Naha_FloatGangwayRepair_2016_0406.pdf
PDF 5 MB Posted
- Attached to
- Naha Float and Gangway Repair 2016
- Solicitation number
- AG-0112-S-16-0014
About this file
Drawing package NAHA FLOAT AND GANGWAY REPAIR 2016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| SpecsNahaGangwayRepair.pdf | ||
| AG-0112-S-16-0014NahaGangwayReplace.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAHA FLOAT AND GANGWAY
REPAIR 2016
INDEX TO SHEETS
NO. DESCRIPTION
8-10
COVER SHEET
GENERAL NOTES
GOVERNMENT FURNISHED GANGWAY
MAIN FLOAT
MAIN FLOAT DETAILS
FINGER FLOAT
GANGWAY FOOTING
GANGWAY DETAILS
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 COVER SHEET
KMRD
MRC & RB 04/01/16
MRC & RB 04/01/16
ACAD.DWG
1 10
132°136°138°140°142° 134°
JUNEAU
Craig
132°
KEY MAP
GULF OF ALASKA
56°
58°
Sitka
138°
60°
Yakutat
ALAS
KA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
PROJECT LOCATION
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 GENERAL NOTES
KMRD
MRC & RB 04/01/16
MRC 04/01/16
ACAD.DWG
2 10
GENERAL NOTES:
1. OPTION 1 FLOAT WORK ITEMS ARE IDENTIFIED UNDER "2016 WORK ITEMS" ON SHEETS
4, 5, 6.
2. IDENTIFIED FLOAT WORK ITEMS SHALL BE COMPLETED IN ACCORDANCE WITH ORIGINAL
DRAWINGS UNLESS OTHERWISE NOTED IN "2016 WORK ITEMS".
3. USE ALL NEW MATERIAL AND HARDWARE.
4. REMOVED MATERIAL SHALL BE DISPOSED LEGALLY AND IN ACCORDANCE WITH ALL
APPLICABLE REGULATIONS.
5. ITEMS MARKED "NEW" ON GANGWAY DETAILS SHEET SHALL BE REPLACED OR PROVIDED
BY CONTRACTOR FOR INSTALLATION OF GANGWAY.
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 MAIN FLOAT
KMRD
MRC 04/01/16
MRC 04/01/16
ACAD.DWG
4 10
2016 WORK ITEMS:
1. REPLACE ALL DECKING. COORDINATE AND ALLOW ONE DAY FOR FOREST
SERVICE PERSONNEL TO INSPECT FLOATATION AND STRUCTURE AFTER
REMOVING EXISTING DECKING AND PRIOR TO INSTALLING NEW DECKING.
2. REPLACE ALL BULL RAIL. NEW BULL RAIL BLOCKING SHALL BE 12" IN LENGTH,
LONG AXIS ALIGNED WITH BULL RAIL.
3. INSTALL BULL RAIL CLEATS AS SHOWN IN SECTION A-A DETAIL ON SHEET 5.
4. REPLACE ALL SKIRTING.
5. INSTALL TIRES WHERE MISSING. SEE TIRE DETAIL ON SHEET 5.
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 FLOAT DETAILS
KMRD
MRC 04/01/16
MRC 04/01/16
ACAD.DWG
5 10
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 FINGER FLOAT
KMRD
MRC 04/01/16
MRC 04/01/16
ACAD.DWG
6 10
2016 WORK ITEMS:
1. REPLACE ALL DECKING. COORDINATE AND ALLOW ONE DAY FOR FOREST
SERVICE PERSONNEL TO INSPECT FLOATATION AND STRUCTURE AFTER
REMOVING EXISTING DECKING AND PRIOR TO INSTALLING NEW DECKING.
2. REPLACE ALL BULL RAIL. NEW BULL RAIL BLOCKING SHALL BE 12" IN LENGTH,
LONG AXIS ALIGNED WITH BULL RAIL.
3. REPLACE ALL SKIRTING.
4. INSTALL NEW HINGE PLATE BETWEEN MAIN FLOAT AND FINGER FLOAT.
4 IN
6 IN
6 IN
2 IN
12 IN
8 IN 8 IN
2 IN
USDA FOREST SERVICE - TONGASS NATIONAL FOREST SH. ofR-10 -
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 GANGWAY FOOTING
KMRD
MRC 04/01/16
MRC 04/01/16
ACAD.DWG
7 10
DOCK
3/4" THREADED ROD, GALVANIZED STEEL.
ROD SHALL EXTEND A MINIMUM OF 6 FT
INTO BEDROCK AND BE GROUTED IN PLACE.
GALVANIZED NUT AND MALLEABLE IRON
WASHER TYP.
2" MINUS LEVELING PAD, MINIMUM 4" DEEP.
3/4" THREADED ROD
NOTES:
1. ALL HARDWARE SHALL BE GALVANIZED STEEL UNLESS OTHERWISED
NOTED.
2. REMOVE EXISTING FOOTING.
DECKING NOT SHOWN FOR CLARITY.
FOOTING IS SYMMETRICAL TO OTHER
GANGWAY HEAD HANGER.
FIELD LOCATE GANGWAY HEAD HANGER TO
MATCH GANGWAY INSTALLATION. SEE
DETAIL SHEETS 8, 9, 10.
DIMENSIONS FOR LOCATING THREADED
ROD ARE APPROXIMATE.
12 X 12 X 7 FT PRESSURE TREATED
TIMBER
FINISH GRADE 22.0'
1.2 5 :
OR N
AT
URA
L S
LO
PE
3/8" THICK X 4" WIDTH GALVANIZED STEEL
PLATE
3/8" THICK X 4" WIDE GALVANIZED
STEEL PLATE, LENGTH TO EXTEND TO
SYMMETRICAL THREADED ROD (NOT
SHOWN).
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 GANGWAY DETAILS 1
KMRD
MRC 04/01/16
MRC 04/01/16
8 10
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 GANGWAY DETAILS 2
KMRD
MRC 04/01/16
MRC 04/01/16
9 10
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
ENGINEERING & RECREATION TNFTYP:09/04
NAHA FLOAT AND GANGWAY REPAIR 2016 GANGWAY DETAILS 3
KMRD
MRC 04/01/16
MRC 04/01/16
10 10
File details come from the government source that posted it. Updated .