Washout_photos.pdf

PDF 3 MB Posted

Attached to
Portage Bay Washout Bridge Repair Project
Solicitation number
AG-0109-S-16-0021
Issued by

About this file

Washout Photos

View the file

Other files

File Type Posted
amendment_003_.doc DOC document
amendment_002_.doc DOC document
amendment_001_.doc DOC document
Bridge_Site_Photos.pdf PDF
4-WD_AK160006.pdf PDF
Typical_Drawings.pdf PDF
RFP-AG-0109-S-16-0021final.rtf RTF text file
Portage_Bay_Map.pdf PDF
FSSS.docx DOCX document
Worklist.pdf PDF
SF-1442_AG-0109-S-16-0021.rtf RTF text file
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Photo 1. Looking back toward the turnoff for camp. There are two culverts in this picture. Blue arrow is pointed at the inlet of a plugged squashed pipe. See Photo 4 for a description of the green arrow.

Photo 2. Looking downstream (sort of toward camp) of the plugged squashed pipe.

Photo 3. Looking downstream at the outlet of the round pipe you can see in Photo 1.

Photo 4. Looking downstream from where the green arrow is pointed on Photo 1.

Photo 5. Looking away from camp from where the green arrow is pointed on Photo 1.

Photo 6. Refocused close‐up of Photo 5.

Photo 7. Looking upstream from the green arrow in Photo 1.

Photo 8. Looking upstream and sort of back toward camp from the green arrow in Photo 1. The blue arrow is pointed at the same culvert as in Photo 1. We removed as much of the debris from the inlet as we could while we were there.

Photo 9. Looking upstream from the green arrow in Photo 1.

Photo 10. Looking away from camp.

File details come from the government source that posted it. Updated .