Indian River Worklist 07211

View the file

Other files for this federal contract opportunity

Other files attached to Indian River Road Storage, newest first.
File Type Posted
indian_river_vicinty_map.pdf PDF
SOW_attachment072211.pdf PDF
technical_specifications_072111.pdf PDF
AG-0116-S-11-0118_072911.pdf PDF
OMB_Experiance CapabilityQuestionnaire.docx DOCX document
Daily Activity Report.pdf PDF
WageDeter_05-2017REV15_07.22.11.pdf PDF
Typical Collection 072911.pdf PDF
Synopsis_063011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indian River Road Storage Worklist

Road No. Milepost Work Description 7500 0.030 Remove abandoned Toyota pickup truck from project area, haul to approved landfill

0.050 Construct waterbar

0.078 Remove 18" culvert, located just past trail to right

0.106 Remove 18" culvert

0.137 Remove 18" culvert

0.155 Remove 18" culvert

0.200 Construct waterbar

0.285 Remove 18" culvert

0.290 Remove 18" culvert

0.312 Remove 36' log bridge, construct OHV ford

0.369 Remove 18" culvert

0.381 Remove 42' log bridge, construct OHV ford, fish stream

0.415 Remove 18" culvert

0.427 Remove 18" culvert

0.451 Remove 18" culvert

0.466

Remove 50' log bridge, construct 50' trail bridge with 6 ' travel width with rails on both sides as shown on the drawings. Furnish and install object markers on all 4 corners.

0.602 Construct waterbar just past spur road to right

0.677 Remove gate, haul to approved landfill. Remove 43' log bridge, construct OHV ford

0.709 Remove 18" culvert

0.735 Remove 24" culvert

0.771 Remove 18" culvert

0.822 Remove 18" culvert

1.222 Property boundary between City of Tenakee Springs and National Forest Land

1.228

Remove 38' log bridge, construct OHV ford. Far sill log has been undermined by stream flow, end of bridge has dropped approximately 2', fish stream

1.350 Remove 18" culvert

1.379 Remove 18" culvert

1.432 Remove 18" culvert

1.482 Remove 18" culvert

1.605 Construct waterbar

1.611 Remove 18" culvert

1.648 Remove 18" culvert

1.700 Construct waterbar

1.754 Remove 18" culvert

1.788 Remove 18" culvert

Construct waterbar

Construct waterbar

Construct waterbar

2.027 Remove 24" culvert

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

7500 2.377 Remove 18" culvert

2.427 Remove 36" culvert, fish stream

2.441 Remove 18" culvert, fish stream

2.485 Remove 18" culvert

2.492 Remove 36" culvert, beaver activity, fish stream

Construct waterbar

2.590 Remove 42' log bridge, construct OHV ford, fish stream

Construct waterbar

3.023 Remove 18" culvert

3.318 Remove 18" culvert

Remove 18" culvert

3.546 Remove 18" culvert

3.606 Remove 24" culvert

3.714 Remove 18" culvert

3.730 Remove 18" culvert

Construct waterbar

Construct waterbar

Construct waterbar

Remove 18" culvert

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

4.348 Remove 36" culvert

Remove 18" culvert

4.350 Remove 24" culvert

4.362 Remove 24" culvert

4.446 Remove 24" culvert

4.489 Remove 36" culvert, at base of old slide

4.518 Remove 60" pipe arch, fish stream

Remove 18" culvert

Construct waterbar

Construct waterbar

Construct waterbar

4.681 Remove 36" culvert, fish stream

4.758 Remove 48" pipe arch, fish stream

Construct waterbar just past spur to right

Construct waterbar

4.938 Remove 43' log bridge, construct OHV ford, fish stream

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

5.214 Remove 18" culvert

7500 5.257 Remove 18" culvert

5.296 Remove 18" culvert

Construct waterbar

Construct waterbar

5.657 30' log bridge, leave in place

Construct waterbar

Construct waterbar

Construct waterbar skewed to roadway

Construct waterbar skewed to roadway

6.102 Remove 24" culvert

6.210 Remove 18" culvert

6.227 Remove 18" culvert

6.249 Remove 18" culvert

Construct waterbar

6.373 Remove 24" culvert, fish stream

6.402 Remove 24" culvert

6.443 Remove 24" culvert, beaver activity

6.491 Remove 24" culvert

6.548 Remove 36" pipe arch, fish stream, leave skewed 24" culvert in place

Construct waterbar

6.655 Remove 18" culvert, fish stream

6.693 Remove 18" culvert

6.722 Remove 18" culvert

6.755 Remove 18" culvert

6.859 Remove 48" culvert, fish stream

6.894 Remove 18" culvert

6.935 Remove 18" culvert

6.978 Remove 18" culvert

7.017 Remove 18" culvert

7.046 Remove 18" culvert

7.177 Remove 24" culvert, beaver activity

Construct waterbar

7.397 Remove 24" culvert, fish stream

7.426 Remove 18" culvert

7.455 Remove 48" culvert

7.469 Remove 48" culvert

7.586 Remove 60" pipe arch

Construct waterbar just past spur to right

7.710 Remove 60" pipe arch, fish stream

Construct waterbar

7.791 Remove 60" pipe arch, fish stream

7.801 Remove 48" culvert, fish stream

7.869 Remove 48" culvert, fish stream

7.953 Remove 18" culvert

7.974 Remove 18" culvert, fish stream

8.003 Remove 18" culvert

7500 8.342 Remove 18" culvert

8.368

Remove 40' modular bridge and rails, treated sills and backwalls, transport bridge and components to Thorne Bay sortyard. Construct OHV ford, fish stream

8.396 Remove 36" culvert

8.424 Remove 48" culvert

8.470 Remove 36" culvert, fish stream

Remove 18" culvert

8.549 Remove 48" culvert, leave 24" culvert in place, fish stream

8.589

Intersection to left, road no. 75004. Construct rock and log barrier past intersection to block motorized traffic from this point forward

8.625 Remove 18" culvert

8.655 Remove 18" culvert

Construct waterbar

8.685 Remove 18" culvert

8.727 Remove 18" culvert

8.730 Remove 18" culvert

8.737

Remove 80' Hamilton bridge, transport to Thorne Bay sortyard. Optional work, if awarded, includes furnishing 4"x12" treated wooden planks to fill middle bridge gap along entire bridge length (2 planks wide gap), plus furnishing and installing 3"x12" untreated wood planks on bridge surface in accordance with drawings.

8.780 Longitudinal cracking in roadway

8.816 Remove 18" culvert

8.870 Construct waterbar before spur to left

8.916 Remove 18" culvert

8.930 Remove 24" culvert

8.958 Remove 36" culvert

Construct waterbar

8.999 Remove 18" culvert

9.026 Remove 24" culvert, skewed to roadway

9.064 Remove 24" culvert

9.073 Remove 36" culvert

Construct waterbar

Construct waterbar

Construct waterbar

Remove 24" culvert

Remove 36" culvert

Remove 18" culvert, skewed to roadway

Remove 18" culvert

Remove 18" culvert

Remove 18" culvert

9.487 Remove 18" culvert

9.594 Remove 18" culvert

9.635 Remove 48" culvert

Construct waterbar

7500 9.835

Remove 60' Hamilton bridge, transport to Thorne Bay sortyard. Optional work, if awarded, includes furnishing 4"x12" treated wooden planks to fill middle bridge gap along entire bridge length (2 planks wide gap), plus furnishing and installing 3"x12" untreated wood planks on bridge surface in accordance with drawings.

10.008 Remove 84" pipe arch

10.060 Remove 18" culvert

10.089 Remove 18" culvert

10.220 Remove 36" culvert, skewed to roadway

10.246 Remove 48" culvert

Construct waterbar

Construct waterbar

10.331 Remove 18" culvert

10.341 Remove 18" culvert

10.363 Remove 18" culvert

10.388 Remove 18" culvert

10.496 Remove 18" culvert, fish stream

10.569 Remove 18" culvert

Remove 18" culvert

Construct waterbar skewed to roadway

Remove 18" culvert

Construct waterbar

Construct waterbar

Remove 18" culvert

10.895 Remove 18" culvert

Intersection to left, road 7502

10.977 Remove 18" culvert

10.987 Remove 24" culvert

11.038 Remove 24" culvert

11.267 Remove 40' log bridge

Construct waterbar

Remove 18" culvert, buried

11.617 Remove 48" culvert, fish stream

11.868 Remove 50' log bridge

Construct waterbar

12.144

Remove 60' log bridge. Bridge stringers have failed, presently can cross bridge with OHVs but not pickup trucks. Bridge logs are sitting on stream bottom with rock borrow surface on collapsed stringer logs.

Construct waterbar

Construct waterbar

Construct waterbar

Reconstruct existing waterbar

Construct waterbar

12.629 Remove 18" culvert

Construct waterbar

12.725 Remove 18" culvert

12.831 Remove 18" culvert

7500 12.903 Remove 18" culvert

11.932 Remove 48" culvert, fish stream

12.500 Remove 36" culvert, fish stream

Reconstruct existing waterbar

Construct waterbar

12.629 Remove 18" culvert

12.645 Remove 24" culvert, fish stream

Construct waterbar

12.725 Remove 18" culvert

12.771 Remove 24" culvert, fish stream

12.831 Remove 18" culvert

12.903 Remove 18" culvert

12.953

Collapsed 70' log bridge. Remove near side log crib abutment and remaining bridge stringers.

Excavate rock borrow and log crib approaches for equipment access across stream, fish stream

Construct waterbar

Approximately 300' beyond bridge site at MP 12.953 the alder growth on the roadway becomes impassable to OHVs

13.095 Remove 18" culvert, fish stream

13.140 Remove 36" culvert, fish stream

Remove 70' Hamilton bridge and transport to Thorne Bay sortyard. Optional work, if awarded, includes furnishing 4"x12" treated wooden planks to fill middle bridge gap along entire bridge

13.273 length (2 planks wide gap), plus furnishing and installing 3"x12" untreated wood planks on bridge surface in accordance with drawings, fish stream

13.338 Remove 18" culvert

13.378 Remove 37' log bridge, near side bridge sill has dropped due to stream scour, fish stream

13.529 Remove 18" culvert, fish stream

13.578 Remove 18" culvert, fish stream

13.621 Remove 18" culvert, fish stream

13.653 Remove 18" culvert

13.703 Remove 18" culvert

Construct waterbar

Construct waterbar

Remove 18" culvert

13.950 Remove 60' log bridge, fish stream

14.196 Construct waterbar

7501 0.000 Road begins at MP 6.387 Road 7500, road is brushy

0.045 Remove 75' log bridge, only 3 stringers remain intact, others broken, fish stream

0.142 Remove 35' log bridge, fish stream

0.196 Remove 36" culvert, fish stream

0.225 Remove 25' log bridge, fish stream

0.544 Remove 34' log bridge, fish stream

75011 0.000 Road begins at MP 0.161 Road 7501, road is brushy

75011 0.199 Remove 35' log bridge

75012 0.000 Road begins at MP 0.419 Road 7501, road is brushy

75012 0.127 Remove 36" culvert

75012 0.213 Remove 18" culvert

7502 0.000

Road begins at MP 10.935 Road 7500, road is open to OHVs to approximately MP 1.6, then very brushy but passable to OHVs to end

0.037 Remove 18" culvert

0.091 Remove 18" culvert

0.138 Remove 32' log bridge, far side sill log has dropped approximately 2' due to stream scour

Remove abandoned vehicle from project area, haul to an approved landfill

Construct waterbar

0.205 Remove 18" culvert, fish stream

0.244 Remove 18" culvert

0.299 Remove 18" culvert

0.339 Remove 18" culvert

Construct waterbar

Construct waterbar skewed to roadway

0.433 Remove 18" culvert

0.463 Remove 18" culvert

0.489 Remove 18" culvert

0.556 Remove 36" culvert

Construct waterbar

0.640 Remove 24" culvert

0.689 Remove 24" culvert

0.729 Remove 36" culvert, fish stream

Construct waterbar

Construct waterbar

0.819 Remove 24" culvert

0.847 Remove 18" culvert

0.888 Remove 24" culvert

Construct waterbar

0.929 Remove 18" culvert

Construct waterbar

Construct waterbar

Remove 18" culvert

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

Construct waterbar

1.234

Remove 41' log bridge, far side sill log has dropped approximately 2' due to stream scour, fish stream

1.248 Remove 18" culvert

7502 1.319 Remove 36" culvert

Remove 36" culvert

Construct waterbar

1.473 Remove 18" culvert

Construct waterbar

Construct waterbar

1.530 Remove 24" culvert

1.617 Remove 36" culvert

2.092 Remove 24" culvert

2.157 Remove 18" culvert

2.251 Remove 18" culvert

2.359 Remove 36" culvert

2.515 Remove 24" culvert

2.560 Remove 24" culvert

Construct waterbar

2.644 Remove 36" culvert

2.734 Remove 48" culvert

Construct waterbar

2.901 Remove 60' log bridge

2.953 Remove 24" culvert, fish stream

Construct waterbar

Remove 24" culvert

Construct waterbar

3.072 Remove 18" culvert

3.117 Remove 18" culvert

3.130 Small slide on road, remove and sidecast minimum amount of material for equipment access

3.146 Remove 24" culvert

3.193 Remove 18" culvert

3.235 Remove 18" culvert

3.269 Remove 18" culvert

3.335 Remove 50' log bridge, rotten brow logs, fish stream

3.367 Remove 24" culvert

3.439 Remove 30' log bridge, fish stream

Construct waterbar

3.685 Remove 60' log bridge, fish stream

Construct waterbar

3.749 Remove 18" culvert

3.759 Remove 18" culvert

Remove 24" culvert

4.115 Remove 30' log bridge, fish stream

Construct waterbar

Construct waterbar

Remove 36" culvert

Construct waterbar

4.345 Remove 36" culvert

7502 Construct waterbar

4.383 Remove 36" culvert

4.413 Remove 36" culvert

Construct waterbar

4.581 Remove 18" culvert

4.662 Remove 62' log bridge, fish stream

4.711 Remove 18" culvert

4.742 Remove 18" culvert

4.753 Remove 18" culvert

4.790 Remove 18" culvert

Remove 18" culvert

4.828 Remove 44' log bridge, fish stream

Construct waterbar

Construct waterbar

Construct waterbar

5.003 Remove 36" culvert, fish stream

5.018 Remove 24" culvert

5.098 Remove 18" culvert

5.218 Remove 36" culvert

75021 0.000 Road begins at MP 0.691 Road 7502, road is brushy and impassable to OHVs beyond MP 0.08

0.065 Remove 56' log bridge

0.096 Remove 18" culvert

0.127 Construct waterbar

0.158 Remove 36" culvert

0.190 Remove 36" culvert

75005 0.000 Road begins at MP 13.667 Road 7500, road is brushy

0.068 Remove 18" culvert

75006 0.000 Road begins at MP 13.77 Road 7500, road is brushy

0.082 Remove 24" culvert, fish stream

0.150 Remove 18" culvert

option wear surface bridge planks