AG-0261-S-09-0046 Williams Creek Road Reconstruction.pdf
PDF 451 KB Posted
- Attached to
- Williams Creek Road Reconstruction
- Solicitation number
- AG-0261-S-09-0046
About this file
Solicitation Package
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Williams Creek Road Reconstruction FSSS Take 2.pdf | ||
| Williams Creek Final Plans Take 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-0261-S-09-0046
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
05/07/2009 279708
1 62
1249 S VINNELL WAY
SUITE 200
BOISE ID 83709
BOISE NATIONAL FOREST
10/01/2009
BOISE NATIONAL FOREST
1249 S VINNELL WAY
SUITE 200
BOISE
ID 83709
208 373-4166ROBERT HOFFMAN
05/21/2009 1630 MD
FOB DESTINATION
OTHER
(See Schedule)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Williams Creek Road Reconstruction
This Project is a 100% HUB-ZONE SET-ASIDE
Please input your pricing on the Bid Schedule on Page 2.
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 2
ND PRICES
ruction Project nger District tional Forest
Item No. Description Unit Cost Total
SERVICES A
Williams Creek Road Reconst
Cascade Ra Boise Na
Unit Quantity
15101 mp
1 Mobilization Lu
Sum 15211 staki ile 0.32 * Construction survey and method II, tolerance E ng, M
20103 mp ile 0.44 * Clearing and grubbing, disposal of tops and limbs f, logs f, stu s f
M
20104 Clearing and grubbing, disposal of stum
Acre 1.51 * tops and limbs e, logs e, ps f
20301 osal d ch 5 Removal of culvert, disp a metho Ea
20401A way excavation, compac ubic rd
1440 * Road tion method B
C Ya
20401B pac od C bic Yard
170 * Roadway excavation, com method C, finishing meth tion
Cu
20426 Grade 1 dip Each
30322 paction A ile 0.44 * Road reconditioning, com M
32232 agg e, ver
Cubic 345 * Haul and place stockpiled compaction method B (G regat o
Furnished) nment Yard
40401 te Ton 29 * Minor hot asphalt concre
60250 ipe
0.06 h et near Foot
104 A 18 inch corrugated metal p inch thickness for steel or
, 0.064 0 inc thickness for aluminum , M hod A
Li
60250 ipe 4 or 0.060 inch ethod A
Linear Foot
32 B 24 inch corrugated metal p inch thickness for steel
, 0.06 thickness for aluminum, M 60250 pipe 9 l or 0.13 near
Foot 70 C 48 inch corrugated me inch thickness for stee tal , 0.07
5 inch thickness for aluminum, Method A
Li
60253 53 inch span, 41 inch rise corrugated metal p
Linear 28 ipe arch, 0.079 inch thickness aluminum, Method A
Foot for steel, 0.135 inch thickness for
62529* Seeding and mulching (dry method) Acre 0.59
65001 Furnish and install road closure device, type stock gate, size 16'
Each 1
The offeror shall insert a quote in each Bid Schedule opposite each pay name listed in the Schedule.
A quote is not to be tendered for any item not listed. All other items not listed are incidental to one of the above items above.
Note: * next to an Item Number above indicates that the quantity shown is a Contract Quantity per
FP-03
Specification 109.02
RFQ AG-0261-S-09-0046 W struction Pg. 3
NTENTS
illiams Creek Road Recon
TABLE OF CO
SECTION PAGE NUMBER(S)
Notice to Offerors (St. of Idaho Certificate of Verification) 4
5-7
Contract Administration Data 10
12-19
Davis Bacon Wage Determination 21-44
47-54
Instructions, Conditions, and Notices to Offerors or Respondents 55-58
Proposal Preparation Instructions 59
Evaluation Factors For Award 60
Experience Questionnaire 61-62
SF 18 Request for Quotations
Bid Schedule Prices/Costs
Table of Contents 3
Description/Specifications/Statement of Work
Inspection and Acceptance
Deliveries or Performance
Special Contract Requirements
Contract Clauses
List of Attachments
Fire Precautions 45-46
Representations and Instructions
RFQ AG-0261-S-09-0046 W onstruction Pg. 4 illiams Creek Road Rec
NOTICE OF OFFERORS
STATE OF IDAHO CERTIFICATE OF VERIFICATION
efore completing form
OF WORKER’S COMPENSATION INSURANCE
Read thoroughly b part-time employees, to unless specifically exempted. Failure to comply s well as an injunction to prohibit the employer from operating the business. Failure to carry workers’ compensation insurance for employees is a misdemeanor under Idaho Law.
company, corporation or firm who is bidding on a contract for the United States en notified by the
WHEN MUST THE FORM BE COMPLETED?
ed by the USFS uired prior to the final le to your operations could result in a delay in processing.
WHAT ARE THE WORKERS’ COMPENSATION REQUIREMENTS?
The Idaho Workers’ Compensation Law requires that employers who hire one or more, either full or perform work in the State of Idaho, carry workers compensation insurance could result in monetary penalties a
WHO MUST COMPLETE THIS FORM?
Any person, partnership, limited liability Department of Agriculture/Forest Service (USFS) for work that is within the State of Idaho and who has be USFS that he/she/it has been selected for a USFS contract.
The form must be completed and forwarded to one of the Industrial Commission offices when you are notifi that you have been selected for a USFS contract. The approval of the Industrial Commission is req award.
ADDITIONAL COMMENTS:
Failure to complete any part of the form that is applicab mplete a Certificate of iness is a partnership, limited liability company or corporation, each partner/member/corporate officer must sign ication form for each contract awarded.
S COMPLETED AND SIGNED THE FORM, FAX, MAIL, OR DELIVER IT TO THE
MISSION OFFICE. IF YOU HAVE ANY QUESTIONS, CONTACT A
TIVE AT ANY OF THE FOLLOWING OFFICES:
d Street, Suite 100
ID 83814
9-1465
Southwest Idaho 317 Main Street
P 0 BOX 83720, BOISE ID 83720-0041
(208) 334-6032 or 1-800-950-2110 or FAX (208) 334-5145
Southeast Idaho 1070 Hiline, Suite 300
POCATELLO ID 83201
(208) 236-6366 or FAX (208) 236-6040
If any of the work is to be performed by sub-contractors, each sub-contractor must obtain and co Verification of Worker’s Compensation Insurance.
If your bus the form where designated You must submit a separate verif
ONCE THE BIDDER HA
APPROPRIATE INDUSTRIAL COM
TACOMPLIANCE REPRESEN
North Idaho 1221 Ironwoo
COEUR D'ALENE
(208) 769-1565 or FAX (208) 76
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 5
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
uction on the shoe Bend, Idaho. The work excavation; hauling t furnished aggregate; placing hot asphalt; installing culverts; seeding and nstalling a gate. The Williams Creek Rd. access the Williams Creek Summer Home area on the Boise National Forest..
s located on NFSR #023E (Williams Creek Rd), within the Williams Creek Summer Home area, Emmett Ranger District. To reach the project area, from Boise ID, at intersection of State Street (
. 55) travel north 40.4 miles to the intersection with Williams Creek is located approxmently 600 ft. north of the intersection of NFSR #023E on the west
Scope of Contract
The Project consists of 0.32 mile of road construction and 0.44 miles of road reconstr National Forest System Road (NFSR) 023E along Highway 55 north of Horse includes construction staking; clearing and grubbing; removal of culverts; roadway and placing governmen mulching; and i
Project Location
The project i
Hwy. 26) and State Highway 55(Hwy Rd. The work site side of Hwy. 55.
Estimated Price Range – $25,000 to $100,000
List of Specifications
Standard Specifications (FP-03) and Forest Service Supplemental Specifications (FSSS) contained in the cluded in full text. in ct amend, supplement, or replace the Standard Specifications.All specifications not but referenced by listed specifications are applicable. Standard e on-line at www.wfl.fha.dot.gov/design/specs/fp03.htm following list are applicable to this Public Works contract. All applicable FSSS are in Section J of the contra included in the specification listing Specifications (FP-03) are availabl in pdf format pecifications included in full text Specifications for this project include but are not g list.
finitions t, and Definitions t l FSSS 105 - Control of Material FP-03 106 - Acceptance of Work FSSS 106 - Acceptance of Work FP-03 107 - Legal Relations and Responsibility To the Public FSSS 107 - Legal Relations and Responsibility To the Public FSSS 108 - Prosecution and Progress FP-03 109 - Measurement and Payment FSSS 109 - Measurement and Payment FP-03 151 – Mobilization FSSS 153 – Contractor Quality Control
Supplemental Project S limited to the followin
FP-03 101 - Terms, Format, and De FSSS 101 - Terms, Forma FSSS 102 - Bid, Award, and Execution of Contrac FP-03 103 - Scope of Work FSSS 103 - Scope of Work FP-03 104 - Control of Work of Work FSSS 104 - Control FP-03 105 - Control of Materia
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 6 king es for Construction Contracts se Prevention d Obstructions d Obstructions avation and Embankment s ucture Excavation and Backfill ion and Backfill itioning gate Courses sphalt Concrete rete rt and Drains rt and Drains urf Establishment FSSS 625 – Turf Establishment these Standard and Forest Service Supplemental to submission of bids.
988) isted in Section J are hereby made part of this ontract.
tion drawings and Forest Service Supplemental Specifications are included in Section J.
ings, which are not specifically bid items, are considered incidental of furnishing and installing all incidental items will not be paid for separately, but shall be included in the unit price bid for other items unless noted otherwise.
Order of Precedence - Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(a) Schedule of Items
(b) Representations and other instructions
(c) Contract clauses
FSSS 152 –Construction Survey and Sta FSSS 155 – Schedul FSSS 156 – Public Traffic ntrolFSSS 157 – Soil Erosion Co FSSS 171 - Weed and Disea FP-03 201 – Clearing and Grubbing FSSS 201 – Clearing and Grubbing FP-03 203 – Removal of Structures an nFSSS 203 – Removal of Structures a FSSS 204 – Exc FP-03 209 – Str FSSS 209 – Structure Excavat FP-03 251 – Riprap FSSS 251 – Riprap FSSS 303 – Road Recond FSSS 322 – Minor Aggre FP-03 401 – Minor Hot A FSSS 401 – Minor Hot Asphalt Conc FP-03 602 – Culve FSSS 602 – Culve
FP-03 625 – T
FSSS 651 – Development of Pits and Quarries FP-03 703 – Aggregate FSSS 703 – Aggregate FP-03 705 – Rock
NOTE: Bidders are cautioned to carefully review Specifications prior
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1
The attachments to the Statement of Work/Specifications l solicitation and any resultant c
Technical Requirements
Specific construc All items shown or noted on draw items. The cost
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 7 nts
(2) Plans, large scale contract plans over small scale contract plans
(3) Schedules on contract plans over any conflicting notations on contract plans
(d) Other documents, exhibits, and attachme
(e) Forest Service Supplemental Specifications (FSSS)
(f) Standard Specifications (FP-03)
g) Construction Drawings
(1) Plans, figured dimensions over scaled dimensions
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 8
INSPECTION AND ACCEPTANCE
ade by the Contracting Officer’s Representative (COR) or the COR’s designated Inspector. Work not completed to contract standards shall be rejected and reworked without additional compensation to the Contractor.
52.246-12 Inspection of Construction (AUG 1996)
Periodic field inspections will be m
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 9
LIVERIES OR PERFORMANCE
1984) calendar days after notice to proceed, (b) prosecute the work diligently, and (c) complete ork ready for use not later than October 1, 2009. The time stated for completion shall include final cleanup of the premises.
on t ime
ESTIMATED START DATE
DE
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR
The Contractor shall be required to (a) commence work under this contract within 10 the date the Contractor receives the the entire w
C t T rac
CONTRACT TIME
6/3/09 120 calendar days
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 10
CONTRACT ADMINISTRATION DATA
and held within 10 ward. The conference will be held at Boise National Forest Headquarters
Office, 1249 S. Vinnel Way, Boise, ID.
ty
There is Government furnished property.
Measurement
Units of measurement shall be as indicated in the Schedules of Items.
A post award conference with the successful offeror is required. It will be scheduled days after the date of contract a
Government Furnished Proper
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 11
SPECIAL CONTRACT REQUIREMENTS
streams) is prohibited. Refueling of equipment may be done within the RCA only at locations approved itted to the CO for approval prior inning construction. A spill containment kit shall be available on site that is of sufficient size to accommodate potential spills from the equipment used during construction.
umps used for drafting must be outfitted with a suction screen that has a maximum opening size of ficient capacity
Other
See the Forest Service Supplemental Specifications and/or the Typical Sections & Construction Notes sheet 4 in the Plans for requirements for Equipment Cleaning; Erosion Control Plan; and Dewatering Plan.
Storage of fuel and other toxicants within Riparian Conservation Areas
Storage of fuel and other toxicants within Riparian Conservation Areas (RCA – within 300 feet of live by the CO.
A Hazardous Spill Plan is required per FSSS 107.10 and shall be subm to beg
Pumps
All p 3/32”. Portable pumps used on the project shall sit in a secondary spill container with suf to contain the quantity of fuel in the pump fuel tank.
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 12
CONTRACT CLAUSES
were
t. Upon request, the Contracting Officer will make their full text available. Also, the full ctronically at this/these address(es):
www.ar
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they given in full tex text of a clause may be accessed ele net.gov/far/ lwww.usda.gov/procurement/policy/agar.htm
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
when Subcontracting barred, Suspended, or Proposed for Debarment (MAY 2008) uantity (APR 1984)
-3 t-Aside (JAN 1999) quirements (FEB 1988) L 2005)
Debarment (FEB 1988) ns (FEB 1988)
88) 988) acilities (FEB 1999) ents for Construction (FEB 1999) kers with Disabilities (JUN 1998) g in Persons (SEP 2007) s (DEC 2007)
(APR 1984)
struction Contracts (DEC 2007) -2
2) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)
52.209-6 Protecting the Government's Interest with Contractors De 52.211-18 Variation in Estimated Q
52.219 Notice of Total HUBZone Se
52.222-3 Convict Labor (JUN 2003) 52.222- Davis-Bacon Act (JUL 2005) 52.222- Withholding of Funds (FEB 1988) 52.222- Payrolls and Basic Records (FEB 1988) 52.222- Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Re 52.222-11 Subcontracts (Labor Standards) (JU 52.222-12 Contract Termination - 52.222-13 Compliance with Davis-Bacon and Related Act Regulatio 52.222-14 Disputes Concerning Labor Stand
(FEB 1
ards (FEB 19
52.222-15 Certification of Eligibility 52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) 52.222-21 Prohibition of Segregated F 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirem 52.222-36 Affirmative Action for Wor 52.222-50 Combating Traffickin 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Product 52.224-1 Privacy Act Notification 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Con
52.228 Additional Bond Security (OCT 1997)
52.228-11 Pledges of Assets (FEB 199
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 13 ions Affecting the Work (APR 1984)
984) ctor (APR 1984) on, Structures, Equipment, Utilities, and Improvements
Areas (APR 1984) r to Completion (APR 1984)
NOV 1991)
991) 1984)
52.236-16 ys (APR 1984) nstruction (FEB 1997)
(FEB 1995)
(DEC 2008)
52.24 52.246-21 Warranty of Construction (MAR 1994) rt From) (APR 1984)
on) (APR 1984)
ION REGULATION (48 CFR CHAPTER 4) CLAUSES
iums – Fixed-Price Construction Contracts (NOV 1996)
(NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the
52.236-3 Site Investigation and Condit 52.236-5 Material and Workmanship (APR 1 52.236-6 Superintendence by the Contra 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetati
(APR 1984)
52.236-10 Operations and Storage 52.236-11 ion Prio Use and Possess 52.236- Cleaning Up (APR 1984) 52.236-13 Accident Prevention (
Alternate I (NOV 1 52.236-15 Schedules for Construction Contracts (APR
Quantity Surve Alternate I (APR 1984)
52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Co
Alternate I (APR 1984) 52.236-26 Preconstruction Conference 52.243-5 Changes and Changed Conditions (APR 1984)
52.244 Subcontracts for Commercia
52.245-1 Property Records (JUN 2007)
-6 l Items
5-2 Government Property (Fixed-Price Contracts) (JUN 2007)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Sho 52.249-10 Default (Fixed-Price Constructi 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISIT
452.232-70 Reimbursement for Bond Prem 452.236-72 Use of Premises
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause—
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg business concern to establish additional CCR records fo
. 14 r identifying alternative Electronic Funds Transfer
(EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4
Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record the Government as a
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee through final payment of agreement resulting from of its offer, the otation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the s stated in the offer. The DUNS number will be used by the offeror is registered in the CCR database.
n and Bradstreet directly to obtain r may obtain a DUNS number—
“Registered in the CCR database” means that— number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer
“Active”. The Contractor will be required to provide consent for TIN validation to part of the CCR registration process.
shall be registered in the CCR database prior to award, during performance, and any contract, basic agreement, basic ordering agreement, or blanket purchasing this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page ann offeror’s name and address exactly a Contracting Officer to verify that the
(c) If the offeror does not have a DUNS number, it should contact Du one.
(1) An offero
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it et at 1-866-705-5711 if located within the United States; or adstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and
(2) The offeror should be prepared to provide the following information:
e.
ther name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
may call Dun and Bradstre
(ii) If located outside the United States, by contacting the local Dun and Br
Bradstreet office.
(i) Company legal business nam
(ii) Tradestyle, doing business, or o
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 15
(viii) Chief executive officer/key manager.
our entity).
ror does not become registered in the CCR database in the time prescribed by the ise successful
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
y upon receipt of this in the CCR database, or incomplete data. To in the CCR database after the initial registration, the Contractor is required to review dates its information in n in the CCR does y executed changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, egarding novation and change-of-name agreements in of one tracting Officer. The rt the legally changed this clause, or fails to of a properly executed ontractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database.
Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within y
(d) If the Offe Contracting Officer, the Contracting Officer will proceed to award to the next otherw registered Offeror.
Offerors who are not registered should consider applying for registration immediatel solicitation.
(f) The Contractor is responsible for the accuracy and completeness of the data with and for any liability resulting from the Government’s reliance on inaccurate remain registered and update on an annual basis from the date of initial registration or subsequent up the CCR database to ensure it is current, accurate and complete. Updating informatio not alter the terms and conditions of this contract and is not a substitute for a properl contractual document.
(g) (1)(i) If a Contractor has legally but has not completed the necessary requirements r Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Con Contractor must provide with the notification sufficient documentation to suppo name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence novation or change-of-name agreement, the CCR information that shows the C
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction
(h) Offerors and Contractors may obtain information on registration and annual c
Pg. 16 onfirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
Act-Construction Materials (FEB 2009)
(1) Means any item of supply (including construction material) that is—
(ii) Sold in substantial quantities in the commercial marketplace; and t or subcontract at any tier, without modification, in the
984 (46 U.S.C. App.
uction material.
ction site by the r for incorporation into the building or work. The term also includes an item sembled from articles, materials, or supplies. However, emergency life safety , and audio evacuation systems, that are discrete systems inco ems, are evaluated as a sing parts or components of thos the Government are supplies, not construction material.
“Co
, the acquisition cost, including transportation oration into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
FAR 52.225-9 Buy American
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(iii) Offered to the Government, under a contrac same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a constr
“Construction material” means an article, material, or supply brought to the constru Contractor or a subcontracto brought to the site preas systems, such as emergency lighting, fire alarm rporated into a public building or work and that are produced as complete syst le and distinct construction material regardless of when or how the individual e systems are delivered to the construction site. Materials purchased directly by st of components” means--
(1) For components purchased by the Contractor costs to the place of incorp issued); or
(2) For components manufactured by the Contractor, RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction P
(i) The cost of its components mined, produced, or manufactured in the United of the cost of all its components. Components of foreign or
g. 17 States exceeds 50 percent igin of the same class or kind for which made are treated as domestic; or estic construction
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b)
.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the
m. (See FAR tractor shall use only domestic construction material in performing this
(2) This requirement does not apply to the construction material or components listed by the
(3) The Contracting Officer may add other foreign construction material to the list in paragraph particular domestic y American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
i) The application of the restriction of the Buy American Act to a particular construction material would practicable or inconsistent with the public interest; or
United States in sufficient and reasonably
(c) Request for determination of inapplicability of the Buy American Act.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
nonavailability determinations have been
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a dom material.
Domestic preference.
(1) This clause implements the Buy American Act (41 U.S
Buy American Act is waived for construction material that is a COTS ite 12.505(a)(2)). The Con contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
Government as follows: None.
(b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a construction material subject to the requirements of the Bu
(i be im
(iii) The construction material is not mined, produced, or manufactured in the available commercial quantities of a satisfactory quality.
RFQ AG-0261- ad Reconstruction Pg. 18
(E) Time of delivery or availability;
aterials market and a completed this clause.
ion site and any the t have requested the
(2) merican Act applies and will modify the contract to allow use of the foreign construction material. However, when the basis for the sideration is not less
(3) Unl e Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
ta. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, e the llowing inform tion and y applicable supporting data based on the n an omestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
S-09-0046 Williams Creek Ro
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction m cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the price comparison table in the format in paragraph (d) of
(iii) The price of construction material shall include all delivery costs to the construct applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why Contractor could not reasonably foresee the need for such determination and could no determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
If the Government determines after contract award that an exception to the Buy A the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer exception is the unreasonable price of a domestic construction material, adequate con than the differential established in paragraph (b)(3)(i) of this clause.
ess the Government determines that an exception to th
(d) Da the Contractor shall includ fo a an survey of suppliers:
Foreig d D
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free
Pg. 19 entry certificate is issued).]
2000) wing payment protections
(b) The amount of the payment protection shall be 100 percent of the contract price.
bmission of the payment protection is required within 10 days of contract award.
e period plus a one-otection procedures, the ent protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds edings or mutual agreement of the parties.
liers of labor and the escrow agreement.
AGAR 452.228-70 Alternative Forms of Security (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
FAR 52.228-13 Alternative Payment Protections (JUL
(a) The Contractor shall submit one of the follo __Payment Bond_______________________ __Irrevocable Letter of Credit______________________ __Cashier’s Check or Money Order_________________
(c) The su
(d) The payment protection shall provide protection for the full contract performanc year period.
(e) Except for escrow agreements and payment bonds, which provide their own pr Contracting Officer is authorized to access funds under the paym pending resolution by administrative or judicial proce
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only supp material that signed
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 20
LIST OF ATTACHMENTS
Forest Service Supplemental Specifications (FSSS) (Will be posted in a separate Document)
Construction Drawings (Will be posted in a separate Document)
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 21 General Decision Number: ID080015 03/13/2009 ID15 ber: ID20070022 laine, Bonner, sia, Clark, ooding, Idaho, Jefferson, Jerome, Kootenai, Latah, Lemhi, Lewis, Lincoln, Madison, yette, Shoshone, Teton, Twin
Publication Date /2008 /2008 /2008 /2008 /2008 /2008
6 08/08/2008
03/06/2009 11 03/13/2009
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORHT OF THE 46TH
AH, LEWIS, NEZ PERCE AND SHOSHONE
9.30
ZONE PAY:
ZONE 1 0-40 MILES FREE
ZONE 2 41-65 MILES $2.25/PER HOUR
ZONE 3 66-100 MILES $3.25/PER HOUR
ZONE 4 OVER 100 MILES $4.75/PER HOUR
DISPATCH POINTS:
PASCO (2819 W. SYLVESTER) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
Superseded General Decision Num
State: Idaho
Construction Type: Highway m, BCounties: Adams, Bear Lake, Benewah, Bingha Bonneville, Boundary, Butte, Camas, Caribou, Cas Clearwater, Custer, Elmore, Fremont, G
Minidoka, Nez Perce, Oneida, Pa Falls, Valley and Washington Counties in Idaho.
Modification Number 0 02/08 1 04/25 2 06/06 3 06/13 4 06/20 5 06/27
7 09/19/ 8 12/05/2008 9 02/20/2009
CARP0001-011 06/01/2007
PARALLEL), KOOTENAI, LAT
COUNTIES
Rates Fringes
CARPENTER........................$ 25.01
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 22 n Post Office of residence of employee (Whichever is closest to
TCHEE (27 N. CHELAN) or Main Post Office of established residence of employee (Whichever is closest to the
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office losest
ACKSON) or Main Post Office of established residence of employee (Whichever is closest to the
ADAMS, BEAR LAKE, BINGHAN, BUTTE, BONNEVILLE, CAMAS, CARIBOU,
LMORE, FRANKLIN, FREMONT, GOODING,
ARALLEL), JEFFERSON, JEROME, LEMHI,
ONEIDA, PAYETTE, TETON, TWIN FALLS,
VALLEY AND WASHINGTON COUNTIES.
the lower zone
$1.50
Zone 1: That area within the State of Idaho located within n-Idaho State d I-86 in
, then ing State Highway to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock County extended to the West.
Zone 2: The remaining area of that portion of the State of Idaho south of Parallel 46 (the Washington-Oregon State Line extended eastward to Montana) that is not included in Zone 1 as described above.
ELEC0073-007 01/01/2009
SPOKANE (127 E. AUGUSTA AVE.) or Mai established the worksite).
WENA
worksite).
of established residence of employee (Whichever is c to the worksite).
MOSCOW (302 N. J
worksite).
CARP0808-007 01/01/2009
CASSIA, CLARK, CUSTER, E
IDAHO (SOUTH OF THE 46TH P
LINCOLN, MADISON, MINIDOKA,
CARPENTER........................$ 25.27 9.1
e If a project is located in more than one zon rate shall apply
Zone Differential (add to Zone 1 rate): Zone 2 -
30 miles on either side of I-84 from the Orego Line on the West to the Intersection of I-84 an Cassia County, then following I-86 to Pocatello following I-15 to Idaho Falls, then follow #20 - 10 miles north
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 23
IDAHO (SOUTH OF THE 46TH PARALLEL) COUNTY
3%+12.48 .............$ 27.82 3%+12.48
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO(NORTH OF THE 46TH
WIS, NEZ PERCE AND SHOSHONE
ELECTRICIAN......................$ 27.82 3%+12.48
1-009 01/01/2009
AND WASHINGTON COUNTIES
Rates Fringes es.........$ 35.79 3%+$10.00
Adams, Valley and Washington Counties.........$ 32.54 3%+$10.00
.$ 29.54 3%+$10.00
ELECTRICIAN......................$ 23.00 5% + $8.25
ELEC0449-008 06/01/2008
BEAR LAKE, BINGHAM, BONNEVILLE, BUTTE, CARIBOU, CLARK, CUSTER,
FRANKLIN, FREMONT, JEFFERSON, LEMHI, MADISON, ONEIDA AND TETON
CABLE SPLICER....................$ 28.22
ELECTRICIAN
ELEC0073-008 01/01/2009
PARALLEL), KOOTENAI, LATAH, LE
Cable Splicer....................$ 28.22 3%+12.48
* ELEC029
ADAMS, ELMORE, PAYETTE, VALLEY
Cable Splicer Adams, Valley and Washington Counti Elmore and Payette Counties.$ 32.50 3%+$10.00
ELECTRICIAN
Elmore and Payette Counties
ELEC0449-006 12/01/2008
BLAINE, CAMAS, CASSIA, GOODING, JEROME, LINCOLN, MINIDOKA AND
TWIN FALLS COUNTIES
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 24
5%+$9.50
TE, CAMAS,
(SOUTH OF THE 46TH PARALLEL), JEFFERSON, JEROME, LEMHI,
LINCOLN, MADISON, MINIDOKA, ONEIDA, PAYETTE, TETON, TWIN FALLS,
AREA 2:(Anyone working on HAZMAT jobs working with supplied air e classification)
AT CLASSIFICATION INCLUDED IN EACH GROUP
TORS:
ges
8.95 8.95 8.95
5....................$ 24.77 8.95
GROUP 6....................$ 24.94 8.95
lower zone
Zone Differential (Add to Zone 1 rate): Zone 2 - $1.50
Zone 1: That area within the State of Idaho located within 30 miles on either side of I-84 from the Oregon-Idaho State Line on the West to the Intersection of I-84 and I-86 in Cassia County, then following I-86 to Pocatello, then following I-15 to Idaho Falls, then following State Highway #20 - 10 miles north to the intersection with Moody Road then following I-15 south from the city of Pocatello to a point 10 miles South of the Southern Boundary of Bannock
ELECTRICIAN
..............$ 26.80
ENGI0370-001 01/01/2009
ADAMS, BEAR LAKE, BINGHAM, BLAINE, BONNEVILLE, BUT
TER, ELMORE, FREMONT, GOODING, IDAHO CARIBOU, CASSIA, CLARK, CUS
VALLEY AND WASHINGTON COUNTIES
shall receive $1.00 per hour abov
THERE IS A HAZM
POWER EQUIPMENT OPERA
ZONE 1:
Rates Frin
Power equipment operators:
GROUP 1....................$ 23.76
GROUP 2....................$ 23.92
GROUP 3....................$ 24.29
GROUP 4....................$ 24.60 8.95
GROUP
GROUP 7....................$ 25.31 8.9
GROUP 8....................$ 25.54 8.95
GROUP 9....................$ 25.77 8.95
GROUP 10....................$ 26.02 8.
If a project is located in more than one zone the
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 25 County extended to the West.
the State of gon State ontana) that is not included in
GROUP 1: Brakeman; Crusher Plant Feeder (Mechanical);
nd Plane;
rigeration Plant Blower Operator m; Cement iscing -
Distributor Leverman; Drill Steel Thereader Machine lic Monitor e of equipment);
y Curing Machine;
wedish Cranes, Ross struction jobs); Battery Tunnel s elled);
t-Fork lift & ower Loader ller
Machines (earth or rock); Quarrymaster-Joy-iamond; Front (up to and ydra-Hammer;
e;
er tired-using hing Machines;
; Asphalt Spreaders;
Groundman on Rotomill
GROUP 5: Concrete Plant Operator; Concrete Road Paver (dual); Elevating Grader Operator; Euclid Elevating Loader;
Generator Plant Operator-Mechanic (diesel electric); Post Hole Auger or Punch Operator; Power Shovels, Backhoes and Draglines (under 3/4 yd); Pumpcrete; Refrigeration Plant Operator(1000 tons and under; Road Roller(finishing high type pavement); Skidder-rubber tired; Sub Grader; Multiple Station Beltline Operator; Screed Operator
Zone 2: The remaining area of that portion of
Parallel 46 (the Washington-Ore Idaho south of Line extended eastward to M Zone 1 as described
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Deckhand; Grade Checker; Heater Tender; La Pumpman; Rear Chainman
GROUP 2: Air Compressor; Assistant Ref Operator; Bell Boy; Bit Grinder Operator;
(cement); Bolt Threader Machine Operator; Broo Hog; Concrete Mixer; Concrete Saw multiple cut; D motive power); Harrowing or Mulching (regardless of
Operator; Fireman-all; Hoist-single drum; Hydrau Operator-skid mounted; Oiler (single piec Crusher Oiler; Pugmixer-Box Operator; Spra Tractor-rubber tired farm type using attachments
GROUP 3: A-Frame Truck (hydra lift, S Carrier, Hyster on con Locomotive; Belt Finishing Machine; Cable Tender (underground); Chip Spreader Machine (self-prop Hoist-2 or more durms or Tower Hoist; Hydralif und); P similar (when hoisting); Oilers (undergro (bucket elevator conveyors); Rodman; Road Ro (regardless of motive power)
GROUP 4: Boring tractor mounted, Drills: Churn-Core-Calyx or D End & Overhead Loaders and similar machines-including 4 yds)(rubber-tired); Grout Pump; H Locomotive Engineer; Longitudinal Float Machin Mobilemixer; Spreader Machine; Tractor-rubb Backhoe, Transverse Finishing Machine; Trenc Waggoner Compactor and similar
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 26 alt Plant ete Slip Form her Plant it under 8 ilar; Front
Machine nt Operator;
es and Draglines er
Plant 00 tons); Trimmer Machine Operator;
d including r or Vactor cavator (Barber edges; Drilling erse uivalent; Front ilar machines-(over 7 yards);
d type lling 0 yards to and
Units; Tower Crane rapers - Euclid & similar, pulling wagons, belly luding 80 ote grade control device (GPS or Laser or similar) is used d and similar, pulling wagons, including 100 yards ards
BOOM PAY: All Cranes and Concrete Pump Boom Trucks 100 ft to 150 ft $.15 over scale 150 ft to 200 ft $.30 over scale Over 200 ft $.45 over scale
NOTE: In computing the length of the boom on Tower Cranes, they shall be measured from the base of the tower to the point of the boom.
ENGI0370-003 06/01/2008
GROUP 6: Asphalt Pavers-self propelled; Asph Operator; Blade Operator (motor patrol); Concr rus Paver; Cranes - up to and including 50 ton; C Operator; Derrick Operator; Drilling Equipment (b inches) - Robbins Reverse Circulation and sim End and Overhead Loaders and similar machines-over 4 yds to and including 7 yds; Koehring Scooper;
a Mucking
(underground); Multi-batch Concrete Pl Piledriver Engineer; Power Shovels, Backho (3/4 yd to and including 3 1/2 yds), Tractor-crawl type-including all attachments; Refrigeration Operator (over 1,0 Concrete Pump Boom Truck; All Scrapers up to an 40 yards; Rotomill; Vacuum or Super-Sucke Operator; Service Oiler
Ex GROUP 7: Cableway Operator; Continuous Greene WL-50); Cranes-over 50 tons; Dr Equipment (bit 8 inches and over)-Robbins Rev Circulation & similar; Fin End & Overhead Loaders & sim e Grader-CMI or eq
Power Shovels & Draglines over 3 1/2 yards; Qua Tractors with all attachements; all Scrapers, pu wagons, belly dumps and attachments (over 4 including 60 yards); Multiple Scraper Operator; Heavy Duty Mechanic
GROUP 8: Sc dumps and attachments, over 60 yards to and inc when rem yards; Dozer or Blade (Motor Patrol)
GROUP 9: Scrapers - Eucli ents, over 80 yards to and belly dumps and attachem
GROUP 10: Scrapers - Euclids and similar, pulling wagons, belly dumps and attachements, over 100 y
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 27
O (NOUTH OF THE 46TH
EL), KOOTENAI, LATAH, LEWIS, NEZ PERCE AND SHOSHONE
COUNTIES.
AREA 1: (Anyone working on HAZMAT jobs working with supplied ll receive $1.00 per hour above classification) es
9.80 9.80 9.80 9.80
GROUP 4.....................$ 24.85 9.80
GROUP 8.....................$ 26.66 9.80
(Add to Zone 1 rate): Zone 2 - $2.00 ashington;
ASSIFICATIONS
iler; Steam Cleaner achine; Compressors er); Deck rill rod pressor, repair drill rig and drill tools, drive drill support truck to and on the job site, remove drill cuttings from around bore hole and inspect drill rig while in operation);
Fireman & Heater Tender; Hydro-seeder, Mulcher, Nozzleman;
Oiler Driver, & Cable Tender, Mucking Machine; Pumpman;
Rollers, all types on subgrade, including seal and chip coatings (farm type, Case, John Deere & similar, or Compacting Vibrator), except when pulled by Dozer with operable blade; Welding Machine; Crane Oiler-Driver (CLD required) & Cable Tender, Mucking Machine
BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAH
PARALL
air sha
Rates Fring
Power equipment operators:
GROUP 1A...................$ 23.21
GROUP 1.....................$ 23.76
GROUP 2.....................$ 24.08
GROUP 3.....................$ 24.69
GROUP 5.....................$ 25.01 9.80
GROUP 6.....................$ 25.29 9.80
.....................$ 25.56 9.80 GROUP 7
ZONE DIFFERENTIAL
Zone 1: Within 45 mile radius of Spokane, Pasco, W Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CL
er; O GROUP 1A: Boat Operator; Crush Feed
GROUP 1: Bit Grinders; Bolt Threading M (under 2000 CFM, gas, diesel, or electric pow Hand; Drillers Helper (Assist driller in making d connections, service drill engine and air com
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 28 istant Refrigeration , Fireman per; Belt t); Cement Hog;
istributor tor Hoisting ft or Lumber e);
rs and concrete);
wer Broom;
opelled);
); Railroad uring Machine raddle Buggy ctor (Farm gger Operator
; Assistant 000 ton);
Wet Mix Conveyors with ilar);
Machine
it) (Quarry inau or hipper (without e); Deck
& similar); Elevating Grader-type Loader (Dumor, Adams or tric);
r; Locomotive sthole Auger or or to D-6 or hine;
GROUP 4: Concrete Pumps (squeeze-crete, flow-crete, pump-crete, Whitman & similar); Curb Extruder (asphalt or concrete); Drills (churn, core, calyx or diamond);
Equipment Serviceman; Greaser & Oiler; Hoist (2 or more drums or Tower Hoist); Loaders (overhead & front-end, under 4 yds. R/T); Refrigeration Plant Engineer (under 1000 ton);
Rubber-tired Skidders (R/T with or without attachments);
Surface Heater & Plant Machine; Trenching Machines (under 7
ft. depth capacity); Turnhead (with re-screening); Vacuum Drill (reverse circulation drill under 8 inch bit)
GROUP 2: A-frame Truck (single drum); Ass Plant (under 1000 ton); Assistant Plant Operator cra or Pugmixer (asphalt); Bagley or Stationary S Finishing Machine; Blower Operator (cemen Compressor (2000 CFM or over, 2 or more, gas diesel or electric power); Concrete Saw (multiple cut); D Leverman; Ditch Witch or similar; Eleva Materials; Dope Pots (power agitated); Fork Li Stacker, hydra-lift & similar; Gin Trucks (pipelin Hoist, single drum; Loaders (bucket elevato conveyors); Longitudinal Float; Mixer (portable-
; Po Pavement Breaker, Hydra-Hammer & similar Railroad Ballast Regulation Operator (self-pr Railroad Power Tamper Operator (self-propelled Tamper Jack Operator (self-propelled; Spray C t (concrete); Spreader Box (self-propelled); S (Ross & similar on construction job only); Tra type R/T with attachment, except Backhoe); Tu
GROUP 3: A-frame Truck (2 or more drums) Refrigeration Plant & Chiller Operator (over 1 Backfillers (Cleveland & similar); Batch Plant & Operator, single unit (concrete); Belt-Crete power pack or similar; Belt Loader (Kocal or sim Bending Machine; Bob Cat (Skid Steer); Boring (earth); Boring Machine (rock under 8 inch b Master, Joy or similar); Bump Cutter (Wayne, Sag similar); Canal Lining Machine (concrete); C in crane); Cleaning & Doping Machine (pipel ating Belt-type Loader (Euclid, Barber Green Engineer; Elev similar); Generator Plant Engineers (diesel or elec Gunnite Combination Mixer & Compresso Engineer; Mixermobile; Mucking Machine; Po Punch; Pump (grout or jet); Soil Stabilizer (P & H similar); Spreader Machine; Dozer/Tractor (up equivalent) and Traxcavator; Traverse Finish Mac Turnhead Operator
RFQ AG-0261-S-09-0046 Williams Creek Road Reconstruction Pg. 29 oe & Hoe Ram (under
5 tons); Cranes amshell, Drilling se circulation ving (dual lled);
nalman e Checker c Subgrader (Ditches & similar on grade
000 gw); Backhoes nits);
its, 2 & incl. 4);
able ed with
Slip Form Paver;
ns), all sher, Grizzle similar; Drill , 4 yds. incl.
; Paving k or similar an (finishing asphalt pavement); Roto ines r guzzler, cle Train);
rusher ackhoes & Hoe Ram (3 yds
CMI, ABC,
omatic;
ontamination ut not including and dragine;
ver); Elevating Belt perator; Loader r or similar);
Loaders (overhead & front-end, over 8 yds.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .