Williams Creek Final Plans Take 2.pdf
PDF 4 MB Posted
- Attached to
- Williams Creek Road Reconstruction Federal contract opportunity
- Solicitation number
- AG-0261-S-09-0046
About this file
Plans/Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Williams Creek Road Reconstruction FSSS Take 2.pdf | ||
| AG-0261-S-09-0046 Williams Creek Road Reconstruction.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOISE NATIONAL FOREST
EMMETT RANGER DISTRICT
VALLEY COUNTY
IDAHO
WILLIAMS CREEK ROAD RECONSTRUCTION
PROJECT DESCRIPTION
Banks-Lowman Highway
45 23 1
7 8
334 12
612 44 53
5 4
9 7
5 6
65 23 1
11 11
11 11
20 20
16 17 15
14 16
28 27
33 33
22 2321
1920 21 2022 23 212420 221921 22 2323 2424 19 20 21 2219
1513 16
Payette R iver
N or th F or k
Pa ye tte R iv er
Little Squaw Cree k
M idd le Fork
P ay et te
Ri ve r
South Fork Payette River
T 9 N R 4 E
T 9 N R 3 E
T 10 N R 4 E
T 10 N R 3 E
T 9 N R 2 E
T 10 N R 2 E
T 9 N R 5 E
T 10 N R 5 E
T 8 N R 3 E
T 8 N R 4 E
T 11 N R 4 E
T 11 N R 3 E
T 11 N R 2 E
T 8 N R 2 E
T 8 N R 5 E
T 11 N R 5 E
The Project consists of 0.32 miles of road realignment and
0.44 miles of road reconstruction on the National Forest System Road (NFSR) 023E along Highway 55 north of Horseshoe Bend, Idaho. The work includes construction staking; clearing and grubbing; removal of culverts;
roadway excavation; hauling and placing government furnished aggregate; placing hot asphalt; installing culverts; seeding and mulching; and installing a gate.
Crouch
R
Project Area
To B oise 40 M iles Þ
SPECIFICATION:
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units www.wfl.fha.dot.gov/design/specs/fp03.htm
DISTRICT RANGER
APPROVED:
DATE:
FOREST ENGINEER
APPROVED:
DATE:
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION 4
PLANS FOR PROPOSED PROJECT
Burley
Pocatello Twin Falls
Boise
Coeur d'Alene
Bonners Ferry
Lewiston
McCall
Cascade
Emmett
Challis St Anthony
§̈¦84 tu93 tu95 tu12 tu20 tu26 tu2 tu191 tu20 tu93 tu26 tu26 tu95
Utah
Montana
Idaho
Nevada
O re go n
W yo m in g
W as hi ng to n
§̈¦84 §̈¦86
§̈¦15
§̈¦90
§̈¦15
IDAHO MAP
BOISE
NATIONAL
FOREST
Idaho City
Lowman
Mountain Home
Cascade
Emmett
Sheet Name Sheet Title Sheet 1 Vicinity Map 2 Estimated Quantities & Description 3 Typical Sections & Construction Notes 4 Standard Details – Construction Staking, Catchpoint 5 Standard Details – Construction Staking, Culvert 6 Standard Details – Corrugated Metal Pipe 7 Standard Details – Grade Dip, Outslope 8 Approach Apron Paving 9 Standard Details – Stock Gate 10 Description of Work –Road Reconstruction 023E 11 Description of Work – Realignment Construction 023E 12- 13
INDEX TO SHEETS
R O
A D
N
U M
B E
R
Mobilization …..Lump Sum
Construction survey and staking, method II, tolerance E …..Mile
Clearing and grubbing, disposal of tops and limbs f. logs f, stumps f …….Mile
Clearing and grubbing, disposal of tops and limbs e. logs e, stumps f …….Acre
Removal of culvert , disposal method a …..Each
Roadway Excavation, compaction method B …..Cubic Yard
Roadway Excavation, compaction method C, finishing method C …..Cubic Yard
Grade dips ….Each
Road reconditioning, compaction method A …..Mile
Haul and place stockpiled aggregate, compaction method B (Government Furnished) …..Cubic Yard
Minor hot asphalt concrete ……..Ton
18 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum Method A …..Linear Foot
24 inch corrugated metal pipe, 0.064 inch thickness for steel or 0.060 inch thickness for aluminum Method A …..Linear Foot
48 inch corrugated metal pipe, 0.079 inch thickness for steel or 0.135 inch thickness for aluminum Method A …..Linear Foot
53 inch span, 41 inch rise corrugated metal pipe, 0.079 inch thickness for steel or 0.135 inch thickness for aluminum Method A …..Linear Foot
Seeding and mulching (dry method) …..Acre
Furnish and install road closure device, type stock gate, size 16' …..Each
15101 15211
20103 20104
20301 20401A
20401B 20426
30322 32232
40401 60250A
60250B 60250C
60253 62529
65001 023E
(R
R E
A L
IG
N
M E
N T
0.32
1.51
0.38
023E (R
0.44
0.44
0.21
T otals
0.32
0.44 1.51
0.44
0.59
P R
O
JE
C T
E
ST
IM
A
T E
D Q
U A
N T
IT
IE
S
C O
N
STR
U C
TIO
N
LEG
A
L D
ESC
R
IPTIO
N
R O
A D
TO
LER
A N
C E
LEN
G
TH
(m ile)
PR
O
JEC
T B
EG
IN
N
IN
G
N O
R
O A
D N
A M
E FSSS 204 Table 204-2
FR
O
M
TO
R
EC
O N
ST
R
EA
LIG
N M
EN
T
T.
R
SEC
023E(R
W illiam s Creek Sum m er H om es A rea I
0+00 17+05
0.32
10N 3E
023E(R
W illiam s Creek Sum m er H om es A rea K
17+05 40+50
0.44 10N
3E
STA
TIO
N
IN
G
PR
O
JE
C
T D
E
SC
R
IPT
IO
N
C H
A
RT A
RO
A
D G
RA
D
E
LEN
G
TH
U
P TO
3% 35'
4%
TO
6% 25'
O V
ER 6%
15'
C H
A
RT B
RO
A
D G
RA
D
E
LEN
G
TH
U
P TO
3% 65'
4%
TO
6% 75'
O V
ER 6%
85'
R O
A D
N O
STA
TIO
N
ITEM
N
O
Q
UA
N
UN
IT
D
ESC
R
IPTIO
N
O F W
O R
K R
EM
A
R K
S
023E(R
17+05
Begin Reconstruction
17+05 - 40+50 20103
0.44 M
ile Clear vegetation
30322 0.44
M ile
Recondition road - do not scarify M aintain existing tem plate unless otherw ise noted
17+05 20103
Indirect Rem ove 3 trees and stum ps left of loop intersection
20401
Cubic Yards W iden loop intersection left U se excess m aterial at Sta. 17+85 road w idening
17+85 20301
Each
Rem ove culvert
D ispose of culvert by rem oval from N ational Forest land
60250C
Linear Foot Install 48" x 34' CM
P Place riprap on inlet and outlet – indirect to 602 Pay Item
20401
Cubic Yards W iden road to 14' over culvert site 10' long each side of culvert Taper road 25' ahead and back
62529 0.03
A cre
Seed and m ulch disturbed area
20401
Cubic Yards
Rem ove berm ahead U se m aterial to im prove outslope tem plate
19+50 20401
Indirect Construct turnout by rem oving berm
62529 0.02
A cre
Seed and m ulch disturbed area
21+55 End berm rem oval and outslope tem plate im provem ent Top of vertical
25+35 20401
Cubic Yards
Rem ove berm ahead U se m aterial to im prove outslope tem plate. Use caution -
W ater line right side goes under road
26+00 20426
Each
Construct grade dip
26+40 End berm rem oval and outslope tem plate im provem ent
27+40
28+35 30322
Indirect Pull ditch
Use caution - W ater line left side goes under road
29+00 End ditch pull
31+95 20301
Each
Rem ove culvert
D ispose of culvert by rem oval from N ational Forest land
60250A
Linear Foot Install 18" x 24' CM
P Place riprap on inlet and outlet – indirect to 602 Pay Item
Indirect Construct 15' long outlet ditch
33+60 20401
Cubic Yards
Construct turnout right
62529 0.02
A cre
Seed and m ulch disturbed area
35+10 20401
Cubic Yards
Construct turnout by rem oving berm
62529 0.02
A cre
Seed and m ulch disturbed area
35+50 20401
Cubic Yards
Rem ove berm ahead U se m aterial to im prove outslope tem plate
62529 0.07
A cre
Seed and m ulch disturbed area
38+70 End berm rem oval and outslope tem plate im provem ent
20301
Each Rem ove culvert D ispose of culvert by rem oval from
N ational Forest land
60250C
Linear Foot Install 48" x 36' CM
P Place riprap on inlet and outlet – indirect to 602 Pay Item
62529 0.05
A cre
Seed and m ulch disturbed area
20103 Indirect
Rem ove 3 trees and stum ps just past culvert installation to im prove alignm ent
40+50 End Reconstruction