Drawing 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12-S-0009 Amd 1.pdf | ||
| S-12-0009 Q A.pdf | ||
| DSC00657.JPG | JPG image | |
| DSC00660.JPG | JPG image | |
| DSC00659.JPG | JPG image | |
| DSC00658.JPG | JPG image | |
| DSC00656.JPG | JPG image | |
| DSC00662.JPG | JPG image | |
| DSC00663.JPG | JPG image | |
| Polk5-footing.pdf | ||
| Polk2-location.pdf | ||
| Polk1-title.pdf | ||
| Polk4-deck.pdf | ||
| AG-0116-S-12-0009 Polk Bridge Installation.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
POLK BRIDGE EMERGENCY INSTALLATION PLAN & PROFILE
THORNE BAY RANGER DISTRICT
M.DORGAN 10/00/11
M.DORGAN 10/00/11
Q. SMITH 10/00/11
ACAD.DWG
3 5
BEAVER DAM - ELEV 97.6
FL
O
W
EXISTING ROAD
EXISTING ROAD
NEW SILL, TYP.
POLK
IN
LE
T
KL
AW
OCK
R.P.: SPIKE IN BASE
OF TREE, ELEV. 100.0
53 FT.
NEW 70FT MODULAR BRIDGE DECK
U.S. CL D.S.
SEE NOTE 2
2. THE PROFILES SHOWN ARE THE OBSERVED ERODED BANKS AT
UPSTREAM EDGE, DOWNSTREAM EDGE, AND CENTERLINE OF ROAD.
LEFT BANK ONLY WAS MEASURED. STREAM BED AND RIGHT BANK
ARE ASSUMED ONLY. "BR" REPRESENTS BEDROCK ENCOUNTERED,
IN APPEARS SIMILARLY ON RIGHT BANK.
U.S. CL D.S.110
E
LE
V A
TI
O
N
BR
BACKWALL & SILL
ROAD BACKFILL
ABUTMENT SPREAD
FOOTING (NOTE 3)
GEOTEXTILE
RIPRAP, CLASS
5 OR 6 (NOTE 4)
1. THE ORIGINAL 8 FT DIA. C.M.P. CULVERT AT THIS SITE HAS
WASHED OUT, LEAVING THE EXPOSED BANKS ABOVE BEDROCK.
SURVEY DATA IS LIMITED. PLACE MODULAR 70 FT BRIDGE TO BEST
FIT THE SITE, MAINTAINING ROAD GRADE ON EITHER END OF BRIDGE.
3. BUILD ABUTMENT SPREAD FOOTING TO A MINIMUM THICKNESS OF
4 FT. RIPRAP MAY BE USED BELOW FOOTING DOWN TO BEDROCK.
PLACE GEOTEXTILE BETWEEN RIPRAP AND FOOTING.
0 50 100 150
4. MACHINE PLACE RIPRAP STONES INDIVIDUALLY TO FORM AN
INTERLOCK STONE WALL.