AMENDMENT NO 1 – AG-0261-S-08-9005 Mores South Stewardship Page 1

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applic.)

Amendment No. 1 11/26/2008

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

USDA Forest Service SW Idaho/Nevada Acquisition Center 1249 South Vinnell Way, Suite 200 Boise, ID 83709-1663

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

[X] AG-0261-S-09-9001

9B. DATED (see item 11) 11/14/08

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (see item 13)

CODE FACILITY

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[ ] A. THIS CHANGE ORDER IS PURSUANT TO: FAR 52.243-5 Changes and Changed Conditions The changes set forth in Item 14 are made in the Contract Order Number in Item 10A.

[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

[ ] D. OTHER (specify type of modification and authority) E. Contractor [ ] is, [X ] is not required to sign this document and return _____ ___ copy(s) to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION

REFER TO SOLICITATION NO. AG-0261-S-09-9001, MORES SOUTH STEWARDSHIP RE-ISSUE ON THE BOISE NATIONAL FOREST, AND AMEND AS FOLLOWS:

1. REFER TO PAGE 14, APPENDICES, APPENDIX A, I-ROAD DECOMMISSIONING/CLOSURE

SPECIFICATIONS.

DELETE PAGE 14

REPLACE WITH ATTACHED PAGE I-ROAD DECOMMISSIONING/CLOSURE SPECIFICATIONS.

2. REFER TO APPENDICES, APPRENDIX B, PAGE 59. DELETE PAGE 59.

REPLACE WITH ATTACHED PAGE.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (type or print) ROBERT M. HOFFMAN, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

__________________________ BY:________________________

(Signature of authorized person to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)

PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243

AMENDMENT NO 1 – AG-0261-S-08-9005 Mores South Stewardship Page 2

COMMERCIAL ITEM – AG-0261-S-09-9001 Mores South Steardship Re-Issue Page 14

I - ROAD DECOMMISSIONING/CLOSURE SPECIFICATIONS

Refer to Contract Area Map for road locations

A – Recontour entire length. .24 Miles. (See 2, 6, 7 below) Please note that Road A is not located within or adjacent to a logging unit. Slash will need to be brought in from another location to meet the service item objectives or an agreement may be made to complete this line item by other means,

ie. spreading straw.

B – Pull culvert, restore natural gradient of stream channel, rip, seed and place slash over entire section.

.53 Miles. (See 3, 5, 6, 7, 8, 9, 10 below)

C – Recontour beginning of road. Rip and seed. .27 miles. (See 1, 2, 5, 6, 7 below)

D – Recountour beginning of road to landing, scatter slash and seed. Erosion protection measures needed.

Rip and seed remaining length of road and spread slash. Portion of road within creek channel does not need treated. .46 miles (See 1, 2, 5, 6, 7, 8 below)

E – Recontour beginning of road. .07 miles (See 1, 2, 3 below)

F – Recontour both ends of road. .21 miles Outslope remaining length, rip, seed and spread slash where available 1.0 Miles. (See 1, 2, 3, 4, 5, 6, 7 below)

Specifications:

1. The entrance of all decommissioned or closed roads, (200’-300’ or sight distance which ever is less as determined by the Forest Service), would be recontoured to prevent motorized entry.

2. Recontoured fill material will be piled to match the natural slope of the landscape or a 2:1 slope, placed against the road cut and gradually outsloped to the outer road prism edge.

3. Roads that cannot be recontoured, the entrance will be designed to prevent motorized entry by placing rocks or logs over entrance.

4. The remaining road bed will be outsloped >5%.

5. Rip roads to 6”-12”.

6. Slash will be placed over the entire section of recontoured road.

7. Disturbed material would be seeded with recommended seed mixtures (refer to K-G.6.0.1#).

8. Erosion control methods (waddles) would be used to prevent sediment-laden water from entering a stream. Waddles will be removed by hand after work is complete.

9. Restore natural gradient of the stream within the crossing site by removing all fill material.

Gradient would be an average of the upstream and downstream gradients of the channel.

10. In-channel excavation work. To minimize sediment delivery to streams, activities will be delayed until flow has ceased or is at lowest flow (base flow).

AMENDMENT NO 1 – AG-0261-S-09-9001 Mores South Stewardship Re-Issue Page 3

COMMERCIAL ITEM – AG-0261-S-09-9001 Mores South Stewardship Re-Issue Page 59

8 89 T/J WTY, L&S, YUM

11 8 T/J WTY, L&S

14 7 T/J WTY, L&S

20 28 T/J WTY, L&S

21 63 T/J WTY, L&S

22 53 T/J WTY, L&S

24 34 T/J WTY, L&S

25 70 T/J WTY, L&S

27 287 T/J WTY, L&S, Optional YUM

28 121 T/J WTY, L&S

All Landings 40 All

Systems

PLS

L&S = Lop And Scatter WTY = Whole Tree Yarding T/J = Tractor/Jammer PLS = Pile Landing Slash YUM = Yard Umerchantable Material

1. Pile Landing Slash

A landing is considered a place where any logs or products are gathered for loading. Logs not meeting utilization standards accumulated at landings shall be decked at locations agreed to in writing by the Forest Service. Slash created from landing construction must be piled away from residual timber. All slash accumulated at landings shall be piled in locations pre-approved by the Forest Service.

Where feasible, landing slash shall be sorted and piled according to the diameter of the slash. All slash 6 inches in diameter and less shall be piled separately. All slash greater than 6 inches in diameter and longer than 1 foot in length shall be piled in a separate pile.

Piles shall be reasonably compact and free of soil to facilitate burning. Piles will not be less than 4 feet in height. Piles shall be of a size and location that will not impair road use or result in damage to residual timber.

Piles shall be located at least 50 feet from residual timber. Piles shall not be more than 45 feet long.

All pieces that extend more than 4 feet in any direction from the windrow or pile profile will be cut off and returned to the windrow or pile.

The piling of landings will be done by a grapple-type machine.

2. Whole Tree Yarding (WTY) (Tractor/Jammer Units: 1,2,7,8,11,14,20-22,24,25,27,28) Purchaser shall leave tops and limbs of felled trees attached to Included Timber and tractor/jammer yard them to landings. Limbs greater than 3 inches in diameter may have to be lopped where the tree falls if damage, during skidding, to the residual stand is occurring due to the large limbs being left on the skidded trees. Tops and limbs which are lost on the way to the landing site due to normal felling, skidding and/or yarding operations are not required to be yarded and will be lopped and scattered as described below in Item 3.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and