Old_Cascade_2014_Revised_Map_Drawings.pdf
PDF 922 KB Posted
- Attached to
- Old Cascade 2014 Re-Solicitation Federal contract opportunity
- Solicitation number
- AG-0261-S-14-0109
About this file
Attachment 2 Maps and Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FSSS_FP-03_OLD_CASCADE_2014Revised_7_24_2014.pdf | ||
| Cost_Estimate0109.xlsx | XLSX spreadsheet | |
| WD_ID140086_01_03_14_Highway.pdf | ||
| S140109.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-0261-S-14-0109
Attachment 2
50285
50199
50165
50900
50165
50198
50487
50165
50183
51851
51848
50150
51680
51854
51677
51850
51682 51679
51599
51849
51678
50997
353433
20 24
32 36
16 15 1417 13±
T 17 N
R 1 E
OLD CASCADE ROAD - 2014
Revised Vicinity Map Sheet 2
Co ld Spring
Creek
Mi ll Creek
Cold Spring Summit
Shingle Flat Pit Disposal Area
Closure Point Road 50150
Pit Run Source
<== HWY 95 - 4 mi
Begin Project 282+30
End Project 348+00
STATION ITEM NO QUANTITY UNIT DESCRIPTION OF WORK REMARKS
282+30 start of project
Junction with roads 51849 and road 50150 which is also called Cutoff Saddle
282+30 - 348+00 303 (26) 1.24 mi Roadbed reconditioning
282+30 - 348+00 201 (03) 1.24 mi Brushing, moderate/light
282+30 - 296+00 204 (01a)
52 CY
see note at end of table
Average road width is 13 feet, road grade varies from
8% to 13%.
282+30 - 314+00 303 (26)
About 65 large rocks need to be removed or covered.
See note at end of table.
283+30 204 (67a) 1 ea reshape existing dip
287+50 204 (67a) 1 ea
292+80 204 (67a) 1 ea
Construct earthen dip Construct earthen dip Construct earthen dip
296+00 - 323+00 20401a) 600 CY Average road width is 11.4 feet, road grade varies from 8% to 13%.
296+35 -296+75 204 (01a) 23 CY existing width is about 12'.
297+50 204 (67a) 1 ea
298+80 204 (67a) 1 ea
299+00 - 299+40 204 (01a) 23 CY existing width is about 11'.
302+00 204 (67a) 1 ea
303+70 - 304+10 204 (01a) 23 CY see note at end of table
Construct turnout, widen to 20' with 10' tapers, see note at end of table.
Construct earthen dip
Construct earthen dip
Construct turnout, widen to 20' with 10' tapers, see note at end of table
Construct earthen dip
Construct turnout, widen to 20' with 10' tapers, see note at end of table existing width is about 10'
305+30 204 (67a) 1 ea Construct earthen dip
307+30 204 (67a) 1 ea Construct earthen dip
309+20 204 (67a) 1 ea Construct earthen dip
311+00 204 (67a) 1 ea Construct earthen dip
314+00 - 348+00 303 (26) About 55 large rocks need to be removed or covered.
See note at end of table.
314+00 204 (67a) 1 ea Construct earthen dip
317+80 204 (67a) 1 ea Construct earthen dip
318+90 - 319+30 204 (01a) 23 CY Construct turnout, widen to 20' with 10' tapers, see note at end of table.
existing width is about 13'.
321+30 204 (67a) 1 ea Construct earthen dip
322+80 204 (67a) 1 ea Construct earthen dip
Old Cascade Road 2014
SHEET 4
STATION ITEM NO QUANTITY UNIT DESCRIPTION OF WORK REMARKS
Old Cascade Road 2014
323+00 - 348+00 204(01a) 52 CY see note at end of table Average road width is 13.8 feet, road grade varies from -2% to +10%
323+50 - 324+00 204(01a)
Existing turnout, bedrock in road bed. Import 24 CY of borrow from excavation for turnout at 327+00 to
327+40, or import pit run with fines.
325+80 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
327+00 - 327+40 204 (01a) 24 CY Construct turnout, (widen to 20' with 10 ' tapers ) use excavated material for road bed at 323+50 to
324+00 ( 24 CY)
328+00 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
332+00 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
336+00 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
337+20 - 337+60 204 (01a) 24 CY Construct turnout, (widen to 20' with 10' tapers ) spread material to fill gullies and reshape road
340+30 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
343+50 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
345+85 204 (67c) 1 ea Construct armored grade dip, (24 CY pit run)
348+00 end of project This point is called Cold Springs Summit. This point is the end of Old Cascade project of 2013.
Classification is a visual estimate shown for informational purposes. Pay items are bid and payed for at one rate and to not vary by classification. Conttractor is responsible for verifing ground conditions prior to bidding.
Notes for 204(01). Widen road to 12' Minimum, remove berms as needed, outslope to 2 - 4%. Material generated by widening and by turnout construction shall be incorporated into the road surface and will be used to fill gullies and cover large rocks in the roadbed. See FSSS 204 and FSSS 303. Cutslopes shall be 3/4 : 1 and fill slopes shall be 1 1/3 :1
SHEET 5