Cost_Estimate0109.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Old Cascade 2014 Re-Solicitation Federal contract opportunity
- Solicitation number
- AG-0261-S-14-0109
About this file
Attachment 4 Cost Estimate Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FSSS_FP-03_OLD_CASCADE_2014Revised_7_24_2014.pdf | ||
| WD_ID140086_01_03_14_Highway.pdf | ||
| Old_Cascade_2014_Revised_Map_Drawings.pdf | ||
| S140109.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| PLEASE COMPLETE PAGE 2 | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED CONTRACT PRICE | ||
| AG-0261-S-14-0109 OLD CASCADE 2014 | |||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |
| Payette NF, Council Ranger District |
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | MANDAYS | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 51251-0.2 Star Creek | ||||||||||
| 151-01 | Mobilization | Lump Sum | 1.00 | 0.00 | 0.00 | 0.00 | ||||
| 201(03) | Brushing, Disposal Method e or f | Mile | 1.20 | 0.00 | 0.00 | 0.00 | ||||
| 204(01a)* | Excavation and Embankment, Method 1 | Cubic Yard | 820.00 | 0.00 | 0.00 | 0.00 | ||||
| 204-(67a) | Drainage Excavation, Construct Earthen Dip | Each | 13.00 | 0.00 | 0.00 | 0.00 | ||||
| 204-(67c) | Drainage Excavation, Construct Armored Grade Dip, Includes 24 CY Pit Run | Each | 7.00 | 0.00 | 0.00 | 0.00 | ||||
| 303(26a)* | Road Reconditioning | Mile | 1.20 | 0.00 | 0.00 | 0.00 | ||||
| TOTALS | 0.00 | 0.00 | 0.00 | 0.00 | ||||||
| MATH CHECK | 0.00 |
AG-0261-S-14-0190
Attachment 4
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||
| itemizing of all direct costs. | ||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||
| the contractor is responsible for determining quantity estimates. | ||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||
| significant dollar value. | ||
| Col 10 Line Total. Self-explanatory. | ||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |
| page as follows | ||
| TOTAL MATERIAL COSTS | $ |
TOTAL LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
TOTAL DIRECT COSTS $ 0.00
OVERHEAD % $ 0.00
SUBTOTAL $ 0.00
PROFIT % $ 0.00
TOTAL PRICE $ 0.00
DATE FIRM NAME
| TITLE | BY | |
| (Signature) |
| INSTRUCTIONS TO OFFERORS | ||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | ||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||
| a. | The existing, verifiable data. | |
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |
| c. | The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | ||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |
| and made available to the contracting officer his authorized representative upon request. | ||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | ||
| with any negotiations prior to contract award. |
AG-0261-S-14-0109
Attachment 4
File details come from the government source that posted it. Updated .