposed of.
2. 650’ ft of perimeter chain link fencing, including 2 gates to be removed and disposed of.
Site Recontouring
1. The site should be re-graded to match existing contour (with minimal disturbance of established vegetation) after all demolition and hauling activities are completed.
Application Regulations and Publications: The regulations listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only. The latest version of applicable regulations shall take precedence over the requirements of this specification when the regulation results in a higher standard of performance. This includes obtaining third party oversight.
1. Code of Federal Regulations (CFR) Publications:
a. 29 CFR 1910.20 Access to Employee Exposure and Medical Records
b. 29 CFR 1920.134 Respiratory Protection
c. 29 CFR 1910.145 Specifications for Accident Prevention Signs and Tags
d. 29 CFR 1926.1101 Asbestos’ Tremolite, Anthophylite, and Actinolite
e. 40 CFR 61, Subpart A General Provisions
f. 40 CFR 61, Subpart M National Emission Standard for Hazardous Air Pollutants
(NESHAP)
g. 40 CFR 241 Guidelines for the Land Disposal of Solid Wastes
h. 40 CFR 257 Criteria for Classification of Solid Waste Disposal Facilities
i. 40 CFR 763 Appendix C to Subpart E Asbestos Model Accreditation Plan
j. 49 CFR 171 and 172 Department of Transportation (DOT) General Information
k. 49 CFR 171 and 172 Hazardous Material Transportation
2. American National Standards Institute (ANSI) Publications:
a. Z9.2-79 Fundamentals Governing the Design and Operation of Local Exhaust Systems
b. Z88.2-80 Practices for Respiratory Protection
3. National Institute of Occupational Safety and Health (NIOSH) Publications:
a. Manual of Analytical Methods, 2nd Ed., Vol. 1, Physical and Chemical Analysis Method (P&CAM):
b. Method 239 Asbestos Fibers in Air
c. Method 7400 Fibers (NI, 3rd Ed., Vol. 1)
4. Underwriters Laboratories, Inc. (UL) Publication:
a. 586-77 (R 1982) Test Performance of High Efficiency Particulate, Air Filter Units
Definitions: Refer to Federal and State Regulations for definitions of terms used in this document.
Protection of Government Property: All abatement work shall be performed without damage to or contamination of adjacent areas, equipment or materials. Should existing equipment or materials become damaged or contaminated by work done under this contract, the contractor shall restore all areas to original condition at no additional cost to the government.
Licenses, Permits, and Notifications:
1. The contractor is responsible for obtaining all necessary permits in conjunction with asbestos removal, hauling, and disposal. Provide timely notification of such actions as may be required by federal, state, regional, and/or local authorities. Notification requirements shall be 10 days prior to the commencement of work in accordance with applicable IDEQ and EPA regulations. Submit a copy of this notification to the Contracting Officers Representative
(COR).
2. Notify the COR at least 48 hours prior beginning work. Failure to obtain proper permits, or failure to make proper notification, or beginning work without first coordinating with the COR in advance, will be sufficient grounds for termination of this contract.
3. EPA AHERA certification is required for all individuals engaged in any aspect of asbestos abatement or design. This certification shall be current.
Safety and Health Compliance: In addition to detailed requirements of this specification, comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with the applicable requirements of the current issue of 29 CFR 1926.1101 and 40 CFR 61, Subparts A and M. Where specification requirements and performance documents vary, the most stringent requirement shall apply.
Submittals: Submittals shall be provided to the COR for approval 10 working days prior to commencing work involving asbestos materials.
1. Schedule: The contractor shall develop a draft project schedule, which will include all of the tasks described in this scope of work. The project schedule will depict for each task: the starting date, ending date, and major milestones for successfully accomplishing the requirements set forth in this scope of work.
2. Asbestos Work and Health and Safety Plan: This plan shall addresses the principal tasks involved in completing the work. This combination plan should be specific to the work outlined in this solicitation and commensurate with the complexity of site specific demolition.
Submit a detailed, project design plan of the work procedures to be used in the removal and abatement of materials containing asbestos. The plan shall be prepared and signed by the certified Project Designer. Such plan shall include a sketch showing the location, size, and details of asbestos control areas, location, layout, and details of the decontamination area, and locations of local exhaust equipment. The plan shall indicate all temporary utilities and include interface of trades involved in the construction, sequencing of asbestos-related work, disposal plan, type of wetting agent to be used, air monitoring, respirators, protective equipment, and a detailed description of the method to be employed in order to control site access and the generation of air-borne asbestos including contingencies for containment breach, and fire. The plan must be approved by the government prior to the start of any asbestos work. Prior to beginning work, the Contractor shall meet with the COR to discuss in detail the asbestos plan, including work procedures and safety precautions.
3. Air Monitoring Plan: Submit a detailed air monitoring plan to address monitoring of the enclosed containment areast areas prior to, during, and after completion of the asbestos work.
The air monitoring section shall address the use of a qualified independent third party (such as an Industrial Hygienist) not employed by the abatement contractor to perform any required air monitoring for this contract. This qualified person shall be EPA Contractor/Supervisor or Project Monitor certified for asbestos projects. If monitoring outside the asbestos control area shows airborne concentrations have reached the action level, stop work, correct the condition(s) causing the increase, and notify the COR immediately. In areas where the construction of an enclosed asbestos control area is not required, after initial Time Weighted Averages (TWA’s) are established, and provided the same type of work is performed, provide personal and area monitoring at the designated limits of the asbestos work area at a frequency noted in the asbestos work plan. This plan must be approved by the government prior to the start of any asbestos work. Prior to beginning work, the Contractor shall meet with the COR to discuss in detail the asbestos air monitoring plan.
4. Testing Laboratory: Submit the name, address, and certification documents of the testing laboratory selected to perform all sample analysis when required by this contract. The lab shall be certified under the National Voluntary Lab Accreditation program (NVLAP) and American Industrial Hygiene Agency (AIHA) accredited.
5. Landfill: Submit evidence that the landfill selected is approved for disposal of asbestos by the EPA, State, and local regulatory agencies.
6. Submit proof of Insurance: Contractor shall submit proof of an active occurrence type liability insurance policy that covers asbestos abatement. Claims made policies are unacceptable.
7. Submit evidence of notification: Contractor shall submit documentation of the required notification to the IDEQ/EPA, as specified in paragraph “Licenses, Permits, and Notifications” above, prior to starting work.
8. Air Monitoring results: Submit documentation of fiber counts. Submit monitoring results to the COR within 24 hours of receipt, signed by Director of the testing laboratory.
9. Waste shipment records: Submit completed waste shipment records for regulated asbestos containing materials [RACM] as required by the National Emission Standards for Hazardous Air Pollutants [NESHAPS] regulations. The term “owner” shall refer to the Government.
The term “operator” shall refer to the contractor. The signature block for the operator shall be signed by an authorized agent of the contractor. At the completion of the project, submit a final report. This report shall contain, all air monitoring results, all clearance testing results, and the WSR record for disposal of the asbestos removed.
10. Prepare Final letter Report: A final letter report documenting the work effort and containing all manifest documentation should be submitted within 45 days of completing the site work.
The Contractor shall provide an electronic version of the draft final report for FS review
(Microsoft WORD, tables and figures as .pdf files). The report will include copies of all field notes and photos. Final report submittal shall include two hard copies, and one electronic copy (MS Word and .pdf format). The contractor shall prepare a letter report detailing the site work and asbestos abatement and disposal. This report will present an overview of pre-work site conditions, and an analysis of the work completed, complete with photos.
1) Introduction and Purpose
2) Site Description (location, access and conditions)
3) Work effort
4) Asbestos abatement and disposal
5) Summary
MEASUREMENT AND PAYMENT
Measurement and Payment: Payment shall be a lump sum for the removal and disposal of existing asbestos tile and flooring materials that cover the asbestos tile and will include and all equipment, material, work and incidentals required to complete the item described in this document.
1. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
2. ACTUAL QUANTITIES (AQ) – These quantities are determined from actual measurements of completed work.
Mobilization: The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PRODUCTS
Equipment: Equipment shall be provided by contractor but not limited to:
1. Warning Signs and Labels: Provide warning signs in accordance with OSHA 29 CFR
1926.1101 at all approaches to asbestos control areas. Provide all drums, bags, wrapped components, or other similar asbestos laden containers with appropriate warning labels.
2. Generator: Contractor shall provide own power if needed. During abatement of friable asbestos, the contractor may be required to provide an auxiliary generator to supply power to negative air system; no commercial power is available at the site.
3. Local Exhaust System: Local exhaust systems (for enclose work areas) must be installed and operated in accordance with ANSI Z9.2. The contractor shall notify the COR immediately of any variance in the pressure differential which could cause exposure of adjacent unsealed areas to asbestos fiber concentrations in excess of 0.01 fibers/cc.
4. Temporary Utilities: The contractor must supply water and power to the work site as necessary. There are no utilities available onsite. The contractor may be required to provide electricity with an electric generator or to transport water onto the work site for use.
EXECUTION
Work Area: Perform asbestos-related work in accordance with OSHA, EPA, and any local and State regulations, and as specified herein.
1. Asbestos Control Area Requirements: The construction of a totally enclosed asbestos control area may at times be impractical or impossible within the project limits (such as for outdoor asbestos work). When this determination is made, the contractor may submit the details of alternative control measures as part of the Asbestos Work Plan. Provide a 20-foot roped off perimeter around the area where the asbestos handling procedures are performed and maintain other requirements for asbestos control areas.
2. Control Area Requirements for Removal of Non-friable Asbestos Materials: For interior surfaces where the non-friable asbestos surface material (such as Resilient Floor Coverings, Vinyl Asbestos Tiles, or Asbestos Cement panels) can be removed intact, perform the work in accordance with applicable OSHA regulations.
3. Monitoring: Monitoring of airborne concentrations of asbestos fibers shall be in accordance with 29 CFR 1926.1101 and as specified herein using NIOSH Method 7400. The Government shall have the option to perform independent monitoring.
4. Site Inspection: While performing asbestos removal work, the Contractor shall be subject to on-site inspection by the COR who may be assisted by Government safety or environmental personnel. If the work is found to be in violation of any part of these specifications, the COR will issue a stop work order which will take effect immediately and remain in place until the violation is resolved. Standby time and expenses required to resolve the violation shall be at the Contractor’s expense.
Clearance Sampling After Final Cleanup: For enclosed containment areas, after the removal site has passed the visual inspection, the contractor shall perform an aggressive air sample of the area (at least 3 samples per removal site, with minimum volume of 3000 liters per sample). Submit the results of these samples to the COR. The contractor shall not remove the containment area until written permission is received from the COR. Before authorization to tear down the containment structure will be granted, the fiber counts from all three samples must be less than 0.01 fibers per cubic centimeter of air. If the baseline TWA, established before work began, is greater than 0.01 f/cc, then all three samples must not exceed the baseline count. Should any of the three final samplings indicate a higher value, the Contractor shall re-clean the area and shall repeat the clearance process until the fiber count is equal to or below that set by the above limits. All costs associated with re-cleaning and re-testing as a result of failure to meet clearance sampling limits or visual inspections mentioned above shall be born by the contractor.
Disposal of Asbestos: Collect asbestos waste, scrap, debris, bags, containers, equipment, and asbestos-contaminated clothing which may produce airborne concentrations of asbestos fibers, in sealed double 6 mil plastic bags labeled in accordance with 29 CFR sec. 1910.100 (j) (2) or 1926.1101 (k) (2) (iii). The name “US Forest Service” and the location of the site where the asbestos waste was generated must be clearly and permanently affixed to the container label or wrapping. Where the asbestos material is hard or otherwise has sharp edges the material shall be prepackaged in burlap, nylon or other material to prevent puncture of the plastic. Dispose of waste asbestos material in the approved landfill designated in the submittals. Before transporting off site, complete the required waste shipping record (WSR) and have it signed by the COR or designated government representative. No asbestos waste will be permitted to leave the site without a completed and signed waste shipping record. Upon arrival at the approved disposal site, the WSR is to be signed by the site personnel and a copy of the signed WSR is to be sent to the contractor within the time frame as required by 40 CFR 61.149(e). A copy of the returned WSR is to be provided to the COR. If the signed copy of the WSR is not received by the contractor within 35 days, the contractor must contact the site to determine the status of the waste shipment. If after 45 days a copy has still not been received, the contractor must notify U.S. EPA Region 10 Asbestos NESHAPS Coordinator in writing and provide the following information: (a.) A copy of the WSR for the load in question, and (b.) A cover letter signed by the contractor explaining his efforts to locate the waste shipment and the results of those efforts. Failure to comply with this or other requirements of the specification will constitute sufficient grounds for termination of this contract. For temporary storage if necessary, an area for interim storage of asbestos waste will be assigned by the COR or by an authorized representative. Procedure for hauling and disposal shall comply with 40 CFR 61, Subpart M, 49 CFR 172-177, 40 CFR 241 and 257, and state, regional, and local standards.
Fire Control
(a) Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b) Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or the Contractor’s employees, the Contractor when requested by the Contracting Officer shall place the employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.
Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and equipment adequate for the protection of the area.
An equitable adjustment in contract time may be made for this period.
(c) Fire Protection Requirements - Fire Plan. At all times during closed fire season period, as specified by State law, the Contractor shall comply with each of the following provisions to the extent applicable to the Contractor’s operation under the contract.
(1) Fire Tools. The Contractor will provide for each employee in the contract area at least one approved handtool of a type appropriate in the contract area, such as shovel, pulaski, or ax. Tools required and furnished under (2) and (4) below, shall count toward fulfillment of the above requirement. Where additional tools, beyond those required under (2) and (4) below, are to be provided, the Contractor shall seal such tools in one or more boxes painted red and marked "Tools for Fire Only." All tools required herein shall be kept sharp and in good serviceable condition and maintained at locations to be designated by the Forest Service.
(2) Fire Extinguishers and Tools on Mobile or Stationary Equipment. Each unit of powered equipment used in connection with this contract, including automobiles, trucks, tractors, etc., shall be equipped with serviceable tools and fire extinguishers as follows:
One - fire extinguisher, dry chemical type of not less than 2-1/2 pound capacity with 4 BC or higher rating.
One - shovel, round point #0 lady or equal.
One - ax, 2 pounds or over, 26-inch minimum length, or one pulaski.
One - water container (at least 1-gallon capacity), not required with stationary equipment.
(3) Spark Arresters. Each internal combustion engine shall be provided with a spark arrester or spark arresting device approved by the Forest Service. Exceptions where the Forest Service may approve mufflers, or other equipment in lieu of spark arresters qualified and rated under Forest Service Standard 5100-1a are: (a) small multiposition engines, such as chain saws, shall meet Society of Automotive Engineers J335b standards; (b) passenger-carrying vehicles and light trucks may have baffle-type mufflers with tail pipe; (c) heavy-duty trucks may have a vertical stack exhaust system and muffler, provided the exhaust stack extends above the cab of the vehicle. An exhaust-driven turbocharger is considered to be a satisfactory spark arrester. Internal combustion engine exhaust systems, arresters, and other devices must be properly installed and maintained.
(4) Powersaws. For each powersaw used in connection with this contract, the following will be provided:
One - shovel, round point #0 lady or equal. Shovel must be immediately available for use.
One - Fire extinguisher, containing not less than 8 ounces of extinguisher fluid, or a dry chemical powder-type of not less than 1-pound capacity. The extinguisher must be immediately accessible to the saw operator at all times.
Any fueling or refueling of a powersaw shall only be done in an area which has first been cleared or is free of all material capable of carrying fire; powersaw shall be moved at least 10 feet from place of fueling before starting.
(5) Blasting. Fuse or prima cord shall not be used unless authorized in writing by the COR with special precautions stated.
(6) Smoking. Smoking shall not be permitted within the contract area except on surfaced or dirt roads, at landings, within closed vehicles, in camps, or at other posted places, and shall never be allowed while working or traveling on foot.
(7) Storage of Petroleum and Other Highly Flammable Products. Gasoline, oil, grease, or other highly flammable material will be stored either in a separate building used exclusively for such storage, or at a site where all combustible debris and vegetation is cleared away within a radius of 25 feet. Fire extinguishers and/or sand barrels may be required at such locations specified by the Forest Service when unusually hazardous conditions exist.
(8) Debris Burning and Warming Fires. Burning permits will be required for all debris burning fires.
Lunch and warming fires may be allowed in fireproofed areas during periods of low fire danger if and as specified in the fire plan. Such fires must not be left burning unattended.
(9) Precautions for Stoves. Stovepipes on all temporary buildings, trailers, and tents using wood burning stoves, will be equipped with roof jacks and serviceable spark arresters of mesh with openings no larger than 5/8 inch.
All stovepipes,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .