Project Specifications Naha Gangway Repair
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Naha_FloatGangwayRepair_2016_0406.pdf | ||
| AG-0112-S-16-0014NahaGangwayReplace.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Specifications Naha Gangway Repair
Table of Contents Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts 155 Delete
171 - Weed and Disease Prevention 204 - Excavation and Embankment 555 - Steel Structures 557 - Timber Structures 716 – Material for Timber Structures 717 - Structural Metal 718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005 101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
http://www.nist.gov/
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005 Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
171 - Weed and Disease Prevention 171.00_1005_us_03_21_2012
Weed Prevention Description
171.01 This work consists of washing and treating construction equipment and brushers to remove soil, seeds, plants, and plant fragments from the equipment before the equipment is used on National Forest System lands. Clean air filters of all plant matter and seeds.
Material
171.02 Conform to the following Subsection:
Water 725.01
Construction Requirements
171.03 General . Notify the CO in writing at least 15 days before moving any construction equipment onto National Forest System lands. Construction equipment includes pickup trucks, shop trucks, and others operating on native soil subgrades and does not include passenger cars, or other vehicles that regularly travel roads between the construction site and areas outside of National Forest System lands.
Perform all work at a location designated on the plans or other locations approved in writing.
Provide the CO with 2 day opportunity to inspect the washed equipment. The Contractor may certify equipment cleaning if CO inspection is impractical.
171.04 Equipment. Use a high pressure washing system.
For work on National Forest System lands, use a washing system that traps all soil, seeds, and plant material for removal from National Forest System lands or recycles the water for continued use. If the equipment recycles the water, provide adequate filters for seed removal. Dispose of the filter material and removed seeds in an approved manner. Do not mix soaps, detergents, or other chemicals with the wash water.
For work at a commercial washing facility, use approved facilities.
171.05 Washing. Wash the sides, tops, beds, and undercarriages of all construction equipment. Remove all soil, seeds, plants, plant fragments, dirt, and debris from the construction equipment, including engine air cleaners.
171.06 Inspection. Inspect the washed construction equipment, including the undercarriage, to ensure that the washing removed the dirt, debris, and seeds from the construction equipment. Rewash the construction equipment as necessary or as directed.
171.07 Acceptance. Weed prevention will be evaluated under Subsection 106.02.
Measurement
171.08 Do not measure weed prevention for payment.
Payment
171.09 Include all costs associated with the Section 171-Weed Prevention in the unit price for Section 151-Mobilization.
204 - Excavation and Embankment 204.16_1005_us_05_04_2007
204.16 (b) Unclassified borrow, select borrow, and select topping.
Add the following:
When contract quantities are designated in the schedule as method of measurement estimate the borrow excavation quantity from design data based on prism cubic yard compacted in final position, in the embankment.
The quantity of material hauled will be based on the quantity of borrow excavation shown in the schedule. Measure haul distance between the center of the material source and the center of embanked material. Compute haul by analytical methods as determined by CO.
Haul from non-designated material source requested by the Contractor will be considered haul from Contractor-furnished sources with an adjustment in contract price, in accordance with applicable contract provisions.
Haul distance from a Contractor-furnished source will be measured as the haul distance from the designated material source if the haul distance from the Contractor-furnished material source is greater than the haul distance from the designated source.
Haul distance from a Contractor furnished-sources will be measured as the haul distance from the Contractor-furnished material source if the haul distance from the Contractor-furnished source is less than the haul distance from the designated source.
555 - Steel Structures 555.03_1005_us_06_08_2005
555.03 General.
Add the following to the second paragraph:
Perform welding and weld qualification tests in accordance with the provisions of (ANSI)/AWS Structural Steel Welding Code D1.1 for Tubular and other steel sections not addressed by the ANSI/AASHTO/AWS Bridge Welding Code D 1.5.
555.08 Fabrication.
Add the following to Subsection (a):
Rolled material must be straight before being laid off or worked. If straightening is necessary, use methods that will not injure the metal. Sharp kinks and bends will be cause for rejection of the material.
555.10 Bolt Holes.
Add the following after the first sentence in Paragraph 1:
Flame cutting is allowed only for the fabrication of slotted holes.
555.14 Welded Connections.
Add the following:
Prepare edges of tubular members and other steel sections not covered by ANSI/AASHTO/AWS Bridge Welding Code D 1.5 according to ANSI/AWS Structural Steel Welding Code D 1.1.
555.18 Welding.
Add the following:
Welding, welder qualifications, prequalification of weld details, and inspection of welds for pipe and tubular members shall conform to ANSI/AWS Structural Welding Code D 1.1.
557 - Timber Structures 557.04_1005_us_05_20_2005
557.04 Treated Timber.
Replace the first sentence of the third paragraph with the following:
Use a copper naphthenate solution containing a minimum of 2 percent copper metal for field treatments of material originally treated with copper naphthenate, pentachlorophenol, creosote, creosote solution, or waterborne preservatives, unless specified otherwise in the contract. Impregnate all holes using equipment suitable for proper application of the preservative.
Add the following Subsection:
557.04A Untreated Timber. Coat the following untreated timber surfaces in accordance with AWPA M4:
(a) All ends and tops, and all contact surfaces of posts, sills, and caps.
(b) All ends, joints, and contact surfaces of bracing and truss members.
(c) All surfaces of timber bumpers and the back faces of bulkheads.
(d) All other timber that will be in contact with earth.
557.06 Bolts and Washers.
Add the following to the first paragraph:
Do not galvanize glued laminated deck panel dowels.
Add the following to the second paragraph:
Place cut washers under nuts at steel surfaces. Malleable washers are not required under economy head bolts.
557.09 Framing Bents.
Add the following at the end of the Subsection:
Fasten posts to pedestals with dowels not less than 11/16-inch in diameter that extend at least 6 inches into the posts, or with other types of connectors as specified in the contract. Fasten posts to sills using one of the following methods, as specified in the contract:
(a) With dowels not less than 11/16-inch in diameter that extend at least 6 inches into posts and sills.
(b) With drift bolts not less than 11/16-inch diameter driven diagonally through the base of the post and extending at least 7 inches into the sill. Drive drift bolts into holes at a 45° angle to enter the post at least 6 inches above the post base.
(c) With other types of connectors as specified in the contract.
Treat, furnish, and drive timber piles in accordance with Section 551.
Add the following Subsection after the end of Subsection 557.14, and renumber Subsections 557.15 through 557.21 in the parent Specification to Subsections 557.16 through 557.22:
557.15 Glued Laminated Panel Decks. Do not drag or skid panels. When lifted, support panels in the weak-moment plane at a sufficient number of points to avoid overstressing, and protect the edges from damage.
When dowels are specified in the contract between deck panels, use a template or drilling jig to ensure that dowel holes are accurately spaced and drilled parallel to one another and to the horizontal surfaces of the panel. Drill holes to a depth ¼ inch greater than one-half the dowel length, and of a diameter that is 1/16 inch greater than the dowel, unless otherwise specified in the contract. Use a temporary dowel as a check for snug fit prior to production drilling. Use dowels of the size specified in the contract, with the tips slightly tapered or rounded. Use an approved lubricant to facilitate the connection process.
Start the tips of all dowels partially and equally into the holes of the two panels being joined. Draw the panels together keeping the edges parallel, until the panels abut tightly. Securely fasten each panel to each stringer as specified in the contract.
Assemble and match-mark panels prior to delivery to the construction site when specified in the contract. Follow erection procedures given in FPL-263, Forest Service, Forest Products Laboratory (FPL), Madison, Wisconsin.
716 – Material for Timber Structures 717.01_1005_us_06_07_2007
716.03 Treated Structural Timber and Lumber
Add: “and Other Sensitive” after “Aquatic” in the second paragraph.
Add the following to the second paragraph:
Provide certification from the producer of the treated wood that the “Best Management Practices for the Use of Treated Wood in Aquatic and Other Sensitive Environments” were utilized.
Conformance to these standards to be certified in writing by a third party inspection or by the presence of the BMP Certification Mark. www.wwpinstitute.org
717 - Structural Metal 717.01_1005_us_06_08_2005
717.01 Structural Steel
Add the following:
(f) Load-Indicating Washers. Furnish load-indicating washers that conform to ASTM F 959, type 325 or 490. Use type 325 with AASHTO M 164 bolts, and type 490 with AASHTO M 253 bolts.
(g) Steel Anchor Bolts. Furnish steel anchor bolts that conform to AASHTO M 314 and are of the grade and dimensions indicated in the contract. Ensure that the exposed portion of the bolt is zinc coated by hot dip of mechanical deposition.
717.07 Galvanized Coatings
Add the following:
Galvanize hardware according to AASHTO M 232. Perform all fabrication processes prior to galvanizing products.
Add the following Subsection:
717.17 Dowels
Furnish dowels that conform to the requirements of AASHTO M 31 (ASTM A 615) for grades 40 and 60, or AASHTO M 227 (ASTM A 663) for grades 70, 75, and 80. 718 - Traffic Signing and Marking Material
718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
http://www.wwpinstitute.org/
| Table of Contents |
| Preface |
| 101 - Terms, Format, and Definitions |
| 101.01 Meaning of Terms |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid, Award, and Execution of Contract |
| 102 Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| Deletions |
| 104 - Control of Work |
| Deletions |
| 104.06 Use of Roads by Contractor |
| 105 - Control of Material |
| 105.02 Material Sources. |
| 105.02(a) Government-provided sources. |
| 105.05 Use of Material Found in the Work. |
| 106 - Acceptance of Work |
| 106.07 Delete |
| 107 - Legal Relations and Responsibility to the Public |
| 107.05 Responsibility for Damage Claims. |
| 107.06 Contractor’s Responsibility for Work. |
| 107.09 Legal Relationship of the Parties. |
| 107.10 Environmental Protection. |
| 108 - Prosecution and Progress |
| 108 Delete. |
| 109 - Measurement and Payment |
| 109 Deletions |
| 109.02 Measurement Terms and Definitions. |
| 155 - Schedules for Construction Contracts |
| 155 Delete. |
| 171 - Weed and Disease Prevention |
| 204 - Excavation and Embankment |
| 555 - Steel Structures |
| 557 - Timber Structures |
| Add the following Subsection: |
| Add the following to the first paragraph: |
| Add the following to the second paragraph: |
| Add the following at the end of the Subsection: |
| 716 – Material for Timber Structures |
| Add: “and Other Sensitive” after “Aquatic” in the second paragraph. |
| Add the following to the second paragraph: |
| 717 - Structural Metal |
| Add the following: |
| Add the following: |
| Add the following Subsection: |
| 717.17 Dowels |
| 718.05 Aluminum Panels |